A TENAGA PEMASANGAN
Ongkos Pemasangan grc Ls 1.000 150,000.00 150,000.00
Ongkos Pemasangan rangka Ls 1.000 120,000.00 120,000.00
Jumlah Tenaga Kerja 270,000.00
B BAHAN
Grc Panel m2 1.000 870,000.00 870,000.00
Besi siku 4/4 Kg 3.860 15,000.00 57,900.00
Besi siku 5/5 Kg 2.610 15,000.00 39,150.00
Besi Polos Kg 2.150 8,500.00 18,275.00
Dynabolt Bh 4.000 3,500.00 14,000.00
Kawat las Kg 2.000 35,000.00 70,000.00
Sealant kg 0.300 150,000.00 45,000.00
Jumlah Harga Bahan 1,114,325.00
C PENGECATAN
Pengecatan Rangka m2 1.000 12,000.00 12,000.00
Pengecatan Panel grc m2 1.000 150,000.00 150,000.00
Jumlah 162,000.00
D Harga Pekerjaan A+B+C 1,546,325.00
A TENAGA PEMASANGAN
Ongkos Pemasangan Fiber Ls 1.000 120,000.00 120,000.00
Ongkos Pemasangan rangka Ls 1.000 70,000.00 70,000.00
Jumlah Tenaga Kerja 190,000.00
B BAHAN
Fiber Panel m2 1.000 1,030,000.00 1,030,000.00
Besi siku 4/4 Kg 2.740 15,000.00 41,100.00
Besi siku 5/5 Kg 2.180 15,000.00 32,700.00
Besi Hollow 4/4 Kg 4.170 13,900.00 57,963.00
Besi Polos Kg 2.150 8,500.00 18,275.00
Dynabolt Bh 4.000 3,500.00 14,000.00
Kawat las Kg 2.000 15,000.00 30,000.00
Jumlah Harga Bahan 1,224,038.00
C PENGECATAN
Pengecatan Rangka m2 1.000 12,000.00 12,000.00
Pengecatan Panel fiber m2 1.000 150,000.00 150,000.00
Jumlah 162,000.00
D Harga Pekerjaan A+B+C 1,576,038.00
Suplemen B.25 Pemasangan 1 m2 Ornament Plafond FIBER
A TENAGA PEMASANGAN
Ongkos Pemasangan Fiber Ls 1.000 120,000.00 120,000.00
Ongkos Pemasangan rangka Ls 1.000 70,000.00 70,000.00
Jumlah Tenaga Kerja 190,000.00
B BAHAN
Fiber Panel m2 1.000 1,030,000.00 1,030,000.00
Besi siku 4/4 Kg 2.740 15,000.00 41,100.00
Besi siku 5/5 Kg 2.180 15,000.00 32,700.00
Besi Polos Kg 0.150 8,500.00 1,275.00
Dynabolt Bh 4.000 3,500.00 14,000.00
Kawat las Kg 2.000 15,000.00 30,000.00
Jumlah Harga Bahan 1,149,075.00
C PENGECATAN
Pengecatan Rangka m2 1.000 12,000.00 12,000.00
Pengecatan Panel fiber m2 1.000 150,000.00 150,000.00
Jumlah 162,000.00
D Harga Pekerjaan A+B+C 1,501,075.00
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : Komponen MCB Di Box Panel Utama (listrik)
GAMBAR KERJA
Jumlah Harga PEKERJAAN TAMBAH PEKERJAAN KURANG Harga Satuan Jumlah Harga
Volume
Harga Satuan MC-0
No. Uraian Pekerjaan Volume Satuan Analisa Volume Jumlah Bertambah Volume Jumlah Berkurang MC- Sat Keterangan
( Rp. ) (
Bertambah (Rp.) Berkurang (Rp.) 0
Rp. ) ( Rp. ) ( Rp. )
I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir 10,000,000.00 10,000,000.00 - - - - 1.00 Ls 10,000,000.00 10,000,000.00
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir 750,000.00 3,000,000.00 - - - - 4.00 SISI 750,000.00 3,000,000.00
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir 3,000,000.00 24,000,000.00 - - 8.00 24,000,000.00 - SISI 3,000,000.00 -
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir 30,000,000.00 30,000,000.00 - - 1.00 Ls 30,000,000.00 30,000,000.00
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - 1.00 Ls 15,000,000.00 15,000,000.00
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00
JUMLAH 112,000,000.00 - 24,000,000.00 JUMLAH 88,000,000.00
II PEKERJAAN PEMASANGAN ORNAMEN GRC
1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 154.67 M2 Suplemen B.1 1,549,250.00 239,622,497.50 119.90 185,405,913.83 34.77 M2 1,546,325.00 53,764,173.93
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 270.34 M2 Suplemen B.20 1,549,250.00 418,824,245.00 22.29 34,459,852.63 248.06 M2 1,546,325.00 383,573,647.88
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 199.05 M2 Suplemen B.20 1,549,250.00 308,378,212.50 5.22 8,071,816.50 204.27 M2 1,546,325.00 315,867,807.75
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 106.77 M2 Suplemen B.20 1,549,250.00 165,413,422.50 4.35 6,718,782.13 102.43 M2 1,546,325.00 158,382,338.13
5 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK A 0.00 M2 Suplemen B.21 - - 107.68 169,707,771.84 - - 107.68 M2 1,576,038.00 169,707,771.84
6 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK B 0.00 M2 Suplemen B.21 - - 20.46 32,245,737.48 - - 20.46 M2 1,576,038.00 32,245,737.48
7 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK C 0.00 M2 Suplemen B.21 - - 13.64 21,497,158.32 - - 13.64 M2 1,576,038.00 21,497,158.32
JUMLAH 1,132,238,397.50 231,522,484.14 226,584,548.58 JUMLAH 1,135,038,635.32
III PEKERJAAN PEMASANGAN KUBAH GRC
1 PEMASANGAN ORNAMENT KUBAH DALAM GRC 172.70 M2 Suplemen B.2 1,549,701.00 267,633,362.70 - - 155.88 241,561,115.59 16.82 M2 1,549,701.00 26,072,247.11
2 PEMASANGAN ORNAMENT KUBAH DALAM FIBER 0.00 M2 Suplemen B.25 - - 64.45 96,744,283.75 - - 64.45 M2 1,501,075.00 96,744,283.75
JUMLAH 267,633,362.70 96,744,283.75 241,561,115.59 JUMLAH 122,816,530.86
IV PEKERJAAN DINDING TENGAH
1 PEMASANGAN ORNAMENT GRC MASIV DINDING TENGAH 197.34 M2 Suplemen B.3 1,220,000.00 240,754,800.00 35.02 42,729,280.00 - - 232.36 M2 1,220,000.00 283,484,080.00
2 PEMASANGAN ORNAMENT GRC PLAFOD DINDING TENGAH 70.80 M2 Suplemen B.1 1,549,250.00 109,686,900.00 - - 70.80 109,686,900.00 - M2 1,549,250.00 -
JUMLAH 350,441,700.00 42,729,280.00 109,686,900.00 JUMLAH 283,484,080.00
V PEKERJAAN DINDING KUBAH DALAM
1 PEMASANGAN ORNAMENT GRC MASIV DINDING KUBAH DALAM 141.12 M2 Suplemen B.3 1,220,000.00 172,166,400.00 101.52 123,851,960.00 - - 242.64 M2 1,220,000.00 296,018,360.00
2 PEMASANGAN ORNAMENT GRC KERAWANGAN DINDING KUBAH DALAM 93.20 M2 Suplemen B.4 1,240,678.00 115,631,189.60 - - 93.20 115,631,189.60 - M2 1,240,678.00 -
13 Lampu Menara Termasuk Instalasi dan Aksesoris Lengkap Terpasang ( Strip light) m' Taksir 96.00 3,360,000.00 96.00 m' 35,000.00 3,360,000.00
14 Komponen Ac
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 14.Komponen Ac
14 Komponen Ac
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 13. Lampu Menara Termasuk Instalasi dan Aksesoris Lengkap Terpasang
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : Lampu dalam Menara + Instalasi
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 11. Pemasangan instalasi kabel baru untuk Toa
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 10. Box Panel 40 x 60 untuk AC
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 9. Pemasangan instalasi kabel baru Instalasi AC
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 8. Pemasangan instalasi kabel baru Instalasi CCTV
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 1. ARMARTUR
1 ARMARTUR
d Lampu
Down Light LED, 3 watt + fitting
aksesories lengkap terpasang - Bh - 130.00
e Lampu
Baret ( 1 Bohlam) Emergency 18 Watt +
fitting aksesories lengkap terpasang - Bh - 29.00
g Lampu
LED Decorative 25 Watt + fitting
aksesories lengkap terpasang 24.00 Bh 24.00 0.00
h Lampu
Down Light LED, 45 watt + fitting
aksesories lengkap terpasang 4.00 Bh 4.00 0.00
k Pemasangan instalasi kabel baru Instalasi CCTV 6.00 titik 6.00 0.00
n Pemasangan instalasi kabel baru untuk Toa 1.00 titik 1.00 0.00
p Lampu
Menara Termasuk Instalasi dan Aksesoris
Lengkap Terpasang 12 8 / sisi m' 96.00 0.00
GAMBAR KERJA
A TENAGA PEMASANGAN
Ongkos Pemasangan grc dan rangka Ls 1.000 201,000.00
Jumlah Tenaga Kerja
B BAHAN
Grc Panel m2 1.000 870,000.00
Besi siku 4/4 Kg 5.010 15,000.00
Besi siku 5/5 Kg 4.790 30,000.00
Besi Polos Kg 2.150 8,500.00
Jumlah Harga Bahan
C PENGECATAN
Pengecatan (setara Kemtone atau Jotu m2 1.000 150,000.00
Jumlah
D Harga Pekerjaan A+B+C
A TENAGA PEMASANGAN
Ongkos Pemasangan Fiber dan rangk Ls 1.000 201,000.00
Jumlah Tenaga Kerja
B BAHAN
Fiber Panel m2 1.000 1,348,000.00
Besi siku 4/4 Kg 5.010 15,000.00
Besi Hollow 4/4 Kg 4.160 13,900.00
Besi Polos Kg 2.150 8,500.00
Jumlah Harga Bahan
C PENGECATAN
Pengecatan (setara Kemtone atau Jotu m2 1.000 150,000.00
Jumlah
D Harga Pekerjaan A+B+C
201,000.00
201,000.00
870,000.00
75,150.00
143,700.00
18,275.00
1,107,125.00
150,000.00
150,000.00
1,458,125.00
Jumlah Harga
201,000.00
201,000.00
1,348,000.00
75,150.00
57,824.00
18,275.00
1,499,249.00
150,000.00
150,000.00
1,850,249.00
Jumlah Harga
4,800.00
6,000.00
660.00
300.00
11,760.00
31,500.00
0.00
31,500.00
43,260.00
43,260.00
rekap mc - 0 rab 2,353,869,954.86
mc - 0 analisa 2,300,150,041.98
CONTRACK CHANGE ORDER (CCO)
Jumlah Harga
Jumlah Harga PEKERJAAN TAMBAH PEKERJAAN KURANG Harga Satuan
Volume MC-0
Harga Satuan
No. Uraian Pekerjaan Volume Satuan Analisa Volume Jumlah Bertambah Volume Jumlah Berkurang MC- Sat Keterangan
( Rp. )
Bertambah (Rp.) Berkurang (Rp.) 0
( Rp. ) ( Rp. )
( Rp. )
I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir 10,000,000.00 10,000,000 - - - - 1.00 Ls 10,000,000.00 10,000,000.00
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir 750,000.00 3,000,000 - - - - 4.00 SISI 750,000.00 3,000,000.00
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir 3,000,000.00 24,000,000 - - 8.00 24,000,000.00 - SISI 3,000,000.00 -
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir 30,000,000.00 30,000,000 - - 1.00 Ls 30,000,000.00 30,000,000.00
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000 - - 1.00 Ls 15,000,000.00 15,000,000.00
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir 15,000,000.00 15,000,000 - - - - 1.00 Ls 15,000,000.00 15,000,000.00
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000 - - - - 1.00 Ls 15,000,000.00 15,000,000.00
JUMLAH 112,000,000 - 24,000,000.00 JUMLAH 88,000,000.00
II PEKERJAAN PEMASANGAN ORNAMEN GRC
1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 154.67 M2 Suplemen B.20 1,458,125.00 225,528,194 - - 119.90 174,830,645.63 34.77 M2 1,458,125.00 50,697,548.13
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 270.34 M2 Suplemen B.20 1,458,125.00 394,189,513 - - 22.29 32,494,315.63 248.06 M2 1,458,125.00 361,695,196.88
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 199.05 M2 Suplemen B.20 1,458,125.00 290,239,781 5.22 7,611,412.50 204.27 M2 1,458,125.00 297,851,193.75
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 106.77 M2 Suplemen B.20 1,458,125.00 155,684,006 - - 4.35 6,335,553.13 102.43 M2 1,458,125.00 149,348,453.13
5 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK A 0.00 M2 Suplemen B.21 1,850,249.00 - 107.68 199,234,812.32 - - 107.68 M2 1,850,249.00 199,234,812.32
6 Gypsum PLAFOND A 0.00 M1 Taksir 35,000.00 - 42.00 1,470,000.00 - - 42.00 M1 35,000.00 1,470,000.00
7 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK B 0.00 M2 Suplemen B.21 1,850,249.00 - 20.46 37,856,094.54 - - 20.46 M2 1,850,249.00 37,856,094.54
8 Gypsum PLAFOND B 0.00 M1 Taksir 35,000.00 - 134.80 4,718,000.00 - - 134.80 M1 35,000.00 4,718,000.00
9 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK C 0.00 M2 Suplemen B.21 1,850,249.00 - 13.64 25,237,396.36 - - 13.64 M2 1,850,249.00 25,237,396.36
10 Gypsum PLAFOND C 0.00 M1 Taksir 35,000.00 - 99.92 3,497,200.00 99.92 M1 35,000.00 3,497,200.00
11 Gypsum Teras 0.00 M1 Taksir 35,000.00 - 117.06 4,097,100.00 117.06 M1 35,000.00 4,097,100.00
JUMLAH 1,065,641,514 283,722,015.72 213,660,514.38 JUMLAH 1,135,702,995
III PEKERJAAN PEMASANGAN KUBAH GRC
1 PEMASANGAN ORNAMENT KUBAH DALAM GRC 172.70 M2 Suplemen B.2 1,549,701.00 267,633,363 - - 155.88 241,561,115.59 16.82 M2 1,549,701.00 26,072,247.11
2 PEMASANGAN ORNAMENT KUBAH DALAM FIBER 0.00 M2 Suplemen B.21 1,850,249.00 - 64.45 119,248,548.05 - - 64.45 M2 1,850,249.00 119,248,548.05
JUMLAH 267,633,363 119,248,548.05 241,561,115.59 JUMLAH 145,320,795.16
IV PEKERJAAN DINDING TENGAH
1 PEMASANGAN ORNAMENT GRC MASIV DINDING TENGAH 197.34 M2 Suplemen B.3 1,220,000.00 240,754,800 35.02 42,729,280.00 - - 232.36 M2 1,220,000.00 283,484,080.00
2 PEMASANGAN ORNAMENT GRC PLAFOD DINDING TENGAH 70.80 M2 Suplemen B.1 1,549,250.00 109,686,900 - - 70.80 109,686,900.00 - M2 1,549,250.00 -
JUMLAH 350,441,700 42,729,280.00 109,686,900.00 JUMLAH 283,484,080.00
V PEKERJAAN DINDING KUBAH DALAM
1 PEMASANGAN ORNAMENT GRC MASIV DINDING KUBAH DALAM 141.12 M2 Suplemen B.3 1,220,000.00 172,166,400 101.52 123,851,960.00 - - 242.64 M2 1,220,000.00 296,018,360.00
2 PEMASANGAN ORNAMENT GRC KERAWANGAN DINDING KUBAH DALAM 93.20 M2 Suplemen B.4 1,240,678.00 115,631,190 - - 93.20 115,631,189.60 - M2 1,240,678.00 -
Jumlah Harga PEKERJAAN TAMBAH PEKERJAAN KURANG Harga Satuan Jumlah Harga
Volume
Harga Satuan MC-0
No. Uraian Pekerjaan Volume Satuan Analisa Volume Jumlah Bertambah Volume Jumlah Berkurang MC- Sat Keterangan
( Rp. )
Bertambah (Rp.) Berkurang (Rp.) 0
( Rp. ) ( Rp. ) ( Rp. )
I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir 10,000,000.00 10,000,000 - - - - 1.00 Ls 10,000,000.00 10,000,000.00
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir 750,000.00 3,000,000 - - - - 4.00 SISI 750,000.00 3,000,000.00
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir 3,000,000.00 24,000,000 - 8.00 24,000,000.00 - SISI 3,000,000.00 -
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir 30,000,000.00 30,000,000 1.00 Ls 30,000,000.00 30,000,000.00
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000 1.00 Ls 15,000,000.00 15,000,000.00
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir 15,000,000.00 15,000,000 - - - - 1.00 Ls 15,000,000.00 15,000,000.00
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000 - - - - 1.00 Ls 15,000,000.00 15,000,000.00
JUMLAH 112,000,000 - 24,000,000.00 JUMLAH 88,000,000.00
II PEKERJAAN PEMASANGAN ORNAMEN GRC
1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 154.67 M2 Suplemen B.1 1,549,250.00 239,622,498 119.90 185,756,624.25 34.77 M2 1,549,250.00 53,865,873.25
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 270.34 M2 Suplemen B.1 1,549,250.00 418,824,245 22.29 34,525,036.25 248.06 M2 1,549,250.00 384,299,208.75
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 199.05 M2 Suplemen B.1 1,549,250.00 308,378,213 5.22 8,087,085.00 204.27 M2 1,549,250.00 316,465,297.50
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 106.77 M2 Suplemen B.1 1,549,250.00 165,413,423 4.35 6,731,491.25 102.43 M2 1,549,250.00 158,681,931.25
5 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK A 0.00 M2 Suplemen B.21 - 107.68 - - - 107.68 M2 - -
6 Gypsum PLAFOND A 0.00 M1 Taksir - 42.00 - - - 42.00 M1 - -
7 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK B 0.00 M2 Suplemen B.21 - - 20.46 - - - 20.46 M2 - -
8 Gypsum PLAFOND B 0.00 M1 Taksir - - 134.80 - - - 134.80 M1 - -
9 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK C 0.00 M2 Suplemen B.21 - - 13.64 - - - 13.64 M2 - -
10 Gypsum PLAFOND C 0.00 M1 Taksir - - 99.92 - 99.92 M1 - -
11 Gypsum Teras 0.00 M1 Taksir - - 117.06 - 117.06 M1 - -
JUMLAH 1,132,238,398 8,087,085.00 227,013,151.75 JUMLAH 913,312,310.75
III PEKERJAAN PEMASANGAN KUBAH GRC
1 PEMASANGAN ORNAMENT KUBAH DALAM GRC 172.70 M2 Suplemen B.2 1,549,701.00 267,633,363 155.88 241,561,115.59 16.82 M2 1,549,701.00 26,072,247.11
2 PEMASANGAN ORNAMENT KUBAH DALAM FIBER 0.00 M2 Suplemen B.21 - - 64.45 - - - 64.45 M2 - -
JUMLAH 267,633,363 - 241,561,115.59 JUMLAH 26,072,247.11
IV PEKERJAAN DINDING TENGAH
1 PEMASANGAN ORNAMENT GRC MASIV DINDING TENGAH 197.34 M2 Suplemen B.3 1,220,000.00 240,754,800 35.02 42,729,280.00 232.36 M2 1,220,000.00 283,484,080.00
2 PEMASANGAN ORNAMENT GRC PLAFOD DINDING TENGAH 70.80 M2 Suplemen B.1 1,549,250.00 109,686,900 - - 70.80 109,686,900.00 - M2 1,549,250.00 -
JUMLAH 350,441,700 42,729,280.00 109,686,900.00 JUMLAH 283,484,080.00
V PEKERJAAN DINDING KUBAH DALAM
1 PEMASANGAN ORNAMENT GRC MASIV DINDING KUBAH DALAM 141.12 M2 Suplemen B.3 1,220,000.00 172,166,400 101.52 123,851,960.00 - - 242.64 M2 1,220,000.00 296,018,360.00
2 PEMASANGAN ORNAMENT GRC KERAWANGAN DINDING KUBAH DALAM 93.20 M2 Suplemen B.4 1,240,678.00 115,631,190 - - 93.20 115,631,189.60 - M2 1,240,678.00 -
I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir 10,000,000.00 10,000,000.00 - - - - 1.00 Ls 10,000,000.00 10,000,000.00 Tetap
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir 750,000.00 3,000,000.00 - - - - 4.00 SISI 750,000.00 3,000,000.00 Tetap
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir 3,000,000.00 24,000,000.00 - - 8.00 24,000,000.00 - SISI 3,000,000.00 - hapus
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir 30,000,000.00 30,000,000.00 - - - - 1.00 Ls 30,000,000.00 30,000,000.00 Tetap
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
JUMLAH 112,000,000.00 - 24,000,000.00 JUMLAH 88,000,000.00
II PEKERJAAN PEMASANGAN ORNAMEN GRC
1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 154.67 M2 Suplemen B.1 1,549,250.00 239,622,497.50 - - 119.90 185,756,624.25 34.77 M2 1,458,125.00 50,697,548.13 Kurang
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 270.34 M2 Suplemen B.1 1,549,250.00 418,824,245.00 22.29 34,525,036.25 248.06 M2 1,458,125.00 361,695,196.88 Kurang
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 199.05 M2 Suplemen B.1 1,549,250.00 308,378,212.50 5.22 8,087,085.00 204.27 M2 1,458,125.00 297,851,193.75 Tambah
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 106.77 M2 Suplemen B.1 1,549,250.00 165,413,422.50 - - 4.35 6,731,491.25 102.43 M2 1,458,125.00 149,348,453.13 Kurang
7 Pembenahan Kabel Listrik Luar Masjid dan istalasi 1.00 Ls Taksir 25,000,000.00 25,000,000.00 1.00 25,000,000.00 - Ls 25,000,000.00 - hilang
2,300,150,035.98
JUMLAH HARGA 2,829,137,635.80 100.00 342,550,307.00 817,817,981.94 2,353,869,960.86 100.00
I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir 10,000,000.00 10,000,000.00 - - - - 1.00 Ls 10,000,000.00 10,000,000.00 Tetap
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir 750,000.00 3,000,000.00 - - - - 4.00 SISI 750,000.00 3,000,000.00 Tetap
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir 3,000,000.00 24,000,000.00 - - 8.00 24,000,000.00 - SISI 3,000,000.00 - hapus
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir 30,000,000.00 30,000,000.00 - - - - 1.00 Ls 30,000,000.00 30,000,000.00 Tetap
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
JUMLAH 112,000,000.00 - 24,000,000.00 JUMLAH 88,000,000.00
II PEKERJAAN PEMASANGAN ORNAMEN GRC
1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 154.67 M2 Suplemen B.20 1,458,125.00 225,528,193.75 - - 119.90 174,830,645.63 34.77 M2 1,458,125.00 50,697,548.13 Kurang
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 270.34 M2 Suplemen B.20 1,458,125.00 394,189,512.50 22.29 32,494,315.63 248.06 M2 1,458,125.00 361,695,196.88 Kurang
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 199.05 M2 Suplemen B.20 1,458,125.00 290,239,781.25 5.22 7,611,412.50 204.27 M2 1,458,125.00 297,851,193.75 Tambah
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 106.77 M2 Suplemen B.20 1,458,125.00 155,684,006.25 - - 4.35 6,335,553.13 102.43 M2 1,458,125.00 149,348,453.13 Kurang
7 Pembenahan Kabel Listrik Luar Masjid dan istalasi 1.00 Ls Taksir 25,000,000.00 25,000,000.00 1.00 25,000,000.00 - Ls 25,000,000.00 - hilang
I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir 10,000,000.00 10,000,000.00 - - - - 1.00 Ls 10,000,000.00 10,000,000.00 Tetap
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir 750,000.00 3,000,000.00 - - - - 4.00 SISI 750,000.00 3,000,000.00 Tetap
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir 3,000,000.00 24,000,000.00 - - 8.00 24,000,000.00 - SISI 3,000,000.00 - hapus
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir 30,000,000.00 30,000,000.00 - - - - 1.00 Ls 30,000,000.00 30,000,000.00 Tetap
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
JUMLAH 112,000,000.00 - 24,000,000.00 JUMLAH 88,000,000.00
II PEKERJAAN PEMASANGAN ORNAMEN GRC
1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 154.67 M2 Suplemen B.1 1,549,250.00 239,622,498 - - 119.90 185,756,624.25 34.77 M2 1,549,250.00 53,865,873.25 Kurang
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 270.34 M2 Suplemen B.1 1,549,250.00 418,824,245 22.29 34,525,036.25 248.06 M2 1,549,250.00 384,299,208.75 Kurang
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 199.05 M2 Suplemen B.1 1,549,250.00 308,378,213 5.22 8,087,085.00 204.27 M2 1,549,250.00 316,465,297.50 Tambah
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 106.77 M2 Suplemen B.1 1,549,250.00 165,413,423 - - 4.35 6,731,491.25 102.43 M2 1,549,250.00 158,681,931.25 Kurang
7 Pembenahan Kabel Listrik Luar Masjid dan istalasi 1.00 Ls Taksir 25,000,000.00 25,000,000.00 1.00 25,000,000.00 - Ls 25,000,000.00 - hilang
I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir Rp 10,000,000
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir Rp 750,000
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir Rp 3,000,000
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir Rp 30,000,000
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir Rp 15,000,000
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir Rp 15,000,000
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir Rp 15,000,000
VI PEKERJAAN LOGAM
1 ORNAMENT LOGAM KUNINGAN PADA PLAFOND 96 Bh Taksir Rp 300,000
2 ORNAMENT LOGAM TEMBAGA PADA TIANG DAN RELUNG 10 M2 Suplemen C.1 Rp 5,000,000
3 KALIGRAFI ASMAUL HUSNA 99 buah 24.75 M2 Suplemen C.1 Rp 5,000,000
4 ORNAMENT LOGAM KUNINGAN PADA DINDING MIHRAB 7.3 M2 Suplemen C.1 Rp 5,000,000
Rp 10,000,000
Rp 3,000,000
Rp 24,000,000
Rp 30,000,000
Rp 15,000,000
Rp 15,000,000
Rp 15,000,000
Rp 112,000,000
Rp 239,622,498
Rp 418,824,245
Rp 308,378,213
Rp 165,413,423
Rp 1,132,238,378
Rp 267,633,363
Rp 267,633,363
Rp 240,754,800
Rp 109,686,900
Rp 350,441,700
Rp 172,166,400
Rp 115,631,190
Rp 287,797,590
Rp 28,800,000
Rp 50,000,000
Rp 123,750,000
Rp 36,500,000
Rp 239,050,000
Rp 2,340,000
Rp 4,200,000
Rp 5,400,000
Rp 11,050,000
Rp 5,800,000
Rp 38,000,000
Rp 41,080,000
Rp 382,500
Rp 682,500
Rp 18,000,000
Rp 25,000,000
Rp 151,935,000
Rp 288,041,600
Rp 288,041,600
112,000,000
1,132,238,378
267,633,363
350,441,700
287,797,590
239,050,000
151,935,000
288,041,600
2,829,137,630
2,829,137,000
COVER
BACK UP DATA
BACK UP DATA
JENIS PEKERJAAN : I. PEKERJAAN PERSIAPAN
Item Pembayaran :-
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 1. PEMASANGAN ORNAMENT GRC PLAFOND BLOK A
Total A1 M2 34.77
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 2.PEMASANGAN ORNAMENT GRC PLAFOND BLOK B
Total A1 M2 268.52
Total A2 M2 20.46
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 3. PEMASANGAN ORNAMENT GRC PLAFOND BLOK C
Total A1 M2 292.41
Total A2 M2 74.50
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 4. PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS
Ruas T1 + T2
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 5. PEMASANGAN ORNAMENT FIBER PLAFOND BLOK A
Total A1 M2 107.68
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 6.Less Gypsum Plafond A
Total A1 M2 42.00
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 7. PEMASANGAN ORNAMENT FIBER PLAFOND BLOK B
Total M2 20.46
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 8.Less Gypsum Plafond B
3.15 - - M1 3.15
2.25 M1 2.25
2.40 M1 2.40
20.40 M1 20.40
2.25 M1 2.25
3.15 M1 3.15
5.50 M1 5.50
Total M1 67.40
2x sisi M1 134.80
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 9. PEMASANGAN ORNAMENT FIBER PLAFOND BLOK C
total M2 13.64
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 10. Less Gypsum Plafond C
Total M1 99.92
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 11. Less Gypsum Plafond Teras
Total M1 117.06
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : III.PEKERJAAN PEMASANGAN KUBAH GRC
Item Pembayaran : 1. PEMASANGAN ORNAMENT KUBAH DALAM GRC
1 PEMASANGAN
DALAM GRC
ORNAMENT KUBAH
A 9.39
B 3.11
T 3.13
TOTAL A M2 68.33
D 8.10
TOTAL A M2 51.50
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : III.PEKERJAAN PEMASANGAN KUBAH GRC
Item Pembayaran : 2. PEMASANGAN ORNAMENT KUBAH DALAM FIBER
Total M2 64.45
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : IV. PEKERJAAN DINDING TENGAH
Item Pembayaran : 1. PEMASANGAN ORNAMENT GRC MASIV DINDING TENGAH
Ruas Dalam
Total A1 M2 205.70
Total 256.56
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : IV. PEKERJAAN DINDING TENGAH
Item Pembayaran : 2. PEMASANGAN ORNAMENT GRC PLAFOD DINDING TENGAH
Total M2 46.38
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : V.PEKERJAAN DINDING KUBAH DALAM
Item Pembayaran : 1. PEMASANGAN ORNAMENT GRC MASIV DINDING KUBAH DALAM
Ruas Dalam
1/2 x A + t A t
Ruas Luar
1/2 x A + t A t
Total 242.64
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : V.PEKERJAAN DINDING KUBAH DALAM
Item Pembayaran : 2. PEMASANGAN ORNAMENT GRC KERAWANGAN DINDING KUBAH DALAM
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VI. PEKERJAAN LOGAM
Item Pembayaran : 1. ORNAMENT LOGAM KUNINGAN PADA PLAFOND
Total Bh 216.00
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VI. PEKERJAAN LOGAM
Item Pembayaran : 2. ORNAMENT LOGAM TEMBAGA PADA TIANG DAN RELUNG
Tinggi 0.60 -
atas 2.20 -
bawah 1.75
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VI. PEKERJAAN LOGAM
Item Pembayaran : 3. KALIGRAFI ASMAUL HUSNA 99 buah
Total 22.34
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VI. PEKERJAAN LOGAM
Item Pembayaran : IV. ORNAMENT LOGAM KUNINGAN PADA DINDING MIHRAB
Pias 2
Total M2 6.43
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VI. PEKERJAAN LOGAM
Item Pembayaran : V. PELAPIS GRC BINGKAI KALIGRAFI DINDING
Total M2 18.91
GAMBAR KERJA
4.60 3.28
BACK UP DATA
JENIS PEKERJAAN : VI. PEKERJAAN LOGAM
Item Pembayaran : VI. PELAPIS GRC BINGKAI ASMAUL HUSNA
Total M2 35.64
GAMBAR KERJA
0.6
0.60
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 2. Pemasangan Instalasi untuk Lampu gantung + kipas
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 3. Instalasi titik penerangan, instalasi termasuk kabel NYA 2,5 mm dalam pipa PVC fitting lampu dan
kelengkapan instalasi terpasang
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 4. Stop Kontak setara Panasonik
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 5. Saklar Ganda setara Panasonik
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 6. Pemasangan instalasi kabel baru untuk sound
12.00
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 7. Pembenahan Kabel Listrik Luar Masjid dan istalasi
TAKSIR - - - - Ls -
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LAIN LAIN
Item Pembayaran : PEKERJAAN RESINE + FIBER ATAP DAK
Total 1,496.94
GAMBAR KERJA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LAIN LAIN
Item Pembayaran : PEKERJAAN PENGECATAN
1 PEKERJAAN PENGECATAN
Total M3 41.04
Total 0.36
GAMBAR KERJA
I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 1.00 Ls Taksir 10,000,000.00 10,000,000.00 10,000,000.00
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 4.00 SISI Taksir 750,000.00 3,000,000.00 3,000,000.00
3 PEMBONGKARAN DINDING BETON 0.00 8.00 SISI Taksir 3,000,000.00 24,000,000.00 -
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 1.00 Ls Taksir 30,000,000.00 30,000,000.00 30,000,000.00
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 1.00 Ls Taksir 15,000,000.00 15,000,000.00 15,000,000.00
6 PEMBUATAN WORKSHOP DILOKASI 1.00 1.00 Ls Taksir 15,000,000.00 15,000,000.00 15,000,000.00
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 1.00 Ls Taksir 15,000,000.00 15,000,000.00 15,000,000.00
JUMLAH 287,797,589.60 -
VI PEKERJAAN LOGAM
1 ORNAMENT LOGAM KUNINGAN PADA PLAFOND 216.00 96.00 Bh Taksir 300,000.00 28,800,000.00 64,800,000.00
2 ORNAMENT LOGAM TEMBAGA PADA TIANG DAN RELUNG 9.48 10.00 M2 Suplemen C.1 5,000,000.00 50,000,000.00 47,400,000.00
3 KALIGRAFI ASMAUL HUSNA 99 buah 22.34 24.75 M2 Suplemen C.1 5,000,000.00 123,750,000.00 111,684,375.00
4 ORNAMENT LOGAM KUNINGAN PADA DINDING MIHRAB 6.43 7.30 M2 Suplemen C.1 5,000,000.00 36,500,000.00 32,150,000.00
5 PELAPIS GRC BINGKAI KALIGRAFI DINDING 18.91 0.00 M2 Suplemen B.3 1,220,000.00 - 23,072,640.00
6 PELAPIS GRC BINGKAI ASMAUL HUSNA 35.64 0.00 M2 Suplemen B.3 1,220,000.00 - 43,480,800.00
7
2,829,137,629.80 #REF!