IRGOVEL IND.

RIOGRANDENSE DE ÓLEOS VEGETAIS LTDA


CRONOGRAMA DE ATIVIDADES Projeto: Melhorias no telhado e paredes da Peleteira I
Mês: Julho/2010 Data: 2
Dias
Data Atividades
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
06.07.2010 Retirada dos Rufos para pintura - 1º mód.
07.07.2010 Pintura das tesouras - 1º mód.
09.07.2010 Pintura dos tirantes - 1º mód.
09.07.2010 Limpeza dos tijolos - 1º mód.
19.07.2010 Remoção e pintura das terças - 1º mód.
26.07.2010 Colocação das telhas
Em andamento
Conluído
Em atraso
Final de semana
Projeto: Melhorias no telhado e paredes da Peleteira I
010 Data: 26.07.2010
Dias
Status
23 24 25 26 27 28 29 30 31
100% no prazo
100% concluído c/atraso
40% concluído
100% no prazo
50% concluído
0% Concluído
IRGOVEL IND. RIOGRANDENSE DE ÓLEOS VEGETAIS LTDA
SCHEDULE OF ARRIVAL AND ASSEMBLY EQUIPMEN Project: Purchasing of Equipments Phase 1
Year: 2011 Last
Meses
Describe of Activities
Jan Feb Mar Apr May Jun Jul Aug Set Oct Nov
GEA Westfalia Separator do Brasil
Centrifuge Waiting for the arrival of the equipment

Indústria e Comércio Chavantes


Pelleting Machine Equipment Delivered
Cooler Equipment Delivered

Extech-Link Indústria Mecânica


Extraction Expansion 80% defined project. Materials acquired. Start of manufacture in two weeks
Mineral Oil System Defined project. Awaiting arrived of the heat exchangers and pumps. 50% produced.
Lecethin Drier Awaiting for arrived of the domed covers. Assembly of the drier scheduled for this week.
Redler Bulk Flow Extractor/DTDC 30% produced.
Redler Bulk Flow DTDC/Silos 30% produced.
Desolventizer unit for DRB 90% of the defined project. Motor and gear unit acquired. Awaiting for completion of manufacturing of the
Desodorizer/Oil Stripper 70% defined project. Materials in quotation process. Manufacturing shall start within three weeks
Preparation Design and dimensioning of equipments in progress. Discuss specifications with suppliers.

Imoto Indústria de Motores e Máquinas


Feed Pelleting Improviment Awaiting for return of assembly team and completion of manufacture of the equipments

Só Elétrica
Automation for Animal Feed Plant Waiting for Assembly of equipments Imoto.

Central de Motores
Cabin Electrical Measurement
Project: Purchasing of Equipments Phase 1
Last Survey: 06/21/2011
% Completation
Status
Dez 10 20 30 40 50 60 70 80 90 100

In Progress

Finished
Finished

Delay
Delay
In Progress
Delay
Delay
In Progress
In Progress
In Progress

In Progress

Awaiting

Awaiting