Initial Ground Dia of

Total Number of Type of Height of Weight of Span


Sr. No Description Type of conductor tension SCF(kg) Clearance Insulator Remarks
Eqp connection Equipment Equipment Length
(Kg) (From Plinth) Portion

1 132KV LA 18 AAC 400 sq.mm Twin 100 361 4.6 m 1.9 m 160 300 5m
2 33KV LA 6 160mm Al. tube Al. tube 100 500 3.7 m 1.38 m 100 Kgs. 165 5m
3 132KV CVT 18 AAC 400 sq.mm Twin 100 230 4.6 m 2.4 500 Kgs. 300 3m
4 36KV NCT 2 160mm Al. tube Al. tube 100 NA 3.7 m 1.38 m 235 Kgs. 215 1m

Volume 2 - Part III, Section 4


Contract Appendix A [Scope of
Tower with peak -Type-2
5 2 Single conductor Single As per spec. 12 12+6 - - - Works] - Attachment A-1,
Tower with one beam
Table 2.3.6 Transmission Line
Termination Gantries, 132 kV

Tower with peak -Type-2


6 3 Single conductor Single As per spec. 12 12+6 - - -
Tower with two beam
Outdoor Cable trench Types, length, width &
7
depth
1TIER, 900 W X 800D 50M - - - - - - - - -
2TIER, 1200 W X 1000D 150M - - - - - - - - -
3TIER, 900 W X 800D 200M - - - - - - - - -
8 132kV/33KV, 120MVA auto transformers 2 160mm Al. tube Al. tube 100 361 as per eqpt. Drg. 5m

9 33/0.4KV, 200KVA earthing transformers 2 160mm Al. tube Al. tube 100 500 as per eqpt. Drg. 3m

Single, Two 35m, 4 mast is connected with shield


10 Lightning mast 4 Shield Wire - - - - - -
side at 90 drg. 20m wire.