OBRA: MEJORAMIENTO DE LA CARRETERA TRAMO: CRUCE SHANANGO - BELLAVISTA -

TRAMO: TRAMO 1
ESTRUCTURA: BASE
PROGRESIVA: KM
VIGA: DOS BRAZOS
MUESTREO:
LECTURAS DEL
PRIMER DIAL
FECHA PROG. (KM) ESTRUCTURA LADO
L0 L25 L50
0.01 mm 0.01 mm 0.01 mm
7-Apr 2 + 650 base derecho 0 15 33
7-Apr 2 + 675 base derecho 0 15 25
7-Apr 2 + 700 base derecho 0 8 15
7-Apr 2 + 725 base derecho 0 12 23
7-Apr 2 + 750 base derecho 0 8 15
7-Apr 2 + 775 base derecho 0 8 13
7-Apr 2 + 800 base derecho 0 15 30
7-Apr 2 + 825 base derecho 0 9 19
7-Apr 2 + 850 base derecho 0 8 11
7-Apr 2 + 875 base derecho 0 7 13
7-Apr 2 + 900 base derecho 0 8 15
7-Apr 2 + 925 base derecho 0 8 12
7-Apr 2 + 950 base derecho 0 8 12
7-Apr 2 + 975 base derecho 0 8 12
7-Apr 3 + 000 base derecho 0 10 19
7-Apr 3 + 025 base derecho 0 8 13
CE SHANANGO - BELLAVISTA - RIO MARAÑON ING. RESP: OMAR OCAÑA
1 TECNICO: JINGMAR CONTRERAS
FECHA: 7 de abril 2018
CARRIL: DERECHO / IZQUIERDO
ZOS RELACION DE TRABAJO: 1-Feb

LECTURAS DEL DIAL


PARAMETROS DE EVALUACION
PRIMER DIAL SEGUNDO DIAL
L75 L100 L 500 L1 L 2 (25 CM) D´ D´ 25 RC
0.01 mm 0.01 mm 0.01 mm 0.01 mm 0.01 mm 0.01 mm 0.01 mm (mm)
40 45 52 0 25
32 35 40 0 20
22 28 31 0 15
33 40 45 0 22
19 21 27 0 14
19 20 22 0 11
35 38 41 0 17
21 25 33 0 16
19 20 25 0 13
16 18 22 0 10
18 21 25 0 12
15 18 20 0 10
18 20 23 0 11
15 18 22 0 11
29 31 38 0 19
18 20 23 0 12
PROYECTO: MEJORAMIENTO DE LA CAR
NIVEL DE CAPA:
TRAMO LIBERADO:
CANTERA: MATER
MUESTRA:
PROFUNDIDAD DEL HOYO:

PRUEBA N° 1
PROGRESIVA DE MUESTRA 10 + 257.4
PUNTO DE MUESTRA 4.54 m B.I
ESPESOR 0.25
FECHA

DEN
PESO DEL FRASCO + ARENA (gr.) 8953
PESO DEL FRASCO + ARENA SOBRANTE (gr.) 3298.7
PESO DE LA ARENA EMPLEADA (gr.) 5654.3
PESO DE LA ARENA EN EL CONO (gr.) 1490
PESO DE LA ARENA EN EL HUECO (gr.) 4164.3
DENSIDAD DE LA ARENA (gr / cc) 1.45
VOLUMEN DEL HUECO (cc) 2871.93
PESO DE LA TARA + SUELO + GRAVA (gr.)
PESO DE LA TARA (gr.)
PESO DEL SUELO + GRAVA (gr.) 7135
PESO RETENIDO EN EL TAMIZ 3/4 ´´ (gr.) 1205
% GRAVA 3/4 ´´ 17.12
PESO ESPECIFICO DE LA GRAVA(gr. /cc) 2.6
VOLUMEN DE LA GRAVA (cc) 463.46
PESO DEL SUELO (gr.) 5930
VOLUMEN DEL SUELO (cc) 2408.47
DENSIDAD HUMEDA (gr. / cc) 2.46

CONTE
RECIPIENTE N°
PESO DE LA TARA + SUELO HUMEDO (gr.)
PESO DE LA TARA + SUELO SECO (gr.)
PESO DEL AGUA (gr.)
PESO DE LA TARA (gr.)
PESO DEL SUELO SECO (gr.)
CONTENIDO DE HUMEDAD % 7%
RE
MAXIMA DENSIDAD SECA (gr / cc) 2.27
OPTIMO CONTENIDO DE HUMEDAD %
DENSIDAD SECA (gr / cc) 2.3
% DE COMPACTACION 101.32
% DE COMPACTACION (ESPECIFICACION)

OBSERVACIONES:

HECHO POR
NOMBRE Y CARGO:

FECHA:
JORAMIENTO DE LA CARRETERA TRAMO: CRUCE SHANANGO - BELLAVISTA - RIO MARAÑON CERT. N°:
BASE HECHO POR:
RESP.:
MATERIAL DE CANTERA ¨CEMENTERIO / BELLAVISTA¨ REV. POR :
CAPA DE BASE
13 A 15 CM

UBICACIÓN DE ENSAYO
2 3 4 5 6
10 + 361.2 10 + 406.2 10 + 480.5 10 + 539 10 + 542.9
0.75 m B.I 1.97 m B.I 4.27 m B.I 4.01 m B.I 2.77 Mb.i
0.25 0.25 0.25 0.25 0.25

DENSIDAD DE CAMPO (ASTM 01556)


9188 9152 9324 9158 9060
3155 3125 3815 3216 3466
6033 6027 5509 5942 5594
1490 1490 1490 1490 1490
4543 4537 4019 4452 4104
1.45 1.45 1.45 1.45 1.45
3133.10 3128.97 2771.72 3070.34 2830.34

7806 7683 7015 7832 6900


1309 1259 1455 981 1314
16.77 16.38 20.74 12.5 19
2.6 2.6 2.6 2.6 2.6
503.46 484.23 559.62 377.31 505.38
6497 6424 5560 6851 5586
2629.64 2644.73 2212.11 2693.04 2324.96
2.47 2.43 2.51 2.54 2.40

CONTENIDO DE HUMEDAD (ASTM D 2216 )

HUMEDADES TOMADAS CON SPEEDY


7% 7% 7% 7% 6%
RESUMEN DEL ENSAYO PROCTOR
2.27 2.27 2.27 2.27 2.27

2.42 2.271 2.346 2.37 2.26


106.61 100.04 103.35 104.41 99.56

REVISADO POR APROBADO POR


NOMBRE Y CARGO: NOMBRE Y CARGO:

FECHA: FECHA:
DC - MSB - OI
JINGMAR CONTRERAS
TEC. JINGMAR CONTRERAS
ING. OMAR OCAÑA

7
10 + 596.7
4.19 m B.I
0.25

9032
3613
5419
1490
3929
1.45
2709.66

6655
1160
17.4
2.6
446.15
5495
2263.50
2.43

6%
2.27

2.288
100.79

OBADO POR
PROYECTO: MEJORAMIENTO DE LA CARRETERA TRAMO: CRUCE SHANA
NIVEL DE CAPA: BASE
TRAMO LIBERADO:
CANTERA: MATERIAL DE CANTERA ¨CEMENTERIO
MUESTRA: CAPA DE BASE
PROFUNDIDAD DEL HOYO: 13 A 15 CM

UBICACIÓN DE ENS
PRUEBA N° 1 2
PROGRESIVA DE MUESTRA 11 + 020 11 + 080
PUNTO DE MUESTRA
NIVEL DE CAPA
PROFUNDIDAD DEL HOYO 15 15
FECHA 20-Apr 20-Apr

DENSIDAD DE CAMPO (AS


PESO DEL FRASCO + ARENA (gr.) 9014 8836
PESO DEL FRASCO + ARENA SOBRANTE (gr.) 4207 3877
PESO DE LA ARENA EMPLEADA (gr.) 4807 4959
PESO DE LA ARENA EN EL CONO (gr.) 1490 1490
PESO DE LA ARENA EN EL HUECO (gr.) 3317 3469
DENSIDAD DE LA ARENA (gr / cc) 1.45 1.45
VOLUMEN DEL HUECO (cc) 2287.59 2392.41
PESO DE LA TARA + SUELO + GRAVA (gr.)
PESO DE LA TARA (gr.)
PESO DEL SUELO + GRAVA (gr.) 5678 6072
PESO RETENIDO EN EL TAMIZ 3/4 ´´ (gr.) 1198 1362
% GRAVA 3/4 ´´ 21.1 22.4
PESO ESPECIFICO DE LA GRAVA(gr. /cc) 2.6 2.6
VOLUMEN DE LA GRAVA (cc) 460.77 523.85
PESO DEL SUELO (gr.) 4480 4710
VOLUMEN DEL SUELO (cc) 1826.82 1868.57
DENSIDAD HUMEDA (gr. / cc) 2.45 2.52

CONTENIDO DE HUMEDAD (A
RECIPIENTE N°
PESO DE LA TARA + SUELO HUMEDO (gr.)
PESO DE LA TARA + SUELO SECO (gr.)
PESO DEL AGUA (gr.)
PESO DE LA TARA (gr.)
HUMED
PESO DEL SUELO SECO (gr.)
CONTENIDO DE HUMEDAD % 6.5% 7%
RESUMEN DEL ENSAYO P
MAXIMA DENSIDAD SECA (gr / cc) 2.27 2.27
OPTIMO CONTENIDO DE HUMEDAD %
DENSIDAD SECA (gr / cc) 2.3 2.36
% DE COMPACTACION 101.32 103.96
% DE COMPACTACION (ESPECIFICACION)

OBSERVACIONES:

HECHO POR REVISADO POR


NOMBRE Y CARGO: NOMBRE Y CARGO:

FECHA: FECHA:
ARRETERA TRAMO: CRUCE SHANANGO - BELLAVISTA - RIO MARAÑON CERT. N°: DC - MSB - OI
BASE HECHO POR: JINGMAR CONTRERAS
RESP.: TEC. JINGMAR CONTRERAS
ERIAL DE CANTERA ¨CEMENTERIO / BELLAVISTA¨ REV. POR : SUPERVISION
CAPA DE BASE
13 A 15 CM

UBICACIÓN DE ENSAYO
3 4 5 6 7
11 + 110 11 + 140 11 + 170 11 + 200 11 + 230

15 15 15 15 15
20-Apr 20-Apr 20-Apr 20-Apr 20-Apr

NSIDAD DE CAMPO (ASTM 01556)


9016 9038 9005 8938 9080
3742 3732 4201 4233 3953
5274 5306 4804 4705 5127
1490 1490 1490 1490 1490
3784 3816 3314 3215 3637
1.45 1.45 1.45 1.45 1.45
2609.66 2631.72 2285.52 2217.24 2508.28

6365 6808 5650 5410 6063


1099 1641 1212 730 1094
17.4 24.1 21.5 13.5 18
2.6 2.6 2.6 2.6 2.6
422.69 631.15 466.15 280.77 420.77
5266 5167 4438 4680 4969
2186.96 2000.57 1819.36 1936.47 2087.51
2.41 2.58 2.44 2.42 2.38

ENIDO DE HUMEDAD (ASTM D 2216 )

HUMEDADES TOMADAS CON SPEEDY


6% 7% 7% 6.5% 6%
RESUMEN DEL ENSAYO PROCTOR
2.27 2.27 2.27 2.27 2.27

2.25 2.38 2.27 2.27 2.24


99.12 104.85 100.00 100.00 98.68

REVISADO POR APROBADO POR


Y CARGO: NOMBRE Y CARGO:

FECHA:
PROYECTO: MEJORAMIENTO DE LA CARRETERA TRAMO: CRUCE SHANA
NIVEL DE CAPA: BASE
TRAMO LIBERADO:
CANTERA: MATERIAL DE CANTERA ¨CEMENTERIO
MUESTRA: CAPA DE BASE
PROFUNDIDAD DEL HOYO: 13 A 15 CM

UBICACIÓN DE ENS
PRUEBA N° 1 2
PROGRESIVA DE MUESTRA 11 + 260 11 + 290
PUNTO DE MUESTRA
NIVEL DE CAPA
PROFUNDIDAD DEL HOYO 15 15
FECHA 20-Apr 20-Apr

DENSIDAD DE CAMPO (AS


PESO DEL FRASCO + ARENA (gr.) 9040 8987
PESO DEL FRASCO + ARENA SOBRANTE (gr.) 4136 3671
PESO DE LA ARENA EMPLEADA (gr.) 4904 5316
PESO DE LA ARENA EN EL CONO (gr.) 1490 1490
PESO DE LA ARENA EN EL HUECO (gr.) 3414 3826
DENSIDAD DE LA ARENA (gr / cc) 1.45 1.45
VOLUMEN DEL HUECO (cc) 2354.48 2638.62
PESO DE LA TARA + SUELO + GRAVA (gr.)
PESO DE LA TARA (gr.)
PESO DEL SUELO + GRAVA (gr.) 5580 6343
PESO RETENIDO EN EL TAMIZ 3/4 ´´ (gr.) 990 1458
% GRAVA 3/4 ´´ 21.1 23
PESO ESPECIFICO DE LA GRAVA(gr. /cc) 2.6 2.6
VOLUMEN DE LA GRAVA (cc) 380.77 560.77
PESO DEL SUELO (gr.) 4590 4885
VOLUMEN DEL SUELO (cc) 1973.71 2077.85
DENSIDAD HUMEDA (gr. / cc) 2.33 2.35

CONTENIDO DE HUMEDAD (A
RECIPIENTE N°
PESO DE LA TARA + SUELO HUMEDO (gr.)
PESO DE LA TARA + SUELO SECO (gr.)
PESO DEL AGUA (gr.)
PESO DE LA TARA (gr.)
HUMED
PESO DEL SUELO SECO (gr.)
CONTENIDO DE HUMEDAD % 6.5% 7%
RESUMEN DEL ENSAYO P
MAXIMA DENSIDAD SECA (gr / cc) 2.27 2.27
OPTIMO CONTENIDO DE HUMEDAD %
DENSIDAD SECA (gr / cc) 2.3 2.36
% DE COMPACTACION 101.32 103.96
% DE COMPACTACION (ESPECIFICACION)

OBSERVACIONES:

HECHO POR REVISADO POR


NOMBRE Y CARGO: NOMBRE Y CARGO:

FECHA: FECHA:
ARRETERA TRAMO: CRUCE SHANANGO - BELLAVISTA - RIO MARAÑON CERT. N°: DC - MSB - OI
BASE HECHO POR: JINGMAR CONTRERAS
RESP.: TEC. JINGMAR CONTRERAS
ERIAL DE CANTERA ¨CEMENTERIO / BELLAVISTA¨ REV. POR : SUPERVISION
CAPA DE BASE
13 A 15 CM

UBICACIÓN DE ENSAYO
3 4 5 6 7
11 + 320 11 + 350 11 + 380 11 + 410 11 + 440

15 15 15 15 15
20-Apr 20-Apr 20-Apr 20-Apr 20-Apr

NSIDAD DE CAMPO (ASTM 01556)


9021 8881 9000 8838
4064 3335 3425 3179
4957 5546 5575 5659
1490 1490 1490 1490 1490
3467 4056 4085 4169
1.45 1.45 1.45 1.45 1.45
2391.03 2797.24 2817.24 2875.17

5910 6978 7071 7258


900 1159 1607 1173
24.1 16.6 22.7 16.16
2.6 2.6 2.6 2.6
346.15 445.77 618.08 451.15
5010 5819 5464 6085
2044.88 2351.47 2199.16 2424.02
2.45 2.47 2.48 2.51

ENIDO DE HUMEDAD (ASTM D 2216 )

HUMEDADES TOMADAS CON SPEEDY


6% 7% 7% 6.5% 6%
RESUMEN DEL ENSAYO PROCTOR
2.27 2.27 2.27 2.27 2.27

2.287 2.301 2.32


100.75 101.37 102.20

REVISADO POR APROBADO POR


Y CARGO: NOMBRE Y CARGO:

FECHA:
PROYECTO: MEJORAMIENTO DE LA CARRETERA TRAMO: CRUCE SHANANGO - BELL
NIVEL DE CAPA: BASE
TRAMO LIBERADO:
CANTERA: MATERIAL DE CANTERA ¨CEMENTERIO / BELLAVIS
MUESTRA: CAPA DE BASE
PROFUNDIDAD DEL HOYO: 13 A 15 CM

UBICACIÓN DE ENSAYO
PRUEBA N° 1 2 3
PROGRESIVA DE MUESTRA 11 + 470 11 + 500 11 + 530
PUNTO DE MUESTRA
NIVEL DE CAPA
PROFUNDIDAD DEL HOYO 15 15 15
FECHA 21-Apr 21-Apr 21-Apr

DENSIDAD DE CAMPO (ASTM 015


PESO DEL FRASCO + ARENA (gr.) 9026 8974 9092
PESO DEL FRASCO + ARENA SOBRANTE (gr.) 3389 2984 3384
PESO DE LA ARENA EMPLEADA (gr.) 5637 5990 5708
PESO DE LA ARENA EN EL CONO (gr.) 1490 1490 1490
PESO DE LA ARENA EN EL HUECO (gr.) 4147 4500 4218
DENSIDAD DE LA ARENA (gr / cc) 1.45 1.45 1.45
VOLUMEN DEL HUECO (cc) 2860.00 3103.45 2908.97
PESO DE LA TARA + SUELO + GRAVA (gr.)
PESO DE LA TARA (gr.)
PESO DEL SUELO + GRAVA (gr.) 7146 7740 7196
PESO RETENIDO EN EL TAMIZ 3/4 ´´ (gr.) 1163 1318 1492
% GRAVA 3/4 ´´ 16.3 17.03 20.7
PESO ESPECIFICO DE LA GRAVA(gr. /cc) 2.6 2.6 2.6
VOLUMEN DE LA GRAVA (cc) 447.31 506.92 573.85
PESO DEL SUELO (gr.) 5983 6422 5704
VOLUMEN DEL SUELO (cc) 2412.69 2596.53 2335.12
DENSIDAD HUMEDA (gr. / cc) 2.48 2.47 2.44

CONTENIDO DE HUMEDAD (ASTM D


RECIPIENTE N°
PESO DE LA TARA + SUELO HUMEDO (gr.)
PESO DE LA TARA + SUELO SECO (gr.)
PESO DEL AGUA (gr.)
PESO DE LA TARA (gr.)
HUMEDADES TO
PESO DEL SUELO SECO (gr.)
CONTENIDO DE HUMEDAD % 8.0% 8% 8%
RESUMEN DEL ENSAYO PROCTO
MAXIMA DENSIDAD SECA (gr / cc) 2.27 2.27 2.27
OPTIMO CONTENIDO DE HUMEDAD %
DENSIDAD SECA (gr / cc) 2.296 2.27 2.262
% DE COMPACTACION 101.15 100.00 99.65
% DE COMPACTACION (ESPECIFICACION)

OBSERVACIONES:

HECHO POR REVISADO POR


NOMBRE Y CARGO: NOMBRE Y CARGO:

FECHA: FECHA:
O: CRUCE SHANANGO - BELLAVISTA - RIO MARAÑON
CERT. N°: DC - MSB - OI
BASE HECHO POR: JINGMAR CONTRERAS
RESP.: TEC. JINGMAR CONTRERAS
RA ¨CEMENTERIO / BELLAVISTA¨ REV. POR : SUPERVISION
APA DE BASE
13 A 15 CM

CIÓN DE ENSAYO
4 5 6 7

CAMPO (ASTM 01556)

HUMEDAD (ASTM D 2216 )

HUMEDADES TOMADAS CON SPEEDY


EL ENSAYO PROCTOR

DO POR APROBADO POR


NOMBRE Y CARGO:

FECHA: