First pass Kick off meeting

Data collection Agree scope Value setting


On software With contractor
Contract for
PLN Interface Backfeeding document Backfeeding PLN Certification Operator
Preparation application Approval Coordination with P3B/ Substation Well water?
Jaser/etc

TAPPING IN DECISION S4EPC validate


Radio Commissioning Towns water
erection Town water plan
Communication, Switching availability
Procurement Agree setting Procedure
SCADA,Phone, Installation
Lead time = 7 months
PLC Build fire water
second pass Fill Reservoir
On software Make water reservoir
Design Need 30 days Tower erection Backfeeding
Special Certification Pumps
Concept At least for / stringing Fire pumphouse
Tower design Other equipment
Protection design Fire protection Commission fire
Flushing Pump house ready
Coverage test
Substation erection
Earthing Installation
Water system Procure
Well water EDG temporay Fire protection GT fire protection
erection
EDG Room & supply equipment
Substation Fill tank Feed WTP
Installation Eq. Ready
Earthing
Switchboard
Security Erection Electrical Chemical water treatment
Water/Chemical Water System
Commissioning Switchboard ready Building ready
Lab Ready
Substation
Purchase Erection Earthed CERTIFIED Make Demin
Fencing
water Chemical water treatment
Control system ready

IPB&NSPB Manufacturing Erection Test

GIS eq. ready


POWER
GIS Control ready
GIS Manufacturing Shipping Erection Fill SF6 ON
Commissioning Erection Relays/UPS/DC Switchroom GIS System
Protection/timing.etc, Commissioning Equipment ready ready
Pre-Com

Generator Test : winding,temp,


Generator Tx.base Erection, wiring, Commissioning
Transformer CT,IR,ratio,vector group, Battery room ready
oil filling Interface Setting relay
Resistant,gas monitoring
Temporary Supply

Generator & GCB Base / Room Erection, wiring Protection,control,


Testing/commsissioning

UAT Base / Room Erection, wiring Protection,control,


Testing/commsissioning Appoint Translate
Train Decide safety rules
Safety rule + issue Safety
Authorize staff GB or International
manager Rules
MV 6.3 kV standard
Switchboard Room ready Erection, wiring Protection,control,
Testing/commsissioning
PTW Office Implement rules (one
+ Locks etc month before SCRR)

Relay
Protection Room ready Erection, wiring Protection,control,
Testing/commsissioning

Safety Rules
DC/UPS Room ready Erection, wiring Protection,control, Clearance
Testing/commsissioning
Certificate

Lightning
Protection Room ready Erection, wiring Protection,control,
Testing/commsissioning

LV 400 V
Switchboard Room ready Erection, wiring Protection,control,
Testing/commsissioning