You are on page 1of 2

DESIGN VERIFICATION PLAN AND REPORT

CUSTOMER: DVP&R NUMBER: DEPT.


PART NAME: REPORT DATE: PLAN ORIGINATOR:
PART NUMBER: COMPONENT / ASSEMBLY: MANAGER:
MODEL YEAR: REPORTING ENGINEER:

TEST PLAN TEST REPORT


Item Specification or Acceptance Test SAMPLES TESTED TIMING TEST RESULTS
No Clause Reference Test Description Responsibility Test Stage NOTES
Criteria Quantity Type Start date Finish date Test Result Quantity Pass Quantity Fail
1

Page 1 of 2
DESIGN VERIFICATION PLAN AND REPORT
CUSTOMER: DVP&R NUMBER: DEPT.
PART NAME: REPORT DATE: PLAN ORIGINATOR:
PART NUMBER: COMPONENT / ASSEMBLY: MANAGER:
MODEL YEAR: REPORTING ENGINEER:

TEST PLAN TEST REPORT


Item Specification or Acceptance Test SAMPLES TESTED TIMING TEST RESULTS
No Clause Reference Test Description Responsibility Test Stage NOTES
Criteria Quantity Type Start date Finish date Test Result Quantity Pass Quantity Fail
10

11

12

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

Page 2 of 2