You are on page 1of 1

PLANTA DE ZAPATA 0.20 0.

20
ARMADURA SUPERIOR Ø3/8"@.20 Ø3/8"@.20
2Ø1/2" .8
0

0.20
0.50
2Ø1/2" 2Ø1/2"
.8
0
5.50
Ø5/8"@.20

0.60
(Anular)

0.20
2Ø1/2" 2Ø1/2"

0.50
2Ø1/2"
1.85 Ø3/8"@.20
.70

2Ø5/8"
Ensanche Gradual DET. 01 C/CARA
de 7 a 15 cm 0.25
4Ø3/8"
Ø3/8"@.25 0.50 0.60 0.50
4Ø3/4" R6
VER DETALLE D1 .6
Ø3/8"@.25 3
VER DETALLE 2 Ø3/8"@.20
DETALLE ARMADURA VENTANAS
ESC. 1/25
Ø5/8"@.20
.30

.40

(Anular)
(altura máximo de vaciado continuo: 2.40m)

0.20 0.20
Se debe realizar 2 juntas con water stop

Ø3/4"@.10 RESERVORIO

0.20
0.25
(ver en plano de detalles)

.8
VIGA DE CIMENTACION 6Ø1/2" 0 Ø3/8"@.20

0.20
Ø3/8"@.20
Ø3/4"@.10
(.70 x 1.00 )
Pared y Fondo : .15 (Anular) .8
0 6Ø1/2"

0.50
Tarrajeo Pulido .70
.30 Ø3/8"@.15
Impermeabilizado
4.57

V=400 m3 Ø5/8" Ø5/8"


.40 .40 .55 5.28
Ø3/4"@.10 Zona de empalme

2.10
bastones Ø85" a Ø43", L=60cm
2.23

6Ø1/2"
Ø3/8"@.15 6Ø1/2"
Ø5/8"@.10
Nota:
.30

Los Fierros se prolongaran


Ø3/4"@.20 0.40 cm. fuera del circulo 3Ø5/8"

0.50
Ø1"@.135 4Ø1/2"
Ø5/8"@.20
16Ø1" 4Ø1/2" 2Ø5/8"
Ø3/8"@.25 4Ø1/2" C/CARA
Ø1/2"@.20 Ø1/2"@.20
0 Ø3/8"@.25
VER DETALLE D4 .3 VER DETALLE D3
Ø3/4"@.25 0.40
0.50 1.20 0.50
0 Ø1/2"@.25
.3
DETALLE ARMADURA INGRESO
6Ø1" ESC. 1/25
Ø3/8"@.25
VER DETALLE D5 PLANTA DE ZAPATA
ARMADURA INFERIOR
Ø1/2"@.20 V Ø5/8"@.20
H Ø3/8"@.20
Ø1 2" @.20
Losa de Piso
Cota=155.35 Ø5 8" @.15 Ø1 2" @.20 Ø5/8" @.20 5 est. circular Ø1/2"@.10
Ø1 2" @.25 Ø5 8" @.15
.30
1.15 .85 .85 1.40
PERFIL NATURAL DE TERRENO
Ø1/2"@.25 Muro de 160 fº Ø3/4"
.75

Ø1 2" @.20 Ø1 2" @.25


sostenimiento todo el perímetro
Lado exterior
Lado interior Columna de
sostenimiento

.30
Ø5/8"@.20
3.00

A A
10 Ø1/2"@.15

Estribo circular Ø12"


1@.05; 10@.15 a/e
Ø5/8"@.25 Rto. @.20 (EN CADA CARA) 4Ø3/4"
Ø12" @.20
4.50

4Ø3/4"
Ø5/8"@.15 (compartido)
Cota=152.35 Ø5/8"@.25 (Meridional)
.45
Min.
.50

Ø5/8"@.20
(anular)
Ø58"@.20
Cota=150.85 Ø5/8"@.20 Ø5/8"@.20
PILOTE - PLANTA
SECCION
ESC. 1/25
ELEVACION PILOTES
ESC. 1/50
GOBIERNO REGIONAL DE UCAYALI
GERENCIA GENERAL REGIONAL
CORTE B-B
GERENCIA REGIONAL DE INFRAESTRUCTURA
ESCALA 1/50 ESTRUCTURA RESERVORIO ELEVADO 400M3
PLANTA - MALLA INFERIOR DE LOSA DE CIMENTACION (Cota 139.80) RE-05
GRI