Professional Documents
Culture Documents
com
Landline: +61 - 283 111 178 – Text/WhatsApp: +61 - 428 441 457
CAREER EPISODE - 3
Name of the Project : Controlling the load of Electricity using GSM technology
1
Professional CDR Preparation Assistance by Dinesh – www.CDRWritersAustralia.com
Landline: +61 - 283 111 178 – Text/WhatsApp: +61 - 428 441 457
2
Professional CDR Preparation Assistance by Dinesh – www.CDRWritersAustralia.com
Landline: +61 - 283 111 178 – Text/WhatsApp: +61 - 428 441 457
3
Professional CDR Preparation Assistance by Dinesh – www.CDRWritersAustralia.com
Landline: +61 - 283 111 178 – Text/WhatsApp: +61 - 428 441 457
4
Professional CDR Preparation Assistance by Dinesh – www.CDRWritersAustralia.com
Landline: +61 - 283 111 178 – Text/WhatsApp: +61 - 428 441 457
for controlling the microcontroller. I have further developed the connectivity between the different elements
and successfully constructed the prototype model. In this way I have accomplished my delegated work.
Solutions: In term of mitigating the solution, I have communicated with the project manager who was guiding
me for this project. With his guidance, I have decided the power supply of 12V that I have connected for
rectification to diodes. I have observed that converted DC waves contained small amount of harmonics with it.
For this purpose, I have used filter for rectification of the harmonics. This has allowed me in employing the
capacity of electrolytes. For ensuring the effective DC output voltage, I have applied 78XX voltage regulators.
5
Professional CDR Preparation Assistance by Dinesh – www.CDRWritersAustralia.com
Landline: +61 - 283 111 178 – Text/WhatsApp: +61 - 428 441 457
problem when doing programming in the microcontroller. Also, I used to share my progress with my
teammates. After individual team member delegated work was completed then my teammate and I assembled
and run our project for test. I was able to successfully complete the prototype model with the application of
collaborative approach.