Rahatgarh WTP Compliance Report

1) SUMP
Sr. No. Comments
1 For finding out……. Part 2.
2 As per …………….. Condition
3 As per … Components.
4 Reinforcement ………………… Elevation.
5 Detail of air vent …………….. Bars.
Check level ………………..Raft.
6

7 The location……. Elevation.


8 As the tank ………. Site.
9 Access ladded …….. Provided.
10 all around . .. Drawing
11 All around . .. . . Rain water
12 The wall ………….cases
13 The wall ……….. Water.
14 Walll …. Stress.
15 Include .. .slab.
16 Provide .. SP34.
17 Give… legibility.
18 All …….. Drawing.
WTP Compliance Report

Compliance
Compliance made.
Compliance made.
Compliance made.
Corrected.
Compliance made.
Ground level is 475.5m lvl. Corrected in Drawing.

Coorected.
Notes included as suggested.
Ladder provided.
Handrailing Provided.
All around curbing provided.
Compliance made.
Compliance made.
Compliance made.
Notes included as suggested.
Compliance made.
Compliance made.
Compliance made.
Rahatgarh WTP Compliance Report
2) Clariflocculator
Sr. No. Comments Compliance
1 As per ………… 3.8 m Compliance made.
2 Coefficient …. Part 4. Corection made.
3 Indicate………. Section 1-1 GL level indicated.
4 It is not ……………. Level. Compliance made.
Wall Foundation ………… slab. Wall foundation has been taken 1.0m below GL,
5 Accordinly drgs are modified accordilngly. SBC
reported is 14T/m2 from 1 m below GL.
6 The ………… stress Checked, Found O.K.
7 As per ……………. Thickness. Compliance made.
8 To accommodate ….. 110mm. Compliance made.
9 The moment…. Channel. Checked, Found O.K.
10 The …. Shear. Checked, Found O.K.
Furnish … bridge. FOR MECHANICAL ARRANGEMENT REFER DRG.NO-
11 SC/JV/RHG/WTP-7/10092017 R0 & R01.
12 Show………. Clarifloccular. Compliance made.
13 Provide access ……….. Drawing. Compliance made.
14 Top slab …. Mechanism. Compliance made.
15 Provide ……. Reinforcement. Central shaft is modified as suggested.
Provide at least 150 ……. Provided 150mm thickness for partittion wall. With
Reinforcement. 45mm cover and two layers of reinforcement
16 concreting will be difficult. Therefore R/F is provided
in one layer.

17 As per…………. Component. Compliance made.


18 Permissible ………. Shaft. Compliance made.
19 As tank…… 0.35%. Compliance made.
20 As the tank …..grade M30. Notes Included.
21 Show location …………. Confirm. Compliance made.
22 Provide ……… Slab. Compliance made.
23 Provide…… SP34. Compliance made.
24 Give… legibility. Compliance made.
25 All …….. Drawing. Compliance made.
Rahatgarh WTP Compliance Report
3) Aerator

Sr. No. Comments Compliance

1 As per ………… Accordingily. Compliance made.


2 Include…………M30. Added in Notes.
3 Hand……………….Drawing. Compliance made.
4 Give ……….. Legibility. Compliance made.
5 All….. Drawing. Compliance made.
6 Provide………….001A. Compliance made.
7 As per ………… Accordingily. Compliance made.
8 Give…………….. Channel. Compliance made.
9 Ensure………………House. Added in Notes.
Submit…………………Supporting it. Design of raw water channel has been added. &
10 Brackets supporting Channel will be included in
Chemical House Design and Drawing.