You are on page 1of 5

-----------------------------------------------------------------------------------

------------------------------------------------
| UCACUE |
| DIgSILENT | Project: SEP 2 |
| ELECTRICA |
| PowerFactory |-------------------------------
| |
| 15.1.7 | Date: 5/15/2018 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete
System Report: Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence No |
| Automatic Tap Adjust of Transformers No | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits No | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: SEP2 System Stage: SEP2 | Study Case: Study Case
| Annex: EXPANCION / 1 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rtd.V Bus - voltage
Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5
0 +5 +10 |
-----------------------------------------------------------------------------------
------------------------------------------------
|BARRA A
|
| 15.75 1.000 15.75 0.00
| |
|BARRA B
|
| 220.00 1.002 220.34 143.40
| |
|BARRA C
|
| 220.00 1.001 220.29 138.05
| |
|BARRA D
|
| 60.00 1.002 60.11 -12.67
| |
|BARRA E
|
| 60.00 0.993 59.55 -14.61
<<| |
|BARRA F
|
| 15.75 0.990 15.60 -16.72
<<| |
|BARRA G
|
| 15.75 0.988 15.56 -18.90
<<<| |
|BARRA M
|
| 15.75 1.013 15.96 -15.65
|>>> |
|BARRA L
|
| 220.00 1.013 222.93 134.35
|>>> |
|BARRA K
|
| 220.00 1.002 220.53 134.41
|> |
|BARRA J
|
| 60.00 0.991 59.47 -17.41
<<| |
|BARRA I
|
| 60.00 0.997 59.82 -18.02
<| |
|BARRA H
|
| 15.75 1.015 15.98 -19.38
|>>>> |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| UCACUE |
| DIgSILENT | Project: SEP 2 |
| ELECTRICA |
| PowerFactory |-------------------------------
| |
| 15.1.7 | Date: 5/15/2018 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete
System Report: Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence No |
| Automatic Tap Adjust of Transformers No | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits No | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: SEP2 System Stage: SEP2 | Study Case: Study Case
| Annex: EXPANCION / 2 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 15.75 179.92 0.00 24.00 -0.00 0.00
0.11 0.11 0.00 |
| 7.98 0.00 7.19 -8.24 0.00
-5.68 0.19 -5.87 |
| 60.00 kV
-24.11 -0.00 -0.00 0.00 |
|
6.72 0.89 0.89 0.00 |
| 220.00 kV
179.92 0.00 0.00 0.00 |
|
7.98 20.76 20.76 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 60.00 0.00 0.00 45.00 0.00 0.00
0.35 0.35 0.00 |
| 0.00 0.00 21.79 0.00 0.00
-0.09 1.05 -1.14 |
| 15.75 kV
24.11 -0.00 -0.00 0.00 |
|
-5.83 0.89 0.89 0.00 |
| 220.00 kV
-69.46 -0.00 -0.00 0.00 |
|
-15.88 2.03 2.03 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 220.00 0.00 0.00 108.00 -0.00 0.00
2.46 2.46 0.00 |
| 0.00 0.00 52.31 -75.31 0.00
-7.69 24.57 -32.27 |
| 15.75 kV
-179.92 0.00 0.00 0.00 |
|
12.78 20.76 20.76 0.00 |
| 60.00 kV
69.46 -0.00 -0.00 0.00 |
|
17.91 2.03 2.03 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 179.92 0.00 177.00 -0.00 0.00
0.00 2.92 2.92 0.00 |
| 7.98 0.00 81.30 -83.54 0.00
0.00 10.22 49.50 -39.28 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| UCACUE |
| DIgSILENT | Project: SEP 2 |
| ELECTRICA |
| PowerFactory |-------------------------------
| |
| 15.1.7 | Date: 5/15/2018 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete
System Report: Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence No |
| Automatic Tap Adjust of Transformers No | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits No | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Total System Summary | Study Case: Study Case
| Annex: EXPANCION / 3 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Generation Motor Load Compen- External Inter
Area Total Load Noload |
| Load sation Infeed
Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/
[MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| \Jenny\Ejercicios de SEP 2\KAJSDB\Network Model\Network Data\SEP2
|
| 179.92 0.00 177.00 -0.00 0.00
0.00 2.92 2.92 0.00 |
| 7.98 0.00 81.30 -83.54 0.00
0.00 10.22 49.50 -39.28 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total:
|
| 179.92 0.00 177.00 -0.00 0.00
2.92 2.92 0.00 |
| 7.98 0.00 81.30 -83.54 0.00
10.22 49.50 -39.28 |
-----------------------------------------------------------------------------------
------------------------------------------------

You might also like