You are on page 1of 1

J K 1

Notes:
T 11 Read in conjunction with relevant S.E,
S M+E, civils, acoustician information,
H 2 BREEAM report and ecologist's report, as
well as tenants' specifications.
A-01-121 R
2 Read in conjunction with relevant
Q 12 architectural drawings and specifications.

For partitions performance information,


1
P refer to the fire strategy and acoustic
F Z 3 strategy drawings.
A-02-120
T
S S.E. to confirm building deflection for live
and dead loads. Partitions to incorporate
relevant head deflection details which
R meet fire and acoustic performance
11 requirements.
Q 4
D GF commercial unit separating walls and
A-01-121 inner face of external walls to be
P 2 1 blockwork (with sealing mist coat).
Z A-02-122 Blockwork head restraints to incorporate
12 resilient layer as indicated in the
acoustician specification.

5 PI timber frame to specialist specification


and details. Allow for required differential
B movement details (movement TBC by
specialist) between timber frame and
1
concrete cores / brick cladding.
A-02-121
PI partitions generally timber framed,
6 products selected as a system to ensure
7 fire / acoustic performance. Details to
system standards.
L 2
2 Design Life of Building:
A-02-121
A-02-120 Structure: 60 years
Roof Covering: 25 years
Windows and Curtain Walling: 25 years
8 Drainage: 25 years

I 9
2
Wn-4.24
Wn-4.23 2
A-21-010
1 Wn-4.22 A-02-123

GA Plans Legend
Wn-4.25
Dn-4.59
1 1:1
G Wn-4.21 A-02-123
10
Dn-4.62
2 Dn-4.58
Dn-4.60
Wn-4.20
Wn-4.26 Dn-4.55
Dn-4.61 Project U-values:
Dn-4.54 Dn-4.48
Dn-4.56 Premier Inn:
E Dn-4.52
Dn-4.57 External Walls – 0.15W/m2K
Dn-4.53 Dn-4.49
Wn-4.27
Dn-4.46
Wn-4.19 Ground Floor (incl. 1st floor overhangs) –
Dn-4.51
3 rw
p
0.15W/m2K
Dn-4.50 Roof – 0.10W/m2K
LI Dn-4.47 All Windows – 1.0W/m2K
Wn-4.28 NE Dn-4.44
2 Doors - 2.2W/m2K
N
A-21-011
C rw
p
ST Wn-4.18
Wn-4.29 O
Wn-4.34 R Dn-4.45 Cinema:
Wn-4.33 E Dn-4.42
2 Wn-4.30 External Walls – 0.15W/m2K
Windows – 1.5W/m2K
A-02-122 4 Dn-4.38
Dn-4.43 Roof – 0.18W/m2K
Wn-4.35 Wn-4.31 Dn-4.41 Wn-4.17
Wn-4.32 Ground Floor – As existing
Dn-4.39 L
A Dn-4.02
Dn-4.06
Dn-4.37
Wn-4.16 GF Commercial Units:
Dn-4.01
Dn-4.34
Dn-4.40
K External Walls – 0.20W/m2K
2
Dn-4.35 Windows – 1.5W/m2K
A-21-011 Dn-4.05
Dn-4.03 Dn-4.33 J Roof – 0.18W/m2K
2 Dn-4.10 Dn-4.30
1
5 A-02-121 Dn-4.04
Dn-4.12
Dn-4.36 Wn-4.15 Ground Floor – 0.15W/m2K for new elements and
BO Dn-4.31 as existing for remainder.
2 Wn-4.01 Dn-4.09 H
A-01-120
A-02-120
Dn-4.07 Dn-4.29
Wn-4.14 I Refurbished Commercial / Office Units – South and
1
Dn-4.08 Dn-4.11 LI Dn-4.32 West Blocks:
rw
FT
Dn-4.26 A-02-120 External Walls – Existing wall buildup / U-values to
p LO
6
Wn-4.02
Dn-4.13
BB
Y
H be investigated. If worse than 0.70W/m2K then
upgrade to min. 0.55W/m2K is required.
7 Dn-4.14 Dn-4.24 Dn-4.27 Wn-4.13 Roof – Existing roof buildup / U-values to be
Dn-4.16 Dn-4.23 investigated. If worse than 0.35W/m2K then
Wn-4.03
Dn-4.15 Wn-4.12 upgrade to min. 0.18W/m2K is required.
Dn-4.25 Dn-4.28
Windows – 1.5W/m2K where replaced.
Dn-4.17 Ground Floor – As existing.
2 G
A-02-1238
Wn-4.04
Dn-4.18
F 2
Dn-4.19 Wn-4.11
Wn-4.05
1 A-01-120
Dn-4.20 Wn-4.10 A-02-121 U-Value Legend
1
Dn-4.21
E 1:1
Wn-4.06
A-02-123 9
Dn-4.22
Wn-4.09 D
Wn-4.07
1
Wn-4.08 A-21-010 C
3

A-21-010
10
B
A

C 03/02/17 MH Minor Amendments


B 27/01/17 MH TENDER ISSUE
A 11/01/17 NOC Work In Progress, South Block Issue
- Checker FIRST ISSUE
Rev Date Check Description

T +44 (0) 20 7287 0735


www.holdermathias.com
London Cardiff Munich

Project

Piries Place
Horsham
Reef Estates
1 04 - Level 4 (+62.10) Title

1 : 200 GA - Proposed Fourth Floor Plan


Status Scale at A1

TENDER As indicated
Job No Zone Sheet No Rev

N 4214 A-00-134 C
0 10 20 m
ISO 14001 : 2004 ISO 9001 : 2000 RIBA Chartered Practice
Please consider the environment before printing this document
C:\Users\owend\Documents\Revit Models 2016\Piries Place, Horsham, CENTRAL_owen.dore.rvt Refer to dimensions where provided
- do not scale from this drawing except for planning purposes -