Professional Documents
Culture Documents
The Evolution of
– Innovative – yet years of experience:
1997
TekNord
1999
MIG Business
Development
2001
MBD Offshore Power –
2002 R&D of Bucket
Prototype 1 Foundation
2005
Prototype 2
2009
Prototype 3
2011:
Press Release – August 2011:
Fred. Olsen United AS, which is owned 50/50 by Bonheur ASA and Ganger Rolf ASA, has
acquired 60% of Danish company Universal Foundation A/S
Fred. Olsen
Universal Foundation Harland and Wolff Windcarrier Natural Power - SeaRoc Global Wind Service
• Design of support • Foundation structure • Marine operations of • Supply and installation of • Installation of wind
structure manufacture at their structures to final site met-mast structures and turbines
shipyard in Belfast equipment • Service & maintenance
• Specialist in
• Fibre repair
engineering and sub- • HSEQ services
seabed installation • Commissioning
Universal Foundation Suction Bucket
Feasibility Assessment - A solution for Near Shore Denmark ?
2012-13 – Met Mast Foundations – Dogger Bank, Firth of Forth – TRL 4 and 5
Question is:
1:
Evacuation of water creates downward
force limited by the water column
2:
Flow around skirt reduces effective
stresses in soil thereby reducing
resistance
Universal Foundation Suction Bucket
Feasibility Assessment - A solution for Near Shore Denmark ?
V
M
Point of rotation
Universal Foundation Suction Bucket
Feasibility Assessment - A solution for Near Shore Denmark ?
Design Drivers:
Geology
Met Ocean conditions
Superstructure (Wind Turbine)
Universal Foundation Suction Bucket
Feasibility Assessment - A solution for Near Shore Denmark ?
MW nameplate 25 to 45 m WD
6 MW
7 MW
8 MW
System f0 below
Allowable frequency interval System f0 within
System f0 above
Remark:
Threshold of structure tonnage = app. 1200 tonnes (Green colour). Very dependent on
installation vessel crane capacity & method
Integrated design – WTG <> Substructure – will accommodate for for correct system f0
Universal Foundation Suction Bucket
Feasibility Assessment - A solution for Near Shore Denmark ?
MW nameplate 25 to 45 m WD
6 MW
7 MW
8 MW
System f0 below
Allowable frequency interval System f0 within
System f0 above
Remark:
Threshold of structure tonnage = app. 1200 tonnes (Green colour). Very dependent on
installation vessel crane capacity & method
Integrated design – WTG <> Substructure – will accommodate for for correct system f0
Universal Foundation Suction Bucket
Feasibility Assessment - A solution for Near Shore Denmark ?
Wind Turbine:
Case study .... Fine tuning system f0 to avoid resonance = load
amplification
The Bucket = ”MP like” shaft but stiffer however not as stiff
as Jacket... Can be tailored by tapered shaft, lid design ...
Typical WTG ranges
System f0 depends on Nacelle/Rotor Mass, Tower, Water
Depth...
Then lets assume we got the integrated design right – what value
proposition is to be expected:
Simplified ULS perspective:
ULS moment as function of Rotordiameter
1000
900
ULS Overturning Moment
800
700
30 m Mudline
600
MNm
500 40 m Mudline
Wave & WTG
400
25 m Mudline
300
200 Lineær (Tower bottom extreme
WTG bending moment)
100
0
60 80 100 120 140 160 180 200
Rotor Diameter
Universal Foundation Suction Bucket
Feasibility Assessment - A solution for Near Shore Denmark ?
1400
1200
1000
tons
800
600
400
200
0
0 100 200 300 400 500 600 700 800 900
Resulting moment @ mudline
ULS, MNm
Universal Foundation Suction Bucket
Feasibility Assessment - A solution for Near Shore Denmark ?
80%
70% 72%
69%
Index
60% 60%
57%
50%
40%
30% 31%
20%
0 10 20 30 40 50
Nos of Structures
Universal Foundation Suction Bucket
Feasibility Assessment - A solution for Near Shore Denmark ?
In conclusion:
The Bucket will be a feasible support structure given the right soils and Met Ocean
conditions…
Tonnage: Site Specific Design required…
At a cost of - too early to say…
All to be confirmed …. i.e we need:
Geotechnical info
Met Ocean info
WTG-Support Structure - integrated design initiated
- Design Basis
- Load Loop Iteration
- Detailed design / Interface concept
Universal Foundation Suction Bucket
Feasibility Assessment - A solution for the ALSTOM Hal150 @ Belwind II ?
Dogger Bank Campaign February 2013
Universal Foundation Suction Bucket
Universal Foundation Suction Bucket
Dogger Bank Met Mast East - SCADA screen dump....
Penetration: 7.31 m
Duration: 6 hrs 46 min Expanding this to full scale project the positive
Verticality: 0,09 degrees impact on project schedule is huge !!
Thank you !