You are on page 1of 1

THEARCHITECTUREHIVE.BLOGSPOT.

COM

DT FORM 002 "ANNEX" LOG SHEET OF DIVERSIFIED TRAINING


FOR ARCHITECTS LICENSURE EXAMINATION

Candidate SHEET NO.


ALEXIS SNOW 2 of 5

PROJECT PERIOD COVERED Corresponding Number of Hours Total No.


TITLE/DESCRIPTION & LOCATION FROM TO of Described Training of Hours
(FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E F
1. PROPOSED TWO STOREY
RESIDENTIAL BUILDING
HIDDEN VALLEY, RAVENWOOD
RAVENWOOD
A. AIDED IN THE PREPARATION OF
14 07 14 22 07 14 56 56
OF SPACE/MANAGEMENT STUDIES
B. TASKED TO PREPARE ARCH'L PL
23 07 14 20 08 14 160 160
AND STRUC'L CONCEPTUALIZATION
C. TASKED TO PREPARE DETAILED
22 08 14 10 09 14 104 104
PLANS OF BEDROOMS
D. ARCHITECTURAL LAYOUTING OF
11 09 14 16 09 14 32 32
AND ELECTRICAL SYSTEMS
E. AIDED IN ESTIMATING AND
17 07 14 24 09 14 48 48
CANVASSING FOR BILL OF MATERIAL
F. TASKED TO ACQUIRE THE REQTS.
25 07 14 10 10 14 96 96
FOR BUILDING PERMIT APPLICATIO
G. ASSISTED IN CONDUCTING
14 11 14 05 03 15 480 480
SITE SUPERVISION

0
Total No. of Hours
160 144 480 56 32 104 976

You might also like