You are on page 1of 1

A. Post L40.60-I210-200 BMS (PROYEK)rev2tepi.

xls

Stress - strain diagram at center span :

1. STRESS - STRAIN DIAGRAM AT INITIAL

Pi/A = 120.03 kg/cm2 M/Wa = -114.71 kg/cm2 V top = 5.31 kg/cm2

- + = -

Pi/A = 120.03 kg/cm2 M/Wb = 106.47 kg/cm2 Vbottom = 226.50 kg/cm2

2. STRESS - STRAIN DIAGRAM AT SERVICE

2 2
M2/Wa' = 47.05 kg/cm V slab = 59.40 kg/cm
2 2
Pi/A = 99.02 kg/cm M1/Wa = -5.86 kg/cm - - V top = 140.22 kg/cm2
- -

- + + =

+ +
+
2 2
Pi/A = 99.02 kg/cm2 M1/Wb = 5.43 kg/cm M2/Wb' = -82.66 kg/cm Vbottom = 21.79 kg/cm2

8.3 Deflection

l Note :
P = Prestress force
e' = Distance between c.g of strand at end and
P P c.g of strand at lowest point.
l = length of anchor to anchor
e' w = Equivalent loading for prestress force
Ix = Inertia of beam
Ex = Modulus of Elasticity
l/ 2 l/ 2
8 . P . e'
w=
l2
Reference :
PCI Design Handbook : Part 11.1.4 page no. 11-12
w

q p w
Condition
(t/m) (ton) (t/m)
at initial 1.96 0.00 -4.09
at aDL (total) 1.58 0.00
at service (total) 4.94 12.32 -3.38
due to Live Load 1.40 12.32
4 3
deflection = (5q*L /384EI) + (pL /48EI)
based : PCI handbook 4.6.5 Long-Time Chamber Deflection
No. due load (1) release multiplier (2) erect. multiplier (3) final descibtion Allowable
(cm) (cm) (cm) (cm) (cm) L/800 (cm)
1 prestress -10.51 1.8 x (1) -18.91 2.45 x (1) -25.74 ( - ) up
2 wd 5.02 1.85 x (1) 9.04 2.7 x (1) 13.95 (+ ) down
-5.49 -9.88 -11.78
3 w ad 2.10 3 x (2) 6.30
-7.78 -5.48
4 w LL 2.51 5.00
-2.97

page 8 / 13

You might also like