SIGNATURE

HOURS
DATE TIME TASKS PERFORMED SIGNIFICANT LEARNINGS OF
RENDERED
SUPERVISOR

April 10, 8:00 8 Assigned to the Meter Laboratory for  Learned how to read meters.
2015 AM the whole week.  Learned how to replace the parts of
5:00 kilowatt hour meter.
PM 1. Practice reading kilowatt hour  Familiarized myself with kWh meter
meters. parts.
 Learned how to clean kilowatt hour
2. Practice replacing parts of kWh meter.
meters.  Practice replacing parts of kilowatt
hour meter.
3. Clean kWh meters, type I-70-S100.

April 11, 8:00 8 Meter Laboratory  Learned how to clean kilowatt hour
2015 AM meter.
5:00 1. Clean kWh meters, type I-70-S100.  Learned the cause of problem of
PM kilowatt hour meter.
2. Practice calibrating kilowatt hour  Learned how to calibrate a kilowatt
meters. hour meter.
 Practice calibrate a kilowatt hour
meter.

April 13, 8:00 8 Meter Laboratory  Learned how to clean kilowatt hour
2015 AM meter.
5:00 1. Clean kWh meters, type I-70-S200.  Learned how to dial test kilowatt hour
PM meter through meter warm-up board
2. Dial test kWh meters through meter 2x15.
warm-up board 2x15.  Learned how to used meter warm-up
board 2x15.
April 14, 8:00 8 Meter Laboratory  Learned how to clean kilowatt hour
2015 AM meter.
5:00 1. Clean kWh meters, type I-70-S200.  Learned how to calibrate a kilowatt
PM hour meter.
2. Practice calibrating kilowatt hour  Learned how to dial test kilowatt hour
meters. meter through meter warm-up board
2x15.
3. Dial test kWh meters through meter  Learned how to used meter warm-up
warm-up board 2x15. board 2x15.

April 15, 8:00 8 Meter Laboratory  Learned how to clean kilowatt hour
2015 AM meter.
5:00 1. Clean kWh meters, type I-70-S200  Learned how to calibrate a kilowatt
PM and I-55-S. hour meter.
 Learned how to dial test kilowatt hour
2. Calibrating kilowatt hour meters. meter through meter warm-up board
2x15.
3. Dial test kWh meters through meter  Learned how to used meter warm-up
warm-up board 2x15. board 2x15.

April 16, 8:00 8 Meter Laboratory  Learned how to clean kilowatt hour
2015 AM meter.
5:00 1. Clean kWh meters, type I-50-S and  Learned how to dial test kilowatt hour
PM I-55-S. meter through meter warm-up board
2x15.
2. Dial test kWh meters through meter  Learned how to used meter warm-up
warm-up board 2x15. board 2x15.
April 17, 8:00 8 Meter Laboratory  Learned how to clean kilowatt hour
2015 AM meter.
5:00 1. Clean kWh meters, type  Learned how to dial test kilowatt hour
PM Westinghouse I-D2S and I-D3S. meter through meter warm-up board
2x15.
2. Dial test kWh meters through meter  Learned how to used meter warm-up
warm-up board 2x15 board 2x15.

April 18, 8:00 8 Meter Laboratory  Learned how to clean kilowatt hour
2015 AM meter.
5:00 1. Clean kWh meters, type  Learned how to dial test kilowatt hour
PM Westinghouse I-D2S and I-D3S. meter through meter warm-up board
2x15.
2. Dial test kWh meters through meter  Learned how to used meter warm-up
warm-up board 2x15 board 2x15.
SIGNATURE
HOURS
DATE TIME TASKS PERFORMED SIGNIFICANT LEARNINGS OF
RENDERED
SUPERVISOR

April 20, 8:00 8 Assigned to the Planning Operation  Notice and learned the different types
2015 AM Maintenance Control Center of pole, the Galvanized Pole, Concrete
5:00 (POMCC) office for the whole week. Pole, Creosoted Pole and Tanalized
PM Pole.
1. Pull out for transformer
specifications and streetlight  Learned the different types of street
inventory of the Poro line, Feeder 2. lights and there corresponding
wattage: 150 Watts for Sodium, 125
2. Determine the location and dead Watts for Mercury and 18 to 25 Watts
end or end user of every for Compact Fluorescent Lamp.
transformer.
 Familiarized with the map of the
3. Mapping the distribution system of distribution system of LUECO.
LUECO.

April 21, 1:00 8 Planning Operation Maintenance  Learned that transformer


2015 PM Control Center (POMCC) specifications (Nameplate Data)
9:00 includes rating, brand, serial number,
PM 1. Peak load reading and specifications number of bushing, polarity,
of transformer at Brgy. Poro and dimension, feeder line, pole number
Brgy. San Francisco, San Fernando and size of jumper at primary and
City. secondary

 Learned different types of distribution


post used by LUECO.
April 22, 8:00 8 Planning Operation Maintenance  Discovered that the service lines of
2015 AM Control Center (POMCC) several household in the area were
5:00 tapped from distant secondary line,
PM 1. Assigned to check the Bill of which in turn contributes losses in
Materials of the proposed project for the system.
the three barangays of San
Fernando known as brgy. Saoay,
Tanquigan and Langcuas.

April 23, 8:00 8 Planning Operation Maintenance  Learned how to use auto cad in
2015 AM Control Center (POMCC) drawing the maps of the locations for
5:00 the different poles and transformers.
PM 1. Drew some locations of
transformers, poles, streetlights and  Learned how to present the map of
labeled the corresponding account distribution system of LUECO in
numbers of connected end users AutoCad.
using AutoCAD.

2. Presenting the distribution system


of LUECO in AutoCad.

April 24, 8:00 8 Planning Operation Maintenance  Learned some of the construction
2015 AM Control Center (POMCC) types of poles.
5:00
PM 1. Drew some locations of  Learned how to present the map of
transformers, poles, streetlights and distribution system of LUECO in
labeled the corresponding account AutoCad.
numbers of connected end users
using AutoCAD.
2. Presenting the distribution system
of LUECO in AutoCad.

April 25, 8:00 8 Planning Operation Maintenance  Learned that the Daily Alteration
2015 AM Control Center (POMCC) Report includes the account number,
5:00 account name, meter reading and
PM 1. Drew some locations of serial number.
transformers, poles, streetlights and
labeled the corresponding account  Learned how to present the map of
numbers of connected end users distribution system of LUECO in
using AutoCAD. AutoCad.
SIGNATURE
HOURS
DATE TIME TASKS PERFORMED SIGNIFICANT LEARNINGS OF
RENDERED
SUPERVISOR

April 27, 8:00 8 Assigned to the Planning Operation  Familiarized the different types of pole
2015 AM Maintenance Control Center and learned the different types of
5:00 (POMCC) office for the whole week. streetlights and there corresponding
PM wattage.
1. Pulled out to finish the streetlight
inventory of the Poro line, feeder 2
for whole day.The Feeder 2 includes
some Transformers from the
barangays of Poro, San Francisco,
Canaoay and San Agustin, City of
San Fernando.

2. Determined the location and dead


end of every transformer.

April 28, 8:00 8 Planning Operation Maintenance  Became familiar with the different
2015 AM Control Center (POMCC) parts of the substation.
5:00
PM 1. Drew some locations of the  Observed that in constructing a
surveyed transformers, poles and Substation, there are many Factors to
streetlights in Poro line, Feeder 2 be considered such as the location,
and labeled the corresponding resources and the different standard
account numbers of connected end measurements or amount of the
users using AutoCAD. materials needed.

2. Pulled out and went to Bauang  Learned how to present the map of
Substation to observe the on-going distribution system of LUECO in
construction of the new substation. AutoCad.
April 29, 8:00 8 Planning Operation Maintenance  Learned some techniques in
2015 AM Control Center (POMCC) performing AutoCAD.
5:00
PM 1. Drew some locations of the  Learned how to present the map of
surveyed transformers, poles and distribution system of LUECO in
streetlights in Poro line, Feeder 2 AutoCad.
and labeled the corresponding
account numbers of connected end
users using AutoCAD.

April 30, 8:00 8 Planning Operation Maintenance  Improve skills in performing AutoCAD.
2015 AM Control Center (POMCC)
5:00  Learned how to present the map of
PM 1. Continued drawing some locations distribution system of LUECO in
of the surveyed transformers, poles AutoCad.
and streetlights in Poro line, Feeder
2 and labeled the corresponding
account numbers of connected end
users using AutoCAD.

May 02, 8:00 8 Planning Operation Maintenance  Learned the proper synchronization of
2015 AM Control Center (POMCC) poles used for electrical transmission.
5:00
PM 1. Power Interruption of LUECO. We  Observe the testing of the 20 MVA
went to Bauang Substation to transformer that will be used in the
observe the on-going construction of new Substation.
the new 20 MVA substation.
 Learned how to present the map of
2. Drew some locations of distribution system of LUECO in
transformers, poles, streetlights of
the whole Feeder 2 in Poro Line and AutoCad.
labeled the corresponding account
numbers of connected end users
and indicate the different types of
poles with color code using
AutoCAD.
SIGNATURE
HOURS
DATE TIME TASKS PERFORMED SIGNIFICANT LEARNINGS OF
RENDERED
SUPERVISOR

May 4-6, 8:00 24 Assigned toPoro Substation.  Learned the different relevant terms
2015 AM and equipment’s used in Poro
5:00 1. Hourly monitoring for the three Substation.
PM power transformers in the
substation: the 5MVA for Poro Line,  Familiarized with the different parts of
15MVA for California and the Poro substation.
Pennsylvania Line, and 10MVA for
San Juan Line.  Learned how to read the winding
temperature and liquid temperature of
2. Tasked to read every hour the AC the power transformers.
voltage (Vac), the ambient
temperature (At), and the winding  Learned what to do when there is a
temperature (Wt) and liquid trip or power interruption in the
temperature (Lt) of the three power system.
transformers.
 Learned how to read and record the
3. To read and record the value of value of current, voltage, power,
current, voltage, power, frequency, frequency, and power factor of the
and power factor of the Reclosers Reclosers.
for the 5MVA, 15MVA, and 10MVA.
 Learned how and when to reset the
meter for the kilowatt per hour of the
three feeders for 5MVA transformer.

 Computing the total apparent power


using Microsoft Excel and applying
the knowledge in numerical methods.
SIGNATURE
HOURS
DATE TIME TASKS PERFORMED SIGNIFICANT LEARNINGS OF
RENDERED
SUPERVISOR

May 7-9, 8:00 24 Assigned to Bauang Substation.  Familiarized with the different parts of
2015 AM the Bauang substation.
5:00 1. Tasked to read and record every
PM hour the AC voltage (Vac), ambient  Learned how to read reclosers PYL
temperature (At), the control and PGL/CBL.
recloser of the PYL (Payocpoc Line)
and PGL/CBL (Central Bank Line)  Computing the total apparent power
to read their current metering, using Microsoft Excel and applying
energy metering, and power the knowledge in numerical methods.
metering, and the 7.5 MVA power
transformer winding temperature  Writing and preparing a report and
(Wt). inputting the data in Microsoft Excel.
SIGNATURE
HOURS
DATE TIME TASKS PERFORMED SIGNIFICANT LEARNINGS OF
RENDERED
SUPERVISOR

May 8:00 48 Assigned to Regular Metering Crew.  Familiarized with the different
11-16, AM equipments and terms used in
2015 5:00 1. Assist metering crew in assembling Regular Metering Crew.
PM the service entrance to be installed
a kilowatt hour to the customer.  Learned how to assembled kilowatt
2. Assist metering crew for the hour meters to be installed to the
relocation of kilowatt hour consumers.
requested by the customer; verify
low consumption and high  Learned the different parts of kilowatt
consumption of customer. hour meter that used in Regular
Metering Crew.
SIGNATURE
HOURS
DATE TIME TASKS PERFORMED SIGNIFICANT LEARNINGS OF
RENDERED
SUPERVISOR

May 8:00 48 Assigned to Trouble Shooting Crew.  Familiarized with the different
18-23, AM equipments and terms used in
2015 5:00 1. Reconnecting a disconnected troubleshooting.
PM account.
 Learned how to reconnect a
2. Assisting linemen in disconnected account.
troubleshooting secondary (low-
voltage) distribution lines of  Learned how to troubleshoot
LUECO. secondary (low-voltage) distribution
lines of LUECO.

May 25, 8:00 8 Assigned to the Planning Operation  Notice and learned the different types
2015 AM Maintenance Control Center of pole, the Galvanized Pole, Concrete
5:00 (POMCC) office for the whole week. Pole, Creosoted Pole and Tanalized
PM Pole.
1. Pull out for transformer
specifications and streetlight  Learned the different types of street
inventory in Brgy. Madayegdeg, San lights and there corresponding
Fernando City, La Union. wattage: 150 Watts for Sodium, 125
Watts for Mercury and 18 to 25 Watts
2. Determine the lcation and dead end for Compact Fluorescent Lamp.
or end user of every transformer.
 Familiarized with the map of the
3. Mapping the distribution system of distribution system of LUECO.
LUECO.