Professional Documents
Culture Documents
210-FS-T-002
SELF CLEANING SELF CLEANING
ELECTROMAGNET ELECTROMAGNET
210-MA-003 210-MA-004
210-FS-T-001 106 11
CONVEYOR-
DISCHARGE CHUTE-
PEBBLE TRANSFER
BELT SCALE METAL DETECTOR PEBBLE TRANSFER CONVEYOR
210-CV-005
TRASH DISCHARGE CHUTE- TRASH DISCHARGE CHUTE- 210-SL-002 210-MD-002 210-CH-017
TRAMP MAGNET TRAMP MAGNET
210-CH-049 210-CH-050
DIVERTER GATE-
PEBBLE TRANSFER CONVEYOR
210-GA-003
PEBBLE BIN-
CRUSHER FEED
210-BN-002
BY VENDOR
262-FS-T-001 265
FROM MILL WATER HOSE STATIONS
LUBRICATION SYSTEM-
265-FS-T-001 712
BIN DISCHARGE CHUTE- BIN DISCHARGE CHUTE- PEBBLE CRUSHER
FROM PLANT AIR HOSE STATIONS
PEBBLE CRUSHER PEBBLE CRUSHER 210-LU-008/009
210-CH-020 210-CH-021
DIVERTER GATE-
PEBBLE
210-GA-007
FEEDER- FEEDER-
(NOTE 2) PEBBLE CRUSHER PEBBLE CRUSHER
1 210-FE-001 210-FE-002
14 14
42 HYDRAULIC UNIT-
PEBBLE CRUSHER
210-HP-003/004
(FEL)
CONVEYOR-
PEBBLE RECIRCULATING
210-CV-006
210-FS-T-001 411
NOTES:
SECONDARY FLOW SOLID 2.- STREAM No 42. IN CASE OF DETENTION IN PEBBLE CONVEYOR (210-CV-006).
ALSO, AS A BY-PASS FUNCTION IN CASE OF NON-MAGNETIC METALS ARE DETECTED.
INTERMITTENT OR
3.- STREAM No 15. SOLID DESIGN FLOWRATE AREA BASED IN CASE OF PEBBLE BIN ARE FULL (210-BN-002)
ALTERNATE FLOW
SUMP PUMP- AND PEBBLE CRUSHER’S OPERATING ALL THE SAME TIME.
PEBBLE CRUSHING AREA CONSUMABLES DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
210-PP-006
QUALITY CONTROL
DOCUMENT CONTROL
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN NAME SIGN & STAMP
SCALE: PROJECT
R E F E R E N C E S R E V I S I O N S R E V I S I O N S SHEET SIZE
DWG. NO. T I T L E NO. D E S C R I P T I O N BY CHECK APPROVED DATE NO. D E S C R I P T I O N BY CHECK APPROVED DATE
A1
TOROMOCHO PROJECT
NOTICE
AREA
THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES
HERE TO SHALL BE PERFORMED USING CADD ONLY.
DRAWN BY: A.P. DATE: 12/15/08
210 - GRINDING CIRCUIT C-560 REVISION