Professional Documents
Culture Documents
Instructions:
1. Set up given values Notes:
2. Put a value for d in each of cell b11, d11 and e11 When the soil in front and behind the wall
3. Go to cell f31, click Tools, Goal Seek. is uniform and no surcharge is present
Set Cell to: F31 only stress distributions 4, 5, 6 and 7 are used.
To value: 1.0 Distribution 4 continues to the surface.
By changing cell: b11
4. Repeat for cell m31 (To value : 1.5, By changing cell: d11) The values in this spreadsheet and the text book
6. Repeat for cell t31 (To value : 1.0, By changing cell: e11) are slightly different because of rounding.
Example 12.6
Above excavation FSM
qs 10 b 10 deg Ff 1.25
H 8 m g' 18 kN/m 3 Kax 0.42
h 1 m Kpx 3.4
fcs 30 deg FSM
da 20.0 deg Ff 1 H
db 15 deg Kax 0.31 1
g 18 kN/m3 Kpx 4.6
2
do 5.27 m
below excavation
g 20 g' 10.2 do 3
fcs 57 4
30
dp 15 deg
FSM
Pressures Force la M
1 4.2 55.7 5.6 313.8
2 60.5 241.9 4.3 1048.3
FS 1.00
Instructions: Notes
1. Set up given values The values in this spreadsheet and the text book
2. Put a value for d in each of cell b11 are slightly different because of rounding.
3. Go to cell f31, click Tools, Goal Seek.
Set Cell to: F31
To value: 1.0
By changing cell: b11
h
Example 12.7 NPPM
Coefficients
H 6 m g' 8.2 kN/m 3 Kax 0.28
fcs 30 deg js 3.4 kN/m 3 Kpx 4.6
da 20 deg gaj 11.6 kN/m 3
2
3
Example 12.11
(FS)r 1.00
Anchor force Pa - Pp 108.4 kN
Instructions:
1. Set up given values
2. Put a value for d in cell b11
3. Go to cell f29, click Tools, Goal Seek.
Set Cell to: f29
To value: 1.5
By changing cell: b11
For anchor force
Set Cell to: f29
To value: 1.0
By changing cell: b11
anchor
Example 12.5 FS and Coeff.
Above excavation FMM
qs 0 Fp 2
H 3 m g' 18 kN/m 3 Kax 0.28
h 0 m Kpx 4.6
hw 0 m FSM
fcs 30 deg Ff 1.25
da 20.0 deg Kax 0.36
db 15 deg Kpx 3.3
g 18 kN/m3 NPPM FSM NPPM
do 2.95 m 2.41 2.75 Fr 1.5
FS 1.00
Instructions:
1. Set up given values Notes:
2. Put a value for d in each of cell b11, d11 and e11 When the soil in front and behind the wall
3. Go to cell f31, click Tools, Goal Seek. is uniform and no surcharge is present
Set Cell to: F31 only stress distributions 4, 5, 6 and 7 are used.
To value: 1.0 Distribution 4 continues to the surface.
By changing cell: b11
4. Repeat for cell m31 (To value : 1.5, By changing cell: d11) The values in this spreatsheet and the text book
6. Repeat for cell t31 (To value : 1.0, By changing cell: e11) are slightly different because of rounding.
2 hw
a 1
3
5
7 6
below excavation
g 20 g' 10.2 do 3
fcs 57 4
30
dp 15 deg
FSM
Pressures Force la M
1 4.2 55.7 5.6 313.8
2 60.5 241.9 4.3 1048.3
FS 1.00
Instructions: Notes
1. Set up given values The values in this spreadsheet and the text book
2. Put a value for d in each of cell b11 are slightly different because of rounding.
3. Go to cell f31, click Tools, Goal Seek.
Set Cell to: F31
To value: 1.0
By changing cell: b11
h
Example 12.7 NPPM
Coefficients
H 6 m g' 8.2 kN/m 3 Kax 0.28
fcs 30 deg js 3.4 kN/m 3 Kpx 4.6
da 20 deg gaj 11.6 kN/m 3
2
3