-TRANSPORTE DE CONTRAPESA DE EXCAVADORA, COMPRESORA UND 1.00 60.00 35.96 2.00 4,315.20
NEUMATICA -INCLUYE MARTILLOS Y ACCESORIOS.
TOTAL COSTO DE TRASNPORTE DEL EQUIPO TRANSPORTADO CON CAMION: S/. 66,166.40
CAMION VOLQUETE 6x4 330HP (10 M3) UND 4.00 80.00 17.98 2.00 11505.62 11505.62
CAMION CISTERNA 4X2 100HP (CAP. 1000 GLNS) UND 1.00 40.00 17.98 2.00 1438.20 1438.20
TOTAL COSTO DE TRASNPORTE DEL EQUIPO TRANSPORTADO CON CAMION: S/. 71,280.00
CAMION VOLQUETE 6x4 330HP (10 M3) UND 4.00 80.00 22.00 2.00 14080.00 14080.00
CAMION CISTERNA 4X2 100HP (CAP. 1000 GLNS) UND 1.00 40.00 22.00 2.00 1760.00 1760.00
CARRETERA YOYITENI
CAMION VOLQUETE 6x4 330HP (10 M3) UND 4.00 80.00 20.00 2.00 12800.00
CAMION CISTERNA 4X2 165HP UND 1.00 95.00 20.00 2.00 3800.00
99644.55
MATERIAL EXCEDENTE
CALCULO DE LA DISTANCIA MEDIA DE TRANSPORTE
BOTADERO INFLUENCIA DIST. Leja DIST. Cerc ACCESO DIST. MEDIA VOL. CORTE VOL. RELLENO VOL. EXCEDENT X DISTANCIA
KM DE A (m) (m) (m) (m) (m3) (m3) (m3xkm)
00+00 00+700 700.00 0.00 70.00 420.00 15224.55 49.05 6,373.71
00+700 00+700 01+00 300.00 0.00 70.00 220.00 4194.05 53.40 910.94
01+00 01+050 350.00 0.00 70.00 245.00 1555.80 0.80 380.98
01+050 01+400 350.00 0.00 70.00 245.00 9874.35 57.88 2,405.04
01+400
01+400 01+700 300.00 0.00 70.00 220.00 3711.45 80.30 798.85
01+700 02+00 300.00 0.00 80.00 230.00 11587.90 15.38 2,661.68
02+000 02+00 03+00 1000.00 0.00 80.00 580.00 32802.25 71.00 18,984.13
03+00 03+550 1550.00 1000.00 80.00 1355.00 13789.15 236.50 18,363.84
03+550 04+00 1550.00 1100.00 100.00 1425.00 8138.70 100.60 11,454.29
04+00 05+00 1100.00 100.00 100.00 700.00 19503.58 457.28 13,332.41
05+100 05+00 05+100 100.00 0.00 100.00 150.00 1652.95 58.80 239.12
05+100 06+00 900.00 0.00 100.00 550.00 22479.53 331.45 12,181.44
06+00 06+142.94 1042.94 900.00 100.00 1071.47 3103.14 68.05 3,252.01
TOTAL 147617.40 1580.49 91,338.44
% DE ELIMINACION 0.30
CANTIDAD DE VOLUMEN A ELIMINAR 27401.531515
DISTANCIA MEDIA DE TRANSPORTE = 0.63 km