You are on page 1of 28

WEEKLY REPORT

PEMBANGUNAN JEMBATAN HAULING BLOK B - B1 - SMO


PT. BERAU COAL - SITE SAMBARATA

PERIOD:

08 MARET 2018 s.d 14 MARET 2018

REPORT NO. : 31 th
PREVIOUS WEEK : 81.34 %
THIS WEEK : 4.38 %
CUMMULATIVE : 85.73 %
PLAN : 89.29 %
DEVIATION : (3.56) %

CONTRACTOR BY :

PT. KALIRAYA SARI


WEEKL

Project : Pembangunan Jembatan Hauling Blok B - B1 - SMO


No Kontrak : 001/BC-KRS/DIR/AGR-CHID/V/2017
Periode kontrak : 10 Agustus 2017 s.d 21 April 2018
Periode Laporan 08 MARET 2018 s.d 14 MARET 2018

NO. URAIAN PEKERJAAN UNIT

I GENERAL REQUIREMENTS

1 Mobilization and Demobilization of Equipment and Plant to Site ls

2 Safety, Health & Welfare of the works ls


Temporary Office, site camp, Storage & Workshop, Contractor
3 ls
Facilities

4 Design Analysis, Drawing, Administration Cost, and Other Cost ls

5 All Testing Requires Cost ls

SUB TOTAL I (GENERAL REQUIREMENT)

II BRIDGE CONSTRUCTION (FULL LOAD)


A EARTH WORK
1 Soil excavation m3

2 Backfill w/ selected material for foundation (Material by PT. BC) m3

3 Approach road m3
4 Geotextile m2
5 Equipment for site/land preparation ls
6 Temporary bridge (for acces during construction period) ls

Sub Total II.A

B PILING & FOUNDATION


a. Supply Spun Pile for 600 mm diameter; maximum length 30 m'jadi
1 m'
Abutment 1 = 19 m' & Abutment 2 = 18 m'
b. Supply Spun Pile for 500 mm diameter; maximum length 30 m'jadi
m'
Abutment 1 = 18 m' & Abutment 2 = 19 m'
2 a. Driving & Jointing Spun Pile for 600 mm diameter m'
b. Driving & Jointing Spun Pile for 500 mm diameter m'
3 a. Cutting off surpluss lengths 600 mm dia. Piles Ea
b. Cutting off surpluss lengths 500 mm dia. Piles Ea

Page 3 of 28
NO. URAIAN PEKERJAAN UNIT

Abutment, Included. lean concrete, pile head treatment & Counter


4 Rip/Wing (Concrete K-300, Formwork + Support And m3
Reinforcedcement)
Wing Wall Thicks 400 mm (Concrete K-300, Formwork + Support And
5 m3
Reinforcement)
6 Gabion m3

Sub Total II.B

C UPPER STRUCTURE

Steel Structure I Girder 1200x300x20x28 Galvanized (Comp with ;


Joint Plate, Stiffener plate, gusset plate and accessories), Included
1 kg
Install Erection, Berubah jadi 1200x21, 300x28, 300x30 mm, Stiffener
Plate 18 mm, Span 19 M'

Steel Structure Diapragma UNP 2x 125x65x6 mm, End Cross Beam


400x200x8x13 mm dan Diagonal Bottom Bracing Angle 90x90x8 mm
2 kg
Galvanized (with gusset, plate and accessories), Included Install
Erection.
3 Elastomeric bearing, rubber pad and lateral stopper bridge pcs
4 Expansion joint + seal rubber (include anchore Ø16-200) m'
5 Shear connector UNP 100x50 / Emmbeded Plate kg
Deck Slab Thicknes 400 mm (Concrete K-350, Formworks
6 m3
Reinforcement And Install) / Precast
Settlement Slab Thicknes 350 mm (Concrete K-300, Formworks and
7 m3
Reinforcement)
Safety berm or Parapet (Form work, Concrete K-300 and
8 m3
Reinforcement)

Sub Total II.C

D ASPHALT PAVEMENT
1 Asphaltic Concrete Wearing Course (AC - WC) T = 5 m2

Sub Total II.D

E MISC. WORKS

Supply and install pedestrian metal railling, with all necessary steel
1 m'
post, pipes, round bars, anchor bolts as shown on drawing

Drainage spots with grating and all accessories, including stainless


2 Ls
steel fixing plaws, connecting pipes to nearest drain

Sub Total II.E

Page 4 of 28
NO. URAIAN PEKERJAAN UNIT

SUB TOTAL II (BRIDGE CONSTRUCTION - FULL LOAD)

III BRIDGE CONSTRUCTION (EMPTY LOAD)


A EARTH WORK
1 Soil excavation m3

2 Backfill w/ selected material for foundation (Material by PT. BC) m3

3 Approach road m3
4 Geotextile m2
5 Equipment for site/land preparation ls
6 Temporary bridge (for acces during construction period) ls

Sub Total III.A

Page 5 of 28
NO. URAIAN PEKERJAAN UNIT

B PILING & FOUNDATION


Supply Spun Pile for 500 mm diameter; maximum length 30 m' jadi
1 m'
Abutment 1 = 21 m' & Abutment 2 = 20 m'
2 Driving & Jointing Spun Pile for 500 mm diameter m'
3 Cutting off surpluss lengths 500 dia. Piles Ea
Abutment, Included. lean concrete, pile head treatment & Counter
4 Rip/Wing (Concrete K-300, Formwork + Support And m3
Reinforcedcement)

Wing Wall Thicks 350 mm (Concrete K-300, Formwork + Support And


5 Reinforcement), Included Tambahan Guard Wall sisi kiri/kanan, L = m3
5000 mm, H 900 mm, Wing Wall jadi Thicknes 400 mm

6 Gabion m3

Sub Total III.B

C UPPER STRUCTURE

Steel Structure I Girder 1000x300x16x25 Galvanized (Comp with ;


Joint Plate, Stiffener plate, gusset plate and accessories), Included
1 kg
Install Erection, Berubah jadi 1200x21, 300x28, 300x30 mm, Stiffener
Plate 18 mm, Span 19 M'

Steel Structure Diapragma UNP 2x 100x50x5 mm (berubah jadi UNP


2 x 125x65x6), End Cross Beam 400x200x8x13 mm dan Diagonal
2 kg
Bottom BracingJadi Angle 90x90x8 mm Galvanized (with gusset,
plate and accessories), Included Install Erection.

3 Elastomeric bearing, rubber pad and lateral stopper bridge pcs


4 Expansion joint + seal rubber (include anchore Ø16-200) m'
5 Shear connector UNP 100x50 kg
Deck Slab Thicknes 300 mm (Concrete K-350, Formworks
6 m3
Reinforcement And Install) / Precast

Settlement Slab Thicknes 300 mm (Concrete K-300, Formworks and


7 m3
Reinforcement), Berobah Jadi Thicknes 350 mm

Safety berm or Parapet (Form work, Concrete K-300 and


8 m3
Reinforcement)

Sub Total III.C

D ASPHALT PAVEMENT
1 Asphaltic Concrete Wearing Course (AC - WC) T = 5 m2

Sub Total III.D

Page 6 of 28
NO. URAIAN PEKERJAAN UNIT

E MISC. WORKS

Supply and install pedestrian metal railling, with all necessary steel
1 m'
post, pipes, round bars, anchor bolts as shown on drawing

Drainage spots with grating and all accessories, including stainless


2 Ls
steel fixing plaws, connecting pipes to nearest drain

Sub Total III.E

SUB TOTAL III (BRIDGE CONSTRUCTION - EMPTY LOAD)

TOTAL ( I + II + III )

Diperiksa & disetujui oleh:

PT. Berau Coal


CHID Cost Control CHID Section Head CHID Departement Head

Lukas Patandung Andre Bharata Reo Andreas

Page 7 of 28
WEEKLY REPORT PT. KALIRAY

KEMAJUAN FISIK PEKERJAAN


VOLUME BOBOT % MINGGU LALU MINGGU INI S/D MINGGU INI
Volume Bobot Volume Bobot Volume Bobot

1.00 5.36 0.50 2.68 - - 0.50 2.68

1.00 4.85 0.86 4.15 0.03 0.14 0.89 4.29

1.00 1.91 1.00 1.91 - - 1.00 1.91

1.00 0.44 0.86 0.37 0.03 0.01 0.89 0.39

1.00 0.74 0.77 0.56 0.03 0.02 0.79 0.58

13.28 9.68 0.17 9.85

538.20 0.16 538.20 0.16 - - 538.20 0.16

2,847.53 1.04 2,166.33 0.79 - - 2,166.33 0.79

-
720.00 0.23 720.00 0.23 - - 720.00 0.23
1.00 2.94 0.80 2.35 0.10 0.29 0.90 2.65
1.00 0.57 1.00 0.57 - - 1.00 0.57

ub Total II.A 4.95 4.12 0.29 4.41

240.00 1.81 240.00 1.81 - - 240.00 1.81

600.00 3.76 600.00 3.76 - - 600.00 3.76

240.00 0.86 240.00 0.86 - - 240.00 0.86


600.00 2.06 600.00 2.06 - - 600.00 2.06
8.00 0.02 8.00 0.02 - - 8.00 0.02
20.00 0.04 20.00 0.04 - - 20.00 0.04

Page 8 of 28
KEMAJUAN FISIK PEKERJAAN
VOLUME BOBOT % MINGGU LALU MINGGU INI S/D MINGGU INI
Volume Bobot Volume Bobot Volume Bobot

329.21 12.15 312.75 11.54 - - 312.75 11.54

65.52 2.80 58.97 2.52 3.28 0.14 62.24 2.66

143.20 1.48 143.20 1.48 - - 143.20 1.48

ub Total II.B 24.98 24.09 0.14 24.23

42,712.74 7.71 30,121.79 5.43 6,184.80 1.12 36,306.60 6.55

8,727.71 1.57 6,151.30 1.11 - - 6,151.30 1.11

12.00 0.64 8.40 0.45 3.60 0.19 12.00 0.64


28.00 0.98 19.60 0.68 - - 19.60 0.68
537.60 0.10 376.32 0.07 - - 376.32 0.07

67.20 2.75 47.04 1.93 - - 47.04 1.93

33.08 1.36 6.62 0.27 13.23 0.54 19.85 0.81

19.64 0.84 6.87 0.29 - - 6.87 0.29

ub Total II.C 15.95 10.24 1.85 12.09

147.00 0.64 - - - - - -

ub Total II.D 0.64 - - -

44.00 0.24 17.60 0.09 - - 17.60 0.09

16.00 0.09 - - - - - -

ub Total II.E 0.33 0.09 - 0.09

Page 9 of 28
KEMAJUAN FISIK PEKERJAAN
VOLUME BOBOT % MINGGU LALU MINGGU INI S/D MINGGU INI
Volume Bobot Volume Bobot Volume Bobot
46.85 38.54 2.28 40.82

538.20 0.16 538.20 0.16 - - 538.20 0.16

2,183.96 0.80 1,238.91 0.45 - - 1,238.91 0.45

-
720.00 0.23 720.00 0.23 - - 720.00 0.23
1.00 2.94 0.80 2.35 0.10 0.29 0.90 2.65
1.00 0.57 1.00 0.57 - - 1.00 0.57

ub Total III.A 4.71 3.78 0.29 4.07

Page 10 of 28
KEMAJUAN FISIK PEKERJAAN
VOLUME BOBOT % MINGGU LALU MINGGU INI S/D MINGGU INI
Volume Bobot Volume Bobot Volume Bobot

720.00 4.51 720.00 4.51 - - 720.00 4.51

720.00 2.47 720.00 2.47 - - 720.00 2.47


24.00 0.04 24.00 0.04 - - 24.00 0.04

300.68 11.10 285.65 10.54 - - 285.65 10.54

46.86 2.00 42.17 1.80 4.69 0.20 46.86 2.00

138.20 1.43 138.20 1.43 - - 138.20 1.43

ub Total III.B 21.56 20.80 0.20 21.00

31,490.10 5.68 22,187.20 4.00 4,559.77 0.82 26,746.96 4.83

6,728.21 1.21 4,767.51 0.86 - - 4,767.51 0.86

12.00 0.59 8.40 0.41 3.60 0.18 12.00 0.59


28.00 0.98 19.60 0.68 - - 19.60 0.68
537.60 0.10 376.32 0.07 - - 376.32 0.07

50.40 2.07 35.28 1.45 - - 35.28 1.45

28.35 1.16 17.72 0.73 10.63 0.44 28.35 1.16

19.64 0.84 5.89 0.25 - - 5.89 0.25

ub Total III.C 12.63 8.46 1.44 9.89

147.00 0.64 - - - - - -

ub Total III.D 0.64 - - -

Page 11 of 28
KEMAJUAN FISIK PEKERJAAN
VOLUME BOBOT % MINGGU LALU MINGGU INI S/D MINGGU INI
Volume Bobot Volume Bobot Volume Bobot

44.00 0.24 17.60 0.09 - - 17.60 0.09

16.00 0.09 - - - - - -

ub Total III.E 0.33 0.09 - 0.09

39.87 33.13 1.93 35.06

100 81.34 4.38 85.73

Dibuat oleh:

PT. Kaliraya Sari


ment Head Kep. Teknik & Peng. Mutu Site Manager Project Manager

reas Bayu Budhi Wendy A,Y Budi Karyono

Page 12 of 28
PT. KALIRAYA SARI

Report No.

M.31
BOBOT
PERSENTASE
(%)

50.00

88.57

100.00

88.57

79.38

100.00

76.08

100.00
90.00
100.00

100.00

100.00

100.00
100.00
100.00
100.00

Page 13 of 28
BOBOT
PERSENTASE
(%)

95.00

95.00

100.00

85.00

70.48

100.00
70.00
70.00

70.00

60.00

35.00

40.00

Page 14 of 28
BOBOT
PERSENTASE
(%)

100.00

56.73

100.00
90.00
100.00

Page 15 of 28
BOBOT
PERSENTASE
(%)

100.00

100.00
100.00

95.00

100.00

100.00

84.94

70.86

100.00
70.00
70.00

70.00

100.00

30.00

Page 16 of 28
BOBOT
PERSENTASE
(%)

40.00

PT. Kaliraya Sari


Project Manager

Budi Karyono

Page 17 of 28
FOTO PROGRESS
PT. KALIRAYA SARI

Mobilisasi material steel structure Penyambungan steel girder jembatan

Penyambungan steel girder jembatan Instal elastomeric bearing pads girder jembatan

Pembesian plat injak abutment B2 Pengecoran plat injak abutment B2


Pembesian plat injak abutment A2 Pengecoran plat injak abutment A2
AGUSTUS SEPTEMBER
NO. URAIAN PEKERJAAN UNIT VOLUME BOBOT %
M.1 M.2 M.3 M.4 M.5 M.6 M.7
10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27
I GENERAL REQUIREMENTS
1 Mobilization and Demobilization of Equipment and Plant to Site ls 1.00 5.36 0.153 0.153 0.153 0.153 0.153 0.153 0.153
2 Safety, Health & Welfare of the works ls 1.00 4.85 0.138 0.138 0.138 0.138 0.138 0.138 0.138
3 Temporary Office, site camp, Storage & Workshop, Contractor Facilities ls 1.00 1.91 0.055 0.055 0.055 0.055 0.055 0.055 0.055
4 Design Analysis, Drawing, Administration Cost, and Other Cost ls 1.00 0.44 0.012 0.012 0.012 0.012 0.012 0.012 0.012
All Testing
5 ls 1.00 0.74 0.021 0.021 0.021 0.021 0.021 0.021 0.021
Requires Cost

II BRIDGE CONSTRUCTION (FULL LOAD)


A EARTH WORK
1 Soil excavation m3 538.20 0.16
2 Backfill w/ selected material for foundation (Material by PT. BC) m3 2,847.53 1.04
3 Approach road m 3
-
4 Geotextile m2 720.00 0.23
5 Equipment for site/land preparation ls 1.00 2.94 0.098 0.098
6 Temporary bridge (for acces during construction period) ls 1.00 0.57 0.019 0.019

B PILING & FOUNDATION


a. Supply Spun Pile for 600 mm diameter; maximum length 30 m'jadi Abutment 1 =
1 m' 240.00 1.81
19 m' & Abutment 2 = 18 m' 0.604 0.604 0.604
b. Supply Spun Pile for 500 mm diameter; maximum length 30 m'jadi Abutment 1 =
m' 600.00 3.76
18 m' & Abutment 2 = 19 m' 1.254 1.254 1.254
2 a. Driving & Jointing Spun Pile for 600 mm diameter m' 240.00 0.86
b. Driving & Jointing Spun Pile for 500 mm diameter m' 600.00 2.06
3 a. Cutting off surpluss lengths 600 mm dia. Piles Ea 8.00 0.02
b. Cutting off surpluss lengths 500 mm dia. Piles Ea 20.00 0.04
Abutment, Included. lean concrete, pile head treatment & Counter Rip/Wing
4 m3 329.21 12.15
(Concrete K-300, Formwork + Support And Reinforcedcement)
Wing Wall Thicks 400 mm (Concrete K-300, Formwork + Support And Reinforcement)
5 m3 65.52 2.80

6 Gabion m3 143.20 1.48

C UPPER STRUCTURE
Steel Structure I Girder 1200x300x20x28 Galvanized (Comp with ; Joint Plate,
1 Stiffener plate, gusset plate and accessories), Included Install Erection, Berubah jadi kg 42,712.74 7.71
1200x21, 300x28, 300x30 mm, Stiffener Plate 18 mm, Span 19 M'

Page 20 of 28
AGUSTUS SEPTEMBER
NO. URAIAN PEKERJAAN UNIT VOLUME BOBOT %
M.1 M.2 M.3 M.4 M.5 M.6 M.7
10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27

Steel Structure Diapragma UNP 2x 125x65x6 mm, End Cross Beam 400x200x8x13
2 mm dan Diagonal Bottom Bracing Angle 90x90x8 mm Galvanized (with gusset, plate kg 8,727.71 1.57
and accessories), Included Install Erection.
3 Elastomeric bearing, rubber pad and lateral stopper bridge pcs 12.00 0.64
4 Expansion joint + seal rubber (include anchore Ø16-200) m' 28.00 0.98
5 Shear connector UNP 100x50 / Emmbeded Plate kg 537.60 0.10
Deck Slab Thicknes 400 mm (Concrete K-350, Formworks Reinforcement And
6 m3 67.20 2.75
Install) / Precast
Settlement Slab Thicknes 350 mm (Concrete K-300, Formworks and Reinforcement)
7 m3 33.08 1.36

8 Safety berm or Parapet (Form work, Concrete K-300 and Reinforcement) m3 19.64 0.84

D ASPHALT PAVEMENT
1 Asphaltic Concrete Wearing Course (AC - WC) T = 5 m2 147.00 0.64

E MISC. WORKS
Supply and install pedestrian metal railling, with all necessary steel post, pipes, round
1 m' 44.00 0.24
bars, anchor bolts as shown on drawing
Drainage spots with grating and all accessories, including stainless steel fixing plaws,
2 Ls 16.00 0.09
connecting pipes to nearest drain

III BRIDGE CONSTRUCTION (EMPTY LOAD)


A EARTH WORK
1 Soil excavation m3 538.20 0.16
2 Backfill w/ selected material for foundation (Material by PT. BC) m 3
2,183.96 0.80
3 Approach road m3 -
4 Geotextile m2 720.00 0.23
5 Equipment for site/land preparation ls 1.00 2.94 0.098 0.098
6 Temporary bridge (for acces during construction period) ls 1.00 0.57 0.019 0.019

B PILING & FOUNDATION


Supply Spun Pile for 500 mm diameter; maximum length 30 m' jadi Abutment 1 = 21
1 m' 720.00 4.51
m' & Abutment 2 = 20 m'
2 Driving & Jointing Spun Pile for 500 mm diameter m' 720.00 2.47
3 Cutting off surpluss lengths 500 dia. Piles Ea 24.00 0.04
Abutment, Included. lean concrete, pile head treatment & Counter Rip/Wing
4 m3 300.68 11.10
(Concrete K-300, Formwork + Support And Reinforcedcement)
Wing Wall Thicks 350 mm (Concrete K-300, Formwork + Support And
5 Reinforcement), Included Tambahan Guard Wall sisi kiri/kanan, L = 5000 mm, H 900 m3 46.86 2.00
mm, Wing Wall jadi Thicknes 400 mm
6 Gabion m3 138.20 1.43

C UPPER STRUCTURE

Page 21 of 28
AGUSTUS SEPTEMBER
NO. URAIAN PEKERJAAN UNIT VOLUME BOBOT %
M.1 M.2 M.3 M.4 M.5 M.6 M.7
10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27

Steel Structure I Girder 1000x300x16x25 Galvanized (Comp with ; Joint Plate,


1 Stiffener plate, gusset plate and accessories), Included Install Erection, Berubah jadi kg 31,490.10 5.68
1200x21, 300x28, 300x30 mm, Stiffener Plate 18 mm, Span 19 M'

Steel Structure Diapragma UNP 2x 100x50x5 mm (berubah jadi UNP 2 x 125x65x6),


End Cross Beam 400x200x8x13 mm dan Diagonal Bottom BracingJadi Angle
2 kg 6,728.21 1.21
90x90x8 mm Galvanized (with gusset, plate and accessories), Included Install
Erection.
3 Elastomeric bearing, rubber pad and lateral stopper bridge pcs 12.00 0.59
4 Expansion joint + seal rubber (include anchore Ø16-200) m' 28.00 0.98
5 Shear connector UNP 100x50 kg 537.60 0.10
Deck Slab Thicknes 300 mm (Concrete K-350, Formworks Reinforcement And
6 m3 50.40 2.07
Install) / Precast
Settlement Slab Thicknes 300 mm (Concrete K-300, Formworks and
7 m3 28.35 1.16
Reinforcement), Berobah Jadi Thicknes 350 mm
8 Safety berm or Parapet (Form work, Concrete K-300 and Reinforcement) m3 19.64 0.84

D ASPHALT PAVEMENT
1 Asphaltic Concrete Wearing Course (AC - WC) T = 5 m2 147.00 0.64

E MISC. WORKS
Supply and install pedestrian metal railling, with all necessary steel post, pipes, round
1 m' 44.00 0.24
bars, anchor bolts as shown on drawing
Drainage spots with grating and all accessories, including stainless steel fixing plaws,
2 Ls 16.00 0.09
connecting pipes to nearest drain

WEEKLY PROGRESS 0.38 0.38 0.38 0.98 2.24 2.47 1.87


CUMULATIVE PROGRESS 0.38 0.76 1.14 2.12 4.36 6.83 8.70
WEEKLY PROGRESS ACTUAL 0.38 0.38 0.49 0.95 3.33 3.64 3.08
CUMULATIVE PROGRESS ACTUAL 0.38 0.76 1.25 2.20 5.52 9.16 12.25
DEVIASI - - 0.11 0.07 1.16 2.33 3.55

Page 22 of 28
PROJECT SCHEDULE (REVISI)
PEMBANGUNAN JEMBATAN HAULING BLOK B - B1 - SMO
PT. BERAU COAL - SITE SAMBARATA

2017
OKTOBER NOPEMBER DESEMBER JANUARI
M.8 M.9 M.10 M.11 M.12 M.13 M.14 M.15 M.16 M.17 M.18 M.19 M.20 M.21 M.22 M.23 M.24 M.25 M.26
28 - 04 05 - 11 12 - 18 19 - 25 26 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07

0.153 0.153 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142
0.138 0.138 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129
0.055 0.055 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.021 0.021 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020

0.055 0.055 0.055


0.260

0.058
0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098
0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019

0.216 0.216 0.216 0.216


0.515 0.515 0.515 0.515
0.004 0.004 0.004 0.004
0.009 0.009 0.009 0.009

1.105 1.105 1.105 1.105 1.105 1.105 1.105 1.105 1.105 1.105

0.254 0.254 0.254 0.254 0.254 0.254 0.254 0.254 0.254 0.254
0.247 0.247 0.247 0.247 0.247 0.247

0.154 0.154 0.154 0.154 0.154 0.154 0.154 0.154 0.154 0.154 0.154 0.154 0.154 0.154 0.154 0.771 0.771 0.771
Fabrication Page 23 of 28
OKTOBER NOPEMBER DESEMBER JANUARI
M.8 M.9 M.10 M.11 M.12 M.13 M.14 M.15 M.16 M.17 M.18 M.19 M.20 M.21 M.22 M.23 M.24 M.25 M.26
28 - 04 05 - 11 12 - 18 19 - 25 26 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07
Fabrication Material on Site

0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.157 0.157 0.157

0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.207
Fabrication Materi

0.055 0.055 0.055


0.199 0.199 0.199 0.199

0.058 0.058 0.058 0.058


0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098
0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019

1.504 1.504 1.504


0.618 0.618 0.618 0.618
0.011 0.011 0.011 0.011

1.009 1.009 1.009 1.009 1.009 1.009 1.009 1.009 1.009 1.009 1.009

0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182 0.182
0.239 0.239 0.239 0.239 0.239 0.239

Page 24 of 28
OKTOBER NOPEMBER DESEMBER JANUARI
M.8 M.9 M.10 M.11 M.12 M.13 M.14 M.15 M.16 M.17 M.18 M.19 M.20 M.21 M.22 M.23 M.24 M.25 M.26
28 - 04 05 - 11 12 - 18 19 - 25 26 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07

0.114 0.114 0.114 0.114 0.114 0.114 0.114 0.114 0.114 0.114 0.114 0.114 0.114 0.114 0.114 0.568 0.568 0.568 0.568
Fabrication Material on Site

0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.024 0.121 0.121 0.121 0.121
0.147
0.244
0.025

0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.155
Fabrication

0.94 2.44 2.41 2.41 1.53 2.44 2.07 1.57 2.75 4.49 4.99 4.56 4.07 4.06 3.82 5.12 5.12 5.12 5.18
9.64 12.08 14.49 16.91 18.44 20.87 22.94 24.52 27.27 31.76 36.74 41.31 45.38 49.43 53.25 58.37 63.50 68.62 73.80
1.76 0.15 1.23 5.91 1.58 2.31 2.51 1.48 2.28 2.05 3.33 1.85 3.92 2.01 3.42 3.73 1.10 4.49 4.85
14.00 14.15 15.38 21.30 22.87 25.18 27.69 29.17 31.45 33.50 36.83 38.68 42.59 44.61 48.03 51.76 52.86 57.34 62.19
4.37 2.08 0.89 4.39 4.44 4.31 4.75 4.65 4.18 1.74 0.08 (2.63) (2.78) (4.83) (5.23) (6.62) (10.64) (11.28) (11.61)
Diperiksa & disetujui oleh: Dibuat oleh:

PT. Berau Coal


CHID Cost Control CHID Section Head CHID Department Head Site Engineering

Lukas Patandung Andre Bharata Reo Andreas Bayu Budhi

Page 25 of 28
KALIRAYA SARI

2018
FEBRUARI MARET APRIL
REMARK
M.27 M.28 M.29 M.30 M.31 M.32 M.33 M.34 M.35 M.36 M.37
08 - 14 15 - 21 22 - 28 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 21

0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142
0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129 0.129
0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051
0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020

0.260 0.260 0.260

0.058 0.058 0.058


0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098
0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019

1.105

0.254

0.771 0.771 0.771 0.771

Page 26 of 28
FEBRUARI MARET APRIL
REMARK
M.27 M.28 M.29 M.30 M.31 M.32 M.33 M.34 M.35 M.36 M.37
08 - 14 15 - 21 22 - 28 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 21

Installation

0.157 0.157 0.157 0.157


0.159 0.159 0.159 0.159
0.244 0.244 0.244 0.244
0.025 0.025 0.025 0.025

0.207 0.207 0.207 0.275 0.275 0.275 0.275

Material on site Installation


0.452 0.452 0.452

0.279 0.279 0.279

0.320 0.320

0.079 0.079 0.079

0.031 0.031 0.031

0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098


0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019

Page 27 of 28
FEBRUARI MARET APRIL
REMARK
M.27 M.28 M.29 M.30 M.31 M.32 M.33 M.34 M.35 M.36 M.37
08 - 14 15 - 21 22 - 28 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 21

0.568 0.568 0.568


Installation

0.121 0.121 0.121


0.147 0.147 0.147
0.244 0.244 0.244
0.025 0.025 0.025

0.155 0.155 0.155 0.207 0.207 0.207 0.207


Material on site Installation
0.388 0.388 0.388

0.279 0.279 0.279

0.320 0.320

0.079 0.079 0.079

0.031 0.031 0.031

3.73 3.73 3.73 2.15 2.15 1.38 2.22 2.48 2.17 1.46 0.99
77.53 81.26 84.99 87.14 89.29 90.67 92.89 95.37 97.54 99.01 100.00
5.42 4.94 1.75 7.03 4.38
67.61 72.56 74.31 81.34 85.73
(9.92) (8.70) (10.68) (5.80) (3.56)

PT. Kaliraya Sari


Site Manager Project Manager

Wendy A,Y Budi Karyono

Page 28 of 28

You might also like