Boiler # 3: Maintenance Works ( 27.05.

2018 )

Boiler : Tube Joint Status Report


Date
Job Radiographic Testing Status
Specification/Identifi Tube Material Dia Thick.
Sl no

Joint No# Welder ID 1st 2nd PWHT Status


(mm) (mm)
cation Date Result Date Result
SH3 - INLET
1 B3-SH3-IN-38/2 X20CrMoV 1 2 1 31.8 6.3 J1 A 04/06/18 Acc. - - 15/06/18
2 B3-SH3-IN-38/2 X20CrMoV 1 2 1 31.8 6.3 J2 U 04/06/18 R.S 06/06/18 Acc. 15/06/18
3 B3-SH3-IN-39/2 X20CrMoV 1 2 1 31.8 6.3 J1 A 04/06/18 Acc. - - 15/06/18
4 B3-SH3-IN-39/2 X20CrMoV 1 2 1 31.8 6.3 J2 U 04/06/18 Acc. - - 15/06/18
5 B3-SH3-IN-40/2 X20CrMoV 1 2 1 31.8 6.3 J1 M 04/06/18 Acc. - - 15/06/18
6 B3-SH3-IN-40/2 X20CrMoV 1 2 1 31.8 6.3 J2 M 04/06/18 Acc. - - 15/06/18
7 B3-SH3-IN-41/2 X20CrMoV 1 2 1 31.8 6.3 J1 A 06/06/18 Acc. - - 15/06/18
8 B3-SH3-IN-41/2 X20CrMoV 1 2 1 31.8 6.3 J2 K 06/06/18 Acc. - - 15/06/18
9 B3-SH3-IN-42/2 X20CrMoV 1 2 1 31.8 6.3 J1 K 06/06/18 Acc. - - 15/06/18
10 B3-SH3-IN-42/2 X20CrMoV 1 2 1 31.8 6.3 J2 K 06/06/18 Acc. - - 15/06/18
11 B3-SH3-IN-49/2 X20CrMoV 1 2 1 31.8 6.3 J1 K 10/06/18 Acc. - - 15/06/18
12 B3-SH3-IN-49/2 X20CrMoV 1 2 1 31.8 6.3 J2 A 10/06/18 R.S - - 15/06/18
13 B3-SH3-IN-50/2 X20CrMoV 1 2 1 31.8 6.3 J1 U 10/06/18 Acc. - - 16/06/18
14 B3-SH3-IN-50/2 X20CrMoV 1 2 1 31.8 6.3 J2 A 10/06/18 Acc. - - 16/06/18
15 B3-SH3-IN-51/2 X20CrMoV 1 2 1 31.8 6.3 J1 K 10/06/18 Acc. - - 16/06/18
16 B3-SH3-IN-51/2 X20CrMoV 1 2 1 31.8 6.3 J2 M 10/06/18 Acc. - - 16/06/18
17 B3-SH3-IN-52/2 X20CrMoV 1 2 1 31.8 6.3 J1 K 10/06/18 Acc. - - 16/06/18
18 B3-SH3-IN-52/2 X20CrMoV 1 2 1 31.8 6.3 J2 K 10/06/18 R.S 12/06/18 Acc. 16/06/18
19 B3-SH3-IN-53/2 X20CrMoV 1 2 1 31.8 6.3 J1 K 10/06/18 Acc. - - 16/06/18
20 B3-SH3-IN-53/2 X20CrMoV 1 2 1 31.8 6.3 J2 K 10/06/18 R.S - - 16/06/18
21 B3-SH3-IN-45/2 X20CrMoV 1 2 1 31.8 6.3 J1 A 13/06/18 Acc. - - 15/06/18
22 B3-SH3-IN-45/2 X20CrMoV 1 2 1 31.8 6.3 J2 K 12/06/18 Acc. - - 15/06/18
23 B3-SH3-IN-46/2 X20CrMoV 1 2 1 31.8 6.3 J1 U 12/06/18 Acc. - - 15/06/18
24 B3-SH3-IN-46/2 X20CrMoV 1 2 1 31.8 6.3 J2 K 12/06/18 Acc. - - 15/06/18
25 B3-SH3-IN-47/2 X20CrMoV 1 2 1 31.8 6.3 J1 U 12/06/18 Acc. - - 15/06/18
26 B3-SH3-IN-47/2 X20CrMoV 1 2 1 31.8 6.3 J2 A 12/06/18 Acc. - - 15/06/18
Al-Dhow Engineering Boiler : Tube Welding Summary 1 / 10
27 B3-SH3-IN-38/1 X20CrMoV 1 2 1 31.8 6.3 J1 A 12/06/18 Acc. - - 17/06/18
28 B3-SH3-IN-38/1 X20CrMoV 1 2 1 31.8 6.3 J2 A 13/06/18 Acc. - - 17/06/18
29 B3-SH3-IN-39/1 X20CrMoV 1 2 1 31.8 6.3 J1 A 12/06/18 Acc. - - 17/06/18
30 B3-SH3-IN-39/1 X20CrMoV 1 2 1 31.8 6.3 J2 A 13/06/18 Acc. - - 17/06/18
31 B3-SH3-IN-40/1 X20CrMoV 1 2 1 31.8 6.3 J1 K 12/06/18 Acc. - - 17/06/18
32 B3-SH3-IN-40/1 X20CrMoV 1 2 1 31.8 6.3 J2 A 13/06/18 Acc. - - 17/06/18
33 B3-SH3-IN-41/1 X20CrMoV 1 2 1 31.8 6.3 J1 K 12/06/18 Acc. - - 17/06/18
34 B3-SH3-IN-41/1 X20CrMoV 1 2 1 31.8 6.3 J2 K 12/06/18 Acc. - - 17/06/18
35 B3-SH3-IN-42/1 X20CrMoV 1 2 1 31.8 6.3 J1 A 10/06/18 Acc. - - 17/06/18
36 B3-SH3-IN-42/1 X20CrMoV 1 2 1 31.8 6.3 J2 A 10/06/18 Acc. - - 17/06/18
37 B3-SH3-IN-49/1 X20CrMoV 1 2 1 31.8 6.3 J1 U 12/06/18 Acc. - - 16/06/18
38 B3-SH3-IN-49/1 X20CrMoV 1 2 1 31.8 6.3 J2 M 13/06/18 Acc. - - 16/06/18
39 B3-SH3-IN-50/1 X20CrMoV 1 2 1 31.8 6.3 J1 U 13/06/18 Acc. - - 16/06/18
40 B3-SH3-IN-50/1 X20CrMoV 1 2 1 31.8 6.3 J2 K 13/06/18 Acc. - - 16/06/18
41 B3-SH3-IN-51/1 X20CrMoV 1 2 1 31.8 6.3 J1 A 12/06/18 Acc. - - 16/06/18
42 B3-SH3-IN-51/1 X20CrMoV 1 2 1 31.8 6.3 J2 S 13/06/18 Acc. - - 16/06/18
43 B3-SH3-IN-52/1 X20CrMoV 1 2 1 31.8 6.3 J1 A 12/06/18 Acc. - - 16/06/18
44 B3-SH3-IN-52/1 X20CrMoV 1 2 1 31.8 6.3 J2 A 12/06/18 Acc. - - 16/06/18
45 B3-SH3-IN-53/1 X20CrMoV 1 2 1 31.8 6.3 J1 A 12/06/18 Acc. - - 16/06/18
46 B3-SH3-IN-53/1 X20CrMoV 1 2 1 31.8 6.3 J2 A 12/06/18 R.S - - 16/06/18
47 B3-SH3-IN-45/1 X20CrMoV 1 2 1 31.8 6.3 J1 U 12/06/18 Acc. - - 17/06/18
48 B3-SH3-IN-45/1 X20CrMoV 1 2 1 31.8 6.3 J2 M 13/06/18 Acc. - - 17/06/18
49 B3-SH3-IN-46/1 X20CrMoV 1 2 1 31.8 6.3 J1 U 12/06/18 Acc. - - 17/06/18
50 B3-SH3-IN-46/1 X20CrMoV 1 2 1 31.8 6.3 J2 U 13/06/18 R.S - - 17/06/18
51 B3-SH3-IN-47/1 X20CrMoV 1 2 1 31.8 6.3 J1 U 13/06/18 Acc. - - 16/06/18
52 B3-SH3-IN-47/1 X20CrMoV 1 2 1 31.8 6.3 J2 M 13/06/18 Acc. - - 16/06/18
53 B3-SH3-IN-66/1 X20CrMoV 1 2 1 31.8 6.3 J1 A 12/06/18 Acc. - - 16/06/18
54 B3-SH3-IN-66/1 X20CrMoV 1 2 1 31.8 6.3 J2 A 12/06/18 Acc. - - 16/06/18
55 B3-SH3-IN-68/1 X20CrMoV 1 2 1 31.8 6.3 J1 A 12/06/18 Acc. - - 16/06/18
56 B3-SH3-IN-68/1 X20CrMoV 1 2 1 31.8 6.3 J2 U 12/06/18 Acc. - - 16/06/18
SH3 - OUTLET 31.8
1 B3-SH3-OL-21/2 X20CrMoV 1 2 1 31.8 6.3 J1 U 10/06/18 Acc. - - 18/06/18
2 B3-SH3-OL-21/2 X20CrMoV 1 2 1 31.8 6.3 J2 U 10/06/18 Acc. - - 18/06/18
3 B3-SH3-OL-22/2 X20CrMoV 1 2 1 31.8 6.3 J1 U 10/06/18 Acc. - - 18/06/18

Al-Dhow Engineering Boiler : Tube Welding Summary 2 / 10


4 B3-SH3-OL-22/2 X20CrMoV 1 2 1 31.8 6.3 J2 U 10/06/18 Acc. - - 18/06/18
5 B3-SH3-OL-22/1 X20CrMoV 1 2 1 31.8 6.3 J1 U 18/06/18 Acc. - - 18/06/18
6 B3-SH3-OL-22/1 X20CrMoV 1 2 1 31.8 6.3 J2 K 18/06/18 Acc. - - 18/06/18
7 B3-SH3-OL-21/1 X20CrMoV 1 2 1 31.8 6.3 J1 U 18/06/18 Acc. - - 18/06/18
8 B3-SH3-OL-21/1 X20CrMoV 1 2 1 31.8 6.3 J2 K 18/06/18 Acc. - - 18/06/18
9 B3-SH3-OL-11/1 X20CrMoV 1 2 1 31.8 6.3 J1 U 13/06/18 Acc. - - 18/06/18
10 B3-SH3-OL-11/1 X20CrMoV 1 2 1 31.8 6.3 J2 A 18/06/18 Acc. - - 18/06/18
11 B3-SH3-OL-12/1 X20CrMoV 1 2 1 31.8 6.3 J1 U 13/06/18 Acc. - - 18/06/18
12 B3-SH3-OL-12/1 X20CrMoV 1 2 1 31.8 6.3 J2 A 18/06/18 Acc. - - 18/06/18
13 B3-SH3-OL-13/1 X20CrMoV 1 2 1 31.8 6.3 J1 A 13/06/18 Acc. - - 18/06/18

Al-Dhow Engineering Boiler : Tube Welding Summary 3 / 10


14 B3-SH3-OL-13/1 X20CrMoV 1 2 1 31.8 6.3 J2 A 14/06/18 Acc. - - 18/06/18
15 B3-SH3-OL-15/1 X20CrMoV 1 2 1 31.8 6.3 J1 A 13/06/18 Acc. - - 18/06/18
16 B3-SH3-OL-15/1 X20CrMoV 1 2 1 31.8 6.3 J2 U 18/06/18 Acc. - - 18/06/18
17 B3-SH3-OL-16/1 X20CrMoV 1 2 1 31.8 6.3 J1 A 13/06/18 Acc. - - 18/06/18
18 B3-SH3-OL-16/1 X20CrMoV 1 2 1 31.8 6.3 J2 K 18/06/18 Acc. - - 18/06/18
19 B3-SH3-OL-17/1 X20CrMoV 1 2 1 31.8 6.3 J1 U 18/06/18 Acc. - - 18/06/18
20 B3-SH3-OL-17/1 X20CrMoV 1 2 1 31.8 6.3 J2 A 18/06/18 Acc. - - 18/06/18
21 B3-SH3-OL-18/1 X20CrMoV 1 2 1 31.8 6.3 J1 U 18/06/18 Acc. - - 18/06/18
22 B3-SH3-OL-18/1 X20CrMoV 1 2 1 31.8 6.3 J2 K 18/06/18 Acc. - - 18/06/18
23 B3-SH3-OL-19/1 X20CrMoV 1 2 1 31.8 6.3 J1 U 18/06/18 Acc. - - 18/06/18
24 B3-SH3-OL-19/1 X20CrMoV 1 2 1 31.8 6.3 J2 K 18/06/18 Acc. - - 18/06/18
25 B3-SH3-OL-20/1 X20CrMoV 1 2 1 31.8 6.3 J1 A 18/06/18 Acc. - - 18/06/18
26 B3-SH3-OL-20/1 X20CrMoV 1 2 1 31.8 6.3 J2 K 18/06/18 Acc. - - 18/06/18
27 B3-SH3-OL-46/1 X20CrMoV 1 2 1 31.8 6.3 J1 U 13/06/18 Acc. - - 18/06/18
28 B3-SH3-OL-46/1 X20CrMoV 1 2 1 31.8 6.3 J2 A 13/06/18 Acc. - - 18/06/18
29 B3-SH3-OL-23/1 X20CrMoV 1 2 1 31.8 6.3 J1 K - - - - 18/06/18
30 B3-SH3-OL-23/1 X20CrMoV 1 2 1 31.8 6.3 J2 K - - - - 18/06/18
RH-2
1 B3-RH2-IN-8/7 X20CrMoV 1 2 1 44.5 4 J1 K - - - -
2 B3-RH2-IN-8/7 X20CrMoV 1 2 1 44.5 4 J2 M - - - - -
3 B3-RH2-OUT-8/7 X20CrMoV 1 2 1 44.5 4 J1 K - - - - -
4 B3-RH2-OUT-8/7 X20CrMoV 1 2 1 44.5 4 J2 M - - - - -
5 B3-RH2-OUT-20/7 X20CrMoV 1 2 1 44.5 4 J1 K - - - - -
6 B3-RH2-OUT-20/7 X20CrMoV 1 2 1 44.5 4 J2 M - - - - -
7 B3-RH2-OUT-47/6 X20CrMoV 1 2 1 44.5 4 J1 K - - - - -
8 B3-RH2-OUT-47/6 X20CrMoV 1 2 1 44.5 4 J2 M - - - - -

Welder ID : Abbreviations A- Ansari K-Kamalesh U-Umesh U.P-Upendra M-Mani R-Rajendra

Al-Dhow Engineering Boiler : Tube Welding Summary 4 / 10


Boiler # 3: Maintenance Works ( 27.05.2018 )
Date
Boiler : Tube Joint Status Report

Radiographic Testing
Welding Status PWHT Status
Summary Total Status Remarks
Qty % Qty % Qty %
SH3 INLET 56 56 100.0% 56 100.0% 56 100.0%

SH3 OUTLET 30 30 100.0% 28 93.3% 30 100.0%

RH2 8 8 100.0% Nil Nil Nil Nil

Total 94 94 84 86
Note#1 : SH3 Inlet Joints - 4 Numbers of Re-Shoot has not taken due to time limitation; And which shall be carried out during Annual Outage or as per earliest convenience

Note#2 : SH3 Outlet Joints - 2 Joints ( for Tube#23 ) has not taken RT due to time limitation; And which shall be carried out during Annual Outage or as per earliest convenience

Note#3 : RH2 Joints , Radiography and PWHT was not carried out due to Access restriction.

Prepared By Verified By Accepted by


Boiler Engineer Site Engineer MEW Engineer

________________________________ ________________________________ ________________________________

Al-Dhow Engineering Boiler : Tube Welding Summary 5 / 10


ntenance Works ( 27.05.2018 )

21.06.2018

Remarks

Al-Dhow Engineering Boiler : Tube Welding Summary 6 / 10


Al-Dhow Engineering Boiler : Tube Welding Summary 7 / 10
Al-Dhow Engineering Boiler : Tube Welding Summary 8 / 10
Al-Dhow Engineering Boiler : Tube Welding Summary 9 / 10
ntenance Works ( 27.05.2018 )
21.06.2018

Remarks

mitation; And which shall be carried out during Annual Outage or as per earliest convenience

me limitation; And which shall be carried out during Annual Outage or as per earliest convenience

s restriction.

Al-Dhow Engineering Boiler : Tube Welding Summary 10 / 10