MAINTENANCE DEPARTMENT

VICO INDONESIA
Venue : Date/Time : MOM Issued :
MO Lt 1 18 February 2017 18 February 2017
‘Helping me do my job better’ 13:30 – 14:15 WITA
Subject : Meeting Persiapan Trial Oli Blasia SX-150 (Badak)
Attendees: CC:
Puji Setyo Nugroho Mechanical Engineer Ade Diar S. – Henri Simanjuntak Northern Area Manager
Budi Ahmad Fuad – Yudi Irawan Maintenance Manager
Suardi Badak Well Supv. Putu Purwanta – Agus Irawan Maint. Engineering Supt.
Ruslan Badak Mech. Supv. Deni Badruzaman – Rakhmat Zuhdi S. Badak Operation Supt.
Arfenanda Arfian Lead Maint. Planning Subur Prasetyo – Radiasi Napitu Northern Area Maint. Supt.
Irham Haq Badak Well Supervisor
Rigson Sirait – Budi Nugraha Badak Lead Mechanic
Hany Noviandra – Akhmad Fauzi Mechanical Engineer
Alfin Runaldi Lead Maintenance Planning

Item Discussion Summary Action Due date/


by Remarks
A. Tujuan Trial:
info
1. Mencari alternative produk oli yang saat ini digunakan di WHC (Frick dan Kobelco
Compressor) dan FGR (Frick Compressor)
2. Menurunkan biaya konsumsi oli sintetik di VICO sebesar 15% (USD 90k/tahun)
3. Rencana trial akan dimulai dari akhir February hingga May 2017

B. UPDATE PROGRAM TRIAL OLI BLASIA SX150

1. Program Trial Oli Blasia SX150 sudah menjadi salah satu program Continuous info
Improvement dari Maintenance Department tahun 2017
2. Proses diskusi dan evaluasi teknis pra trial sudah dilakukan tahun 2016
3. Proses procurement oli Blasia SX 150 sudah selesai. 12 Drum oli sudah datAng pada
tanggal 31 January 2017.
4. Oli sudah didistribusikan ke masing-masing area
5. Dari diskusi dengan operation, WHC yang dipilih adalah
 C-7370G
 C-7370J
 C-8200B

C. PERSIAPAN PRA PELAKSANAAN PENGGANTIAN OLI

1. Pemilihan Unit
- C-7370J  siap untuk trial.

- C-7370G  saat ini stand by karena ada pekerjaan RST yang akan selesai BWO 20 February
dalam 2 hari ke depan. Jika tidak bisa menggunakan C-7370G, alternative
penggantianya adalah C-7370C. Kepastiaannya hari Senin menunggu
informasi dari BMT.

Page 1 of 3
Item Discussion Summary Action Due date/
by Remarks
2. Kesiapan 12 drum oli Blasia SX-150
- Sudah tersedia di gudang sebanyak 8 drum oli Blasia SX-150
- H-1 harus sudah siap di lokasi WHC sebanyak 2 drum di unit C-7370J dan C- BWO 21 February
7370G
- Perlu drum kosong untuk penampungan oli bekas SHC629 dan oli Blasia SX BWO 21 February
bekas flushing 3 drum kosong per unit (total 6 drum)

3. Kesiapan compressor oil filter


- Saat ini sudah ada filter untuk trial sebanyak 4 ea untuk 1 unit saja. Untuk BM Complete
kebutuhan penggantian oli saja, sudah mencukupi. Untuk spare selama
monitoring perlu order 4 lagi.
- Sudah dicreate SIR untuk order filter oli compressor BM

4. Pengambilan data sebelum Trial


- Sample gas untuk analysis di lab di WHC yang dipilih BWO 20 February
- Survey vibrasi compressor pre-trial (H-1) ME 21-23 Feb
- Sampling oli SHC 629 pre-trial (H-1) sebanyak 2 botol @250 ml ME 21-23 Feb
- Catat parameter operasi pre trial ME 21-23 Feb

5. Pembuatan ID Badge untuk vendor


- Kelengkapan dokumen sudah lengkap dan disubmit ke Security MP 19 Feb
- Sudah ada konfirmasi dari Security bahwa personnel dinyatakan fit. Hari
Minggu 19 February 2017 ID Badge sudah jadi
- Perlu izin ke Security untuk sebelum pelaksanaan. MP 21 Feb

6. Kelengkapan lainnya
- Plank/papan untuk dipasang di WHC bahwa unit sedang melakukan trial oli BWO 21 February
blasia SX150

TRIAL ENI BLASIA SX 150


FOR OIL FLOODED SCREW COMPRESSOR
WHC C-7370G-G/J

March – May 2017

- Reading Sheet  sudah dibuatkan oleh ME untuk direcord by operator ME 18 February


selama proses trial (akan dikirim via email) 2017

D. PELAKSANAAN PENGGANTIAN OLI

1. Pelaksana
- Maintenance Engineering (ME) info
- Badak Maintenance (BM)
- Badak Well Operation (BWO)
- Vendor Representatif dari PT Bahana Nusa Lubrindo dan ENI Lubricant
Indonesia

Tentative pelaksanaan yang disepakati:


 C-7370J  22 February 2017
 C-7370G/C  23 February 2017

Page 2 of 3
Item Discussion Summary Action Due date/
by Remarks
2. Prosedur Penggantian Oli
- Persiapkan WPS, TRA, dan LOTO  disiapkan sore hari sebelum eksekusi ME 21 Febuary
oleh maintenance engineering

- Lakukan drain oli SHC-629 dan tampung dalam drum kosong yang sudah BWO 22-24
disiapkan BM February
- Isi compressor dengan oli Blasia SX 150 sebanyak 1 drum ME
- Start dan runningkan compressor selama 30 menit untuk proses flushing Vendor
- Matikan unit & drain oli Blasia SX 150, tamping dalam drum kosong yang
sudah disiapkan
- Ganti oil filter
- Isi compressor dengan oli blasia SX 150 sebanyak 1 drum
- Start dan runningkan kembali compressor
- Catat parameter dalam reading sheet yang sudah disiapkan
- Ambil data vibrasi

Oli bekas yang sudah ditampung di drum disimpan kembali di gudang dan diberi BWO
label.

3. Proses Start up BM 22- 24


Perlu bantuan dari instrument maintenance incase ada gangguan saat start up February
4. H+1 Pasca Penggantian oli ME 23-25 Feb
ME & perwakilan vendor melakukan sampling oli di masing2 unit yang ditrial Vendor
sebanyak 2 botol

E. PROSES MONITORING

1. Durasi Trial adalah 2000 jam (start dari akhir February – akhir may) Info

2. Reading parameter Continuous


- Dilakukan oleh operator setiap hari dengan form reading sheet khusus yang BWO
sudah disiapkan oleh ME (1 lembar form untuk 1 minggu)
- Reading Sheet setiap minggu dilaporkan ke ME (Hany-Puji-Fauzi)

3. Sampling oli ME Continuous


Sampling oli dilakukan dengan interval sebagai berikut: vendor
H-1 (pre trial)
H+1 (setelah penggantian oli)
H+7 (setelah penggantian oli)
H+21 dan seterusnya dengan interval 2 mingguan

4. Pengambilan data Vibrasi ME Continuous


Mengikuti jadwal PdM setiap bulan

5. Monitoring Stok Oli


BWO & ME perlu memonitor konsumsi dan stok oli yang ada. Jika stok sudah BWO continuous
terpakai untuk top up, maka harus segera diorderkan lagi ke vendor. ME

Minutedby: Reviewed by

Puji Setyo Nugroho All Participant