You are on page 1of 1

Amps X 10 Bus2 (Nom. kV=150, Plot Ref.

kV=150)
,5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
10K 10K
Relay TR GI Polmas - P - 51
5K OC1 5K

Relay Grid GI Polmas - P - 51


3K 3K
OC1
Relay gen. PLTA Pongbembe - P - 51
OC1
1K Square D 1K
Sepam 1000+
CT Ratio 150:5
500 500
IEC - Standard Inverse
Pickup = 0,7 (0,1 - 2,4 xCT Sec)
300 300
Time Dial = 1,514
3x = 9,54 s, 5x = 6,48 s, 8x = 4,99 s
Relay com. PLTA Pongbembe - P - 51
100 OC1 100
Square D
Sepam 1000+
50 50
CT Ratio 100:5
30
IEC - Standard Inverse 30
Pickup = 0,8 (0,1 - 2,4 xCT Sec)
Time Dial = 0,054

Seconds
3x = 0,34 s, 5x = 0,231 s, 8x = 0,178 s
Seconds

10 Relay POC PLTA Pongbembe - P - 51 10


Gen3 OC1
5 Square D 5
Sepam 1000+
3 CT Ratio 100:5 3
IEC - Standard Inverse
Pickup = 0,9 (0,1 - 2,4 xCT Sec)
Time Dial = 0,075
1
3x = 0,473 s, 5x = 0,321 s, 8x = 0,247 s 1

,5 ,5

,3 ,3

TRAFO GI POLMAS
TG4
,1 ,1
TRAFO GI POLMAS
TG4 Inrush
,05
Inrush ,05

,03 ,03

TG4 TRAFO GI POLMAS


FLA FLA
,01 ,01
,5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 Bus2 (Nom. kV=150, Plot Ref. kV=150) ETAP Star 12.6.0H

Star1

Project: Date: 03-06-2018


Location: SN:
Contract: Rev: Base
Engineer: Fault: Phase
Filename: D:\doku\PLTA Pongbembe\PLTA Pongbembe.OTI