GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN

I TE
SS
ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN 1. POWER SUPPLY TO THE BUILDING SHALL BE 230V, THREE

THI
ACCORDANCE WITH THE NATIONAL BUILDING CODE, PHASE, 4-WIRES, 60HZ. TRANSFORMATION OVAL
PROVISIONS OF THE LATEST APPROVED PHILIPPINE
ELECTRICAL CODE, THE LAWS AND ORDINANCES OF THE
2. ALL MATERIALS TO BE USED SHALL BE NEW AND APPROVED
LOCAL CODE ENFORCING AUTHORITIES AND REQUIREMENTS
TYPE FOR PURPOSE & LOCATION.
OF THE LOCAL ELECTRIC, TELEPHONE COMPANY AND
BUILDING ADMINISTRATION REQUIREMENTS.
3. NORMAL AND EMERGENCY CIRCUIT SHALL NOT BE
COMBINED IN ONE RACEWAY OR CONDUIT. PROVIDE ALSO TELECOMMUNICATION SYSTEM BOX
1. CONTRACTOR SHALL SECURE ALL WIRING PERMIT AND MDP2 MDP1

ATS
ALL FEES REQUIRED FOR THE WORKS AND FURNISH THE
OWNER THE CERTIFICATE OF FINAL ELECTRICAL 4. RECEPTACLES FOR GENERAL USE SHALL BE DUPLEX 20A, 3 sets: 3-250mmsq THWNTHHN Cu WIRE
INSPECTION, 250VAC, GROUND TYPE. 1-50mmsq THHNTHWN Cu WIRE
3-250mmsq THWNTHHN Cu WIRE
1-50mmsq THHNTHWN Cu WIRE in 100mm dia PVC CONDUIT (DIRECTLY BURRIED)
2. CONTRACTOR SHALL CONDUCT EARTH GROUND TEST, 5. ALL WIRES SHOULD HAVE A MAXIMUM LOAD OF 80 OF WIRE PROVIDE ALSO 1-3" DIA PVC CONDUIT FOR SERVICE
EXIT
in 100mm dia RSC CONDUIT (DIRECTLY BURRIED)
WIRE INSULATION AND LOAD TEST UPON COMPLETION OF AMPACITY. ENTRANCE OF TELECOMMUNICATION SYSTEM

MDB
SERVICE ENTRANCE

WORKS,
ENTRANCE

6. LIGHT SWITCHES MINIMUM RATING SHALL BE 16A 230VAC. 3-500mmsq THWNTHHN Cu WIRE
3. INCASE OF DISCREPANCY BETWEEN PLANS AND SITE Provide appropriate 1-60mmsq THHNTHWN Cu WIRE
CONDITION, SPECIFICATIONS & REVISIONS CHANGES, 7. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND guying system with messanger (OVERHEAD)(app 15mts)
THE CONTRACTOR SHOULD IMMEDIATELY VERIFY & SHALL HAVE THE "P.S." MARKS.
P E D E S T
CONSULT TOWITH THE ELECTRICAL ENGINEER OF THE R I A N L A N E

PNP ENGINEERING SERVICE (PNPES), 8. MOUNTING HEIGHTS SHALL BE AS FOLLOWS:


Provide New 45' Concrete pole
4. ALL LOCATION & MOUNTING HEIGHT ARE SUBJECT TO A. LIGHT SWITCHES - 1.37m above Floor finish GATE 1 GUARD POST
APPROVAL OF ELECTRICAL ENGINEER OF PNPES, B. CONVENIENCE OUTLET - 0.3m above Floor finish
3-500mmsq THWNTHHN Cu WIRE
C. TELEPHONE OUTLET - 0.3m above Floor finish 3-100kVA Distribution
5. CONTRACTOR SHALL BE RESPONSIBLE IN THE 1-60mmsq THHNTHWN Cu WIRE
D. PANEL BOARD - 1.8m ABOVE FLOOR FINISH Transformer
PREPARATION OF AS-BUILT PLANS DULY SIGNED AND with messanger(OVERHEAD)(app 25mts)
(Provide new concrete
SEALED BY PROFESSIONAL ELECTRICAL ENGINEER, AND 9. CONDUIT EMBEDED WITHIN CONCRETE WALL SHALL HAVE A pole)
ELECTRONIC AUTOCAD FILES, MINIMUM CEMENT PLASTERED OF 20mm THICK.
(Existing concrete pole) Existing
6. FINAL LIGHTING FIXTURES AND WIRING DEVICES SHALL BE
10. ALL CONDUIT PIPE ABOVE CEILING SHOULD HAVE To serve as guying system Additional: 3-38mmsq concrete pole
APPROVED BY PNPES, REPRESENTATIVEENGINEER,
INDEPENDENT HANGER SUPPORTS. coated ACSR (app 40mts) with
7. CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATION BPO BUILDING BFO BUILDING transformers
OF SHOP OR CONSTRUCTION DRAWING REQUIRED BY 11. ALL LIGHTING FIXTURES SHOULD HAVE INDEPENDENT
OWNERARCHITECHENGINEER, THIS INCLUDES DEVICES HANGER SUPPORTS. Additional: 1-38mmsq coated ACSR
AND FIXTURES ELEVATION, (app 30mts)
12. ALL BOXES SHALL BE OCCUPIED ONLY OF 50 OF WIRE Provide appropriate
8. CONTRACTOR SHALL VISIT SITE CONDITION AND INCLUDE VOLUME. guying system
ALL COST NECESSARY TO COMPLETE THE SYSTEM AT NO
COST TO OWNER, INCLUDING COST OF CORING SERVICE 13. VOLTAGE DROP SHALL BE LIMITED TO 2.5 FROM SOURCE TO
AND EXPENSES FOR THE RESTORATION OF ANY DAMAGE PANEL BOARD AS P.E.C. REQUIREMENT OR ACCEPTABLE TO
AFFECTED CIVIL ARCHITECTURAL FINISHES OR THE LABORATORY EQUIPMENT.
RELOCATION OF EXISTING FACILITIES ON BUILDING,

9. CONTRACTOR SHALL LOCATE ALL SPLICING BOXES TO


14. CIRCUIT BREAKERS SERVING MOTORS AND LIGHTING SHALL
BE INDUSTRIAL AND COMMERCIAL BOLT-ON TYPE
LEGEND & SYMBOLS
ACCESSIBLE PLACE OR WITH ACCESS PANELS, RESPECTIVELY WITH MINIMUM OF 10kAIC.

10. NOMINATED CONTRACTOR TO VERIFY ALL EQUIPMENTS 15. ALL WIRES AND CABLES SHALL BE BRAND NEW AND 2-18W LED TUBE with LOUVER 1' x 4' CASING (SURFACED) AIR-CONDITIONING UNIT CB IN NEMA 3R ENCLOSURE
TO BE INSTALLED OR PLACE WITHIN THE BUILDING, AND APPROVED TYPE.
MAKE AN ADJUSTMENT WITH THE PNPES ENGINEER
2-18W LED TUBE with 1' x 4' DUST PROOF CASING (RECESSED) X
EXHAUST FAN (CEILING MOUNTED)
ARCHITECT CONSENT, 16. ALL CIRCUITS SHALL BE 4-WIRES FOR 3Ø & 3-WIRES FOR 2Ø
AND SHALL BE COLOR CODED AS FOLLOWS: 1-18W LED TUBE with 1' x 4' DUST PROOF CASING (RECESSED) Sa ONE GANG OF 1-SINGLE POLE SWITCH
11. THIS DRAWINGS ARE DIAGRAMATIC LAYOUT ONLY, ANY LINE 1 - BLACK
MATERIALS AND FITTINGS NOT SHOWN ON THIS PLANS LINE 2 - RED Sab
2-9W LED TUBE with 1' x 2' DUST PROOF CASING (RECESSED) ONE GANG OF 2-SINGLE POLE SWITCHES
BUT NEEDED TO COMPLETE THE SYSTEM AND OPERATION
LINE 3 - BLUE
SHALL BE INCLUDED WITH THE CONTRACTOR'S SCOPE OF
GROUND WIRE - GREENSTRIPE 2-18 LED TUBE with WATER TIGHT CASING (SURFACED) Sabc ONE GANG OF 3-SINGLE POLE SWITCHES
WORKS.
GREEN-YELLOWGRAY
1-18 LED TUBE with WATER TIGHT CASING (SURFACED) S3W THREE WAY SWITCH
12. ALL WORKS SHALL BE DONE UNDER THE DIRECT
SUPERVISION OF LICENSE DULY REGISTERED ELECTRICAL 17. PREFERRED DISTRIBUTION BOARDS MUST BE INDUSTRIAL
ENGINEER OR REGISTERED MASTER ELECTRICIAN. TYPE, BOLT-ON WITH 18kAIC MINIMUM UNLESS OTHERWISE 7W LED DOWNLIGHT PS PHOTOVOLTAIC SWITCH
SPECIFIED.
PS TUNNELWALL LED LIGHTS, PHOTOSWITCH OPERATED MS MOTION SENSOR SWITCH
13. ADDITIONAL NOTES:
18. USE SOLDERLESS CONNECTOR, MECHANICAL 1 PRESSURE
1
· USE OF MICA SHALL BE LIMITED TO 150mm MAXIMUM TYPE COPPER LUGS FOR CONNECTION OF WIRES LARGER LED EMERGENCY LIGHT DP3 CIRCUIT HOMERUN INDICATING PANEL DESIGNATION
· USE OF FLEXIBLE METALLIC CONDUTIT SHALL BE THAN 8mm².
LIMITED TO 1m MAXIMUM DUPLEX CONVENIENCE OUTLET WITH GROUND ATS AUTOMATIC TRANSFER SWITCH
· PROVIDE PROPER CONDUIT SUPPORT, G.I. WIRES AS 19. USE FILLER COMPOUND, "SCOTCH FILL" OR APPROVED EQUAL
SUPPORT SHALL NOT BE ALLOWED AT SHARP EDGES TO PROVIDE SMOOTH SURFACE BEFORE WP DUPLEX RECEPTACLE WITH GROUND WEATHERPROOF DISTRIBUTION PANEL 1
DP1
· PROVIDE DOUBLE COAT OF RUST PROTECTIVE PAINT TAPING WITH ELECTRICAL TAPE.
(RED OXIDE PRIMER) ON HANGERS AND SUPPORTS. F DUPLEX RECEPTACLE WITH GROUND (FLOOR MOUNTED) MDP MAIN DISTRIBUTION PANEL

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-1
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
2.00 54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

1 8 2 9 3 4 10 5 6 11 7
DP5 DP4 DP5 DP4 DP5 DP5 DP4 DP5 DP5 DP4 DP5

NBI STO

MULTI PURPOSE RM
LANDBANK DI AND NBI DI STO
6
DP2 STO 18

6.00
MALE CR

STORAGE RM
CABINET

CABINET
EXAMINATION RM - 2 EXAMINATION RM - 1 DP1
19
TRANSACTION WINDOWS DP1

8 5 7 17
FE

DP1 DP2 DP2 DP1


H A L L W A Y
CLIENTS LOUNGE CLIENTS LOUNGE
NP SECTION
RECEPTION AREA FEMALE CR
OFFICE

6.00
9 11 20
F F F F DP1 F
DP1 DP1
INTERVIEW RM INTERVIEW RM
CHIEF PANEL
INTERVIEW
LANDBANK DI & NBI CLEARANCE
F F F F F
F 10

CHASE
F F F F

PIPE
DP1
12 COUNTER TABLE COUNTER TABLE
LOCKER STORAGE

24.00
RM DP1
EXIT
16 DP2 MDP2 DP1 MDP1 DP5
DP1
H A L L W A Y

ATS
H A L L W A Y
UP
WASH 8 9
CR DP2 DP2
AREA

6.00
EXIT ELECTRICAL RM
21
FEMALE MALE 10
DP3
CR CR DP2

32.70
COMPUTER TABLE
CLIENTS LOUNGE
SERVER
CCTV RM 13
DP1 14
DP1 CRIME LAB DRUG TESTING CLIENTS WAITING AREA

9
22 23 10 DP5 ENTEXIT
DP3 DP3 DP5
SENIOR CITIZENS & PWD LOUNGE
13
DP4
15 4 RAMP UP
DP1 3
WASH AREA INFORMATION 2
1
14 TRANSACTION WINDOWS
STORAGE UP

6.00
DP4 EXAM RM
3 sets: 3-250mmsq THWNTHHN Cu WIRE
MALE FEMALE
1-50mmsq THHNTHWN Cu WIRE
PWD CR
in 100mm dia PVC CONDUIT (DIRECTLY BURRIED)
EXIT LOBBY PROVIDE ALSO 1-3"DIA PVC CONDUIT FOR SERVICE
UP
CHIEF ENTRANCE OF TELECOMMUNICATION SYSTEM
URINE COLLECTION
STO

MDB
GFCI GFCI
SERVICE ENTRANCE
RAMP UP With SEPARATE CONDUIT FOR TELECOM & FIRE PUMP

ENTRANCE

TRANSFORMATION
ENTRANCE FROM
21
MAIN ENTRY DP1

OVAL
GFCI PORCH GFCI

POWER LAYOUT
3
2 RAMP UP
1
UP

GROUND FLOOR PLAN CANOPY LINE


SCALE 1 : 100MTS

P E D E S T R I A N L A N E

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-2
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

15 12 11 16 17 14 15
13
DP4 DP5 DP5 DP4 DP4 DP5 DP5
DP5
PULL DOWN STAIR
UP

FIRE EXIT

FEO RECORDS RM

FEO STAFF
CHIEF F

6.00
13
DP3
F7 MALE CR
6
DP3 DP3

FEO TRANSACTION WINDOWS


4
DP4

F F F F F
8 9
DP3 DP3
14
DP3
CONFERENCE RM FEO STAFF
F F
FEMALE CR

6.00
CLIENTS LOUNGE
F F F F F
6 10 11 20
DP4 DP3 DP3 DP3

CHASE
15

PIPE
DP3
12
DP3 DP3
STORAGE

24.00
F
MALE CR

FEMALE CR 16

DP4
DP3 16 12 8
DP5 DP4 DP5

UP DN

6.00
DP4
17
DP3

SOSIA TRANSACTION WINDOWS


RECORDS RM

SOSIA STAFF

20 5
DP4 17 DP4
18 DP5
DP5 19 18 6 ROOF LINE
DP5 19 F F F F DP4
DP3
DP3

18 COUNTER TABLE
DP4

6.00
DN
19

INFORMATION
DP4 F F F F
CHIEF

UP
F F F F

POWER LAYOUT
SECOND FLOOR PLAN CANOPY LINE
SCALE 1 : 100MTS

PERIMETER LINE

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-3
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

DN
FIRE EXIT

6.00
8
DP6

6.00
MULTI-PURPOSE AREA
(COVERED ROOFDECK)

24.00
DP6
UP DN

6.00
7
DP6

6.00
DN

POWER LAYOUT
ROOFDECK FLOOR PLAN
SCALE 1 : 100MTS

PERIMETER LINE

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-4
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
2.00 54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

NBI STO

S S
Scd
a a a c c X
Sab

MULTI PURPOSE RM
b a b a a b a b LANDBANK DI AND NBI DI STO y
STO S

6.00
MALE CR

STORAGE RM
CABINET

CABINET
EXAMINATION RM - 2 EXAMINATION RM - 1 MS
PS
TRANSACTION WINDOWS
x y
1 1 X
b b d d
a b a b a DP1
a b a b a DP2

PS Sa Sab Sab Sa Sxy


d S3Wy y y Sc
a
FE

c e c e
d H A L dL W A Y d
S3Wy c
Sab Sabc Sab NP SECTION CLIENTS LOUNGE CLIENTS LOUNGE
FEMALE CR
X
a RECEPTION AREA Sa a
OFFICE

6.00
a a b b c MS
c e c e 7
INTERVIEW RM INTERVIEW RM b b 3 DP1
PS CHIEF PANEL DP2
INTERVIEW
LANDBANK DI & NBI CLEARANCE MS
b
2 Sce STORAGE
6 S

CHASE
DP1

PIPE
a a b b c DP1
a a j i d c
LOCKER COUNTER TABLE COUNTER TABLE

24.00
RM EXIT Sabc Sa Sji Scd
Sa Sh 4
Sf H A L L W A Y
CR f c h DP2
MS a y
f g g k Sab
H A L L W A Y MS 5 a
UP DP1
X
Sab Sb Sg c Sk Sab
S3Wy WASH MS
AREA

6.00
2 ELECTRICAL RM
EXIT 3
MALE MS a b a
DP2
PS FEMALE d a a b b b DP1
a
CR CR CLIENTS LOUNGE
b

32.70
COMPUTER TABLE
MS MS
MS MS
SERVER d J 4 b
CCTV RM X X
c CRIME LAB DRUG TESTING a a DP1 CLIENTS WAITING AREA
MS
d c c d d d MS
Sd Sab Sabc ENTEXIT
PS
SENIOR CITIZENS & PWD LOUNGE INFORMATION MS
a 4 RAMP UP
MS MS Sabc b a b
3
WASH AREA 2
e e e f f 1
TRANSACTION WINDOWS c
b b S STORAGE UP

6.00
EXAM RM
MALE FEMALE
Sab MS PS
PWD MS
CR MS MS S
MS c
EXIT S X LOBBY
X X
X UP
URINE COLLECTION
STO CHIEF

RAMP UP b
ENTRANCE
MS

TRANSFORMATION
b b

ENTRANCE FROM
MAIN ENTRY

OVAL
PS PS
a
PORCH
4
J

LIGHTING LAYOUT
3
a 2 a RAMP UP
1
UP 21
DP4

GROUND FLOOR PLAN SINAGE LIGHTING AT CANOPY


CANOPY LINE
SCALE 1 : 100MTS

P E D E S T R I A N L A N E

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-5
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

DN

UP
PULL DOWN STAIR

FIRE EXIT
CHIEF
a i h k d l l m n n o k o n

FEO RECORDS RM
X
y

FEO STAFF
a

6.00
MS
MALE CR
Sa
x y
Sb X
a Sa i h k e l a m n f o j n p

FEO TRANSACTION WINDOWS


b

Shi Sxy
Sjk

g g j d l b m n g o k o q
CONFERENCE RM FEO STAFF
4.55

w x w X
Sa FEMALE CR a

6.00
MS MS

CLIENTS LOUNGE
Swx

j e l a m n f o j n p q S

CHASE
f f

PIPE
MS 1
DP3 STORAGE
Sfg

24.00
MS
MALE CR

FEMALE CR MS 2 3 1 4 2
MS DP3 DP3 DP4 DP3 DP4
X
X UP DN c d l b m n g o k o q p
3
c DP4

6.00
Scde
5
Sa DP3

SOSIA TRANSACTION WINDOWS


a
RECORDS RM

e l a m n f o j n p n
d
SOSIA STAFF

PS

a ROOF LINE
d l c m n h o k o Sno Spq n o
d COUNTER TABLE

6.00
DN
INFORMATION
Sb
CHIEF
i PS
b

UP
e a c m n h
e
Sde Sabc Slm Sno Sfgh Sijk
ONE STOP LIGHTINGS PS

21
DP4
PNP LOGO LIGHTINGS

LIGHTING LAYOUT
SECOND FLOOR PLAN CANOPY LINE
SCALE 1 : 100MTS

PERIMETER LINE

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-6
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

DN
FIRE EXIT

i j X
y
k h g f e d c a b

6.00
MS

x y
X

i j
Sxy
k g h e f c d b a

MULTI-PURPOSE AREA
(COVERED ROOFDECK) Sa
X
a

6.00
MS MS

i j
k h g f e d c a b
S
1
DP6
SijSkl

24.00
i
UP MS
DN l
6
DP6 g h
5
DP6 e f
4
DP6 c d
3
DP6 b a
2
DP6

6.00
PS l h g f e d c a b

Sgh Sef Scd Sab

6.00
DN PS
MS
l g h e f c d

LIGHTING LAYOUT
ROOFDECK FLOOR PLAN
SCALE 1 : 100MTS

PERIMETER LINE

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-7
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
2.00 54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

NBI STO
SD
SD SD SD M
SD SD SD SD SD

MULTI PURPOSE RM
LANDBANK DI AND NBI DI STO
SD
STO

6.00
MALE CR

STORAGE RM
CABINET

CABINET
SD EXAMINATION RM - 2 EXAMINATION RM - 1 SD

B
Z105
TRANSACTION WINDOWS
FACP

SD SD Z104 SD SD
FACP
SD SD

B
FE

H A L L W A Y SD
M Z106
CLIENTS LOUNGE CLIENTS LOUNGE
NP SECTION FACP

RECEPTION AREA FEMALE CR


OFFICE

6.00
SD INTERVIEW RM INTERVIEW RM
CHIEF SD SD SD PANEL
INTERVIEW SD Z201 SD Z202
LANDBANK FACP DI & NBI CLEARANCE FACP

CHASE
SD

PIPE
Z103
FACP SD
LOCKER COUNTER TABLE COUNTER TABLE STORAGE

24.00
RM EXIT
H A L L W A Y
SD H A L L W A Y Z107 SD
SD FACP
SD HD
UP

M
WASH
CR B
AREA SD

6.00
EXIT Z203 ELECTRICAL RM
FEMALE MALE FACP Z205
Z101 FACP
CR CR FACP
CLIENTS LOUNGE

32.70
COMPUTER TABLE
SD SD SD SD SD HD
SERVER
CCTV RM SD SD
CRIME LAB DRUG TESTING Z204 CLIENTS WAITING AREA
FACP

ENTEXIT
SENIOR CITIZENS & PWD LOUNGE 22

FACP
DP1 4 RAMP UP
SD SD 3
WASH AREA INFORMATION 2
Z102
1
TRANSACTION WINDOWS FACP
SD SD STORAGE UP

6.00
EXAM RM
SD
MALE FEMALE
PWD CR SD
SD
EXIT LOBBY UP
CHIEF
URINE COLLECTION
STO

RAMP UP
ENTRANCE
SD

TRANSFORMATION
ENTRANCE FROM
MAIN ENTRY

OVAL
PORCH
4

FIRE ALARM LAYOUT


3
2 RAMP UP
1
UP

GROUND FLOOR PLAN CANOPY LINE


SCALE 1 : 100MTS

P E D E S T R I A N L A N E

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-8
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

DN

UP
PULL DOWN STAIR

FIRE EXIT

SD

FEO RECORDS RM
B
SD

FEO STAFF
CHIEF

6.00
SD SD SD SD SD SD
MALE CR

FEO TRANSACTION WINDOWS


CONFERENCE RM
SD
SD FEO STAFF
FEMALE CR

6.00
SD SD SD SD SD SD

CLIENTS LOUNGE
Z403
FACP
M Z301
FACP
SD

CHASE
PIPE
SD
STORAGE

24.00
MALE CR

FEMALE CR

UP DN SD

M Z302

6.00
FACP SD SD SD SD SD
SD

SOSIA TRANSACTION WINDOWS


RECORDS RM

SOSIA STAFF

SD

ROOF LINE

COUNTER TABLE
SD Z402

6.00
DN
INFORMATION
SD SD SD FACP Z401
CHIEF FACP
SD SD

UP
B

FIRE ALARM LAYOUT


SECOND FLOOR PLAN CANOPY LINE
SCALE 1 : 100MTS

PERIMETER LINE

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-9
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

DN
FIRE EXIT

HD HD

6.00
HD

MULTI-PURPOSE AREA
(COVERED ROOFDECK)

6.00
HD HD

SD

24.00
B
M

SD
UP DN

6.00
HD

Z501
HD FACP
HD

6.00
Z502
DN
FACP SD

LEGEND
SD SMOKE DETECTOR

M FIRE MANUAL SWITCH

B FIRE ALARM BELL


FIRE ALARM LAYOUT
ROOFDECK FLOOR PLAN
FACP FIRE ALARM CONTROL PANEL

HD HEAT DETECTOR
SCALE 1 : 100MTS
Z106
FACP CIRCUIT HOME RUN & DESIGNATION

PERIMETER LINE

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-10
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 1

3 - 50 mm² THHN/THWN CU WIRE


1 - 8 mm² THHN/THWN CU WIRE
in 50 mm Ø PVC PIPE
123G
NO. & SIZE NO. & SIZE
L O A D OCPD of WIRE & L O A D OCPD of WIRE &
CONDUIT CONDUIT
SPO 125AT SPO
AT, AF, POLE, WIRE mm² AT, AF, POLE, WIRE mm²
DESCRIPTION LO CO NEMA Total Volts kVA L1 L2 L3 Amps
kAIC PVC mmØ
DESCRIPTION LO CO NEMA Total Volts kVA L1 L2 L3 Amps
kAIC PVC mmØ
3R 3R
15AT 15AT
1 L.O. (Multi-purpose & Exam Rm 2) 11 11 230 1.10 4.78 4.78 4.78 15, 50, 2, 18 2-3.5+1-2.0 20 2 L.O. (NP Section Reception Area, Interview Rm & Hallway) 17 17 230 1.70 7.39 7.39 7.39 15, 50, 2, 18 2-3.5+1-2.0 20
15AT 15AT
3 L.O. (CL Drug Testing & PWD Lounge) 20 20 230 2.00 8.70 8.70 8.70 15, 50, 2, 18 2-3.5+1-2.0 20 4 L.O. (CL Drug TestingEnt. InformationWaiting Areas) 19 19 230 1.90 8.26 8.26 8.26 15, 50, 2, 18 2-3.5+1-2.0 20
15AT 15AT
5 L.0. (Main Entrance, Client's Waiting Area & Electrical Rm) 15 15 230 1.50 6.52 6.52 6.52 15, 50, 2, 18 2-3.5+1-2.0 20 6 L.0. (DI & NBI & Landbank C. Table, Hallway & Server Room) 15 15 230 1.50 6.52 6.52 6.52 15, 50, 2, 18 2-3.5+1-2.0 20
15AT 20AT
7 L.0. (Landbank & DI-NBI T. Windows and M & F C.R.) 18 18 230 1.80 7.83 7.83 7.83 15, 50, 2, 18 2-3.5+1-2.0 20 8 Receptacle (Multi-purpose and NP Examination Room 1) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
9 Receptacle (NP Office and Interview Rooms) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20 10 Receptacle (NP Interview Rooms) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
11 Receptacle (NP Office and Interview Rooms) 11 11 230 1.98 8.61 8.61 8.61 20, 50, 2, 18 2-3.5+1-2.0 20 12 Receptacle (NP Interview Rooms) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
13 Receptacle (T. Windows and Sr Citizen's & PWD Lounge) 8 8 230 1.44 6.26 6.26 6.26 20, 50, 2, 18 2-3.5+1-2.0 20 14 Receptacle (CL Drug Testing) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
15 Receptacle (CL Drug TestingEnt. InformationWaiting Areas) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20 16 Receptacle (Landbank Couter Tables) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
17 Receptacle (Examination Room 1) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20 18 Receptacle (Landban, DI and NBI Transaction Windows) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
19 Receptacle (DI & NBI Teller & Stock Rooms) 8 8 230 1.44 6.26 6.26 6.26 20, 50, 2, 18 2-3.5+1-2.0 20 20 Receptacle (DI & NBI Counter Tables) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 30AT
21 Receptacle (CL Examination Room and Main Entry) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20 22 S P A R E (Fire Alarm Control Panel) 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25
30AT 30AT
23 S P A R E 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25 24 S P A R E 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25

Sub-total 64 53 117 18.94 49.48 58.00 57.22 82.35 Sub-total 51 44 95 19.02 52.96 51.22 61.22 82.70
GROUNDING LUGS
FOR EVERY CIRCUIT

1-8MM ² THHNTHWNCOPPERWRIE
ni20MM ØPVCPPIE

PROVDIEGROUNDNIGROD
COPPERCLADSTEELROD(16MMØX3000MM)

COMPUTATION OF SERVICE EQUIPMENT: DP1


Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of DISTRIBUTION PANEL 1: 24 BRANCHES, 250AF,
CONDUCTOR: Number Size Type Icb (Main Over Current Protective Device)= Iw + Largest motor
Largest motor CENTER MAIN
THWN
TOTAL CURRENT, (It) = 57.22 + 61.22 = 118.44 Line: 3 38 mm sq Icb (Main OCPD) = 100.67 + 0.00 = 100.67 BREAKERS: Number Pole AT, AF, kAIC
Copper
THWN
DEMAND FACTOR, (df) = 0.85 Grounding: 1 8 mm sq Main 1 3 125, 150, 25
Copper

25 OF LARGEST MOTOR = 0.25 x 0.00 = 0.00 CONDUIT: 1 40 mm Ø PVC Branches 7 2 15, 50, 18

WIRE AMPACITY, (Iw) = 100.67 + 0.00 = 100.67 Branches 14 2 20, 50, 18

Branches 3 2 30, 50, 18

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-11
LOCATION: CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 2

3 - 22 mm² THHN/THWN CU WIRE


1 - 8 mm² THHN/THWN CU WIRE
in 40 mm Ø PVC PIPE
123G
NO. & SIZE NO. & SIZE
L O A D OCPD of WIRE & L O A D OCPD of WIRE &
CONDUIT CONDUIT
SPO 60AT SPO
AT, AF, POLE, WIRE mm² AT, AF, POLE, WIRE mm²
DESCRIPTION LO CO NEMA Total Volts kVA L1 L2 L3 Amps
kAIC PVC mmØ
DESCRIPTION LO CO NEMA Total Volts kVA L1 L2 L3 Amps
kAIC PVC mmØ
3R 3R
15AT 15AT
1 L.O. (Examination Room 1 and NP Storage Room) 10 10 230 1.00 4.35 4.35 4.35 15, 50, 2, 18 2-3.5+1-2.0 20 2 L.O. (Client's Area, CL Drug Testing & Hallway) 14 14 230 1.40 6.09 6.09 6.09 15, 50, 2, 18 2-3.5+1-2.0 20
15AT 15AT
3 L.O. (Client's Lounge, NP Section and Interview Rooms) 22 22 230 2.20 9.57 9.57 9.57 15, 50, 2, 18 2-3.5+1-2.0 20 4 L.O. (Female & Male C.R., Storage Room and Hallway) 10 10 230 1.00 4.35 4.35 4.35 15, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
5 Receptacle (NP Examination Room 2) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20 6 Receptacle (NP Examination Room 2) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
7 Receptacle (NP Examination Room 1) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20 8 Receptacle (NP Office & Locker Rm, Hallway & Lounge) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
9 Receptacle (Waiting Area) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20 10 Receptacle (Client's Waiting Area & Electrical Room) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
11 S P A R E 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25 12 S P A R E 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25

Sub-total 32 19 51 9.62 24.09 26.78 32.78 41.83 Sub-total 24 19 43 8.82 20.61 29.30 26.78 38.35
GROUNDING LUGS
FOR EVERY CIRCUIT

1-8MM ² THHNTHWNCOPPERWRIE
ni20MM ØPVCPPIE

PROVDIEGROUNDNIGROD
COPPERCLADSTEELROD(16MMØX3000MM)

COMPUTATION OF SERVICE EQUIPMENT: DP2


Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of DISTRIBUTION PANEL 1: 12 BRANCHES, 100AF,
CONDUCTOR: Number Size Type Icb (Main Over Current Protective Device)= Iw + Largest motor
Largest motor CENTER MAIN
THWN
TOTAL CURRENT, (It) = 32.78 + 26.78 = 59.56 Line: 3 22 mm sq Icb (Main OCPD) = 50.63 + 0.00 = 50.63 BREAKERS: Number Pole AT, AF, kAIC
Copper
THWN
DEMAND FACTOR, (df) = 0.85 Grounding: 1 8 mm sq Main 1 3 60, 100, 18
Copper

25 OF LARGEST MOTOR = 0.25 x 0.00 = 0.00 CONDUIT: 1 40 mm Ø PVC Branches 4 2 15, 50, 18

WIRE AMPACITY, (Iw) = 50.63 + 0.00 = 50.63 Branches 8 2 20, 50, 18

Branches 0 2 30, 50, 18

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-12
LOCATION: CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 3

3 - 50 mm² THHN/THWN CU WIRE


1 - 8 mm² THHN/THWN CU WIRE
in 50 mm Ø PVC PIPE
NO. & SIZE of 123G NO. & SIZE of
L O A D OCPD WIRE & L O A D OCPD WIRE &
CONDUIT CONDUIT
SPO SPO
AT, AF, WIRE mm² 125AT AT, AF, WIRE mm²
DESCRIPTION LO CO NEMA Total Volts kVA L1 L2 L3 Amps DESCRIPTION LO CO NEMA Total Volts kVA L1 L2 L3 Amps
POLE, kAIC EMT mmØ POLE, kAIC EMT mmØ
3R 3R
15AT 15AT
1 L.O. (FEO Area) 19 19 230 1.90 8.26 8.26 8.26 15, 50, 2, 18 2-3.5+1-2.0 20 2 L.O. (SOCIA Area & CR) 18 18 230 1.80 7.83 7.83 7.83 15, 50, 2, 18 2-3.5+1-2.0 20
15AT 15AT
3 L.O. (FEO & SOCIA Transaction Windows) 16 16 230 1.60 6.96 6.96 6.96 15, 50, 2, 18 2-3.5+1-2.0 20 4 L.O. (Client's Lounge) 17 17 230 1.70 7.39 7.39 7.39 15, 50, 2, 18 2-3.5+1-2.0 20
15AT 20AT
5 L.O. (Client's Lounge & CR) 17 17 230 1.70 7.39 7.39 7.39 15, 50, 2, 18 2-3.5+1-2.0 20 6 Receptacle (FEO Staff) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20
15AT 20AT
7 Receptacle (FEO Staff) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20 8 Receptacle (FEO Staff) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
9 Receptacle (FEO Staff) 3 3 230 0.54 2.35 2.35 2.35 20, 50, 2, 18 2-3.5+1-2.0 20 10 Receptacle (FEO Staff) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
11 Receptacle (FEO Staff) 3 3 230 0.54 2.35 2.35 2.35 20, 50, 2, 18 2-3.5+1-2.0 20 12 Receptacle (SOCIA Staff) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
13 Receptacle (FEO Transaction Windows) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20 14 Receptacle (FEO Transaction Windows) 5 5 230 0.90 3.91 3.91 3.91 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
15 Receptacle (FEO Transaction Windows) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20 16 Receptacle (SOCIA Transaction Windows) 3 3 230 0.54 2.35 2.35 2.35 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
17 Receptacle (SOCIA Transaction Windows) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20 18 Receptacle (FEO Transaction Windows) 3 3 230 0.54 2.35 2.35 2.35 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
19 Receptacle (SOCIA Staff) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20 20 Receptacle (Counter Table) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20
50AT 20AT
21 SERVER ROOM 1 230 10.00 43.48 43.48 43.48 50, 50, 2, 18 25 22 1 TR (Server Room) 1 230 2.07 9.00 9.00 9.00 20, 50, 2, 18 2-5.5+1-3.525
20AT 30AT
23 1 TR (Server Room) 1 230 2.07 9.00 9.00 9.00 20, 50, 2, 18 2-5.5+1-3.525 24 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

Sub-total 52 28 2 80 22.31 75.13 41.09 77.78 97.00


GROUNDING LUGS
Sub-total 35 38 1 73 15.41 43.78 43.57 46.65 67.00

FOR EVERY CIRCUIT

COMPUTATION OF SERVICE EQUIPMENT: DP3


Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of DISTRIBUTION PANEL 1: 24 BRANCHES, 150AF,
CONDUCTOR: Number Size Type Icb (Main Over Current Protective Device)= Iw + Largest motor
Largest motor CENTER MAIN
THWN
TOTAL CURRENT, (It) = 77.78 + 46.65 = 124.43 Line: 3 50 mm sq Icb (Main OCPD) = 108.02 + 9.00 = 117.02 BREAKERS: Number Pole AT, AF, kAIC
Copper
THWN
DEMAND FACTOR, (df) = 0.85 Grounding: 1 8 mm sq Main 1 3 125, 150, 25
Copper

25 OF LARGEST MOTOR = 0.25 x 9.00 = 2.25 CONDUIT: 1 50 mm Ø PVC Branches 5 2 15, 50, 18

WIRE AMPACITY, (Iw) = 105.77 + 2.25 = 108.02 Branches 17 2 20, 50, 18

Branches 1 2 30, 50, 18

Branches 1 2 50, 50, 18

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-13
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 4

3 - 100 mm² THHN/THWN CU WIRE


1 - 14 mm² THHN/THWN CU WIRE
in 65 mm Ø PVC PIPE
NO. & SIZE of 123G NO. & SIZE of
L O A D OCPD WIRE & L O A D OCPD WIRE &
CONDUIT CONDUIT
SPO SPO
AT, AF, WIRE mm² 200AT AT, AF, WIRE mm²
DESCRIPTION LO CO NEMA Total Volts kVA L1 L2 L3 Amps DESCRIPTION LO CO NEMA Total Volts kVA L1 L2 L3 Amps
POLE, kAIC EMT mmØ POLE, kAIC EMT mmØ
3R 3R
15AT 15AT
1 L.O. (Client's Lounge) 16 16 230 1.60 6.96 6.96 6.96 15, 50, 2, 18 2-3.5+1-2.0 20 2 L.O. (SOCIA Area & CR) 16 16 230 1.60 6.96 6.96 6.96 15, 50, 2, 18 2-3.5+1-2.0 20
15AT 20AT
3 L.O. (FEO & SOCIA Transaction Windows) 13 13 230 1.30 5.65 5.65 5.65 15, 50, 2, 18 2-3.5+1-2.0 20 4 Receptacle (Client's Lounge) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
5 Receptacle (Client's Lounge at Column) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20 6 Receptacle (Counter Table) 8 8 230 1.44 6.26 6.26 6.26 20, 50, 2, 18 2-3.5+1-2.0 20
20AT 30AT
7 Receptacle (InfoClient's Lounge) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20 8 2.5TR (GF Exam Room 2) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525
30AT 30AT
9 3TR (Interview Rooms) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525 10 2.5TR (GF Exam Room 1) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525
40AT 30AT
11 4TR (Client's Lounge) 1 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525 12 2.5TR (GF Waiting Area) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525
30AT 20AT
13 3TR (Client's Testing Area) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525 14 1.5TR (GF EntryHallway) 1 1 230 2.16 9.40 9.40 9.40 20, 50, 2, 18 2-5.5+1-3.525
20AT 40AT
15 1.5TR (2nd Floor FEO Staff) 1 1 230 2.16 9.40 9.40 9.40 20, 50, 2, 18 2-5.5+1-3.525 16 4TR (2nd Floor Client's Lounge) 1 1 230 4.46 9.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
40AT 40AT
17 4TR (2nd Floor Client's Lounge) 1 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525 18 4TR (2nd Floor Client's Lounge) 1 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
40AT 20AT
19 4TR (2nd Floor Client's Lounge) 1 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525 20 1.5TR (2F SOCIA STAFF) 1 1 230 2.16 9.40 5.48 9.40 20, 50, 2, 18 2-5.5+1-3.525
20AT 30AT
21 S P A R E (Sinage Lightings) 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 2-3.5+1-2.0 20 22 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
30AT 30AT
23 SPARE 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25 24 S P A R E 230 3.00 17.00 13.04 13.04 30, 50, 2, 18 25

Sub-total 29 8 6 43 33.71 91.58 101.46 100.07 146.56


GROUNDING LUGS
Sub-total 16 15 7 38 35.28 87.68 98.50 110.63 153.38

FOR EVERY CIRCUIT

COMPUTATION OF SERVICE EQUIPMENT: DP4


Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of DISTRIBUTION PANEL 1: 24 BRANCHES, 250AF,
CONDUCTOR: Number Size Type Icb (Main Over Current Protective Device)= Iw + Largest motor
Largest motor CENTER MAIN
100 mm THWN
TOTAL CURRENT, (It) = 100.07 + 110.63 = 210.70 Line: 3 Icb (Main OCPD) = 183.95 + 19.40 = 203.35 BREAKERS: Number Pole AT, AF, kAIC
sq Copper
THWN
DEMAND FACTOR, (df) = 0.85 Grounding: 1 14 mm sq Main 1 3 200, 250, 25
Copper

25 OF LARGEST MOTOR = 0.25 x 19.40 = 4.85 CONDUIT: 1 65 mm Ø PVC Branches 3 2 15, 50, 18

WIRE AMPACITY, (Iw) = 179.10 + 4.85 = 183.95 Branches 8 2 20, 50, 18

Branches 8 2 30, 50, 18

Branches 5 2 40, 50, 18

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-14
LOCATION: CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 5

3 - 125 mm² THHN/THWN CU WIRE


1 - 22 mm² THHN/THWN CU WIRE
in 65 mm Ø PVC PIPE
123G
NO. & SIZE NO. & SIZE
L O A D OCPD of WIRE & L O A D OCPD of WIRE &
CONDUIT CONDUIT
SPO 250AT SPO
AT, AF, POLE, WIRE mm² AT, AF, POLE, WIRE mm²
DESCRIPTION LO CO NEMA Total Volts kVA L1 L2 L3 Amps
kAIC PVC mmØ
DESCRIPTION LO CO NEMA Total Volts kVA L1 L2 L3 Amps
kAIC PVC mmØ
3R 3R
20AT 30AT
1 1.5 TR (Multi-purpose Room) 1 230 2.16 9.40 9.40 9.40 20, 50, 2, 18 2-5.5+1-3.525 2 3 TR (Exam Room 2) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525
30AT 30AT
3 3 TR (NP Section) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525 4 3 TR (NP Section Intreview Rooms) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525
30AT 40AT
5 3 TR (Exam Room 1) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525 6 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
40AT 30AT
7 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525 8 3 TR (Waiting Areas) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525
40AT 20AT
9 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525 10 1.5 TR (CL Exam Room) 1 230 2.16 9.40 9.40 9.40 20, 50, 2, 18 2-5.5+1-3.525
40AT 30AT
11 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525 12 3 TR (FEO Staff) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525
30AT 40AT
13 2.5 TR (C, FEOConference Room) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525 14 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
40AT 40AT
15 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525 16 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
40AT 40AT
17 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525 18 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
30AT 30AT
19 3 TR (C,SOCIA & Staff) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525 20 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
30AT 30AT
21 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25 22 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
30AT 30AT
23 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25 24 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

Sub-total 10 46.11 131.64 131.64 137.69 200.49 Sub-total 9 44.65 125.29 135.29 127.69 194.13
GROUNDING LUGS
FOR EVERY CIRCUIT

1-22MM ² THHNTHWNCOPPERWRIE
ni25MM ØPVCPPIE

PROVDIEGROUNDNIGROD
COPPERCLADSTEELROD(16MMØX3000MM)

COMPUTATION OF SERVICE EQUIPMENT: DP5


Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of DISTRIBUTION PANEL 1: 24 BRANCHES, 250AF,
CONDUCTOR: Number Size Type Icb (Main Over Current Protective Device)= Iw + Largest motor
Largest motor CENTER MAIN
125 mm THWN
TOTAL CURRENT, (It) = 137.69 + 127.89 = 265.58 Line: 3 Icb (Main OCPD) = 230.59 + 19.40 = 249.99 BREAKERS: Number Pole AT, AF, kAIC
sq Copper
THWN
DEMAND FACTOR, (df) = 0.85 Grounding: 1 22 mm sq Main 1 3 250, 250, 25
Copper

25 OF LARGEST MOTOR = 0.25 x 19.40 = 4.85 CONDUIT: 1 65 mm Ø PVC Branches 0 2 15, 50, 18

WIRE AMPACITY, (Iw) = 225.74 + 4.85 = 230.59 Branches 2 2 20, 50, 18

Branches 13 2 30, 50, 18

Branches 9 2 40, 50, 18

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-15
LOCATION: CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 6

3 - 38 mm² THHN/THWN CU WIRE


1 - 8 mm² THHN/THWN CU WIRE
in 40 mm Ø PVC PIPE
123G
NO. & SIZE NO. & SIZE
L O A D OCPD of WIRE & L O A D OCPD of WIRE &
CONDUIT CONDUIT
SPO 100AT SPO
AT, AF, POLE, WIRE mm² AT, AF, POLE, WIRE mm²
DESCRIPTION LO CO NEMA Total Volts kVA L1 L2 L3 Amps
kAIC PVC mmØ
DESCRIPTION LO CO NEMA Total Volts kVA L1 L2 L3 Amps
kAIC PVC mmØ
3R 3R
15AT 15AT
1 L.O. (Female & Male C.R., Storage Room and Hallway) 13 13 230 1.30 5.65 5.65 5.65 15, 50, 2, 18 2-3.5+1-2.0 20 2 L.O. (Multi-purpose Hall) 13 13 230 1.30 5.65 5.65 5.65 15, 50, 2, 18 2-3.5+1-2.0 20
15AT 15AT
3 L.O. (Multi-purpose Hall) 12 12 230 1.20 5.22 5.22 5.22 15, 50, 2, 18 2-3.5+1-2.0 20 4 L.O. (Multi-purpose Hall) 12 12 230 1.20 5.22 5.22 5.22 15, 50, 2, 18 2-3.5+1-2.0 20
15AT 15AT
5 L.O. (Multi-purpose Hall) 12 12 230 1.20 5.22 5.22 5.22 15, 50, 2, 18 2-3.5+1-2.0 20 6 L.O. (Multi-purpose Hall) 16 16 230 1.60 6.96 6.96 6.96 15, 50, 2, 18 2-3.5+1-2.0 20
20AT 20AT
7 Receptacle (Multi-purpose Hall) 9 9 230 1.62 7.04 7.04 7.04 20, 50, 2, 18 2-3.5+1-2.0 20 8 Receptacle (Multi-purpose Hall) 9 9 230 1.62 7.04 7.04 7.04 20, 50, 2, 18 2-3.5+1-2.0 20
30AT 30AT
9 SPARE 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25 10 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
30AT 30AT
11 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25 12 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

Sub-total 37 9 46 11.32 30.96 30.96 36.52 49.22 Sub-total 41 9 50 11.72 30.96 32.70 38.26 50.96
GROUNDING LUGS
FOR EVERY CIRCUIT

COMPUTATION OF SERVICE EQUIPMENT: DP6


Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of DISTRIBUTION PANEL 1: 12 BRANCHES, 150AF,
CONDUCTOR: Number Size Type Icb (Main Over Current Protective Device)= Iw + Largest motor
Largest motor CENTER MAIN
THWN
TOTAL CURRENT, (It) = 36.52 + 38.26 = 74.78 Line: 3 38 mm sq Icb (Main OCPD) = 63.56 + 0.00 = 63.56 BREAKERS: Number Pole AT, AF, kAIC
Copper
THWN
DEMAND FACTOR, (df) = 0.85 Grounding: 1 8 mm sq Main 1 3 100, 150, 18
Copper

25 OF LARGEST MOTOR = 0.25 x 0.00 = 0.00 CONDUIT: 1 40 mm Ø PVC Branches 6 2 15, 50, 18

WIRE AMPACITY, (Iw) = 63.56 + 0.00 = 63.56 Branches 2 2 20, 50, 18

Branches 4 2 30, 50, 18

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-16
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
SCHEDULE OF LOADS MAIN DISTRIBUTION PANEL 1 SCHEDULE OF LOADS MAIN DISTRIBUTION PANEL 2

NO. & SIZE NO. & SIZE


L O A D OCPD of WIRE & L O A D OCPD of WIRE &
CKT
NO.
CONDUIT CKT
NO.
CONDUIT
LOAD CURRENT AT, AF, POLE, WIRE mm² LOAD CURRENT AT, AF, POLE, WIRE mm²
DESCRIPTION Volts kVA Amps DESCRIPTION Volts kVA Amps
L1 L2 L3 kAIC PVC mmØ L1 L2 L3 kAIC PVC mmØ
1 DISTRIBUTION PANEL 1 230 37.96 165.04 102.44 109.22 118.44 125, 150, 3, 25 3-50+1-8 50 1 DISTRIBUTION PANEL 2 230 18.44 80.17 44.70 56.08 59.56 60, 100, 3, 25 3-22+1-8 40

2 DISTRIBUTION PANEL 3 230 37.72 164.00 118.91 84.66 124.43 125, 150, 3, 25 3-50+1-8 50 2 DISTRIBUTION PANEL 4 230 68.99 299.96 179.26 199.96 210.70 200, 250, 3, 25 3-100+1-14 65

3 DISTRIBUTION PANEL 5 230 90.76 394.61 256.93 266.93 265.58 250, 250, 3, 25 3-125+1-4 65 3 DISTRIBUTION PANEL 6 230 23.04 100.17 61.92 63.66 74.78 100, 150, 3, 18 3-38+1-8 40

4 SPARE 230 3.60 27.11 15.65 15.65 15.65 40, 50, 3, 18 32 4 SPARE 230 3.60 27.11 15.65 15.65 15.65 30, 50, 3, 18 32

TOTAL 170.04 750.76 493.93 476.46 524.10 TOTAL 114.07 507.41 301.53 335.35 360.69

COMPUTATIONS OF LOADS: MAIN DISTRIBUTION PANEL 1 COMPUTATIONS OF LOADS: MAIN DISTRIBUTION PANEL 2
& GENERATOR with ATS & TRANSFORMER with Main Disconnecting Means
Iw (Main Service Entrance Conductor)= (Highest Line Load x Demand Factor) + 25 of the Full Load Current of Largest motor Iw (Main Service Entrance Conductor)= ((Highest Line Load230) x (1.732) x Demand Factor)) + 25 of the Current of Largest motor

USE: 6 - 250 mm² THHN/THWN + 2 - 50 mm² THHN/THWN Copper Wire in 2-100 mm Ø RSC USE: 3 - 250 mm² THHN/THWN + 1 - 50 mm² THHN/THWN Copper Wire in 1-100 mm Ø RSC
Iw (Wire ampacity) = 445.49 + 4.85 = 450.34 Iw (Wire ampacity) = 305.85 + 4.85 = 310.70
PIPE PIPE

Icb (Main Over Current Protective Device)= Iw + Full Load Current of Largest motor Icb (Main Over Current Protection Device)= Iw + Current of Largest motor

USE: 500 AT CB Main CB, 42kAIC, 4 Branches Main Distribution Panel, Bolt-on individual CB, 3 Pole, USE: 350 AT CB Main, 42kAIC, 4 Branches Main Distribution Panel, Bolt-on individual CB, 3 Pole,
Icb (Main OCPD) = 450.34 + 19.40 = 469.74 Icb (Main OCPD) = 310.70 + 19.40 = 330.10
240V, 60Hz with Grounding Lugs 240V, 60Hz with Grounding Lugs
Generator Rating: Transformer Rating, MDB and Main Service Entrance Conductor:
USE: 1-350 KVA GENERATOR SET, 3 PHASE, SILENT TYPE and 800AT Automatic Transfer Switch USE: 3-100 KVA DISTRIBUTION TRANSFORMER
Generator Rating (kVA) = Total kVA Total Load (kVA) = kVA MDP1+kVA
284.1 x 1.250 = 355.14 181.1 1.732 = 104.57 Main Disconnecting Means 700 AT CB
Load*1.25= MDP2*div.f* demand f1.732=
9 - 250 mm2 THHNTHWN + 3-50 mm2 THHNTHWN Copper Wire in 3-100 mm dia RSC

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-17
LOCATION: CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
5
8" Ø EYEBOLT
GALVANIZED

RISER DIAGRAM DRIP LOOP


at least 1500
SERVICE DROP LINE
3-500mm² THWN Cu Wire
1-60mm² THWN Cu Wire
USE SOLDERLESS
CONNECTORS CURRENT TRANFORMER
ENCLOSED, CTR: 5:800
PROVIDE GROUNDING ROD
CONNECTOR
DP6 SERVICE ENTRANCE POLE
100AT 3700mm High for residential property and driveways
5500mm High for public streets, alleys, roads, parking areas
3-100mmØ RIGID STEEL subject to truck traffic
CONDUIT EMBEDED ON
CONCRETE POLE 20 mm Ø RSC with clamps
PROVIDE GROUNDING
3rd F LINE 6-3.5mm² THHN Cu Wire
ELECTRODE ROD
COPPER CLAD STEEL ROD
(16MM DIA x 3000MM)
800AT MAIN DISCONNECTING MEANS
3-38mmsq THWNTHHN Cu WIRE KWHR METER
IN NEMA 3R ENCLOSURES
1-8mmsq THHNTHWN Cu WIRE CT RATED in
in 40mm dia PVC CONDUIT NEMA 3R
ENCLOSURES SEE DETAIL OF MDB
NGL 3 SETS: 3-250mmsq THWNTHHN Cu WIRE
1-50mmsq THHNTHWN Cu WIRE
EXTEROIROFTHE in 100mm dia PVC CONDUIT
BULIDNIG

DP4 DP3
200AT 125AT
SERVICE ENTRANCE
3PHASE, 4-WIRE, 240V, 60HZ
DETAIL OF SERVICE ENTRANCE EQUIPMENT & GROUNDING
NOT DRAWN TO SCALE
2nd F LINE

3-50mmsq THWNTHHN Cu WIRE


3 sets: 3-250mmsq THWNTHHN Cu WIRE
1-8mmsq THHNTHWN Cu WIRE
1-50mmsq THHNTHWN Cu WIRE 3-50mmsq THWNTHHN Cu WIRE
in 50mm dia PVC CONDUIT
in 100mm dia RSC CONDUIT 1-8mmsq THHNTHWN Cu WIRE
in 50mm dia PVC CONDUIT

3-100mmsq THWNTHHN Cu WIRE 0.80


3-22mmsq THWNTHHN Cu WIRE
1-14mmsq THHNTHWN Cu WIRE 3-125mmsq THWNTHHN Cu WIRE TOP
1-8mmsq THHNTHWN Cu WIRE
in 65mm dia PVC CONDUIT 1-22mmsq THHNTHWN Cu WIRE
in 40mm dia PVC CONDUIT 3 SETS SERVICE NOTE:
KWHR METER MDP1 in 65mm dia PVC CONDUIT ENTRANCE CAP COORDINATE TO THE STRUCTURAL
CT RATED M 500AT
ENGINEER THE SIZE OF STEEL BARS
ATS 58" EYEBOLT
MDP2
MCB 800AT
350AT
800AT RIGID STEEL
in NEMA 3R DP2 DP1 DP5 CONDUIT
Enclosures 60AT 125AT 250AT 3-100MM Ø RIGID STEEL RIGID STEEL BARS
CONDUIT EMBEDDED ON STIRRUPS
GF LINE CONCRETE POLE 9 STEEL BARS
1 - 60 MMSQ THHNTHWN COPPER WIRE 5 x 4 PCS
in 32 MM DIA PVC PIPE 2 SETS: 3-250mmsq THWNTHHN Cu WIRE
1-50mmsq THHNTHWN Cu WIRE
in 100mm dia PVC CONDUIT NGL..

0.55
1.50
3-250mmsq THWNTHHN Cu WIRE
1-50mmsq THHNTHWN Cu WIRE SEE SCHEDULE OF LOADS & COMPUTATIONS
in 100mm dia RSC CONDUIT FOR SIZE OF GROUNDING ELECTRODE CONDUCTOR
PROVIDE GROUNDING ROD

1.50
COPPER CLAD STEEL ROD 3 SETS: 3-250mmsq THWNTHHN Cu WIRE 2.50
(16MM DIA x 3000MM) PROVIDE GROUNDING ROD 1-50mmsq THHNTHWN Cu WIRE
COPPER CLAD STEEL ROD in 100mm dia PVC CONDUIT

0.40
1.00

0.35
(16MM DIA x 3000MM)
EXTEROIROFTHE
BULIDNIG

SERVICE POLE DETAIL


NOT DRAWN TO SCALE

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
E-18
LOCATION: CAMP CRAME, QUEZON CITY CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE