Suplemen B.

20 Pemasangan 1 m2 Ornament Plafond GRC

No Uraian Satuan Volume Harga Satuan Jumlah Harga

A TENAGA PEMASANGAN
Ongkos Pemasangan grc Ls 1.000 150,000.00 150,000.00
Ongkos Pemasangan rangka Ls 1.000 120,000.00 120,000.00
Jumlah Tenaga Kerja 270,000.00
B BAHAN
Grc Panel m2 1.000 870,000.00 870,000.00
Besi siku 4/4 Kg 3.860 15,000.00 57,900.00
Besi siku 5/5 Kg 2.610 15,000.00 39,150.00
Besi Polos Kg 2.150 8,500.00 18,275.00
Dynabolt Bh 4.000 3,500.00 14,000.00
Kawat las Kg 2.000 35,000.00 70,000.00
Sealant kg 0.300 150,000.00 45,000.00
Jumlah Harga Bahan 1,114,325.00
C PENGECATAN
Pengecatan Rangka m2 1.000 12,000.00 12,000.00
Pengecatan Panel grc m2 1.000 150,000.00 150,000.00
Jumlah 162,000.00
D Harga Pekerjaan A+B+C 1,546,325.00

Suplemen B.21 Pemasangan 1 m2 Ornament Plafond FIBER

No Uraian Satuan Volume Harga Satuan Jumlah Harga

A TENAGA PEMASANGAN
Ongkos Pemasangan Fiber Ls 1.000 120,000.00 120,000.00
Ongkos Pemasangan rangka Ls 1.000 70,000.00 70,000.00
Jumlah Tenaga Kerja 190,000.00
B BAHAN
Fiber Panel m2 1.000 1,030,000.00 1,030,000.00
Besi siku 4/4 Kg 2.740 15,000.00 41,100.00
Besi siku 5/5 Kg 2.180 15,000.00 32,700.00
Besi Hollow 4/4 Kg 4.170 13,900.00 57,963.00
Besi Polos Kg 2.150 8,500.00 18,275.00
Dynabolt Bh 4.000 3,500.00 14,000.00
Kawat las Kg 2.000 15,000.00 30,000.00
Jumlah Harga Bahan 1,224,038.00
C PENGECATAN
Pengecatan Rangka m2 1.000 12,000.00 12,000.00
Pengecatan Panel fiber m2 1.000 150,000.00 150,000.00
Jumlah 162,000.00
D Harga Pekerjaan A+B+C 1,576,038.00
Suplemen B.25 Pemasangan 1 m2 Ornament Plafond FIBER

No Uraian Satuan Volume Harga Satuan Jumlah Harga

A TENAGA PEMASANGAN
Ongkos Pemasangan Fiber Ls 1.000 120,000.00 120,000.00
Ongkos Pemasangan rangka Ls 1.000 70,000.00 70,000.00
Jumlah Tenaga Kerja 190,000.00
B BAHAN
Fiber Panel m2 1.000 1,030,000.00 1,030,000.00
Besi siku 4/4 Kg 2.740 15,000.00 41,100.00
Besi siku 5/5 Kg 2.180 15,000.00 32,700.00
Besi Polos Kg 0.150 8,500.00 1,275.00
Dynabolt Bh 4.000 3,500.00 14,000.00
Kawat las Kg 2.000 15,000.00 30,000.00
Jumlah Harga Bahan 1,149,075.00
C PENGECATAN
Pengecatan Rangka m2 1.000 12,000.00 12,000.00
Pengecatan Panel fiber m2 1.000 150,000.00 150,000.00
Jumlah 162,000.00
D Harga Pekerjaan A+B+C 1,501,075.00
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : Komponen MCB Di Box Panel Utama (listrik)

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

15 Komponen MCB Di Box Panel Utama (listrik)

a MCB 6 A 7.00 bh 7.00 0.00

b MCB 10 A 4.00 bh 4.00 0.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
MUTUAL CHECK AWAL ( MC - 0 )

Jumlah Harga PEKERJAAN TAMBAH PEKERJAAN KURANG Harga Satuan Jumlah Harga
Volume
Harga Satuan MC-0
No. Uraian Pekerjaan Volume Satuan Analisa Volume Jumlah Bertambah Volume Jumlah Berkurang MC- Sat Keterangan
( Rp. ) (
Bertambah (Rp.) Berkurang (Rp.) 0
Rp. ) ( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir 10,000,000.00 10,000,000.00 - - - - 1.00 Ls 10,000,000.00 10,000,000.00
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir 750,000.00 3,000,000.00 - - - - 4.00 SISI 750,000.00 3,000,000.00
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir 3,000,000.00 24,000,000.00 - - 8.00 24,000,000.00 - SISI 3,000,000.00 -
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir 30,000,000.00 30,000,000.00 - - 1.00 Ls 30,000,000.00 30,000,000.00
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - 1.00 Ls 15,000,000.00 15,000,000.00
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00
JUMLAH 112,000,000.00 - 24,000,000.00 JUMLAH 88,000,000.00
II PEKERJAAN PEMASANGAN ORNAMEN GRC
1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 154.67 M2 Suplemen B.1 1,549,250.00 239,622,497.50 119.90 185,405,913.83 34.77 M2 1,546,325.00 53,764,173.93
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 270.34 M2 Suplemen B.20 1,549,250.00 418,824,245.00 22.29 34,459,852.63 248.06 M2 1,546,325.00 383,573,647.88
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 199.05 M2 Suplemen B.20 1,549,250.00 308,378,212.50 5.22 8,071,816.50 204.27 M2 1,546,325.00 315,867,807.75
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 106.77 M2 Suplemen B.20 1,549,250.00 165,413,422.50 4.35 6,718,782.13 102.43 M2 1,546,325.00 158,382,338.13
5 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK A 0.00 M2 Suplemen B.21 - - 107.68 169,707,771.84 - - 107.68 M2 1,576,038.00 169,707,771.84
6 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK B 0.00 M2 Suplemen B.21 - - 20.46 32,245,737.48 - - 20.46 M2 1,576,038.00 32,245,737.48
7 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK C 0.00 M2 Suplemen B.21 - - 13.64 21,497,158.32 - - 13.64 M2 1,576,038.00 21,497,158.32
JUMLAH 1,132,238,397.50 231,522,484.14 226,584,548.58 JUMLAH 1,135,038,635.32
III PEKERJAAN PEMASANGAN KUBAH GRC
1 PEMASANGAN ORNAMENT KUBAH DALAM GRC 172.70 M2 Suplemen B.2 1,549,701.00 267,633,362.70 - - 155.88 241,561,115.59 16.82 M2 1,549,701.00 26,072,247.11
2 PEMASANGAN ORNAMENT KUBAH DALAM FIBER 0.00 M2 Suplemen B.25 - - 64.45 96,744,283.75 - - 64.45 M2 1,501,075.00 96,744,283.75
JUMLAH 267,633,362.70 96,744,283.75 241,561,115.59 JUMLAH 122,816,530.86
IV PEKERJAAN DINDING TENGAH
1 PEMASANGAN ORNAMENT GRC MASIV DINDING TENGAH 197.34 M2 Suplemen B.3 1,220,000.00 240,754,800.00 35.02 42,729,280.00 - - 232.36 M2 1,220,000.00 283,484,080.00
2 PEMASANGAN ORNAMENT GRC PLAFOD DINDING TENGAH 70.80 M2 Suplemen B.1 1,549,250.00 109,686,900.00 - - 70.80 109,686,900.00 - M2 1,549,250.00 -
JUMLAH 350,441,700.00 42,729,280.00 109,686,900.00 JUMLAH 283,484,080.00
V PEKERJAAN DINDING KUBAH DALAM
1 PEMASANGAN ORNAMENT GRC MASIV DINDING KUBAH DALAM 141.12 M2 Suplemen B.3 1,220,000.00 172,166,400.00 101.52 123,851,960.00 - - 242.64 M2 1,220,000.00 296,018,360.00
2 PEMASANGAN ORNAMENT GRC KERAWANGAN DINDING KUBAH DALAM 93.20 M2 Suplemen B.4 1,240,678.00 115,631,189.60 - - 93.20 115,631,189.60 - M2 1,240,678.00 -

JUMLAH 287,797,589.60 123,851,960.00 115,631,189.60 JUMLAH 296,018,360.00


VI PEKERJAAN LOGAM
1 ORNAMENT LOGAM KUNINGAN PADA PLAFOND 96.00 Bh Taksir 300,000.00 28,800,000.00 120.00 36,000,000.00 - - 216.00 Bh 300,000.00 64,800,000.00
2 ORNAMENT LOGAM TEMBAGA PADA TIANG DAN RELUNG 10.00 M2 Suplemen C.1 5,000,000.00 50,000,000.00 - - 0.52 2,600,000.00 9.48 M2 5,000,000.00 47,400,000.00
3 KALIGRAFI ASMAUL HUSNA 99 buah 24.75 M2 Suplemen C.1 5,000,000.00 123,750,000.00 - - 2.41 12,065,625.00 22.34 M2 5,000,000.00 111,684,375.00
4 ORNAMENT LOGAM KUNINGAN PADA DINDING MIHRAB 7.30 M2 Suplemen C.1 5,000,000.00 36,500,000.00 - - 0.87 4,350,000.00 6.43 M2 5,000,000.00 32,150,000.00
5 PELAPIS GRC BINGKAI KALIGRAFI DINDING 0.00 M2 Suplemen B.3 1,220,000.00 - 18.91 23,072,640.00 18.91 M2 1,220,000.00 23,072,640.00
6 PELAPIS GRC BINGKAI ASMAUL HUSNA 0.00 M2 Suplemen B.3 1,240,678.00 - 35.64 44,217,763.92 35.64 M2 1,240,678.00 44,217,763.92
JUMLAH 239,050,000.00 103,290,403.92 19,015,625.00 JUMLAH 323,324,778.92
VII PEKERJAAN ELEKTRIKAL + MEKANIKAL
1 ARMARTUR
a Lampu LED 3 watt + fitting aksesories lengkap terpasang 36.00 Bh Taksir 65,000.00 2,340,000.00 2.00 130,000.00 38.00 Bh 65,000.00 2,470,000.00
b Lampu Down Light LED 3 warna 12 Watt + fitting aksesories lengkap terpasang 30.00 Bh Taksir 140,000.00 4,200,000.00 20.00 2,800,000.00 10.00 Bh 140,000.00 1,400,000.00
c Lampu Down Light 14 Watt + fitting aksesories lengkap terpasang 72.00 Bh Taksir 75,000.00 5,400,000.00 - - 72.00 5,400,000.00 - Bh 75,000.00 -
d Lampu Down Light LED, 3 watt + fitting aksesories lengkap terpasang 130.00 Bh Taksir 85,000.00 11,050,000.00 - - 130.00 11,050,000.00 - Bh 85,000.00 -
e Lampu Baret (1 Bohlam) Emergency 18 Watt + fitting aksesories lengkap terpasang 29.00 Bh Taksir 200,000.00 5,800,000.00 - - 29.00 5,800,000.00 - Bh 200,000.00 -
f Lampu Down Light 12 Watt + fitting aksesories lengkap terpasang - Bh Taksir - - 10.00 1,560,000.00 10.00 Bh 156,000.00 1,560,000.00
g Lampu LED Decorative 25 Watt + fitting aksesories lengkap terpasang - Bh Taksir - - 24.00 3,432,000.00 24.00 Bh 143,000.00 3,432,000.00
h Lampu Down Light LED, 45 watt + fitting aksesories lengkap terpasang - Bh Taksir - - 4.00 728,000.00 4.00 Bh 182,000.00 728,000.00
i Lampu Sorot 20 Watt - Bh Taksir - - 4.00 912,000.00 4.00 Bh 228,000.00 912,000.00
j Lampu Sorot 50 Watt - Bh Taksir - - 4.00 1,432,000.00 4.00 Bh 358,000.00 1,432,000.00
2 Pemasangan Instalasi untuk Lampu gantung + kipas 19.00 Bh Taksir 2,000,000.00 38,000,000.00 - - 1.00 2,000,000.00 18.00 Bh 2,000,000.00 36,000,000.00
Instalasi titik penerangan, instalasi termasuk kabel NYA 2,5 mm dalam pipa PVC
3 316.00 titik Taksir 130,000.00 41,080,000.00 - - 204.00 26,520,000.00 112.00 titik 130,000.00 14,560,000.00
fitting lampu dan kelengkapan instalasi terpasang
4 Stop Kontak setara Panasonik 9.00 Bh Taksir 42,500.00 382,500.00 11.00 467,500.00 20.00 Bh 42,500.00 850,000.00
5 Saklar Ganda setara Panasonik 15.00 Bh Taksir 45,500.00 682,500.00 4.00 182,000.00 19.00 Bh 45,500.00 864,500.00
6 Pemasangan instalasi kabel baru untuk sound 12.00 Bh Taksir 1,500,000.00 18,000,000.00 - - - - 12.00 Bh 1,500,000.00 18,000,000.00
7 Pembenahan Kabel Listrik Luar Masjid dan istalasi 1.00 Ls Taksir 25,000,000.00 25,000,000.00 1.00 25,000,000.00 - Ls 25,000,000.00 -
8 Pemasangan instalasi kabel baru Instalasi CCTV - titik Taksir - - 6.00 6,000,000.00 6.00 titik 1,000,000.00 6,000,000.00
9 Pemasangan instalasi kabel baru Instalasi AC - titik Taksir - - 10.00 30,000,000.00 10.00 titik 3,000,000.00 30,000,000.00
10 Box Panel 40 x 60 untuk AC - Bh Taksir - - 1.00 600,000.00 - - 1.00 Bh 600,000.00 600,000.00
11 Pemasangan instalasi kabel baru untuk Toa - titik Taksir 1.00 1,200,000.00 1.00 titik 1,200,000.00 1,200,000.00
12 Lampu dalam Menara + Instalasi bh Taksir 4.00 180,000.00 4.00 bh 45,000.00 180,000.00

13 Lampu Menara Termasuk Instalasi dan Aksesoris Lengkap Terpasang ( Strip light) m' Taksir 96.00 3,360,000.00 96.00 m' 35,000.00 3,360,000.00

14 Komponen Ac

a MCB 16 A - bh Taksir - - 11.00 2,640,000.00 11.00 bh 240,000.00 2,640,000.00

b MCB 25 A - bh Taksir - - 1.00 252,000.00 1.00 bh 252,000.00 252,000.00

c MCB 6 A - bh Taksir - - 7.00 352,800.00 7.00 bh 50,400.00 352,800.00

d Duck 45 x 25 - bh Taksir - - 3.00 90,000.00 3.00 bh 30,000.00 90,000.00

e Busbar - bh Taksir - - 4.00 240,000.00 4.00 bh 60,000.00 240,000.00

f Rel mcb - bh Taksir - - 2.00 36,000.00 2.00 bh 18,000.00 36,000.00

g volt meter - bh Taksir - - 3.00 288,000.00 3.00 bh 96,000.00 288,000.00

h amper meter - bh Taksir - - 1.00 96,000.00 1.00 bh 96,000.00 96,000.00

i selector switch ampere - bh Taksir - - 1.00 120,000.00 1.00 bh 120,000.00 120,000.00

j Baut panel - bh Taksir - - 1.00 6,000.00 1.00 bh 6,000.00 6,000.00

k Pilot lamp - bh Taksir - - 3.00 28,800.00 3.00 bh 9,600.00 28,800.00


15 Komponen MCB Di Box Panel Utama (listrik)
a MCB 6 A - bh Taksir - - 7.00 352,800.00 7.00 bh 50,400.00 352,800.00
b MCB 10 A - bh Taksir - - 4.00 201,600.00 4.00 bh 50,400.00 201,600.00

JUMLAH 151,935,000.00 54,887,500.00 78,570,000.00 JUMLAH 128,252,500.00


VIII PEKERJAAN LAIN LAIN
1 PEKERJAAN RESINE + FIBER ATAP DAK 1028.72 M2 Taksir 280,000.00 288,041,600.00 468.22 131,102,482.00 - - 1,496.94 M2 280,000.00 419,144,082.00
JUMLAH 288,041,600.00 131,102,482.00 - JUMLAH 419,144,082.00

JUMLAH TOTAL 2,829,137,649.80 784,128,393.81 815,049,378.77 2,796,078,967.09


-
JUMLAH 2,829,137,649.80 784,128,393.81 815,049,378.77 2,796,078,967.09
DIBULATKAN 2,829,100,000.00 784,128,000.00 815,049,000.00 2,796,000,000.00

Sabang, …… Oktober 2017


Diperiksa Oleh, Diajukan Oleh,
Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Fakhrulrazi S.T


Chief Inspector Direktur
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 14.Komponen Ac

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

14 Komponen Ac

a MCB 16 A 11.00 bh 11.00 0.00

b MCB 25 A 1.00 bh 1.00 0.00

c MCB 6 A 7.00 bh 7.00 0.00

d Duck 45 x 25 3.00 bh 3.00 0.00

e Busbar 4.00 bh 4.00 0.00

f Rel mcb 2.00 bh 2.00 0.00

g volt meter 3.00 bh 3.00 0.00

h amper meter 1.00 bh 1.00 0.00

i selector switch ampere 1.00 bh 1.00 0.00

j Baut panel 1.00 bh 1.00 0.00

k Pilot lamp 3.00 bh 3.00 0.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 13. Lampu Menara Termasuk Instalasi dan Aksesoris Lengkap Terpasang

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

13 Lampu Menara Termasuk Instalasi dan Aksesoris


Lengkap Terpasang ( Strip light)

12 8 / sisi m' 96.00 0.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : Lampu dalam Menara + Instalasi

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat MC-0 Kontrak Ket
(m) (m) (m)

1 Lampu dalam Menara + Instalasi

4.00 bh 4.00 0.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 11. Pemasangan instalasi kabel baru untuk Toa

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

11 Pemasangan instalasi kabel baru untuk Toa

1.00 titik 1.00 0.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 10. Box Panel 40 x 60 untuk AC

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

10 Box Panel 40 x 60 untuk AC

1.00 Bh 1.00 0.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 9. Pemasangan instalasi kabel baru Instalasi AC

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

9 Pemasangan instalasi kabel baru Instalasi AC

10.00 titik 10.00 0.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 8. Pemasangan instalasi kabel baru Instalasi CCTV

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

8 Pemasangan instalasi kabel baru Instalasi CCTV

6.00 titik 6.00 0.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 1. ARMARTUR

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat MC-0 Kontrak Ket
(m) (m) (m)

1 ARMARTUR

Lampu LED 3 watt + fitting aksesories lengkap


a 38.00 Bh 38.00 36.00
terpasang

Lampu Down Light LED 3 warna 12 Watt + fitting


b aksesories lengkap terpasang 10.00 Bh 10.00 30.00

Lampu Down Light 14 Watt + fitting aksesories


c lengkap terpasang - Bh - 72.00

d Lampu
Down Light LED, 3 watt + fitting
aksesories lengkap terpasang - Bh - 130.00

e Lampu
Baret ( 1 Bohlam) Emergency 18 Watt +
fitting aksesories lengkap terpasang - Bh - 29.00

Lampu Down Light 12 Watt + fitting aksesories


f lengkap terpasang 10.00 Bh 10.00 0.00

g Lampu
LED Decorative 25 Watt + fitting
aksesories lengkap terpasang 24.00 Bh 24.00 0.00

h Lampu
Down Light LED, 45 watt + fitting
aksesories lengkap terpasang 4.00 Bh 4.00 0.00

i Lampu Sorot 20 Watt 4.00 Bh 4.00 0.00

j Lampu Sorot 50 Watt 4.00 Bh 4.00 0.00

k Pemasangan instalasi kabel baru Instalasi CCTV 6.00 titik 6.00 0.00

l Pemasangan instalasi kabel baru Instalasi AC 10.00 titik 10.00 0.00

m Box Panel 40 x 60 untuk AC + Komponen 1.00 Bh 1.00 0.00

n Pemasangan instalasi kabel baru untuk Toa 1.00 titik 1.00 0.00

o Lampu dalam Menara + Instalasi 4.00 bh 4.00 0.00

p Lampu
Menara Termasuk Instalasi dan Aksesoris
Lengkap Terpasang 12 8 / sisi m' 96.00 0.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI
Iswandi Nazirruddin., SST., M.T
Chief Inspector Site Manager
box panel

1 Mata siadar 364,000 182,000 546,000


2 Plat 2l 130,000 65,000 195,000
3 MCB 16 A 2,200,000 1,100,000 3,300,000
4 MCB 25 A 210,000 105,000 315,000
5 MCB 6 A 294,000 147,000 441,000
6 MCB 10 A 168,000 84,000 252,000
7 MCB 100 A 440,000 220,000 660,000
9 Duck 45 x 25 75,000 37,500 112,500
10 Busbar 200,000 100,000 300,000
11 Rel mcb 30,000 15,000 45,000
12 volt meter 240,000 120,000 360,000
13 amper meter 80,000 40,000 120,000
14 selector switch ampere 100,000 50,000 150,000
15 Baut panel 5,000 2,500 7,500
16 Pilot lamp 24000 12,000 36,000
17 1/b 65,000 32,500 97,500
4,625,000 2,312,500 ### 6,937,500
6,937,500
52 7,000 1,400 8,400 8,400.00
#REF! 5000 1,000 6,000 6,000.00
11.00 200000 40,000 240,000 240,000.00
1.00 210000 42,000 252,000 252,000.00
7.00 42000 8,400 50,400 50,400.00
#REF! 42000 8,400 50,400 50,400.00
#REF! 440000 88,000 528,000 528,000.00
3.00 25000 5,000 30,000 30,000.00
4.00 50000 10,000 60,000 60,000.00
2.00 15000 3,000 18,000 18,000.00
3.00 80000 16,000 96,000 96,000.00
1.00 80000 16,000 96,000 96,000.00
1.00 100000 20,000 120,000 120,000.00
1.00 5000 1,000 6,000 6,000.00
3.00 8000 1,600 9,600 9,600.00
- 2500 500 3,000 3,000.00
REKAPITULASI PERHITUNGAN MUTUAL CHECK AWAL (MC-0)
PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM
LOKASI : SABANG
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
No. KONTRAK : 640/27/SP-30.14/2017
TANGGAL : 13 SEPTEMBER 2017
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

KONTRAK AWAL PEKERJAAN TAMBAH PEKERJAAN KURANG ADD-I / MC-0


NO URAIAN PEKERJAAN
JUMLAH HARGA (Rp) BOBOT (%) JUMLAH HARGA (Rp) JUMLAH HARGA (Rp) JUMLAH HARGA (Rp) BOBOT (%)

I PEKERJAAN PERSIAPAN 112,000,000.00 3.96 - 24,000,000.00 88,000,000.00 3.15


II PEKERJAAN PEMASANGAN ORNAMEN GRC 1,132,238,397.50 40.02 231,522,484.14 226,584,548.58 1,135,038,635.32 40.59
III PEKERJAAN PEMASANGAN KUBAH GRC 267,633,362.70 9.46 96,744,283.75 241,561,115.59 122,816,530.86 4.39
IV PEKERJAAN DINDING TENGAH 350,441,700.00 12.39 42,729,280.00 109,686,900.00 283,484,080.00 10.14
V PEKERJAAN DINDING KUBAH DALAM 287,797,589.60 10.17 123,851,960.00 115,631,189.60 296,018,360.00 10.59
VI PEKERJAAN LOGAM 239,050,000.00 8.45 103,290,403.92 19,015,625.00 323,324,778.92 11.56
VII PEKERJAAN ELEKTRIKAL + MEKANIKAL 151,935,000.00 5.37 54,887,500.00 78,570,000.00 128,252,500.00 4.59
6 PEKERJAAN LAIN LAIN 288,041,600.00 10.18 131,102,482.00 - 419,144,082.00 14.99

JUMLAH HARGA 2,829,137,649.80 100.00 784,128,393.81 815,049,378.77 2,796,078,967.09 100.00

JUMLAH TOTAL 2,829,137,649.80 784,128,393.81 815,049,378.77 2,796,078,967.09


DIBULATKAN 2,829,130,000.00 784,128,000.00 815,049,000.00 2,796,078,000.00

Sabang, …… Oktober 2017


Diketahui Oleh, Diketahui Oleh, Diperiksa Oleh, Diajukan Oleh,
KUASA PENGGUNA ANGGARAN KUASA PENGGUNA ANGGARAN Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI
KOTA SABANG KOTA SABANG

MAHMUD, S.T Drs. MUHAMMAD ISWANDI Fakrurrazi


Nip. 19680210 1997 1 004 Nip. 196807151994 03 1 010 CHIEF INSPECTOR Kuasa Direktur
Suplemen B.20 Pemasangan 1 m2 Ornament Plafond GRC

No Uraian Satuan Volume Harga Satuan

A TENAGA PEMASANGAN
Ongkos Pemasangan grc dan rangka Ls 1.000 201,000.00
Jumlah Tenaga Kerja
B BAHAN
Grc Panel m2 1.000 870,000.00
Besi siku 4/4 Kg 5.010 15,000.00
Besi siku 5/5 Kg 4.790 30,000.00
Besi Polos Kg 2.150 8,500.00
Jumlah Harga Bahan
C PENGECATAN
Pengecatan (setara Kemtone atau Jotu m2 1.000 150,000.00
Jumlah
D Harga Pekerjaan A+B+C

Suplemen B.21 Pemasangan 1 m2 Ornament Plafond GRC

No Uraian Satuan Volume Harga Satuan

A TENAGA PEMASANGAN
Ongkos Pemasangan Fiber dan rangk Ls 1.000 201,000.00
Jumlah Tenaga Kerja
B BAHAN
Fiber Panel m2 1.000 1,348,000.00
Besi siku 4/4 Kg 5.010 15,000.00
Besi Hollow 4/4 Kg 4.160 13,900.00
Besi Polos Kg 2.150 8,500.00
Jumlah Harga Bahan
C PENGECATAN
Pengecatan (setara Kemtone atau Jotu m2 1.000 150,000.00
Jumlah
D Harga Pekerjaan A+B+C

SNI 2839: 2008 Memasang 1 m' List langit-langit kayu profil


No. Uraian Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja OH 0.0600 80,000.00
Tukang Kayu OH 0.0600 100,000.00
Kepala Tukang OH 0.0060 110,000.00
Mandor OH 0.0030 100,000.00
Jumlah Tenaga Kerja
B BAHAN
List gysum Profil m' 1.0500 30,000.00
Tepung gysum kg 0.1500 0.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
F Harga Satuan Pekerjaan
Jumlah Harga

201,000.00
201,000.00

870,000.00
75,150.00
143,700.00
18,275.00
1,107,125.00

150,000.00
150,000.00
1,458,125.00

Jumlah Harga

201,000.00
201,000.00

1,348,000.00
75,150.00
57,824.00
18,275.00
1,499,249.00

150,000.00
150,000.00
1,850,249.00

Jumlah Harga

4,800.00
6,000.00
660.00
300.00
11,760.00

31,500.00
0.00
31,500.00

43,260.00
43,260.00
rekap mc - 0 rab 2,353,869,954.86
mc - 0 analisa 2,300,150,041.98
CONTRACK CHANGE ORDER (CCO)

Jumlah Harga
Jumlah Harga PEKERJAAN TAMBAH PEKERJAAN KURANG Harga Satuan
Volume MC-0
Harga Satuan
No. Uraian Pekerjaan Volume Satuan Analisa Volume Jumlah Bertambah Volume Jumlah Berkurang MC- Sat Keterangan
( Rp. )
Bertambah (Rp.) Berkurang (Rp.) 0
( Rp. ) ( Rp. )
( Rp. )
I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir 10,000,000.00 10,000,000 - - - - 1.00 Ls 10,000,000.00 10,000,000.00
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir 750,000.00 3,000,000 - - - - 4.00 SISI 750,000.00 3,000,000.00
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir 3,000,000.00 24,000,000 - - 8.00 24,000,000.00 - SISI 3,000,000.00 -
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir 30,000,000.00 30,000,000 - - 1.00 Ls 30,000,000.00 30,000,000.00
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000 - - 1.00 Ls 15,000,000.00 15,000,000.00
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir 15,000,000.00 15,000,000 - - - - 1.00 Ls 15,000,000.00 15,000,000.00
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000 - - - - 1.00 Ls 15,000,000.00 15,000,000.00
JUMLAH 112,000,000 - 24,000,000.00 JUMLAH 88,000,000.00
II PEKERJAAN PEMASANGAN ORNAMEN GRC
1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 154.67 M2 Suplemen B.20 1,458,125.00 225,528,194 - - 119.90 174,830,645.63 34.77 M2 1,458,125.00 50,697,548.13
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 270.34 M2 Suplemen B.20 1,458,125.00 394,189,513 - - 22.29 32,494,315.63 248.06 M2 1,458,125.00 361,695,196.88
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 199.05 M2 Suplemen B.20 1,458,125.00 290,239,781 5.22 7,611,412.50 204.27 M2 1,458,125.00 297,851,193.75
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 106.77 M2 Suplemen B.20 1,458,125.00 155,684,006 - - 4.35 6,335,553.13 102.43 M2 1,458,125.00 149,348,453.13
5 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK A 0.00 M2 Suplemen B.21 1,850,249.00 - 107.68 199,234,812.32 - - 107.68 M2 1,850,249.00 199,234,812.32
6 Gypsum PLAFOND A 0.00 M1 Taksir 35,000.00 - 42.00 1,470,000.00 - - 42.00 M1 35,000.00 1,470,000.00
7 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK B 0.00 M2 Suplemen B.21 1,850,249.00 - 20.46 37,856,094.54 - - 20.46 M2 1,850,249.00 37,856,094.54
8 Gypsum PLAFOND B 0.00 M1 Taksir 35,000.00 - 134.80 4,718,000.00 - - 134.80 M1 35,000.00 4,718,000.00
9 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK C 0.00 M2 Suplemen B.21 1,850,249.00 - 13.64 25,237,396.36 - - 13.64 M2 1,850,249.00 25,237,396.36
10 Gypsum PLAFOND C 0.00 M1 Taksir 35,000.00 - 99.92 3,497,200.00 99.92 M1 35,000.00 3,497,200.00
11 Gypsum Teras 0.00 M1 Taksir 35,000.00 - 117.06 4,097,100.00 117.06 M1 35,000.00 4,097,100.00
JUMLAH 1,065,641,514 283,722,015.72 213,660,514.38 JUMLAH 1,135,702,995
III PEKERJAAN PEMASANGAN KUBAH GRC
1 PEMASANGAN ORNAMENT KUBAH DALAM GRC 172.70 M2 Suplemen B.2 1,549,701.00 267,633,363 - - 155.88 241,561,115.59 16.82 M2 1,549,701.00 26,072,247.11
2 PEMASANGAN ORNAMENT KUBAH DALAM FIBER 0.00 M2 Suplemen B.21 1,850,249.00 - 64.45 119,248,548.05 - - 64.45 M2 1,850,249.00 119,248,548.05
JUMLAH 267,633,363 119,248,548.05 241,561,115.59 JUMLAH 145,320,795.16
IV PEKERJAAN DINDING TENGAH
1 PEMASANGAN ORNAMENT GRC MASIV DINDING TENGAH 197.34 M2 Suplemen B.3 1,220,000.00 240,754,800 35.02 42,729,280.00 - - 232.36 M2 1,220,000.00 283,484,080.00
2 PEMASANGAN ORNAMENT GRC PLAFOD DINDING TENGAH 70.80 M2 Suplemen B.1 1,549,250.00 109,686,900 - - 70.80 109,686,900.00 - M2 1,549,250.00 -
JUMLAH 350,441,700 42,729,280.00 109,686,900.00 JUMLAH 283,484,080.00
V PEKERJAAN DINDING KUBAH DALAM
1 PEMASANGAN ORNAMENT GRC MASIV DINDING KUBAH DALAM 141.12 M2 Suplemen B.3 1,220,000.00 172,166,400 101.52 123,851,960.00 - - 242.64 M2 1,220,000.00 296,018,360.00
2 PEMASANGAN ORNAMENT GRC KERAWANGAN DINDING KUBAH DALAM 93.20 M2 Suplemen B.4 1,240,678.00 115,631,190 - - 93.20 115,631,189.60 - M2 1,240,678.00 -

JUMLAH 287,797,590 123,851,960.00 115,631,189.60 JUMLAH 296,018,360.00


VI PEKERJAAN LOGAM
1 ORNAMENT LOGAM KUNINGAN PADA PLAFOND 96.00 Bh Taksir 300,000.00 28,800,000 120.00 36,000,000.00 - - 216.00 Bh 300,000.00 64,800,000.00
2 ORNAMENT LOGAM TEMBAGA PADA TIANG DAN RELUNG 10.00 M2 Suplemen C.1 5,000,000.00 50,000,000 - - 0.52 2,600,000.00 9.48 M2 5,000,000.00 47,400,000.00
3 KALIGRAFI ASMAUL HUSNA 99 buah 24.75 M2 Suplemen C.1 5,000,000.00 123,750,000 - - 2.41 12,065,625.00 22.34 M2 5,000,000.00 111,684,375.00
4 ORNAMENT LOGAM KUNINGAN PADA DINDING MIHRAB 7.30 M2 Suplemen C.1 5,000,000.00 36,500,000 - - 0.87 4,350,000.00 6.43 M2 5,000,000.00 32,150,000.00
5 PELAPIS GRC BINGKAI KALIGRAFI DINDING 0.00 M2 Suplemen B.3 1,220,000.00 - 18.91 23,072,640.00 18.91 M2 1,220,000.00 23,072,640.00
6 PELAPIS GRC BINGKAI ASMAUL HUSNA 0.00 M2 Suplemen B.3 1,240,678.00 - 35.64 44,217,763.92 35.64 M2 1,240,678.00 44,217,763.92
JUMLAH 239,050,000 103,290,403.92 19,015,625.00 JUMLAH 323,324,778.92
VII PEKERJAAN ELEKTRIKAL + MEKANIKAL
1 ARMARTUR
a Lampu LED 3 watt + fitting aksesories lengkap terpasang 36.00 Bh Taksir 65,000.00 2,340,000 2.00 130,000.00 38.00 Bh 65,000.00 2,470,000.00
b Lampu Down Light LED 3 warna 12 watt + fitting aksesories lengkap terpasang 30.00 Bh Taksir 140,000.00 4,200,000 - - 20.00 2,800,000.00 10.00 Bh 140,000.00 1,400,000.00
c Lampu Down Light 14 Watt + fitting aksesories lengkap terpasang 72.00 Bh Taksir 75,000.00 5,400,000 - - 72.00 5,400,000.00 - Bh 75,000.00 -
d Lampu Down Light LED, 3 watt + fitting aksesories lengkap terpasang 130.00 Bh Taksir 85,000.00 11,050,000 - - 130.00 11,050,000.00 - Bh 85,000.00 -
e Lampu Baret (1 Bohlam) Emergency 18 Watt + fitting aksesories lengkap terpasang 29.00 Bh Taksir 200,000.00 5,800,000 - - 29.00 5,800,000.00 - Bh 200,000.00 -
2 Pemasangan Instalasi untuk Lampu gantung + kipas 19.00 Bh Taksir 2,000,000.00 38,000,000 - - 1.00 2,000,000.00 18.00 Bh 2,000,000.00 36,000,000.00
Instalasi titik penerangan, instalasi termasuk kabel NYA 2,5 mm dalam pipa PVC
3 316.00 titik Taksir 130,000.00 41,080,000 - - 222.00 28,860,000.00 94.00 titik 130,000.00 12,220,000.00
fitting lampu dan kelengkapan instalasi terpasang
4 Stop Kontak setara Panasonik 9.00 Bh Taksir 42,500.00 382,500 11.00 467,500.00 20.00 Bh 42,500.00 850,000.00
5 Saklar Ganda setara Panasonik 15.00 Bh Taksir 45,500.00 682,500 4.00 182,000.00 19.00 Bh 45,500.00 864,500.00
6 Pemasangan instalasi kabel baru untuk sound 12.00 Bh Taksir 1,500,000.00 18,000,000 - - - - 12.00 Bh 1,500,000.00 18,000,000.00
7 Pembenahan Kabel Listrik Luar Masjid dan istalasi 1.00 Ls Taksir 25,000,000.00 25,000,000 1.00 25,000,000.00 - Ls 25,000,000.00 -
- Lampu Down Light (12 Watt Emergecy) + fitting aksesories lengkap terpasang 0.00 Bh Taksir 156,000.00 - 10.00 1,560,000.00 10.00 Bh 156,000.00 1,560,000.00
- Lampu LED Decorative 25 Watt + fitting aksesories lengkap terpasang 0.00 Bh Taksir 143,000.00 - 2.00 286,000.00 2.00 Bh 143,000.00 286,000.00
- Lampu Down Light LED, 45 watt + fitting aksesories lengkap terpasang 0.00 Bh Taksir 182,000.00 - 4.00 728,000.00 4.00 Bh 182,000.00 728,000.00
- Lampu Sorot 20 Watt + fitting aksesories lengkap terpasang 0.00 Bh Taksir 228,000.00 - 4.00 912,000.00 4.00 Bh 228,000.00 912,000.00
- Lampu Sorot 50 Watt + fitting aksesories lengkap terpasang 0.00 Bh Taksir 358,000.00 - 4.00 1,432,000.00 4.00 Bh 358,000.00 1,432,000.00
- Instalasi CCTV 0.00 titik Taksir 1,000,000.00 - 6.00 6,000,000.00 6.00 titik 1,000,000.00 6,000,000.00
- Instalasi AC 0.00 titik Taksir 3,000,000.00 - 10.00 30,000,000.00 10.00 titik 3,000,000.00 30,000,000.00
JUMLAH 151,935,000 41,697,500.00 80,910,000.00 JUMLAH 112,722,500.00
VIII PEKERJAAN LAIN LAIN
1 PEKERJAAN RESINE + FIBER ATAP DAK 1028.72 M2 Taksir 280,000.00 288,041,600 468.22 131,102,482.00 - - 1,496.94 M2 280,000.00 419,144,082.00
2 PEKERJAAN PENGECATAN 0.00 M2 analisa 8,500.00 - - - - - - M2 8,500.00 -
JUMLAH 288,041,600 131,102,482.00 - JUMLAH 419,144,082.00

JUMLAH TOTAL 2,762,540,766 845,642,189.69 804,465,344.57 2,803,717,591.17


-
JUMLAH 2,762,540,766 845,642,189.69 804,465,344.57 2,803,717,591.17
DIBULATKAN 2,762,500,000 845,642,000.00 804,465,000.00 2,803,700,000.00

Sabang, …… Oktober 2017


Diperiksa Oleh, Diajukan Oleh,
Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Fakhrulrazi S.T


Chief Inspector Direktur
REKAPITULASI PERHITUNGAN DAFTAR PEKERJAAN TAMBAH KURANG
PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM
LOKASI : SABANG
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
No. KONTRAK : 640/27/SP-30.14/2017
TANGGAL : 13 SEPTEMBER 2017
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

KONTRAK AWAL PEKERJAAN TAMBAH PEKERJAAN KURANG ADD-I / MC-0


NO URAIAN PEKERJAAN
JUMLAH HARGA (Rp) BOBOT (%) JUMLAH HARGA (Rp) JUMLAH HARGA (Rp) JUMLAH HARGA (Rp) BOBOT (%)

I PEKERJAAN PERSIAPAN 112,000,000.00 4.05 - 24,000,000.00 88,000,000.00 3.14


II PEKERJAAN PEMASANGAN ORNAMEN GRC 1,065,641,513.75 38.57 283,722,015.72 213,660,514.38 1,135,703,015.10 40.51
III PEKERJAAN PEMASANGAN KUBAH GRC 267,633,362.70 9.69 119,248,548.05 241,561,115.59 145,320,795.16 5.18
IV PEKERJAAN DINDING TENGAH 350,441,700.00 12.69 42,729,280.00 109,686,900.00 283,484,080.00 10.11
V PEKERJAAN DINDING KUBAH DALAM 287,797,589.60 10.42 123,851,960.00 115,631,189.60 296,018,360.00 10.56
VI PEKERJAAN LOGAM 239,050,000.00 8.65 103,290,403.92 19,015,625.00 323,324,778.92 11.53
VII PEKERJAAN ELEKTRIKAL + MEKANIKAL 151,935,000.00 5.50 41,697,500.00 80,910,000.00 112,722,500.00 4.02
VIII PEKERJAAN LAIN LAIN 288,041,600.00 10.43 131,102,482.00 - 419,144,082.00 14.95

JUMLAH HARGA 2,762,540,766.05 100.00 845,642,189.69 804,465,344.57 2,803,717,611.17 100.00

JUMLAH TOTAL 2,762,540,766.05 845,642,189.69 804,465,344.57 2,803,717,611.17


DIBULATKAN 2,762,540,000.00 845,642,000.00 804,465,000.00 2,803,717,000.00

Banda Aceh, …… Agustus 2017


Diketahui Oleh, Diketahui Oleh, Diperiksa Oleh, Diajukan Oleh,
KUASA PENGGUNA ANGGARAN KUASA PENGGUNA ANGGARAN Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI
KOTA SABANG KOTA SABANG

MAHMUD, S.T Drs. MUHAMMAD ISWANDI Fakrurrazi


Nip. 19680210 1997 1 004 Nip. 196807151994 03 1 010 CHIEF INSPECTOR Kuasa Direktur
CONTRACK CHANGE ORDER (CCO)

Jumlah Harga PEKERJAAN TAMBAH PEKERJAAN KURANG Harga Satuan Jumlah Harga
Volume
Harga Satuan MC-0
No. Uraian Pekerjaan Volume Satuan Analisa Volume Jumlah Bertambah Volume Jumlah Berkurang MC- Sat Keterangan
( Rp. )
Bertambah (Rp.) Berkurang (Rp.) 0
( Rp. ) ( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir 10,000,000.00 10,000,000 - - - - 1.00 Ls 10,000,000.00 10,000,000.00
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir 750,000.00 3,000,000 - - - - 4.00 SISI 750,000.00 3,000,000.00
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir 3,000,000.00 24,000,000 - 8.00 24,000,000.00 - SISI 3,000,000.00 -
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir 30,000,000.00 30,000,000 1.00 Ls 30,000,000.00 30,000,000.00
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000 1.00 Ls 15,000,000.00 15,000,000.00
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir 15,000,000.00 15,000,000 - - - - 1.00 Ls 15,000,000.00 15,000,000.00
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000 - - - - 1.00 Ls 15,000,000.00 15,000,000.00
JUMLAH 112,000,000 - 24,000,000.00 JUMLAH 88,000,000.00
II PEKERJAAN PEMASANGAN ORNAMEN GRC
1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 154.67 M2 Suplemen B.1 1,549,250.00 239,622,498 119.90 185,756,624.25 34.77 M2 1,549,250.00 53,865,873.25
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 270.34 M2 Suplemen B.1 1,549,250.00 418,824,245 22.29 34,525,036.25 248.06 M2 1,549,250.00 384,299,208.75
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 199.05 M2 Suplemen B.1 1,549,250.00 308,378,213 5.22 8,087,085.00 204.27 M2 1,549,250.00 316,465,297.50
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 106.77 M2 Suplemen B.1 1,549,250.00 165,413,423 4.35 6,731,491.25 102.43 M2 1,549,250.00 158,681,931.25
5 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK A 0.00 M2 Suplemen B.21 - 107.68 - - - 107.68 M2 - -
6 Gypsum PLAFOND A 0.00 M1 Taksir - 42.00 - - - 42.00 M1 - -
7 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK B 0.00 M2 Suplemen B.21 - - 20.46 - - - 20.46 M2 - -
8 Gypsum PLAFOND B 0.00 M1 Taksir - - 134.80 - - - 134.80 M1 - -
9 PEMASANGAN ORNAMENT FIBER PLAFOND BLOK C 0.00 M2 Suplemen B.21 - - 13.64 - - - 13.64 M2 - -
10 Gypsum PLAFOND C 0.00 M1 Taksir - - 99.92 - 99.92 M1 - -
11 Gypsum Teras 0.00 M1 Taksir - - 117.06 - 117.06 M1 - -
JUMLAH 1,132,238,398 8,087,085.00 227,013,151.75 JUMLAH 913,312,310.75
III PEKERJAAN PEMASANGAN KUBAH GRC
1 PEMASANGAN ORNAMENT KUBAH DALAM GRC 172.70 M2 Suplemen B.2 1,549,701.00 267,633,363 155.88 241,561,115.59 16.82 M2 1,549,701.00 26,072,247.11
2 PEMASANGAN ORNAMENT KUBAH DALAM FIBER 0.00 M2 Suplemen B.21 - - 64.45 - - - 64.45 M2 - -
JUMLAH 267,633,363 - 241,561,115.59 JUMLAH 26,072,247.11
IV PEKERJAAN DINDING TENGAH
1 PEMASANGAN ORNAMENT GRC MASIV DINDING TENGAH 197.34 M2 Suplemen B.3 1,220,000.00 240,754,800 35.02 42,729,280.00 232.36 M2 1,220,000.00 283,484,080.00
2 PEMASANGAN ORNAMENT GRC PLAFOD DINDING TENGAH 70.80 M2 Suplemen B.1 1,549,250.00 109,686,900 - - 70.80 109,686,900.00 - M2 1,549,250.00 -
JUMLAH 350,441,700 42,729,280.00 109,686,900.00 JUMLAH 283,484,080.00
V PEKERJAAN DINDING KUBAH DALAM
1 PEMASANGAN ORNAMENT GRC MASIV DINDING KUBAH DALAM 141.12 M2 Suplemen B.3 1,220,000.00 172,166,400 101.52 123,851,960.00 - - 242.64 M2 1,220,000.00 296,018,360.00
2 PEMASANGAN ORNAMENT GRC KERAWANGAN DINDING KUBAH DALAM 93.20 M2 Suplemen B.4 1,240,678.00 115,631,190 - - 93.20 115,631,189.60 - M2 1,240,678.00 -

JUMLAH 287,797,590 123,851,960.00 115,631,189.60 JUMLAH 296,018,360.00


VI PEKERJAAN LOGAM
1 ORNAMENT LOGAM KUNINGAN PADA PLAFOND 96.00 Bh Taksir 300,000.00 28,800,000 120.00 36,000,000.00 - - 216.00 Bh 300,000.00 64,800,000.00
2 ORNAMENT LOGAM TEMBAGA PADA TIANG DAN RELUNG 10.00 M2 Suplemen C.1 5,000,000.00 50,000,000 0.52 2,600,000.00 9.48 M2 5,000,000.00 47,400,000.00
3 KALIGRAFI ASMAUL HUSNA 99 buah 24.75 M2 Suplemen C.1 5,000,000.00 123,750,000 2.41 12,065,625.00 22.34 M2 5,000,000.00 111,684,375.00
4 ORNAMENT LOGAM KUNINGAN PADA DINDING MIHRAB 7.30 M2 Suplemen C.1 5,000,000.00 36,500,000 0.87 4,350,000.00 6.43 M2 5,000,000.00 32,150,000.00
5 PELAPIS GRC BINGKAI KALIGRAFI DINDING 0.00 M2 Suplemen B.3 1,220,000.00 - 18.91 23,072,640.00 18.91 M2 1,220,000.00 23,072,640.00
6 PELAPIS GRC BINGKAI ASMAUL HUSNA 0.00 M2 Suplemen B.3 1,240,678.00 - 35.64 44,217,763.92 35.64 M2 1,240,678.00 44,217,763.92
JUMLAH 239,050,000 103,290,403.92 19,015,625.00 JUMLAH 323,324,778.92
VII PEKERJAAN ELEKTRIKAL + MEKANIKAL
1 ARMARTUR
a Lampu LED 3 watt + fitting aksesories lengkap terpasang 36.00 Bh Taksir 65,000.00 2,340,000 2.00 130,000.00 38.00 Bh 65,000.00 2,470,000.00
b Lampu Down Light LED 3 warna 12 watt + fitting aksesories lengkap terpasang 30.00 Bh Taksir 140,000.00 4,200,000 - - 20.00 2,800,000.00 10.00 Bh 140,000.00 1,400,000.00
c Lampu Down Light 14 Watt + fitting aksesories lengkap terpasang 72.00 Bh Taksir 75,000.00 5,400,000 - - 72.00 5,400,000.00 - Bh 75,000.00 -
d Lampu Down Light LED, 3 watt + fitting aksesories lengkap terpasang 130.00 Bh Taksir 85,000.00 11,050,000 - - 130.00 11,050,000.00 - Bh 85,000.00 -
e Lampu Baret (1 Bohlam) Emergency 18 Watt + fitting aksesories lengkap terpasang 29.00 Bh Taksir 200,000.00 5,800,000 - - 29.00 5,800,000.00 - Bh 200,000.00 -
2 Pemasangan Instalasi untuk Lampu gantung + kipas 19.00 Bh Taksir 2,000,000.00 38,000,000 - - 1.00 2,000,000.00 18.00 Bh 2,000,000.00 36,000,000.00
Instalasi titik penerangan, instalasi termasuk kabel NYA 2,5 mm dalam pipa PVC
3 316.00 titik Taksir 130,000.00 41,080,000 - - 222.00 28,860,000.00 94.00 titik 130,000.00 12,220,000.00
fitting lampu dan kelengkapan instalasi terpasang
4 Stop Kontak setara Panasonik 9.00 Bh Taksir 42,500.00 382,500 11.00 467,500.00 20.00 Bh 42,500.00 850,000.00
5 Saklar Ganda setara Panasonik 15.00 Bh Taksir 45,500.00 682,500 4.00 182,000.00 19.00 Bh 45,500.00 864,500.00
6 Pemasangan instalasi kabel baru untuk sound 12.00 Bh Taksir 1,500,000.00 18,000,000 - - 12.00 Bh 1,500,000.00 18,000,000.00
7 Pembenahan Kabel Listrik Luar Masjid dan istalasi 1.00 Ls Taksir 25,000,000.00 25,000,000 1.00 25,000,000.00 - Ls 25,000,000.00 -
- Lampu Down Light (12 Watt Emergecy) + fitting aksesories lengkap terpasang 0.00 Bh Taksir 156,000.00 - 10.00 1,560,000.00 10.00 Bh 156,000.00 1,560,000.00
- Lampu LED Decorative 25 Watt + fitting aksesories lengkap terpasang 0.00 Bh Taksir 143,000.00 - 2.00 286,000.00 2.00 Bh 143,000.00 286,000.00
- Lampu Down Light LED, 45 watt + fitting aksesories lengkap terpasang 0.00 Bh Taksir 182,000.00 - 4.00 728,000.00 4.00 Bh 182,000.00 728,000.00
- Lampu Sorot 20 Watt + fitting aksesories lengkap terpasang 0.00 Bh Taksir 228,000.00 - 4.00 912,000.00 4.00 Bh 228,000.00 912,000.00
- Lampu Sorot 50 Watt + fitting aksesories lengkap terpasang 0.00 Bh Taksir 358,000.00 - 4.00 1,432,000.00 4.00 Bh 358,000.00 1,432,000.00
- Instalasi CCTV 0.00 titik Taksir 1,000,000.00 - 6.00 6,000,000.00 6.00 titik 1,000,000.00 6,000,000.00
- Instalasi AC 0.00 titik Taksir 3,000,000.00 - 10.00 30,000,000.00 10.00 titik 3,000,000.00 30,000,000.00
JUMLAH 151,935,000 41,697,500.00 80,910,000.00 JUMLAH 112,722,500.00
VIII PEKERJAAN LAIN LAIN
1 PEKERJAAN RESINE + FIBER ATAP DAK 1028.72 M2 Taksir 280,000.00 288,041,600 468.22 131,102,482.00 - - 1,496.94 M2 280,000.00 419,144,082.00
2 PEKERJAAN PENGECATAN 0.00 M2 analisa 8,500.00 - - - - - - M2 8,500.00 -
JUMLAH 288,041,600 131,102,482.00 - JUMLAH 419,144,082.00

JUMLAH TOTAL 2,829,137,650 450,758,710.92 817,817,981.94 2,462,078,358.78


-
JUMLAH 2,829,137,650 450,758,710.92 817,817,981.94 2,462,078,358.78
DIBULATKAN 2,829,100,000 450,758,000.00 817,817,000.00 2,462,000,000.00

Banda Aceh, …… Juni 2017


Diperiksa Oleh, Diajukan Oleh,
Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Fakhrulrazi S.T


Chief Inspector Direktur
REKAPITULASI PERHITUNGAN DAFTAR PEKERJAAN TAMBAH KURANG
PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM
LOKASI : SABANG
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
No. KONTRAK : 640/27/SP-30.14/2017
TANGGAL : 13 SEPTEMBER 2017
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

KONTRAK AWAL PEKERJAAN TAMBAH PEKERJAAN KURANG ADD-I / MC-0


NO URAIAN PEKERJAAN
JUMLAH HARGA (Rp) BOBOT (%) JUMLAH HARGA (Rp) JUMLAH HARGA (Rp) JUMLAH HARGA (Rp) BOBOT (%)

I PEKERJAAN PERSIAPAN 112,000,000.00 3.96 - 24,000,000.00 88,000,000.00 3.57


II PEKERJAAN PEMASANGAN ORNAMEN GRC 1,132,238,397.50 40.02 8,087,085.00 227,013,151.75 913,312,330.75 37.10
III PEKERJAAN PEMASANGAN KUBAH GRC 267,633,362.70 9.46 - 241,561,115.59 26,072,247.11 1.06
IV PEKERJAAN DINDING TENGAH 350,441,700.00 12.39 42,729,280.00 109,686,900.00 283,484,080.00 11.51
V PEKERJAAN DINDING KUBAH DALAM 287,797,589.60 10.17 123,851,960.00 115,631,189.60 296,018,360.00 12.02
VI PEKERJAAN LOGAM 239,050,000.00 8.45 103,290,403.92 19,015,625.00 323,324,778.92 13.13
VII PEKERJAAN ELEKTRIKAL + MEKANIKAL 151,935,000.00 5.37 41,697,500.00 80,910,000.00 112,722,500.00 4.58
6 PEKERJAAN LAIN LAIN 288,041,600.00 10.18 131,102,482.00 - 419,144,082.00 17.02

JUMLAH HARGA 2,829,137,649.80 100.00 450,758,710.92 817,817,981.94 2,462,078,378.78 100.00

JUMLAH TOTAL 2,829,137,649.80 450,758,710.92 817,817,981.94 2,462,078,378.78


DIBULATKAN 2,829,130,000.00 450,758,000.00 817,817,000.00 2,462,078,000.00

Banda Aceh, …… Agustus 2017


Diketahui Oleh, Diketahui Oleh, Diperiksa Oleh, Diajukan Oleh,
KUASA PENGGUNA ANGGARAN KUASA PENGGUNA ANGGARAN Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI
KOTA SABANG KOTA SABANG

MAHMUD, S.T Drs. MUHAMMAD ISWANDI Fakrurrazi


Nip. 19680210 1997 1 004 Nip. 196807151994 03 1 010 CHIEF INSPECTOR Kuasa Direktur
MUTUAL CHECK AWAL ( MC - 0 )
PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 13 SEPTEMBER 2017
NILAI KONTRAK Rp 2,829,215
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT
LOKASI SABANG
TAHUN ANGGARAN 2017

PEKERJAAN TAMBAH PEKERJAAN KURANG


Jumlah Harga Jumlah Harga
Volume Harga Satuan
Harga Satuan MC-0
No. Uraian Pekerjaan Volume Satuan Analisa Volume Jumlah Bertambah Volume Jumlah Berkurang MC- Sat Keterangan
( Rp. )
Bertambah (Rp.) Berkurang (Rp.) 0 ( Rp. )
( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir 10,000,000.00 10,000,000.00 - - - - 1.00 Ls 10,000,000.00 10,000,000.00 Tetap
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir 750,000.00 3,000,000.00 - - - - 4.00 SISI 750,000.00 3,000,000.00 Tetap
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir 3,000,000.00 24,000,000.00 - - 8.00 24,000,000.00 - SISI 3,000,000.00 - hapus
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir 30,000,000.00 30,000,000.00 - - - - 1.00 Ls 30,000,000.00 30,000,000.00 Tetap
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
JUMLAH 112,000,000.00 - 24,000,000.00 JUMLAH 88,000,000.00
II PEKERJAAN PEMASANGAN ORNAMEN GRC
1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 154.67 M2 Suplemen B.1 1,549,250.00 239,622,497.50 - - 119.90 185,756,624.25 34.77 M2 1,458,125.00 50,697,548.13 Kurang
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 270.34 M2 Suplemen B.1 1,549,250.00 418,824,245.00 22.29 34,525,036.25 248.06 M2 1,458,125.00 361,695,196.88 Kurang
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 199.05 M2 Suplemen B.1 1,549,250.00 308,378,212.50 5.22 8,087,085.00 204.27 M2 1,458,125.00 297,851,193.75 Tambah
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 106.77 M2 Suplemen B.1 1,549,250.00 165,413,422.50 - - 4.35 6,731,491.25 102.43 M2 1,458,125.00 149,348,453.13 Kurang

JUMLAH 1,132,238,383.50 8,087,085.00 227,013,151.75 JUMLAH 859,592,391.88


III PEKERJAAN PEMASANGAN KUBAH GRC
1 PEMASANGAN ORNAMENT KUBAH DALAM GRC 172.70 M2 Suplemen B.2 1,549,701.00 267,633,362.70 155.88 241,561,115.59 16.82 M2 1,549,701.00 26,072,247.11 kurang

JUMLAH 267,633,362.70 - 241,561,115.59 JUMLAH 26,072,247.11


IV PEKERJAAN DINDING TENGAH
1 PEMASANGAN ORNAMENT GRC MASIV DINDING TENGAH 197.34 M2 Suplemen B.3 1,220,000.00 240,754,800.00 35.02 42,729,280.00 232.36 M2 1,220,000.00 283,484,080.00 kurang
2 PEMASANGAN ORNAMENT GRC PLAFOD DINDING TENGAH 70.80 M2 Suplemen B.1 1,549,250.00 109,686,900.00 70.80 109,686,900.00 - M2 1,549,250.00 - Hilang
JUMLAH 350,441,700.00 42,729,280.00 109,686,900.00 JUMLAH 283,484,080.00
V PEKERJAAN DINDING KUBAH DALAM
1 PEMASANGAN ORNAMENT GRC MASIV DINDING KUBAH DALAM 141.12 M2 Suplemen B.3 1,220,000.00 172,166,400.00 101.52 123,851,960.00 242.64 M2 1,220,000.00 296,018,360.00 Tambah
2 PEMASANGAN ORNAMENT GRC KERAWANGAN DINDING KUBAH DALAM 93.20 M2 Suplemen B.4 1,240,678.00 115,631,189.60 93.20 115,631,189.60 - M2 1,240,678.00 - Hilang
JUMLAH 287,797,589.60 123,851,960.00 115,631,189.60 JUMLAH 296,018,360.00
VI PEKERJAAN LOGAM
1 ORNAMENT LOGAM KUNINGAN PADA PLAFOND 96.00 Bh Taksir 300,000.00 28,800,000.00 120.00 36,000,000.00 216.00 Bh 300,000.00 64,800,000.00 tambah
2 ORNAMENT LOGAM TEMBAGA PADA TIANG DAN RELUNG 10.00 M2 Suplemen C.1 5,000,000.00 50,000,000.00 0.52 2,600,000.00 9.48 M2 5,000,000.00 47,400,000.00 Hilang
3 KALIGRAFI ASMAUL HUSNA 99 buah 24.75 M2 Suplemen C.1 5,000,000.00 123,750,000.00 2.41 12,065,625.00 22.34 M2 5,000,000.00 111,684,375.00 Hilang
4 ORNAMENT LOGAM KUNINGAN PADA DINDING MIHRAB 7.30 M2 Suplemen C.1 5,000,000.00 36,500,000.00 0.87 4,350,000.00 6.43 M2 5,000,000.00 32,150,000.00 kurang
JUMLAH 239,050,000.00 36,000,000.00 19,015,625.00 JUMLAH 256,034,375.00
VII PEKERJAAN ELEKTRIKAL + MEKANIKAL
1 ARMARTUR
a Lampu LED 3 watt + fitting aksesories lengkap terpasang 36.00 Bh Taksir 65,000.00 2,340,000.00 2.00 130,000.00 38.00 Bh 65,000.00 2,470,000.00 tambah
b Lampu Down Light LED 3 warna 12 watt + fitting aksesories lengkap terpasang 30.00 Bh Taksir 140,000.00 4,200,000.00 20.00 2,800,000.00 10.00 Bh 140,000.00 1,400,000.00 kurang
c Lampu Down Light 14 Watt + fitting aksesories lengkap terpasang 72.00 Bh Taksir 75,000.00 5,400,000.00 72.00 5,400,000.00 - Bh 75,000.00 - hilang
d Lampu Down Light LED, 3 watt + fitting aksesories lengkap terpasang 130.00 Bh Taksir 85,000.00 11,050,000.00 130.00 11,050,000.00 - Bh 85,000.00 - hilang
e Lampu Baret (1 Bohlam) Emergency 18 Watt + fitting aksesories lengkap terpasang 29.00 Bh Taksir 200,000.00 5,800,000.00 29.00 5,800,000.00 - Bh 200,000.00 - hilang
2 Pemasangan Instalasi untuk Lampu gantung + kipas 19.00 Bh Taksir 2,000,000.00 38,000,000.00 1.00 2,000,000.00 18.00 Bh 2,000,000.00 36,000,000.00 Kurang
Instalasi titik penerangan, instalasi termasuk kabel NYA 2,5 mm dalam pipa PVC fitting
3 316.00 titik Taksir 130,000.00 41,080,000.00 222.00 28,860,000.00 94.00 titik 130,000.00 12,220,000.00 Kurang
lampu dan kelengkapan instalasi terpasang
4 Stop Kontak setara Panasonik 9.00 Bh Taksir 42,500.00 382,500.00 11.00 467,500.00 20.00 Bh 42,500.00 850,000.00 tambah
5 Saklar Ganda setara Panasonik 15.00 Bh Taksir 45,500.00 682,500.00 4.00 182,000.00 19.00 Bh 45,500.00 864,500.00 Tambah
6 Pemasangan instalasi kabel baru untuk sound 12.00 Bh Taksir 1,500,000.00 18,000,000.00 - - 12.00 Bh 1,500,000.00 18,000,000.00 tetap

7 Pembenahan Kabel Listrik Luar Masjid dan istalasi 1.00 Ls Taksir 25,000,000.00 25,000,000.00 1.00 25,000,000.00 - Ls 25,000,000.00 - hilang

JUMLAH 151,935,000.00 779,500.00 80,910,000.00 JUMLAH 71,804,500.00


VIII PEKERJAAN LAIN LAIN
1 PEKERJAAN RESINE + FIBER ATAP DAK 1028.72 M2 Taksir 280,000.00 288,041,600.00 468.22 131,102,482.00 - - 1,496.94 M2 280,000.00 419,144,082.00 Tambah
JUMLAH 288,041,600.00 131,102,482.00 - JUMLAH 419,144,082.00

JUMLAH TOTAL 2,829,137,635.80 342,550,307.00 817,817,981.94 2,300,150,035.98

JUMLAH 2,829,137,635.80 342,550,307.00 817,817,981.94 2,300,150,035.98


DIBULATKAN 2,829,130,000.00 342,550,000.00 817,817,000.00 2,300,100,000.00

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Fakhrulrazi S.T


Chief Inspector Kuasa Direktur
REKAPITULASI PERHITUNGAN MUTUAL CHECK AWAL (MC-0)
PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM
LOKASI : SABANG
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
No. KONTRAK : 640/27/SP-30.14/2017
TANGGAL : 13 SEPTEMBER 2017
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

KONTRAK AWAL PEKERJAAN TAMBAH PEKERJAAN KURANG ADD-I / MC-0


NO URAIAN PEKERJAAN
JUMLAH HARGA (Rp) BOBOT (%) JUMLAH HARGA (Rp) JUMLAH HARGA (Rp) JUMLAH HARGA (Rp) BOBOT (%)

I PEKERJAAN PERSIAPAN 112,000,000.00 3.96 - 24,000,000.00 88,000,000.00 3.74


II PEKERJAAN PEMASANGAN ORNAMEN GRC 1,132,238,383.50 40.02 8,087,085.00 227,013,151.75 913,312,316.75 38.80
III PEKERJAAN PEMASANGAN KUBAH GRC 267,633,362.70 9.46 - 241,561,115.59 26,072,247.11 1.11
IV PEKERJAAN DINDING TENGAH 350,441,700.00 12.39 42,729,280.00 109,686,900.00 283,484,080.00 12.04
V PEKERJAAN DINDING KUBAH DALAM 287,797,589.60 10.17 123,851,960.00 115,631,189.60 296,018,360.00 12.58
VI PEKERJAAN LOGAM 239,050,000.00 8.45 36,000,000.00 19,015,625.00 256,034,375.00 10.88
VII PEKERJAAN ELEKTRIKAL + MEKANIKAL 151,935,000.00 5.37 779,500.00 80,910,000.00 71,804,500.00 3.05
6 PEKERJAAN LAIN LAIN 288,041,600.00 10.18 131,102,482.00 - 419,144,082.00 17.81

2,300,150,035.98
JUMLAH HARGA 2,829,137,635.80 100.00 342,550,307.00 817,817,981.94 2,353,869,960.86 100.00

JUMLAH TOTAL 2,829,137,635.80 342,550,307.00 817,817,981.94 2,353,869,960.86


DIBULATKAN 2,829,130,000.00 342,550,000.00 817,817,000.00 2,353,869,000.00

Sabang, …… Oktober 2017


Diketahui Oleh, Mengetahui / Menyetujui, Diperiksa Oleh, Diajukan Oleh,
KUASA PENGGUNA ANGGARAN PEJABAT PELAKSANA TEKNIS KEGIATAN Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI
KOTA SABANG KOTA SABANG

MAHMUD, S.T MULKAN,ST.,MT ISWANDI Fakrurrazi


Nip. 19680210 1997 1 004 Nip. 19760130 200604 1 003 CHIEF INSPECTOR Kuasa Direktur
MUTUAL CHECK AWAL ( MC - 0 )
PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 13 SEPTEMBER 2017
NILAI KONTRAK Rp 2,829,215
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT
LOKASI SABANG
TAHUN ANGGARAN 2017

PEKERJAAN TAMBAH PEKERJAAN KURANG


Jumlah Harga Jumlah Harga
Volume Harga Satuan
Harga Satuan MC-0
No. Uraian Pekerjaan Volume Satuan Analisa Volume Jumlah Bertambah Volume Jumlah Berkurang MC- Sat Keterangan
( Rp. )
Bertambah (Rp.) Berkurang (Rp.) 0 ( Rp. )
( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir 10,000,000.00 10,000,000.00 - - - - 1.00 Ls 10,000,000.00 10,000,000.00 Tetap
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir 750,000.00 3,000,000.00 - - - - 4.00 SISI 750,000.00 3,000,000.00 Tetap
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir 3,000,000.00 24,000,000.00 - - 8.00 24,000,000.00 - SISI 3,000,000.00 - hapus
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir 30,000,000.00 30,000,000.00 - - - - 1.00 Ls 30,000,000.00 30,000,000.00 Tetap
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
JUMLAH 112,000,000.00 - 24,000,000.00 JUMLAH 88,000,000.00
II PEKERJAAN PEMASANGAN ORNAMEN GRC
1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 154.67 M2 Suplemen B.20 1,458,125.00 225,528,193.75 - - 119.90 174,830,645.63 34.77 M2 1,458,125.00 50,697,548.13 Kurang
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 270.34 M2 Suplemen B.20 1,458,125.00 394,189,512.50 22.29 32,494,315.63 248.06 M2 1,458,125.00 361,695,196.88 Kurang
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 199.05 M2 Suplemen B.20 1,458,125.00 290,239,781.25 5.22 7,611,412.50 204.27 M2 1,458,125.00 297,851,193.75 Tambah
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 106.77 M2 Suplemen B.20 1,458,125.00 155,684,006.25 - - 4.35 6,335,553.13 102.43 M2 1,458,125.00 149,348,453.13 Kurang

JUMLAH 1,065,641,499.75 7,611,412.50 213,660,514.38 JUMLAH 859,592,391.88


III PEKERJAAN PEMASANGAN KUBAH GRC
1 PEMASANGAN ORNAMENT KUBAH DALAM GRC 172.70 M2 Suplemen B.2 1,549,701.00 267,633,362.70 155.88 241,561,115.59 16.82 M2 1,549,701.00 26,072,247.11 kurang

JUMLAH 267,633,362.70 - 241,561,115.59 JUMLAH 26,072,247.11


IV PEKERJAAN DINDING TENGAH
1 PEMASANGAN ORNAMENT GRC MASIV DINDING TENGAH 197.34 M2 Suplemen B.3 1,220,000.00 240,754,800.00 35.02 42,729,280.00 232.36 M2 1,220,000.00 283,484,080.00 kurang
2 PEMASANGAN ORNAMENT GRC PLAFOD DINDING TENGAH 70.80 M2 Suplemen B.1 1,458,125.00 103,235,250.00 70.80 103,235,250.00 - M2 1,458,125.00 - Hilang
JUMLAH 343,990,050.00 42,729,280.00 103,235,250.00 JUMLAH 283,484,080.00
V PEKERJAAN DINDING KUBAH DALAM
1 PEMASANGAN ORNAMENT GRC MASIV DINDING KUBAH DALAM 141.12 M2 Suplemen B.3 1,220,000.00 172,166,400.00 101.52 123,851,960.00 242.64 M2 1,220,000.00 296,018,360.00 Tambah
2 PEMASANGAN ORNAMENT GRC KERAWANGAN DINDING KUBAH DALAM 93.20 M2 Suplemen B.4 1,240,678.00 115,631,189.60 93.20 115,631,189.60 - M2 1,240,678.00 - Hilang
JUMLAH 287,797,589.60 123,851,960.00 115,631,189.60 JUMLAH 296,018,360.00
VI PEKERJAAN LOGAM
1 ORNAMENT LOGAM KUNINGAN PADA PLAFOND 96.00 Bh Taksir 300,000.00 28,800,000.00 120.00 36,000,000.00 216.00 Bh 300,000.00 64,800,000.00 tambah
2 ORNAMENT LOGAM TEMBAGA PADA TIANG DAN RELUNG 10.00 M2 Suplemen C.1 5,000,000.00 50,000,000.00 0.52 2,600,000.00 9.48 M2 5,000,000.00 47,400,000.00 Hilang
3 KALIGRAFI ASMAUL HUSNA 99 buah 24.75 M2 Suplemen C.1 5,000,000.00 123,750,000.00 2.41 12,065,625.00 22.34 M2 5,000,000.00 111,684,375.00 Hilang
4 ORNAMENT LOGAM KUNINGAN PADA DINDING MIHRAB 7.30 M2 Suplemen C.1 5,000,000.00 36,500,000.00 0.87 4,350,000.00 6.43 M2 5,000,000.00 32,150,000.00 kurang
JUMLAH 239,050,000.00 36,000,000.00 19,015,625.00 JUMLAH 256,034,375.00
VII PEKERJAAN ELEKTRIKAL + MEKANIKAL
1 ARMARTUR
a Lampu LED 3 watt + fitting aksesories lengkap terpasang 36.00 Bh Taksir 65,000.00 2,340,000.00 2.00 130,000.00 38.00 Bh 65,000.00 2,470,000.00 tambah
b Lampu Down Light LED 3 warna 12 watt + fitting aksesories lengkap terpasang 30.00 Bh Taksir 140,000.00 4,200,000.00 20.00 2,800,000.00 10.00 Bh 140,000.00 1,400,000.00 kurang
c Lampu Down Light 14 Watt + fitting aksesories lengkap terpasang 72.00 Bh Taksir 75,000.00 5,400,000.00 72.00 5,400,000.00 - Bh 75,000.00 - hilang
d Lampu Down Light LED, 3 watt + fitting aksesories lengkap terpasang 130.00 Bh Taksir 85,000.00 11,050,000.00 130.00 11,050,000.00 - Bh 85,000.00 - hilang
e Lampu Baret (1 Bohlam) Emergency 18 Watt + fitting aksesories lengkap terpasang 29.00 Bh Taksir 200,000.00 5,800,000.00 29.00 5,800,000.00 - Bh 200,000.00 - hilang
2 Pemasangan Instalasi untuk Lampu gantung + kipas 19.00 Bh Taksir 2,000,000.00 38,000,000.00 1.00 2,000,000.00 18.00 Bh 2,000,000.00 36,000,000.00 Kurang
Instalasi titik penerangan, instalasi termasuk kabel NYA 2,5 mm dalam pipa PVC fitting
3 316.00 titik Taksir 130,000.00 41,080,000.00 222.00 28,860,000.00 94.00 titik 130,000.00 12,220,000.00 Kurang
lampu dan kelengkapan instalasi terpasang
4 Stop Kontak setara Panasonik 9.00 Bh Taksir 42,500.00 382,500.00 11.00 467,500.00 20.00 Bh 42,500.00 850,000.00 tambah
5 Saklar Ganda setara Panasonik 15.00 Bh Taksir 45,500.00 682,500.00 4.00 182,000.00 19.00 Bh 45,500.00 864,500.00 Tambah
6 Pemasangan instalasi kabel baru untuk sound 12.00 Bh Taksir 1,500,000.00 18,000,000.00 - - 12.00 Bh 1,500,000.00 18,000,000.00 tetap

7 Pembenahan Kabel Listrik Luar Masjid dan istalasi 1.00 Ls Taksir 25,000,000.00 25,000,000.00 1.00 25,000,000.00 - Ls 25,000,000.00 - hilang

JUMLAH 151,935,000.00 779,500.00 80,910,000.00 JUMLAH 71,804,500.00


VIII PEKERJAAN LAIN LAIN
1 PEKERJAAN RESINE + FIBER ATAP DAK 1028.72 M2 Taksir 280,000.00 288,041,600.00 468.22 131,102,482.00 - - 1,496.94 M2 280,000.00 419,144,082.00 Tambah
JUMLAH 288,041,600.00 131,102,482.00 - JUMLAH 419,144,082.00

JUMLAH TOTAL 2,756,089,102.05 342,074,634.50 798,013,694.57 2,300,150,035.98

JUMLAH 2,756,089,102.05 342,074,634.50 798,013,694.57 2,300,150,035.98


DIBULATKAN 2,756,080,000.00 342,074,000.00 798,013,000.00 2,300,100,000.00

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Fakhrulrazi S.T


Chief Inspector Kuasa Direktur
REKAPITULASI PERHITUNGAN MUTUAL CHECK AWAL (MC-0)
PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM
LOKASI : SABANG
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
No. KONTRAK : 640/27/SP-30.14/2017
TANGGAL : 13 SEPTEMBER 2017
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

KONTRAK AWAL PEKERJAAN TAMBAH PEKERJAAN KURANG ADD-I / MC-0


NO URAIAN PEKERJAAN
JUMLAH HARGA (Rp) BOBOT (%) JUMLAH HARGA (Rp) JUMLAH HARGA (Rp) JUMLAH HARGA (Rp) BOBOT (%)

I PEKERJAAN PERSIAPAN 112,000,000.00 4.06 - 24,000,000.00 88,000,000.00 3.83


II PEKERJAAN PEMASANGAN ORNAMEN GRC 1,065,641,499.75 38.66 7,611,412.50 213,660,514.38 859,592,397.88 37.37
III PEKERJAAN PEMASANGAN KUBAH GRC 267,633,362.70 9.71 - 241,561,115.59 26,072,247.11 1.13
IV PEKERJAAN DINDING TENGAH 343,990,050.00 12.48 42,729,280.00 103,235,250.00 283,484,080.00 12.32
V PEKERJAAN DINDING KUBAH DALAM 287,797,589.60 10.44 123,851,960.00 115,631,189.60 296,018,360.00 12.87
VI PEKERJAAN LOGAM 239,050,000.00 8.67 36,000,000.00 19,015,625.00 256,034,375.00 11.13
VII PEKERJAAN ELEKTRIKAL + MEKANIKAL 151,935,000.00 5.51 779,500.00 80,910,000.00 71,804,500.00 3.12
6 PEKERJAAN LAIN LAIN 288,041,600.00 10.45 131,102,482.00 - 419,144,082.00 18.22

JUMLAH HARGA 2,756,089,102.05 100.00 342,074,634.50 798,013,694.57 2,300,150,041.98 100.00

JUMLAH TOTAL 2,756,089,102.05 342,074,634.50 798,013,694.57 2,300,150,041.98


DIBULATKAN 2,756,080,000.00 342,074,000.00 798,013,000.00 2,300,150,000.00

Sabang, …… Oktober 2017


Diketahui Oleh, Mengetahui / Menyetujui, Diperiksa Oleh, Diajukan Oleh,
KUASA PENGGUNA ANGGARAN PEJABAT PELAKSANA TEKNIS KEGIATAN Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI
KOTA SABANG KOTA SABANG

MAHMUD, S.T MULKAN,ST.,MT ISWANDI Fakrurrazi


Nip. 19680210 1997 1 004 Nip. 19760130 200604 1 003 CHIEF INSPECTOR Kuasa Direktur
MUTUAL CHECK AWAL ( MC - 0 )
PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 13 SEPTEMBER 2017
NILAI KONTRAK Rp 2,829,215
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT
LOKASI SABANG
TAHUN ANGGARAN 2017

PEKERJAAN TAMBAH PEKERJAAN KURANG


Jumlah Harga Jumlah Harga
Volume Harga Satuan
Harga Satuan MC-0
No. Uraian Pekerjaan Volume Satuan Analisa Volume Jumlah Bertambah Volume Jumlah Berkurang MC- Sat Keterangan
( Rp. )
Bertambah (Rp.) Berkurang (Rp.) 0 ( Rp. )
( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir 10,000,000.00 10,000,000.00 - - - - 1.00 Ls 10,000,000.00 10,000,000.00 Tetap
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir 750,000.00 3,000,000.00 - - - - 4.00 SISI 750,000.00 3,000,000.00 Tetap
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir 3,000,000.00 24,000,000.00 - - 8.00 24,000,000.00 - SISI 3,000,000.00 - hapus
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir 30,000,000.00 30,000,000.00 - - - - 1.00 Ls 30,000,000.00 30,000,000.00 Tetap
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir 15,000,000.00 15,000,000.00 - - - - 1.00 Ls 15,000,000.00 15,000,000.00 Tetap
JUMLAH 112,000,000.00 - 24,000,000.00 JUMLAH 88,000,000.00
II PEKERJAAN PEMASANGAN ORNAMEN GRC
1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 154.67 M2 Suplemen B.1 1,549,250.00 239,622,498 - - 119.90 185,756,624.25 34.77 M2 1,549,250.00 53,865,873.25 Kurang
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 270.34 M2 Suplemen B.1 1,549,250.00 418,824,245 22.29 34,525,036.25 248.06 M2 1,549,250.00 384,299,208.75 Kurang
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 199.05 M2 Suplemen B.1 1,549,250.00 308,378,213 5.22 8,087,085.00 204.27 M2 1,549,250.00 316,465,297.50 Tambah
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 106.77 M2 Suplemen B.1 1,549,250.00 165,413,423 - - 4.35 6,731,491.25 102.43 M2 1,549,250.00 158,681,931.25 Kurang

JUMLAH 1,132,238,384 8,087,085.00 227,013,151.75 JUMLAH 913,312,310.75


III PEKERJAAN PEMASANGAN KUBAH GRC
1 PEMASANGAN ORNAMENT KUBAH DALAM GRC 172.70 M2 Suplemen B.2 1,549,701.00 267,633,362.70 155.88 241,561,115.59 16.82 M2 1,549,701.00 26,072,247.11 kurang

JUMLAH 267,633,363 - 241,561,115.59 JUMLAH 26,072,247.11


IV PEKERJAAN DINDING TENGAH
1 PEMASANGAN ORNAMENT GRC MASIV DINDING TENGAH 197.34 M2 Suplemen B.3 1,220,000.00 240,754,800.00 35.02 42,729,280.00 232.36 M2 1,220,000.00 283,484,080.00 Tambah
2 PEMASANGAN ORNAMENT GRC PLAFOD DINDING TENGAH 70.80 M2 Suplemen B.1 1,549,250.00 109,686,900.00 70.80 109,686,900.00 - M2 1,549,250.00 - Hilang
JUMLAH 350,441,700 42,729,280.00 109,686,900.00 JUMLAH 283,484,080.00
V PEKERJAAN DINDING KUBAH DALAM
1 PEMASANGAN ORNAMENT GRC MASIV DINDING KUBAH DALAM 141.12 M2 Suplemen B.3 1,220,000.00 172,166,400.00 101.52 123,851,960.00 242.64 M2 1,220,000.00 296,018,360.00 Tambah
2 PEMASANGAN ORNAMENT GRC KERAWANGAN DINDING KUBAH DALAM 93.20 M2 Suplemen B.4 1,240,678.00 115,631,189.60 93.20 115,631,189.60 - M2 1,240,678.00 - Hilang
JUMLAH 287,797,590 123,851,960.00 115,631,189.60 JUMLAH 296,018,360.00
VI PEKERJAAN LOGAM
1 ORNAMENT LOGAM KUNINGAN PADA PLAFOND 96.00 Bh Taksir 300,000.00 28,800,000.00 120.00 36,000,000.00 216.00 Bh 300,000.00 64,800,000.00 tambah
2 ORNAMENT LOGAM TEMBAGA PADA TIANG DAN RELUNG 10.00 M2 Suplemen C.1 5,000,000.00 50,000,000.00 0.52 2,600,000.00 9.48 M2 5,000,000.00 47,400,000.00 Hilang
3 KALIGRAFI ASMAUL HUSNA 99 buah 24.75 M2 Suplemen C.1 5,000,000.00 123,750,000.00 2.41 12,065,625.00 22.34 M2 5,000,000.00 111,684,375.00 Hilang
4 ORNAMENT LOGAM KUNINGAN PADA DINDING MIHRAB 7.30 M2 Suplemen C.1 5,000,000.00 36,500,000.00 0.87 4,350,000.00 6.43 M2 5,000,000.00 32,150,000.00 kurang
JUMLAH 239,050,000 36,000,000.00 19,015,625.00 JUMLAH 256,034,375.00
VII PEKERJAAN ELEKTRIKAL + MEKANIKAL
1 ARMARTUR
a Lampu LED 3 watt + fitting aksesories lengkap terpasang 36.00 Bh Taksir 65,000.00 2,340,000.00 2.00 130,000.00 38.00 Bh 65,000.00 2,470,000.00 tambah
b Lampu Down Light LED 3 warna 12 watt + fitting aksesories lengkap terpasang 30.00 Bh Taksir 140,000.00 4,200,000.00 20.00 2,800,000.00 10.00 Bh 140,000.00 1,400,000.00 kurang
c Lampu Down Light 14 Watt + fitting aksesories lengkap terpasang 72.00 Bh Taksir 75,000.00 5,400,000.00 72.00 5,400,000.00 - Bh 75,000.00 - hilang
d Lampu Down Light LED, 3 watt + fitting aksesories lengkap terpasang 130.00 Bh Taksir 85,000.00 11,050,000.00 130.00 11,050,000.00 - Bh 85,000.00 - hilang
e Lampu Baret (1 Bohlam) Emergency 18 Watt + fitting aksesories lengkap terpasang 29.00 Bh Taksir 200,000.00 5,800,000.00 29.00 5,800,000.00 - Bh 200,000.00 - hilang
2 Pemasangan Instalasi untuk Lampu gantung + kipas 19.00 Bh Taksir 2,000,000.00 38,000,000.00 1.00 2,000,000.00 18.00 Bh 2,000,000.00 36,000,000.00 Kurang
Instalasi titik penerangan, instalasi termasuk kabel NYA 2,5 mm dalam pipa PVC fitting
3 316.00 titik Taksir 130,000.00 41,080,000.00 222.00 28,860,000.00 94.00 titik 130,000.00 12,220,000.00 Kurang
lampu dan kelengkapan instalasi terpasang
4 Stop Kontak setara Panasonik 9.00 Bh Taksir 42,500.00 382,500.00 11.00 467,500.00 20.00 Bh 42,500.00 850,000.00 tambah
5 Saklar Ganda setara Panasonik 15.00 Bh Taksir 45,500.00 682,500.00 4.00 182,000.00 19.00 Bh 45,500.00 864,500.00 Tambah
6 Pemasangan instalasi kabel baru untuk sound 12.00 Bh Taksir 1,500,000.00 18,000,000.00 - - 12.00 Bh 1,500,000.00 18,000,000.00 tetap

7 Pembenahan Kabel Listrik Luar Masjid dan istalasi 1.00 Ls Taksir 25,000,000.00 25,000,000.00 1.00 25,000,000.00 - Ls 25,000,000.00 - hilang

JUMLAH 151,935,000 779,500.00 80,910,000.00 JUMLAH 71,804,500.00


VIII PEKERJAAN LAIN LAIN
1 PEKERJAAN RESINE + FIBER ATAP DAK 1028.72 M2 Taksir 280,000.00 288,041,600.00 468.22 131,102,482.00 - - 1,496.94 M2 280,000.00 419,144,082.00 Tambah
JUMLAH 288,041,600 131,102,482.00 - JUMLAH 419,144,082.00

JUMLAH TOTAL 2,829,137,636 342,550,307.00 817,817,981.94 2,353,869,954.86

JUMLAH 2,829,137,636 342,550,307.00 817,817,981.94 2,353,869,954.86


DIBULATKAN 2,829,130,000 342,550,000.00 817,817,000.00 2,353,800,000.00

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Fakhrulrazi S.T


Chief Inspector Kuasa Direktur
REKAPITULASI PERHITUNGAN MUTUAL CHECK AWAL (MC-0)
PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM
LOKASI : SABANG
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
No. KONTRAK : 640/27/SP-30.14/2017
TANGGAL : 13 SEPTEMBER 2017
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

KONTRAK AWAL PEKERJAAN TAMBAH PEKERJAAN KURANG ADD-I / MC-0


NO URAIAN PEKERJAAN
JUMLAH HARGA (Rp) BOBOT (%) JUMLAH HARGA (Rp) JUMLAH HARGA (Rp) JUMLAH HARGA (Rp) BOBOT (%)

I PEKERJAAN PERSIAPAN 112,000,000.00 3.96 - 24,000,000.00 88,000,000.00 3.74


II PEKERJAAN PEMASANGAN ORNAMEN GRC 1,132,238,377.50 40.02 8,087,085.00 227,013,151.75 913,312,310.75 38.80
III PEKERJAAN PEMASANGAN KUBAH GRC 267,633,362.70 9.46 - 241,561,115.59 26,072,247.11 1.11
IV PEKERJAAN DINDING TENGAH 350,441,700.00 12.39 42,729,280.00 109,686,900.00 283,484,080.00 12.04
V PEKERJAAN DINDING KUBAH DALAM 287,797,589.60 10.17 123,851,960.00 115,631,189.60 296,018,360.00 12.58
VI PEKERJAAN LOGAM 239,050,000.00 8.45 36,000,000.00 19,015,625.00 256,034,375.00 10.88
VII PEKERJAAN ELEKTRIKAL + MEKANIKAL 151,935,000.00 5.37 779,500.00 80,910,000.00 71,804,500.00 3.05
VIII PEKERJAAN LAIN LAIN 288,041,600.00 10.18 131,102,482.00 - 419,144,082.00 17.81

JUMLAH HARGA 2,829,137,629.80 100.00 342,550,307.00 817,817,981.94 2,353,869,954.86 100.00

JUMLAH TOTAL 2,829,137,629.80 342,550,307.00 817,817,981.94 2,353,869,954.86


DIBULATKAN 2,829,130,000.00 342,550,000.00 817,817,000.00 2,353,869,000.00

Sabang, …… Oktober 2017


Diketahui Oleh, Mengetahui / Menyetujui, Diperiksa Oleh, Diajukan Oleh,
KUASA PENGGUNA ANGGARAN PEJABAT PELAKSANA TEKNIS KEGIATAN Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI
KOTA SABANG KOTA SABANG

MAHMUD, S.T MULKAN,ST.,MT ISWANDI Fakrurrazi


Nip. 19680210 1997 1 004 Nip. 19760130 200604 1 003 CHIEF INSPECTOR Kuasa Direktur
BILL OF QUANTITY
PEKERJAAN PENINGKATAN MESJID AGUNG BABUSSALAM
KOTA SABANG

NO URAIAN PEKERJAAN VOLUME ANALISA HARGA SATUAN

I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 Ls Taksir Rp 10,000,000
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 SISI Taksir Rp 750,000
3 PEMBONGKARAN DINDING BETON 8.00 SISI Taksir Rp 3,000,000
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 Ls Taksir Rp 30,000,000
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 Ls Taksir Rp 15,000,000
6 PEMBUATAN WORKSHOP DILOKASI 1.00 Ls Taksir Rp 15,000,000
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 Ls Taksir Rp 15,000,000

II PEKERJAAN PEMASANGAN ORNAMEN GRC


1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 154.67 M2 Suplemen B.1 Rp 1,549,250
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 270.34 M2 Suplemen B.1 Rp 1,549,250
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 199.05 M2 Suplemen B.1 Rp 1,549,250
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 106.77 M2 Suplemen B.1 Rp 1,549,250

III PEKERJAAN PEMASANGAN KUBAH GRC


1 PEMASANGAN ORNAMENT KUBAH DALAM GRC 172.70 M2 Suplemen B.2 Rp 1,549,701

IV PEKERJAAN DINDING TENGAH


1 PEMASANGAN ORNAMENT GRC MASIV DINDING TENGAH 197.34 M2 Suplemen B.3 Rp 1,220,000
2 PEMASANGAN ORNAMENT GRC PLAFOD DINDING TENGAH 70.80 M2 Suplemen B.1 Rp 1,549,250

V PEKERJAAN DINDING KUBAH DALAM


1 PEMASANGAN ORNAMENT GRC MASIV DINDING KUBAH DALAM 141.12 M2 Suplemen B.3 Rp 1,220,000
2 PEMASANGAN ORNAMENT GRC KERAWANGAN DINDING KUBAH DALAM 93.20 M2 Suplemen B.4 Rp 1,240,678

VI PEKERJAAN LOGAM
1 ORNAMENT LOGAM KUNINGAN PADA PLAFOND 96 Bh Taksir Rp 300,000
2 ORNAMENT LOGAM TEMBAGA PADA TIANG DAN RELUNG 10 M2 Suplemen C.1 Rp 5,000,000
3 KALIGRAFI ASMAUL HUSNA 99 buah 24.75 M2 Suplemen C.1 Rp 5,000,000
4 ORNAMENT LOGAM KUNINGAN PADA DINDING MIHRAB 7.3 M2 Suplemen C.1 Rp 5,000,000

VII PEKERJAAN ELEKTRIKAL + MEKANIKAL


1 ARMARTUR
a Lampu LED 3 watt + fitting aksesories lengkap terpasang 36 Bh Taksir Rp 65,000
b Lampu Down Light LED 3 warna 12 watt + fitting aksesories lengkap terpasang 30 Bh Taksir Rp 140,000
c Lampu Down Light 14 Watt + fitting aksesories lengkap terpasang 72 Bh Taksir Rp 75,000
d Lampu Down Light LED, 3 watt + fitting aksesories lengkap terpasang 130 Bh Taksir Rp 85,000
e Lampu Baret (1 Bohlam) Emergency 18 Watt + fitting aksesories lengkap terpas 29 Bh Taksir Rp 200,000
2 Pemasangan Instalasi untuk Lampu gantung + kipas 19 Bh Taksir Rp 2,000,000
3 Instalasi titik penerangan, instalasi termasuk kabel NYA 2,5 mm dalam pipa PVC 316 titik Taksir Rp 130,000
4 Stop Kontak setara Panasonik 9 Bh Taksir Rp 42,500
5 Saklar Ganda setara Panasonik 15 Bh Taksir Rp 45,500
6 Pemasangan instalasi kabel baru untuk sound 12 Bh Taksir Rp 1,500,000
7 Pembenahan Kabel Listrik Luar Masjid dan istalasi 1.00 Ls Taksir Rp 25,000,000

VIII PEKERJAAN LAIN LAIN


1 PEKERJAAN RESINE + FIBER ATAP DAK 1028.72 M2 Taksir Rp 280,000

REKAPITULASI TOTAL BIAYA


I PEKERJAAN PERSIAPAN
II PEKERJAAN PEMASANGAN ORNAMEN GRC
III PEKERJAAN PEMASANGAN KUBAH GRC
IV PEKERJAAN DINDING TENGAH
V PEKERJAAN DINDING KUBAH DALAM
VI PEKERJAAN LOGAM
VII PEKERJAAN ELEKTRIKAL + MEKANIKAL
VIII PEKERJAAN LAIN LAIN
TOTAL
DIBULATKAN
Terbilang :
#REF!
TOTAL HARGA

Rp 10,000,000
Rp 3,000,000
Rp 24,000,000
Rp 30,000,000
Rp 15,000,000
Rp 15,000,000
Rp 15,000,000
Rp 112,000,000

Rp 239,622,498
Rp 418,824,245
Rp 308,378,213
Rp 165,413,423
Rp 1,132,238,378

Rp 267,633,363
Rp 267,633,363

Rp 240,754,800
Rp 109,686,900
Rp 350,441,700

Rp 172,166,400
Rp 115,631,190
Rp 287,797,590

Rp 28,800,000
Rp 50,000,000
Rp 123,750,000
Rp 36,500,000
Rp 239,050,000

Rp 2,340,000
Rp 4,200,000
Rp 5,400,000
Rp 11,050,000
Rp 5,800,000
Rp 38,000,000
Rp 41,080,000
Rp 382,500
Rp 682,500
Rp 18,000,000
Rp 25,000,000
Rp 151,935,000

Rp 288,041,600
Rp 288,041,600

112,000,000
1,132,238,378
267,633,363
350,441,700
287,797,590
239,050,000
151,935,000
288,041,600
2,829,137,630
2,829,137,000
COVER

BACK UP DATA

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jl. T. Panglima Polem Sabang Telp. (0652) 21308

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : I. PEKERJAAN PERSIAPAN
Item Pembayaran :-

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 PEMBONGKARAN PLAFOND LAMA Taksir Ls 1.00 1.00

2 PEMBONGKARAN DINDING TRIPLEK Taksir SISI 4.00 4.00


DINDING TENGAH

3 PEMBONGKARAN DINDING BETON Taksir SISI - -

4 PENYEWAAN SCAFFOLDING ATAU Taksir Ls 1.00 1.00


PERANCAH

5 PEMASANGAN TIRAI VINIL PENUTUP Taksir Ls 1.00 1.00


LOKASI KERJA
6 PEMBUATAN WORKSHOP DILOKASI Taksir Ls 1.00 1.00
7 PENYEWAAN LISTRIK UNTUK KERJA Taksir Ls 1.00 1.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 1. PEMASANGAN ORNAMENT GRC PLAFOND BLOK A

Panjang Lebar Tinggi


No. Uraian Pekerjaan Rumus sisi Sat Volume MC-0 Volume Ket
(m) (m) (m) Kontrak

1 PEMASANGAN ORNAMENT GRC


PLAFOND BLOK A
Pias 1 PxL 0.48 17.80 - 2.00 M2 17.09

Pias 2 PxL 4.30 0.50 - 2.00 M2 4.30

Pias 3 PxL 4.30 0.40 - 4.00 M2 6.88

Pias 4 PxL 5.25 0.33 - 2.00 M2 3.47

Pias 5 PxL 4.60 0.33 - 2.00 M3 3.04

Total A1 M2 34.77

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 2.PEMASANGAN ORNAMENT GRC PLAFOND BLOK B

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 PEMASANGAN ORNAMENT GRC


PLAFOND BLOK B
Ruas 1 PxL 28.05 3.15 - 2.00 M2 176.72

Ruas 2 PxL 20.40 2.25 - 2.00 M2 91.80

Total A1 M2 268.52

FIBER 3D Skect Up = 3,41 3.41 6.00 M2 20.46

Total A2 M2 20.46

Total A1 - Total A2 M2 248.06

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 3. PEMASANGAN ORNAMENT GRC PLAFOND BLOK C

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat MC-0 Kontrak Ket
(m) (m) (m)

PEMASANGAN ORNAMENT GRC


1 PLAFOND BLOK C

Ruas C PxL 17.10 17.10 - - M2 292.41

Total A1 M2 292.41

Kubah pias 1 4.60 - - M2 74.50

FIBER 3.41 4.00 M2 13.64

Total A2 M2 74.50

Total A1 - Total A2 M2 204.27

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 4. PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 PEMASANGAN ORNAMENT GRC


PLAFOND BLOK TERAS

Ruas T1 + T2

Pias 1 PxL 3.28 1.90 - 2.00 M2 12.46


Pias 2 PxL 4.28 1.65 - 2.00 M2 14.12
Pias 3 PxL 1.58 1.65 - 2.00 M2 10.43
Pias 4 PxL 4.20 1.65 - 2.00 M2 13.86
Pias 5 PxL 3.28 1.90 - 2.00 M2 12.46
Pias 6 PxL 4.15 1.40 - 2.00 M2 11.62
Ruas T3 PxL 15.15 1.50 - 1.00 M2 22.73
PxL 1.58 1.50 - 2.00 M3 4.74
Total M2 102.43

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 5. PEMASANGAN ORNAMENT FIBER PLAFOND BLOK A

Panjang Lebar Tinggi Volume MC- Volume Kontrak


No. Uraian Pekerjaan Rumus sisi Sat Ket
(m) (m) (m) 0

1 PEMASANGAN ORNAMENT FIBER


PLAFOND BLOK A
Pias 1 PxL 4.30 4.30 - 3.00 M2 55.47

Pias 2 PxL 4.30 1.15 - 2.00 M2 9.89

Pias 3 PxL 4.60 4.60 - 2.00 M2 42.32

Total A1 M2 107.68

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 6.Less Gypsum Plafond A

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 Less Gypsum Plafond A

Ruas 1 Sx4 5.25 - 2.00 M1 42.00

Total A1 M2 42.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 7. PEMASANGAN ORNAMENT FIBER PLAFOND BLOK B

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 PEMASANGAN ORNAMENT FIBER


PLAFOND BLOK B
Fiber 3D Skect up 3.41 6.00 M2 20.46

Total M2 20.46

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 8.Less Gypsum Plafond B

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 8.Less Gypsum Plafond B

Ruas 1 28.30 - M1 28.30

3.15 - - M1 3.15

2.25 M1 2.25

2.40 M1 2.40

20.40 M1 20.40

2.25 M1 2.25

3.15 M1 3.15

5.50 M1 5.50

Total M1 67.40

2x sisi M1 134.80

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 9. PEMASANGAN ORNAMENT FIBER PLAFOND BLOK C

Panjang sisi Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) MC-0 Kontrak

PEMASANGAN ORNAMENT FIBER


1 PLAFOND BLOK C

Fiber 3D Skect up 3.41 4.00 M2 13.64

total M2 13.64

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 10. Less Gypsum Plafond C

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 Less Gypsum Plafond C

Ruas 1 Sx4 17.10 - M1 68.40

Ruas 2 Sx4 4.60 - M2 18.40

Ruas 3 Sx4 3.28 - M3 13.12

Total M1 99.92

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : II. PEKERJAAN PEMASANGAN ORNAMEN GRC
Item Pembayaran : 11. Less Gypsum Plafond Teras

Panjang sisi Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) MC-0 Kontrak

1 Less Gypsum Plafond Teras

Ruas T1 + T2 17.34 2.00 - M1 34.68

1.90 2.00 - M1 3.80

4.15 2.00 M1 8.30

1.40 2.00 M1 2.80

total sisi M1 49.58

total Ruas T1 + T2 99.16

Ruas T3 7.45 2.00 - M1 14.90

1.50 2.00 M1 3.00

Total Ruas T3 M1 17.90

Total M1 117.06

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : III.PEKERJAAN PEMASANGAN KUBAH GRC
Item Pembayaran : 1. PEMASANGAN ORNAMENT KUBAH DALAM GRC

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 PEMASANGAN
DALAM GRC
ORNAMENT KUBAH

PIAS 1 =(A+B)/2 X T 19.56 M2 39.13

A 9.39

B 3.11

T 3.13

PIAS 2 pXl 9.39 3.11 M2 29.20

TOTAL A M2 68.33

Lingkaran 1/4 x D X D 51.50

D 8.10

TOTAL A M2 51.50

TOTAL A-B M2 16.82

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : III.PEKERJAAN PEMASANGAN KUBAH GRC
Item Pembayaran : 2. PEMASANGAN ORNAMENT KUBAH DALAM FIBER

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

PEMASANGAN ORNAMENT KUBAH


2 DALAM FIBER

RUAS ( 22/7 x r2) X 2 64.45 64.45 3D


M2 SKECT UP

Total M2 64.45

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : IV. PEKERJAAN DINDING TENGAH
Item Pembayaran : 1. PEMASANGAN ORNAMENT GRC MASIV DINDING TENGAH

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat MC-0 Kontrak Ket
(m) (m) (m)

PEMASANGAN ORNAMENT GRC


1 MASIV DINDING TENGAH

Ruas Dalam

Masicv Dinding Tengah PxL 18.70 2.75 - 4.00 M2 205.70

Total A1 M2 205.70

Plafond PxL 18.70 - 0.68 4.00 M2 50.86

Total 256.56

Gas Box PxL 1.10 1.10 - 20.00 M2 24.20

Total (A2) M2 24.20

Jumlah Total 232.36

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : IV. PEKERJAAN DINDING TENGAH
Item Pembayaran : 2. PEMASANGAN ORNAMENT GRC PLAFOD DINDING TENGAH

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 PEMASANGAN ORNAMENT GRC


PLAFOD DINDING TENGAH
Ruas A1 PxL 18.70 - 0.62 4.00 M2 46.38

Total M2 46.38

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : V.PEKERJAAN DINDING KUBAH DALAM
Item Pembayaran : 1. PEMASANGAN ORNAMENT GRC MASIV DINDING KUBAH DALAM

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat MC-0 Kontrak Ket
(m) (m) (m)

1. PEMASANGAN ORNAMENT GRC


1 MASIV DINDING KUBAH DALAM

Ruas Dalam

Pias 1 PxL 1.20 4.43 - 4.00 M2 21.26

Pias2 PxL 1.70 4.43 - 4.00 M2 30.12

Pias 3 PxL 1.20 3.11 - 4.00 M2 14.93

Pias 4 PxL 1.70 3.11 - 4.00 M2 21.15

1/2 x A + t A t

Pias 5 2.22 1.25 4.00 M2 5.54

Pias 6 2.22 1.25 4.00 M2 5.54

Pias 7 1.56 1.25 4.00 M2 3.89

Pias 8 1.56 1.25 4.00 M2 3.89

Ruas Luar

Pias 1 PxL 2.00 4.60 - 4.00 M2 36.80

Pias2 PxL 1.70 4.60 - 4.00 M2 31.28

Pias 3 PxL 2.00 3.28 - 4.00 M2 26.24

Pias 4 PxL 1.70 3.28 - 4.00 M2 22.30

1/2 x A + t A t

Pias 5 2.30 1.25 4.00 M2 5.75

Pias 6 2.30 1.25 4.00 M2 5.75

Pias 7 1.64 1.25 4.00 M2 4.10

Pias 8 1.64 1.25 4.00 M2 4.10

Total 242.64
GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : V.PEKERJAAN DINDING KUBAH DALAM
Item Pembayaran : 2. PEMASANGAN ORNAMENT GRC KERAWANGAN DINDING KUBAH DALAM

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak
PEMASANGAN ORNAMENT GRC
1 KERAWANGAN DINDING KUBAH
DALAM

Dihilangkan dan dipindahkan Ke GRC Masiv Dinding


Kubah Dalam

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VI. PEKERJAAN LOGAM
Item Pembayaran : 1. ORNAMENT LOGAM KUNINGAN PADA PLAFOND

Jumlah Volume Volume


No. Uraian Pekerjaan Rumus Sisi Sat Ket
(Bh) MC-0 Kontrak

1 ORNAMENT LOGAM KUNINGAN PADA


PLAFOND
Pias 1 Taksir 36.00 4 Bh 144

Pias 2 Taksir 36.00 2 Bh 72

Total Bh 216.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VI. PEKERJAAN LOGAM
Item Pembayaran : 2. ORNAMENT LOGAM TEMBAGA PADA TIANG DAN RELUNG

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 ORNAMENT LOGAM TEMBAGA PADA


TIANG DAN RELUNG
Ruas M2 9.48

Tinggi 0.60 -

atas 2.20 -

bawah 1.75

tiang 8.00 Total 9.48

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VI. PEKERJAAN LOGAM
Item Pembayaran : 3. KALIGRAFI ASMAUL HUSNA 99 buah

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 KALIGRAFI ASMAUL HUSNA 99 buah

Pias 1 PxL 0.475 0.475 - 99.00 M2 22.34

Total 22.34

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VI. PEKERJAAN LOGAM
Item Pembayaran : IV. ORNAMENT LOGAM KUNINGAN PADA DINDING MIHRAB

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 ORNAMENT LOGAM KUNINGAN PADA


DINDING MIHRAB

Pias 1 M2 6.43 3D Skect


Up

Pias 2

Total M2 6.43

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VI. PEKERJAAN LOGAM
Item Pembayaran : V. PELAPIS GRC BINGKAI KALIGRAFI DINDING

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

V PELAPIS GRC BINGKAI KALIGRAFI


DINDING
Pias 1 PxL 0.60 4.60 4.00 M2 11.04

Pias 2 PxL 0.60 3.28 4.00 M2 7.87

Total M2 18.91

GAMBAR KERJA

4.60 3.28

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VI. PEKERJAAN LOGAM
Item Pembayaran : VI. PELAPIS GRC BINGKAI ASMAUL HUSNA

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

VI PELAPIS GRC BINGKAI ASMAUL


HUSNA
Pias 1 PxL 0.60 0.60 99.00 M2 35.64

Total M2 35.64

GAMBAR KERJA

0.6

0.60

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 2. Pemasangan Instalasi untuk Lampu gantung + kipas

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 Pemasangan Instalasi untuk Lampu gantung +


kipas

TAKSIR 18.00 bh 18.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL

Item Pembayaran : 3. Instalasi titik penerangan, instalasi termasuk kabel NYA 2,5 mm dalam pipa PVC fitting lampu dan
kelengkapan instalasi terpasang

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 Instalasi titik penerangan, instalasi termasuk


kabel NYA 2,5 mm dalam pipa PVC fitting lampu
dan kelengkapan instalasi terpasang

TAKSIR 94.00 titik 94.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 4. Stop Kontak setara Panasonik

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 Stop Kontak setara Panasonik

TAKSIR 20.00 BH 20.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 5. Saklar Ganda setara Panasonik

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 Saklar Ganda setara Panasonik

TAKSIR 19.00 Bh 19.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 6. Pemasangan instalasi kabel baru untuk sound

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 Pemasangan instalasi kabel baru untuk sound

TAKSIR 12.00 Bh 12.00

12.00

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : VII. PEKERJAAN ELEKTRIKAL + MEKANIKAL
Item Pembayaran : 7. Pembenahan Kabel Listrik Luar Masjid dan istalasi

Panjang Lebar Tinggi Volume Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) MC-0 Kontrak

1 Pembenahan Kabel Listrik Luar Masjid dan istalasi

TAKSIR - - - - Ls -

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LAIN LAIN
Item Pembayaran : PEKERJAAN RESINE + FIBER ATAP DAK

Panjang Lebar Tinggi Volume MC- Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) 0 Kontrak

1 PEKERJAAN RESINE + FIBER ATAP DAK

Ruas lantai Bawah (A) Taksir


Pias 1 P xL 26.90 35.10 M2 944.19
Pias 2 P xL 22.30 4.00 M2 89.20
Pias 3 P xL 37.90 3.70 M2 140.23
Pias 4 P xL 35.10 4.00 M2 140.40
Pias 5 P xL 22.30 4.00 M2 89.20
Total A 1,403.22
Ruas B Taksir 19.00 19.00 M2 361.00
Taksir 2.50 1.80 3.00 M2 13.50
Total B 374.50

Total A- Total B 1,028.72

Ruas lantai Atas (A) Taksir


Pias a P xL 17.17 17.17 M2 294.81
pias D P xL 0.40 18.85 4.00 M2 30.16
Pias C P xL 1.10 17.17 4.00 M2 75.55
Pias B 2 x phi x r x (r + t) r= 3,75 t =l M2 111.86
Total A 512.38

Ruas B( luas kubah) phi x r x r r =3,75 M2 44.16


Total B 44.16

Total A- Total B 468.22

Total 1,496.94

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI
Iswandi Nazirruddin., SST., M.T
Chief Inspector Site Manager
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jln. P. Nyak Makam No. 23 Banda Aceh Tlp. (0651) 7555136

PEKERJAAN : PENINGKATAN MESJID AGUNG BABUSSALAM


NOMOR KONTRAK : 640/27/SP-30.14/2017
TANGGAL KONTRAK : 22 Mei 2017
KONTRAKTOR PELAKSANA : PT. TRAYA ANGGUN PERMAI
KONSULTAN PENGAWAS : CV. TARGET CONSULTANT

BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN LAIN LAIN
Item Pembayaran : PEKERJAAN PENGECATAN

Panjang Lebar Tinggi Volume MC- Volume


No. Uraian Pekerjaan Rumus Unit Sat Ket
(m) (m) (m) 0 Kontrak

1 PEKERJAAN PENGECATAN

Dinding Taksir 17.10 0.60 - 4.00 M2 41.04

Total M3 41.04

Box Asmaul Husna 0.60 0.60 0.36

Total 0.36

Total A1- Total A2 40.68

GAMBAR KERJA

Diperiksa Oleh, Diajukan Oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. TARGET CONSULTANT PT. TRAYA ANGGUN PERMAI

Iswandi Nazirruddin., SST., M.T


Chief Inspector Site Manager
DAFTAR QUANTITAS DAN HARGA

Pekerjaan : : PENINGKATAN MESJID AGUNG BABUSSALAM


Lokasi : SABANG
Tahun Anggaran : 2017

HARGA JUMLAH JUMLAH


VOLUME
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA AWAL HARGA MC- 0
MC-0
(Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7 8

I PEKERJAAN PERSIAPAN
1 PEMBONGKARAN PLAFOND LAMA 1.00 1.00 Ls Taksir 10,000,000.00 10,000,000.00 10,000,000.00
2 PEMBONGKARAN DINDING TRIPLEK DINDING TENGAH 4.00 4.00 SISI Taksir 750,000.00 3,000,000.00 3,000,000.00
3 PEMBONGKARAN DINDING BETON 0.00 8.00 SISI Taksir 3,000,000.00 24,000,000.00 -
4 PENYEWAAN SCAFFOLDING ATAU PERANCAH 1.00 1.00 Ls Taksir 30,000,000.00 30,000,000.00 30,000,000.00
5 PEMASANGAN TIRAI VINIL PENUTUP LOKASI KERJA 1.00 1.00 Ls Taksir 15,000,000.00 15,000,000.00 15,000,000.00
6 PEMBUATAN WORKSHOP DILOKASI 1.00 1.00 Ls Taksir 15,000,000.00 15,000,000.00 15,000,000.00
7 PENYEWAAN LISTRIK UNTUK KERJA 1.00 1.00 Ls Taksir 15,000,000.00 15,000,000.00 15,000,000.00

JUMLAH 112,000,000.00 88,000,000.00


II PEKERJAAN PEMASANGAN ORNAMEN GRC
1 PEMASANGAN ORNAMENT GRC PLAFOND BLOK A 34.77 154.67 M2 Suplemen B.1 1,549,250.00 239,622,497.50 53,865,873.25
2 PEMASANGAN ORNAMENT GRC PLAFOND BLOK B 268.52 270.34 M2 Suplemen B.1 1,549,250.00 418,824,245.00 415,996,863.75
3 PEMASANGAN ORNAMENT GRC PLAFOND BLOK C 204.27 199.05 M2 Suplemen B.1 1,549,250.00 308,378,212.50 316,465,297.50
4 PEMASANGAN ORNAMENT GRC PLAFOND BLOK TERAS 102.43 106.77 M2 Suplemen B.1 1,549,250.00 165,413,422.50 158,681,931.25
#REF! #REF! #REF! 0.00 M2 Suplemen B.1 1,549,250.00 - #REF!

JUMLAH 1,132,238,377.50 945,009,965.75


III PEKERJAAN PEMASANGAN KUBAH GRC
1 PEMASANGAN ORNAMENT KUBAH DALAM GRC 51.50 172.70 M2 Suplemen B.2 1,549,701.00 267,633,362.70 79,815,567.85
2 PEMASANGAN ORNAMENT KUBAH DALAM FIBER 0.00 0.00 Suplemen B.2 1,549,701.00 - -

JUMLAH 267,633,362.70 79,815,567.85


IV PEKERJAAN DINDING TENGAH
1 PEMASANGAN ORNAMENT GRC MASIV DINDING TENGAH #REF! 197.34 M2 Suplemen B.3 1,220,000.00 240,754,800.00 #REF!
2 PEMASANGAN ORNAMENT GRC PLAFOD DINDING TENGAH 46.38 70.80 M2 Suplemen B.1 1,549,250.00 109,686,900.00 71,848,018.00

JUMLAH 350,441,700.00 #REF!


V PEKERJAAN DINDING KUBAH DALAM
1 PEMASANGAN ORNAMENT GRC MASIV DINDING KUBAH DALAM 0.00 141.12 M2 Suplemen B.3 1,220,000.00 172,166,400.00 -
2 PEMASANGAN ORNAMENT GRC KERAWANGAN DINDING KUBAH DALAM 0.00 93.20 M2 Suplemen B.4 1,240,678.00 115,631,189.60 -

JUMLAH 287,797,589.60 -
VI PEKERJAAN LOGAM
1 ORNAMENT LOGAM KUNINGAN PADA PLAFOND 216.00 96.00 Bh Taksir 300,000.00 28,800,000.00 64,800,000.00
2 ORNAMENT LOGAM TEMBAGA PADA TIANG DAN RELUNG 9.48 10.00 M2 Suplemen C.1 5,000,000.00 50,000,000.00 47,400,000.00
3 KALIGRAFI ASMAUL HUSNA 99 buah 22.34 24.75 M2 Suplemen C.1 5,000,000.00 123,750,000.00 111,684,375.00
4 ORNAMENT LOGAM KUNINGAN PADA DINDING MIHRAB 6.43 7.30 M2 Suplemen C.1 5,000,000.00 36,500,000.00 32,150,000.00
5 PELAPIS GRC BINGKAI KALIGRAFI DINDING 18.91 0.00 M2 Suplemen B.3 1,220,000.00 - 23,072,640.00
6 PELAPIS GRC BINGKAI ASMAUL HUSNA 35.64 0.00 M2 Suplemen B.3 1,220,000.00 - 43,480,800.00
7

JUMLAH 239,050,000.00 322,587,815.00


VII PEKERJAAN ELEKTRIKAL + MEKANIKAL
1 ARMARTUR
a Lampu LED 3 watt + fitting aksesories lengkap terpasang 38.00 36.00 Bh Taksir 65,000.00 2,340,000.00 2,470,000.00
b Lampu Down Light LED 3 warna 12 watt + fitting aksesories lengkap terpasang 10.00 30.00 Bh Taksir 140,000.00 4,200,000.00 1,400,000.00
f Lampu Down Light 14 Watt + fitting aksesories lengkap terpasang 10.00 72.00 Bh Taksir 75,000.00 5,400,000.00 750,000.00
g Lampu Down Light LED, 3 watt + fitting aksesories lengkap terpasang 0.00 130.00 Bh Taksir 85,000.00 11,050,000.00 -
h Lampu Baret (1 Bohlam) Emergency 18 Watt + fitting aksesories lengkap terpasang 0.00 29.00 Bh Taksir 200,000.00 5,800,000.00 -
f Lampu LED Decorative 25 Watt + fitting aksesories lengkap terpasang 24.00 0.00 Bh Taksir 250,000.00 - 6,000,000.00
g Lampu Down Light LED, 45 watt + fitting aksesories lengkap terpasang 4.00 0.00 Bh Taksir 350,000.00 - 1,400,000.00
h Lampu Sorot 20 Watt + fitting aksesories lengkap terpasang 4.00 0.00 Bh Taksir 195,000.00 - 780,000.00
i Lampu Sorot 50 Watt + fitting aksesories lengkap terpasang 4.00 0.00 Bh Taksir 350,000.00 - 1,400,000.00
2 Pemasangan Instalasi untuk Lampu gantung + kipas 18.00 19.00 Bh Taksir 2,000,000.00 38,000,000.00 36,000,000.00
Instalasi titik penerangan, instalasi termasuk kabel NYA 2,5 mm dalam pipa PVC fitting lampu
3 94.00 316.00 titik Taksir 130,000.00 41,080,000.00 12,220,000.00
dan kelengkapan instalasi terpasang
4 Stop Kontak setara Panasonik 20.00 9.00 Bh Taksir 42,500.00 382,500.00 850,000.00
5 Saklar Ganda setara Panasonik 19.00 15.00 Bh Taksir 45,500.00 682,500.00 864,500.00
6 Pemasangan instalasi kabel baru untuk sound 12.00 Bh Taksir 1,500,000.00 18,000,000.00 -
7 Pembenahan Kabel Listrik Luar Masjid dan istalasi 0.00 1.00 Ls Taksir 25,000,000.00 25,000,000.00 -
JUMLAH 151,935,000.00 64,134,500.00
VIII PEKERJAAN LAIN LAIN
1 PEKERJAAN RESINE + FIBER ATAP DAK 1,028.72 M2 Taksir 280,000.00 288,041,600.00 -
2 PEKERJAAN PENGECATAN 40.68 0.00 0.00 Taksir 81,000.00 - 3,295,080.00

JUMLAH 288,041,600.00 3,295,080.00

2,829,137,629.80 #REF!

kelebihan uang #REF!