SAROMA ENGINEERING SDN BHD - PULAI MAJU QUARRY

PERFORMANCE ASSESSMENT CRITERIA

Appraisal Aspects Details Points ( 0 to 10)

Individual Work Efficiency &


Initiative (e.g. whether do take initiative to improve
work assigned ? When encountering problem/ faults
(a) in machineries, whether do take effort to report or just
do nothing but wait for instructions or failure? How
Quality

creative in problem solving approaches?)


1

(b) Work Speed (e.g.: how fast a piece of work


(b)
assigned is accomplished satisfactorily ? )

(c) Quality of Work ( What is the quality of work


(c)
produced ? )

(a) Cooperativeness (e.g.: What is the readiness in


(a)
accepting task ? How easy to work together ? )
Teamwork & Discipline

(b) Discipline (e.g.: What is the absenteeism rate,


(b) punctuality & observance of company rules &
2 regulations?)

(c) Work Safety (e.g.: Whether do use protective


safety gears and whether do adopt safe approaches
(c) or procedures in performing daily routines? Whether
always think safety of others and own self when
carrying out work?)

(a) Care for machineries & tools (e.g.: Whether do


(a) understand & do comply to correct operating &
Housekeeping & Maintenance

maintenance procedures, etc. ?)

(b) Materials Usage (e.g.: Whether do use correct


materials for correct application? Whether do apply
3 (b)
proper cost saving methods or whether having the
habit of misuse of materials / resources ? )

(c) Cleanliness of Work Place (e.g.: Whether do


take effort to clean up work place daily? Whether do
(c)
put back tools/consumables back after completing
certain task to ensure tidiness of work place, etc?)

*Points & Ratings


10 to 8 = Very Good
7 to 5 = Average
4 to 2 = Poor
2 to 0 = Very Poor

1/3/2011
SAROMA ENGINEERING SDN BHD - PULAI MAJU QUARRY
PERFORMANCE APPRAISAL - YEAR 2010

Team: Team Leaders & Mobile Eqp Mechanics


APPRAISED BY: Cheah Eng Hoe
No. Name Position Appraisal Aspects Equalized Service
1 (a) 1 (b) 1(c) 2 (a) 2 (b) 2 (c) 3 (a) 3 (b) 3 (c) Scores Duration
Team Leader - Drilling, Blasting &
1 Lim Chin Hoi Quarry Face Development
7 7 8 8 7 7 7 7 7 67 > 1 year
Team Leader - Plant Operation &
2 Chin Nyee Fah Maintenance
5 7 6 6 5 4 6 5 5 50 > 1 year

3 Siow Jann Woo Team Leader - Load/ Haul & OB 7 6 6 8 7 7 6 6 6 61 > 1 year
Asst. Team Leader - Plant Operation &
4 Wong Yune Guan Maintenance
7 8 8 9 7 6 8 8 7 70 > 1 year

5 Mahmood Bin Bachok Team Leader - Store & General Admin 8 8 8 9 7 8 8 7 8 73 > 1 year
Team Leader - Mobile Equipment
6 William Samuel Maintenance
7 7 7 9 9 7 7 7 7 69 > 1 year

7 Ridzwan Mobile Equipment Mechanic 7 8 7 9 4 6 7 7 7 64 > 1 year

Team: Plant Operation & Maintenance


APPRAISED BY: Chin Nyee Fah
No. Name Position Appraisal Aspects Equalized Service
1 (a) 1 (b) 1(c) 2 (a) 2 (b) 2 (c) 3 (a) 3 (b) 3 (c) Scores Duration
1 Jonathan Jubin Plant Mechanic/ Welder 7 7 6 7 6 5 6 6 6 70 > 1 year
2 Ardi Plant Mechanic/ Welder 7 6 5 7 6 5 6 6 6 67 > 1 year
3 Jefri Bin Jabir Primary Crusher Operator 6 6 5 6 6 5 6 6 6 65 > 1 year
4 Sarbin Primary Crusher GW 6 6 5 6 6 5 6 6 6 65 > 1 year
5 Hasan Kunasdi Pr'y Crusher Asst. Operator 6 6 5 6 6 5 6 6 6 65 > 1 year
6 Nobi Secondary Crusher Operator 6 6 5 6 6 5 6 6 6 65 > 1 year
7 Kujiro Bin Arbin Secondary Crusher GW 5 5 4 6 6 5 6 6 6 61 5 mths
8 Rudi Bin Dulkasan Tertiary Crusher Operator 6 6 5 6 6 5 6 6 6 65 > 1 year
9 Masjudi Tert Crusher Asst. Operator 5 5 4 6 5 5 6 6 6 60 > 1 year

1 of 3 1/3/2011
Team: Barmac VSI Plant
APPRAISED BY: Wong Yune Guan
No. Name Position Appraisal Aspects Equalized Service
1 (a) 1 (b) 1(c) 2 (a) 2 (b) 2 (c) 3 (a) 3 (b) 3 (c) Scores Duration
1 Mohd Faiz B Samsu Maarif Plant Technician/Welder 8 8 9 9 7 6 9 7 7 72 5 mths
2 Mohamad Hanafi B Wagiman Plant Operator 6 6 7 6 6 5 7 6 7 57 2 mths

Team: Load & Haul


APPRAISED BY: Siow Jann Woo
No. Name Position Appraisal Aspects Equalized Service
1 (a) 1 (b) 1(c) 2 (a) 2 (b) 2 (c) 3 (a) 3 (b) 3 (c) Scores Duration
1 Mohd Basri B Concong Excavator Operator (EX34) 10 9 8 8 8 8 7 8 9 71 > 1 year
2 Fredoline Evaristus Excavator Operator (EX43) 10 9 8 8 10 8 8 8 9 74 > 1 year
3 Zaini Bin Ramli Excavator Operator (EX37) 9 8 8 8 8 8 8 8 9 70 > 1 year
4 Abd Halim Bin Imun Excavator Operator (Backup) 7 7 6 6 5 7 7 8 8 58 > 1 year
5 Arman Bin Yusuf Breaker Operator (EX19) 9 8 7 6 8 6 8 8 8 64 > 1 year
6 Luter Rengge D Matius Shovel Operator (SV44) 10 9 8 8 9 7 8 8 8 71 > 1 year
7 Khoirul Nasikin Shovel Operator (SV43) 10 9 8 8 9 7 8 8 8 71 > 1 year
8 Iwan Shovel Operator (SV34) 10 9 8 8 9 7 8 8 8 71 > 1 year
9 Heri Cahyono DT Operator (DT21) 8 7 6 6 5 5 8 8 8 58 > 1 year
10 Usman Liku Wata DT Operator (DT23) 7 6 6 5 5 5 8 8 8 55 > 1 year
11 Radiwan Welder-Mobile Eqp 8 7 7 9 8 8 8 6 9 66 > 1 year
12 Zambry Bin Juprin Bulldozer Operator/Welder 7 5 6 5 5 5 7 6 7 50 > 1 year

Team: Store,General Admin & QC


APPRAISED BY: Mahmood Bachok
No. NAMA JAWATAN ASPEK PENILAIAN Equalized Service
1 (a) 1 (b) 1(c) 2 (a) 2 (b) 2 (c) 3 (a) 3 (b) 3 (c) Scores Duration
1 Mustaffa B Mohd Sa'at G Admin/Despatch Asst. 10 10 10 10 10 10 10 10 10 74 > 1 year
2 Azman B Salim Q/C Clerk 9 9 10 10 9 8 10 10 9 69 > 1 year
3 Yussudarso Bin Annuar Cleaner / GW 10 9 9 10 5 8 9 10 10 66 > 1 year
4 Abdul Malik B Salam W/B Clerk 7 8 7 8 7 8 8 8 9 58 4 mths
5 Mohd Nor Ikhwannudin B Sulaiman W/B Clerk 8 8 7 8 7 8 8 9 9 59 2 mths
6 Mohammad Abdillah B Saman Store Asst 7 8 7 9 7 8 8 8 9 58 1 mth
7 Fadzilaton Bt Abdul Hamid W/B Clerk 9 9 9 9 9 9 9 9 9 67 > 1 year
8 Nor Sahara Bt Ahmad W/B Clerk 9 9 9 9 9 9 9 9 9 67 9 mths

2 of 3 1/3/2011
Team: Drill & Blast
APPRAISED BY: Lim Chin Hoi
No. Name Position Appraisal Aspects Equalized Service
1 (a) 1 (b) 1(c) 2 (a) 2 (b) 2 (c) 3 (a) 3 (b) 3 (c) Scores Duration
1 Am Jarinto # Drill Rig Operator 7 7 9 5 7 6 9 7 7 72 > 1 year
2 Agus Podini Drill Rig Operator 6 6 5 6 6 6 6 7 6 61 > 1 year
3 Liton Drill/Blast Helper 6 6 6 7 6 6 7 7 6 64 > 1 year
4 Aris Kurniawan Drill/Blast Helper 6 6 5 6 6 6 7 7 6 62 > 1 year
# Appraised by Cheah EH