JOINT INSPECTION SCHEDULE

Thamrin Nine Development Project


Monday, Nov 28th 2016

No Time Schedule Work Description Gridline Area ACSET WA/PGW Remarks

1 10.00am-11.00am Rebar Inspection for Drop Panel and beam B1 Z3 T14-T16/T1A-T1C' TOWER Kevvin 2nd Inspection

2 02.00pm-04.00pm Rebar Inspection for Drop Panel and beam B1 Z3 T14-T16/T1A-T1C' TOWER Kevvin 2nd Inspection

3 04.00pm-05.00pm Rebar inspection for WT 2 B2-B1 Robbi 2nd Inspection

3 10.00am-11.00am Rebar inspection for Slab & beam B1 P2 MA5-MA8/MAM-MAJ MANSION Calvin 1st Inspection

4 02.00pm-04.00pm Rebar inspection for Slab & beam B1 P2 MA5-MA8/MAM-MAJ MANSION Calvin 1st Inspection

5 03.00pm-04.00pm Rebar inspection for retaining wall MA7-MA8/MAM-MAL MANSION Nando 1st Inspection

6 04.00pm-05.00pm Rebar inspection for WM 1 and 2 West Side MA5-MA8/MAM-MAJ MANSION Nando 1st Inspection

7 04.00pm-05.00pm Rebar inspection for circular wall B3-B2 Nando 1st Inspection

CASTING PLAN TOWER : MANSION : B1 P2

NOTE :
1. Please don’t carry out any kind of joint inpesction unless ACSET's QC inspector signed off internal checklist
2. ACSET CM Team to prepare safe access for planned inspection and fully cooperate during inspection
Prepared by

Devi. M