HAHD ENGINEERING & ASSOCIATES

QS SECTION
TAKING OFF PROGRESS CHART

PROJECT TITLE DISTRIBUTION


INITIAL
CEO
SQS
WEEK NO
PROJECT NO BILL NO.
WEEK ENDING
TENDER TAKING OFF DOC COMPLETION DATE

DATE TEAM TIME LEFT (WK)


% MEASUREMENT DO
ELEMENT TAKER OFF WORK CLASSIFICATION
LAST WEEK
1 FRONT END DOCUMENTATION 1.1 Instructions to Tenderers, Etc.
1.2 Specifications, Etc.

2 GENERAL ITEMS & 2.1 General items


PROVISIONAL SUMS 2.2 Provisional sums

3 SITE CLEARANCE 3.1 Demolitions


3.2 Spot Works/Alterations

4 CONCRETE STRUCTURES 4.1 Earthworks


4.2 In situ concrete
4.3 Concrete ancillaries
4.4 Precast concrete
4.5 Structural metalwork
4.6 Miscellaneous metalworks
4.7 Timber
4.8 Piles
4.9 Piling ancillaries
4.10 Brickwork, blockwork and masonry
4.11 Painting
4.12 Waterproofing

5 BUILDING STRUCTURES 5.1 Earthworks


5.2 In situ concrete
5.3 Concrete ancillaries
5.4 Precast concrete
5.5 Structural metalwork
5.6 Miscellaneous metalworks
5.7 Timber
5.8 Piles
5.9 Piling ancillaries
5.10 Brickwork, blockwork and masonry
5.11 Painting
5.12 Waterproofing

6 SITE WORKS 6.1 Earthworks and Turfing


6.2 Landscaping
6.3 Retaining Walls
6.4 Fences, Gates and Perimeter
6.5 Roads, Driveways and Vehicles
6.6 Aprons, Paved Areas and Paths
6.7 Stormwater Drains and Culverts
389948575.xlsx
6.8 Foul Drainage / Minor Sewers
6.9 Furniture (flag poles, seats, notice
board, signs, bollards)

7 ANCILLARY BUILDINGS 7.1 Substations


7.2 Guard Houses
7.3 Garbage Collection Building
7.4