You are on page 1of 1

CH: 0+000.

00
GL 1576.6
DL 1576.6

1V
:0.
67
H
-3% -3%
0.25 m 2 2 1V
:1.
5H

Datum : 1575.000m

Concrete : 0.3m2 Soil Type : GBM Concrete : 0.3m2


Soling : 0.4m2 Ordinary Fill : 0.17m2 Soling : 0.4m2
Ordinary Cut : 1.78m2
Drain Cut : 0.07m2

Scale HORIZONTAL 1:1000


Aarsavin Engineering Associates P. Ltd. DESIGNED BY: CHECKED BY: 10m 0 20m Date:2018
Government of Nepal Drain & Road Upgrading Works In Myanglung Typical
RECOMMENDED BY: Drawing No.1
Department of Urban Development and Building Construction Municipality Main Bazar Area Balkhu,Kathmandu,Nepal CHECKED BY: VERTICAL 1:200 Cross Section
Division Office Dhankuta, Nepal Charkuwa to Municipality Road 2m 0 4m
Email: aarsavin.engg.nepal@gmail.com ACCEPTED BY: Sheet No.:4/1
APPROVED BY:

You might also like