"MONORAIL" --- MONORAIL BEAM ANALYSIS

Program Description:

"MONORAIL" is a spreadsheet program written in MS-Excel for the purpose of analysis of either S-shape or
W-shape underhung monorail beams analyzed as simple-spans with or without overhangs (cantilevers).
Specifically, the x-axis and y-axis bending moments as well as any torsion effects are calculated. The actual and
allowable stresses are determined, and the effect of lower flange bending is also addressed by two different
approaches.

This program is a workbook consisting of three (3) worksheets, described as follows:

Worksheet Name Description


Doc This documentation sheet
S-shaped Monorail Beam Monorail beam analysis for S-shaped beams
W-shaped Monorail Beam Monorail beam analysis for W-shaped beams

Program Assumptions and Limitations:

1. The following references were used in the development of this program:


a. Fluor Enterprises, Inc. - Guideline 000.215.1257 - "Hoisting Facilities" (August 22, 2005)
b. Dupont Engineering Design Standard: DB1X - "Design and Installation of Monorail Beams" (May 2000)
c. American National Standards Institute (ANSI): MH27.1 - "Underhung Cranes and Monorail Syatems"
d. American Institute of Steel Construction (AISC) 9th Edition Allowable Stress Design (ASD) Manual (1989)
e. "Allowable Bending Stresses for Overhanging Monorails" - by N. Stephen Tanner -
AISC Engineering Journal (3rd Quarter, 1985)
f. Crane Manufacturers Association of America, Inc. (CMAA) - Publication No. 74 -
"Specifications for Top Running & Under Running Single Girder Electric Traveling Cranes
Utilizing Under Running Trolley Hoist" (2004)
g. "Design of Monorail Systems" - by Thomas H. Orihuela Jr., PE (www.pdhengineer.com)
h. British Steel Code B.S. 449, pages 42-44 (1959)
i. USS Steel Design Manual - Chapter 7 "Torsion" - by R. L. Brockenbrough and B.G. Johnston (1981)
j. AISC Steel Design Guide Series No. 9 - "Torsional Analysis of Structural Steel Members" -
by Paul A. Seaburg, PhD, PE and Charlie J. Carter, PE (1997)
k. "Technical Note: Torsion Analysis of Steel Sections" - by William E. Moore II and Keith M. Mueller -
AISC Engineering Journal (4th Quarter, 2002)
2. The unbraced length for the overhang (cantilever) portion, 'Lbo', of an underhung monorail beam is often debated.
The following are some recommendations from the references cited above:
a. Fluor Guideline 000.215.1257: Lbo = Lo+L/2
b. Dupont Standard DB1X: Lbo = 3*Lo
c. ANSI Standard MH27.1: Lbo = 2*Lo
d. British Steel Code B.S. 449: Lbo = 2*Lo (for top flange of monorail beam restrained at support)
British Steel Code B.S. 449: Lbo = 3*Lo (for top flange of monorail beam unrestrained at support)
e. AISC Eng. Journal Article by Tanner: Lbo = Lo+L (used with a computed value of 'Cbo' from article)
3. This program also determines the calculated value of the bending coefficient, 'Cbo', for the overhang (cantilever)
portion of the monorail beam from reference "e" in note #1 above. This is located off of the main calculation page.
Note: if this computed value of 'Cbo' is used and input, then per this reference the total value of Lo+L should be
used for the unbraced length, 'Lbo', for the overhang portion of the monorail beam.
4. This program ignores effects of axial compressive stress produced by any longitudinal (traction) force which is
usually considered minimal for underhung, hand-operated monorail systems.
5. This program contains “comment boxes” which contain a wide variety of information including explanations of
input or output items, equations used, data tables, etc. (Note: presence of a “comment box” is denoted by a
“red triangle” in the upper right-hand corner of a cell. Merely move the mouse pointer to the desired cell to view
the contents of that particular "comment box".)
"MONORAIL.xls" Program
Version 1.3

MONORAIL BEAM ANALYSIS


For S-shaped Underhung Monorails Analyzed as Simple-Spans with / without Overhang
Per AISC 9th Edition ASD Manual and CMAA Specification No. 74 (2004)
Job Name: Subject: ###
Job Number: Originator: Checker: ###
###
Input: ###
RL(min)=-0.73 RR(max)=9.13 ta =
Monorail Size: L=17 Lo=3 l=
Select: S12x50 x=8.313 Cxo =
Design Parameters: S=0.75 Cx1 =
Beam Fy = 36 ksi Czo =
Beam Simple-Span, L = 17.0000 ft. S12x50 Cz1 =
Unbraced Length, Lb = 17.0000 ft. Section Ratio
Bending Coef., Cb = 1.00 Pv=7.4 bf/(2*tf) =
Overhang Length, Lo = 3.0000 ft. Nomenclature d/tw =
Unbraced Length, Lbo = 11.5000 ft. Qs =
Bending Coef., Cbo = 1.00 S12x50 Member Properties:
Lifted Load, P = 6.000 kips A= 14.60 in.^2 d/Af = 3.32 For Lo = 0 (n
Trolley Weight, Wt = 0.400 kips d= 12.000 in. Ix = 303.00 in.^4
Hoist Weight, Wh = 0.100 kips tw = 0.687 in. Sx = 50.60 in.^3
Vert. Impact Factor, Vi = 15 % bf = 5.480 in. Iy = 15.60 in.^4
Horz. Load Factor, HLF = 10 % tf = 0.659 in. Sy = 5.69 in.^3
Total No. Wheels, Nw = 4 k= 1.438 in. J = 2.770 in.^4
Wheel Spacing, S = 0.7500 ft. rt = 1.250 in. Cw = 502.0 in.^6
Distance on Flange, a = 0.3750 in. x=
Support Reactions: (with overhang) Mx =
Results: RR(max) = 9.13 = Pv*(L+(Lo-S/2))/L+w/1000/(2*L)*(L+Lo)^2My =
RL(min) = -0.73 = -Pv*(Lo-S/2)/L+w/1000/(2*L)*(L^2-Lo^2) Lateral Flang
Parameters and Coefficients: e=
Pv = 7.400 kips Pv = P*(1+Vi/100)+Wt+Wh (vertical load) at =
Pw = 1.850 kips/wheel Pw = Pv/Nw (load per trolley wheel) Mt =
Ph = 0.600 kips Ph = HLF*P (horizontal load) X-axis Stress
ta = 0.493 in. ta = tf-bf/24+a/6 (for S-shape) fbx =
l = 0.156 l = 2*a/(bf-tw) Lc =
Cxo = -0.850 Cxo = -1.096+1.095*l+0.192*e^(-6.0*l) Lu =
Cx1 = 0.600 Cx1 = 3.965-4.835*l-3.965*e^(-2.675*l) Lb/rt =
Czo = 0.165 Czo = -0.981-1.479*l+1.120*e^(1.322*l) fa/Fy =
Cz1 = 1.948 Cz1 = 1.810-1.150*l+1.060*e^(-7.70*l) Is Lb<=Lc?
Is d/tw<=allow?
Bending Moments for Simple-Span: Is b/t<=65/SQRT(Fy)?
x = 8.313 ft. x = 1/2*(L-S/2) (location of max. moments from left end ofIssimple-span)
b/t>95/SQRT(Fy)?
Mx = 30.08 ft-kips Mx = (Pv/2)/(2*L)*(L-S/2)^2+w/1000*x/2*(L-x) Fbx =
My = 2.44 ft-kips My = (Ph/2)/(2*L)*(L-S/2)^2 Fbx =
Fbx =
Lateral Flange Bending Moment from Torsion for Simple-Span: (per USS Steel Design Manual, 1981)Fbx =
e = 6.000 in. e = d/2 (assume horiz. load taken at bot. flange) Fbx =
at = 21.662 at = SQRT(E*Cw/(J*G)) , E=29000 ksi and G=11200 ksi Fbx =
Mt = 0.29 ft-kips Mt = Ph*e*at/(2*(d-tf))*TANH(L*12/(2*at))/12 Fbx =
Use: Fbx =
X-axis Stresses for Simple-Span: Y-axis Stress
fbx = 7.13 ksi fbx = Mx/Sx fby =
Lb/rt = 163.20 Lb/rt = Lb*12/rt fwns =

3 of 14 08/02/2018 09:19:32
"MONORAIL.xls" Program
Version 1.3

Fbx = 17.72 ksi Fbx = 12000*Cb/(Lb*12/(d/Af)) <= 0.60*Fy fbx <= Fbx, O.K.
(continued)

4 of 14 08/02/2018 09:19:32
"MONORAIL.xls" Program
Version 1.3

Y-axis Stresses for Simple-Span: S.R. =


fby = 5.14 ksi fby = My/Sy
fwns = 1.21 ksi fwns = Mt*12/(Sy/2) (warping normal stress) Pv =
fby(total) = 6.35 ksi fby(total) = fby+fwns D(max) =
Fby = 27.00 ksi Fby = 0.75*Fy fby <= Fby, O.K.
D(allow) =
Combined Stress Ratio for Simple-Span:
S.R. = 0.638 S.R. = fbx/Fbx+fby(total)/Fby S.R. <= 1.0, O.K.
My =
Vertical Deflection for Simple-Span: Lateral Flang
Pv = 6.500 kips Pv = P+Wh+Wt (without vertical impact) e=
D(max) = 0.1412 in. D(max) = Pv/2*(L-S)/2/(24*E*I)*(3*L^2-4*((L-S)/2)^2)+5*w/12000*L^4/(384*E*I) at =
D(ratio) = L/1445 D(ratio) = L*12/D(max) Mt =
D(allow) = 0.4533 in. D(allow) = L*12/450 Defl.(max) <= Defl.(allow), O.K.
fbx =
Bending Moments for Overhang: Lc =
Mx = 19.65 ft-kips Mx = (Pv/2)*(Lo+(Lo-S))+w/1000*Lo^2/2 Lu =
My = 1.58 ft-kips My = (Ph/2)*(Lo+(Lo-S)) Lbo/rt =
fa/Fy =
Lateral Flange Bending Moment from Torsion for Overhang: (per USS Steel Design Manual,Is1981) Lbo<=Lc?
e = 6.000 in. e = d/2 (assume horiz. load taken at bot. flange) Is d/tw<=allow?
at = 21.662 at = SQRT(E*Cw/(J*G)) , E=29000 ksi and G=11200 ksi Is b/t<=65/SQRT(Fy)?
Mt = 0.57 ft-kips Mt = Ph*e*at/(d-tf)*TANH(Lo*12/at)/12 Is b/t>95/SQRT(Fy)?
Fbx =
X-axis Stresses for Overhang: Fbx =
fbx = 4.66 ksi fbx = Mx/Sx Fbx =
Lbo/rt = 110.40 Lbo/rt = Lbo*12/rt Fbx =
Fbx = 21.60 ksi Fbx = 12000*Cbo/(Lbo*12/(d/Af)) <= 0.60*Fy fbx <= Fbx, O.K. Fbx =
Fbx =
Y-axis Stresses for Overhang: Fbx =
fby = 3.32 ksi fby = My/Sy Use: Fbx =
fwns = 2.42 ksi fwns = Mt*12/(Sy/2) (warping normal stress) Y-axis Stress
fby(total) = 5.74 ksi fby(total) = fby+fwns fby =
Fby = 27.00 ksi Fby = 0.75*Fy fby <= Fby, O.K. fwns =
fby(total) =
Combined Stress Ratio for Overhang: Fby =
S.R. = 0.428 S.R. = fbx/Fbx+fby(total)/Fby S.R. <= 1.0, O.K. Combined St
S.R. =
Vertical Deflection for Overhang: (assuming full design load, Pv without impact, at end of overhang) Vertical Defle
Pv = 6.500 kips Pv = P+Wh+Wt (without vertical impact) Pv =
D(max) = 0.0715 in. D(max) = Pv*Lo^2*(L+Lo)/(3*E*I)+w/12000*Lo*(4*Lo^2*L-L^3+3*Lo^3)/(24*E*I) D(max) =
D(ratio) = L/503 D(ratio) = Lo*12/D(max) D(ratio) =
D(allow) = 0.0800 in. D(allow) = Lo*12/450 Defl.(max) <= Defl.(allow), O.K.

Bottom Flange Bending (simplified):


be = 7.908 in. Min. of: be = 12*tf or S*12 (effective flange bending length) be =
tf2 = 0.859 in. tf2 = tf+(bf/2-tw/2)/2*(1/6) (flange thk. at web based on 1:6 slope of flange)
tf2 =
am = 1.818 in. am = (bf/2-tw/2)-(k-tf2) (where: k-tf2 = radius of fillet) am =
Mf = 3.363 in.-kips Mf = Pw*am Mf =
Sf = 0.572 in.^3 Sf = be*tf^2/6 Sf =
fb = 5.88 ksi fb = Mf/Sf fb =
Fb = 27.00 ksi Fb = 0.75*Fy fb <= Fb, O.K.
Bottom Flang

5 of 14 08/02/2018 09:19:32
"MONORAIL.xls" Program
Version 1.3

(continued)

6 of 14 08/02/2018 09:19:33
"MONORAIL.xls" Program
Version 1.3

sxo =
Bottom Flange Bending per CMAA Specification No. 74 (2004): (Note: torsion is neglected) szo =

Local Flange Bending Stress @ Point 0: (Sign convention: + = tension, - = compression)


sxo = -6.46 ksi sxo = Cxo*Pw/ta^2 sz1 =
szo = 1.25 ksi szo = Czo*Pw/ta^2
S-shape sx2 =
Local Flange Bending Stress @ Point 1: sz2 =
sx1 = 4.56 ksi sx1 = Cx1*Pw/ta^2 Trolley
sz1 = 14.82 ksi sz1 = Cz1*Pw/ta^2 Wheel sz =
sx =
Local Flange Bending Stress @ Point 2: txz =
sx2 = 6.46 ksi sx2 = -sxo sto =
sz2 = -1.25 ksi sz2 = -szo Pw Pw
sz =
Resultant Biaxial Stress @ Point 0: sx =
sz = 13.22 ksi sz = fbx+fby+0.75*szo txz =
sx = -4.85 ksi sx = 0.75*sxo st1 =
txz = 0.00 ksi txz = 0 (assumed negligible)
sto = 16.19 ksi sto = SQRT(sx^2+sz^2-sx*sz+3*txz^2) <= Fb = 0.66*Fy = 23.76 ksi, O.K.
sx =
Resultant Biaxial Stress @ Point 1: txz =
sz = 23.39 ksi sy = fbx+fby+0.75*sz1 st2 =
sx = 3.42 ksi sx = 0.75*sx1
txz = 0.00 ksi txz = 0 (assumed negligible)
st1 = 21.88 ksi st1 = SQRT(sx^2+sz^2-sx*sz+3*txz^2) <= Fb = 0.66*Fy = 23.76 ksi, O.K.

Resultant Biaxial Stress @ Point 2:


sz = 11.34 ksi sz = fbx+fby+0.75*sz2
sx = 4.85 ksi sx = 0.75*sx2
txz = 0.00 ksi txz = 0 (assumed negligible)
st2 = 9.85 ksi st2 = SQRT(sx^2+sz^2-sx*sz+3*txz^2) <= Fb = 0.66*Fy = 23.76 ksi, O.K.

tw

X
Pw Z Pw

tf

Point 2 Point 1 ta
bf/4
Point 0 tw/2 bf

7 of 14 08/02/2018 09:19:33
"MONORAIL.xls" Program
Version 1.3

8 of 14 08/02/2018 09:19:33
"MONORAIL.xls" Program
Version 1.3

MONORAIL BEAM ANALYSIS


For W-shaped Underhung Monorails Analyzed as Simple-Spans with / without Overhang
Per AISC 9th Edition ASD Manual and CMAA Specification No. 74 (2004)
Job Name: Subject: ###
Job Number: Originator: Checker: ###
###
Input: ###
RL(min)=-0.73 RR(max)=9.13 ta =
Monorail Size: L=17 Lo=3 l=
Select: W12x50 x=8.313 Cxo =
Design Parameters: S=0.75 Cx1 =
Beam Fy = 36 ksi Czo =
Beam Simple-Span, L = 17.0000 ft. W12x50 Cz1 =
Unbraced Length, Lb = 17.0000 ft. Section Ratio
Bending Coef., Cb = 1.00 Pv=7.4 bf/(2*tf) =
Overhang Length, Lo = 3.0000 ft. Nomenclature d/tw =
Unbraced Length, Lbo = 11.5000 ft. Qs =
Bending Coef., Cbo = 1.00 W12x50 Member Properties:
Lifted Load, P = 6.000 kips A= 14.60 in.^2 d/Af = 2.36 For Lo = 0 (n
Trolley Weight, Wt = 0.400 kips d= 12.200 in. Ix = 391.00 in.^4
Hoist Weight, Wh = 0.100 kips tw = 0.370 in. Sx = 64.20 in.^3
Vert. Impact Factor, Vi = 15 % bf = 8.080 in. Iy = 56.30 in.^4
Horz. Load Factor, HLF = 10 % tf = 0.640 in. Sy = 13.90 in.^3
Total No. Wheels, Nw = 4 k= 1.140 in. J = 1.710 in.^4
Wheel Spacing, S = 0.7500 ft. rt = 2.170 in. Cw = 1880.0 in.^6
Distance on Flange, a = 0.3750 in. x=
Support Reactions: (with overhang) Mx =
Results: RR(max) = 9.13 = Pv*(L+(Lo-S/2))/L+w/1000/(2*L)*(L+Lo)^2My =
RL(min) = -0.73 = -Pv*(Lo-S/2)/L+w/1000/(2*L)*(L^2-Lo^2) Lateral Flang
Parameters and Coefficients: e=
Pv = 7.400 kips Pv = P*(1+Vi/100)+Wt+Wh (vertical load) at =
Pw = 1.850 kips/wheel Pw = Pv/Nw (load per trolley wheel) Mt =
Ph = 0.600 kips Ph = HLF*P (horizontal load) X-axis Stress
ta = 0.640 in. ta = tf (for W-shape) fbx =
l = 0.097 l = 2*a/(bf-tw) Lc =
Cxo = -1.903 Cxo = -2.110+1.977*l+0.0076*e^(6.53*l) Lu =
Cx1 = 0.535 Cx1 = 10.108-7.408*l-10.108*e^(-1.364*l) Lb/rt =
Czo = 0.192 Czo = 0.050-0.580*l+0.148*e^(3.015*l) fa/Fy =
Cz1 = 2.319 Cz1 = 2.230-1.490*l+1.390*e^(-18.33*l) Is Lb<=Lc?
Is d/tw<=allow?
Bending Moments for Simple-Span: Is b/t<=65/SQRT(Fy)?
x = 8.313 ft. x = 1/2*(L-S/2) (location of max. moments from left end ofIssimple-span)
b/t>95/SQRT(Fy)?
Mx = 30.08 ft-kips Mx = (Pv/2)/(2*L)*(L-S/2)^2+w/1000*x/2*(L-x) Fbx =
My = 2.44 ft-kips My = (Ph/2)/(2*L)*(L-S/2)^2 Fbx =
Fbx =
Lateral Flange Bending Moment from Torsion for Simple-Span: (per USS Steel Design Manual, 1981)Fbx =
e = 6.100 in. e = d/2 (assume horiz. load taken at bot. flange) Fbx =
at = 53.354 at = SQRT(E*Cw/(J*G)) , E=29000 ksi and G=11200 ksi Fbx =
Mt = 0.67 ft-kips Mt = Ph*e*at/(2*(d-tf))*TANH(L*12/(2*at))/12 Fbx =
Use: Fbx =
X-axis Stresses for Simple-Span: Y-axis Stress
fbx = 5.62 ksi fbx = Mx/Sx fby =
Lb/rt = 94.01 Lb/rt = Lb*12/rt fwns =

9 of 14 08/02/2018 09:19:33
"MONORAIL.xls" Program
Version 1.3

Fbx = 21.60 ksi Fbx = 12000*Cb/(Lb*12/(d/Af)) <= 0.60*Fy fbx <= Fbx, O.K.
(continued)

10 of 14 08/02/2018 09:19:33
"MONORAIL.xls" Program
Version 1.3

Combined St
Y-axis Stresses for Simple-Span: S.R. =
fby = 2.11 ksi fby = My/Sy Vertical Defle
fwns = 1.16 ksi fwns = Mt*12/(Sy/2) (warping normal stress) Pv =
fby(total) = 3.27 ksi fby(total) = fby+fwns D(max) =
Fby = 27.00 ksi Fby = 0.75*Fy fby <= Fby, O.K.
D(allow) =
Combined Stress Ratio for Simple-Span: Bending Mom
S.R. = 0.381 S.R. = fbx/Fbx+fby(total)/Fby S.R. <= 1.0, O.K.
My =
Vertical Deflection for Simple-Span: Lateral Flang
Pv = 6.500 kips Pv = P+Wh+Wt (without vertical impact) e=
D(max) = 0.1094 in. D(max) = Pv/2*(L-S)/2/(24*E*I)*(3*L^2-4*((L-S)/2)^2)+5*w/12000*L^4/(384*E*I) at =
D(ratio) = L/1865 D(ratio) = L*12/D(max) Mt =
D(allow) = 0.4533 in. D(allow) = L*12/450 Defl.(max) <= Defl.(allow), O.K.
fbx =
Bending Moments for Overhang: Lc =
Mx = 19.65 ft-kips Mx = (Pv/2)*(Lo+(Lo-S))+w/1000*Lo^2/2 Lu =
My = 1.58 ft-kips My = (Ph/2)*(Lo+(Lo-S)) Lbo/rt =
fa/Fy =
Lateral Flange Bending Moment from Torsion for Overhang: (per USS Steel Design Manual,Is1981) Lbo<=Lc?
e = 6.100 in. e = d/2 (assume horiz. load taken at bot. flange) Is d/tw<=allow?
at = 53.354 at = SQRT(E*Cw/(J*G)) , E=29000 ksi and G=11200 ksi Is b/t<=65/SQRT(Fy)?
Mt = 1.41 ft-kips Mt = Ph*e*at/(d-tf)*TANH(Lo*12/at)/12 Is b/t>95/SQRT(Fy)?
Fbx =
X-axis Stresses for Overhang: Fbx =
fbx = 3.67 ksi fbx = Mx/Sx Fbx =
Lbo/rt = 63.59 Lbo/rt = Lbo*12/rt Fbx =
Fbx = 21.60 ksi Fbx = 12000*Cbo/(Lbo*12/(d/Af)) <= 0.60*Fy fbx <= Fbx, O.K. Fbx =
Fbx =
Y-axis Stresses for Overhang: Fbx =
fby = 1.36 ksi fby = My/Sy Use: Fbx =
fwns = 2.43 ksi fwns = Mt*12/(Sy/2) (warping normal stress) Y-axis Stress
fby(total) = 3.79 ksi fby(total) = fby+fwns fby =
Fby = 27.00 ksi Fby = 0.75*Fy fby <= Fby, O.K. fwns =
fby(total) =
Combined Stress Ratio for Overhang: Fby =
S.R. = 0.310 S.R. = fbx/Fbx+fby(total)/Fby S.R. <= 1.0, O.K. Combined St
S.R. =
Vertical Deflection for Overhang: (assuming full design load, Pv without impact, at end of overhang) Vertical Defle
Pv = 6.500 kips Pv = P+Wh+Wt (without vertical impact) Pv =
D(max) = 0.0554 in. D(max) = Pv*Lo^2*(L+Lo)/(3*E*I)+w/12000*Lo*(4*Lo^2*L-L^3+3*Lo^3)/(24*E*I) D(max) =
D(ratio) = L/650 D(ratio) = Lo*12/D(max) D(ratio) =
D(allow) = 0.0800 in. D(allow) = Lo*12/450 Defl.(max) <= Defl.(allow), O.K.

Bottom Flange Bending (simplified): Bottom Flang


be = 7.680 in. Min. of: be = 12*tf or S*12 (effective flange bending length) be =
am = 3.355 in. am = (bf/2-tw/2)-(k-tf) (where: k-tf = radius of fillet) tf2 =
Mf = 6.207 in.-kips Mf = Pw*am am =
Sf = 0.524 in.^3 Sf = be*tf^2/6 Mf =
fb = 11.84 ksi fb = Mf/Sf Sf =
Fb = 27.00 ksi Fb = 0.75*Fy fb <= Fb, O.K.
Fb =
Bottom Flang

11 of 14 08/02/2018 09:19:33
"MONORAIL.xls" Program
Version 1.3

(continued)

12 of 14 08/02/2018 09:19:33
"MONORAIL.xls" Program
Version 1.3

sxo =
Bottom Flange Bending per CMAA Specification No. 74 (2004): (Note: torsion is neglected) szo =
Local Flange
Local Flange Bending Stress @ Point 0: (Sign convention: + = tension, - = compression)
sxo = -8.60 ksi sxo = Cxo*Pw/ta^2 sz1 =
szo = 0.87 ksi szo = Czo*Pw/ta^2 Local Flange
sx2 =
Local Flange Bending Stress @ Point 1: sz2 =
sx1 = 2.42 ksi sx1 = Cx1*Pw/ta^2 Resultant Bia
sz1 = 10.47 ksi sz1 = Cz1*Pw/ta^2 sz =
sx =
Local Flange Bending Stress @ Point 2: txz =
sx2 = 8.60 ksi sx2 = -sxo sto =
sz2 = -0.87 ksi sz2 = -szo Resultant Bia
sz =
Resultant Biaxial Stress @ Point 0: sx =
sz = 8.38 ksi sz = fbx+fby+0.75*szo txz =
sx = -6.45 ksi sx = 0.75*sxo st1 =
txz = 0.00 ksi txz = 0 (assumed negligible) Resultant Bia
sto = 12.88 ksi sto = SQRT(sx^2+sz^2-sx*sz+3*txz^2) <= Fb = 0.66*Fy = 23.76 ksi, O.K.
sx =
Resultant Biaxial Stress @ Point 1: txz =
sz = 15.58 ksi sy = fbx+fby+0.75*sz1 st2 =
sx = 1.81 ksi sx = 0.75*sx1 W24x370
txz = 0.00 ksi txz = 0 (assumed negligible) W24x335
st1 = 14.76 ksi st1 = SQRT(sx^2+sz^2-sx*sz+3*txz^2) <= Fb = 0.66*Fy = 23.76 ksi, O.K.
W24x279
Resultant Biaxial Stress @ Point 2: W24x250
sz = 7.08 ksi sz = fbx+fby+0.75*sz2 W24x229
sx = 6.45 ksi sx = 0.75*sx2 W24x207
txz = 0.00 ksi txz = 0 (assumed negligible) W24x192
st2 = 6.78 ksi st2 = SQRT(sx^2+sz^2-sx*sz+3*txz^2) <= Fb = 0.66*Fy = 23.76 ksi, O.K.
W24x162
W24x146
Y W24x131
W24x117
W24x104
W24x103
W24x94
W24x84
W24x76
tw W24x68
W24x62
X
Pw Pw W24x55
Z W21x402
W21x364
Point 2 W21x333
W21x300
W21x275
W21x248
tf W21x223
Point 0
W21x201
Point 1 W21x182
bf W21x166

13 of 14 08/02/2018 09:19:33
"MONORAIL.xls" Program
Version 1.3

W21x147

14 of 14 08/02/2018 09:19:33

You might also like