FONCODES-MIMDES 17/04/2006

ANALISIS DE COSTOS UNITARIOS PAG.-001

--------------------------------------------------------------------------------------------------------------------------
DATOS DEL EXPEDIENTE : NUMERO : OBRA :
LINEA DE INVERSION :
REGION : DEPARTAMENTO :
PROVINCIA : DISTRITO :
LOCALIDAD :
DATOS DE LA EVALUACION : FECHA : 23/01/2006 EVALUADOR : FEBO ZONA : 3 MES Y A¥O ACT. : 11 / 2005

-------------------------------------------------------------------------------- ORDEN TITULO DE PARTIDA


UNID
INSUMOS UNID CANTIDAD P.UNIT COSTO PARCIAL TOTAL
--------------------------------------------------------------------------------
**.** 01 - REHAB. CAPTACION (01 UND)

01.01 LIMPIEZA Y DEFORESTACION MANUAL M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 4.00-PEON + 0.00-BRI.


Rendimiento : 200.00 M2/DIA
ZZ0004 PEON HH 0.160 1.25 0.20
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 0.21

--------------------------------------------------------------------------------
01.02 TRAZO Y REPLANTEO PRELIMINAR M2 0.00-CAP. + 1.50-OPE. + 0.00-OFI. + 4.50-PEON + 0.00-BRI.
Rendimiento : 300.00 M2/DIA
IC0430 YESO KG 0.050 0.21 0.01
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 0.020 3.00 0.06
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.120 1.25 0.15
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.02 0.41

--------------------------------------------------------------------------------
01.03 DEMOLICION DE ESTRUCTURAS M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 0.80 M3/DIA
ZZ0004 PEON HH 10.000 1.25 12.50
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.63 13.13

--------------------------------------------------------------------------------
01.04 PICADO DE TARRAJEOS EN MAL ESTADO M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 20.00 M2/DIA
ZZ0004 PEON HH 0.400 1.25 0.50
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.03 0.53

--------------------------------------------------------------------------------
02.01 EXCAVACION PARA ESTRUCTURAS M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
03.01 CONCRETO F'C=175 KG/CM2. SIN MEZCLADORA M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 12.00-PEON + 0.00-BRI.
Rendimiento : 10.00 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 8.430 21.40 180.40
NA0017 PIEDRA CHANCADA 1/2" (NO AFECTO IGV) M3 0.640 85.00 54.40
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 0.510 85.00 43.35

ZZ0002 OPERARIO HH 1.600 4.22 6.75


ZZ0003 OFICIAL HH 1.600 3.83 6.13
ZZ0004 PEON HH 9.600 1.25 12.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 1.24 304.27

--------------------------------------------------------------------------------------------------------------------------
03.02 CONCRETO 1:8 + 25% PM M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 10.00-PEON + 0.00-BRI.
Rendimiento : 9.00 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 3.800 21.40 81.32
NA0370 PIEDRA MEDIANA (NO AFECTO IGV) M3 0.400 30.00 12.00
NA0658 HORMIGON (NO AFECTO IGV) M3 0.900 80.00 72.00
ZZ0002 OPERARIO HH 1.778 4.22 7.50
ZZ0003 OFICIAL HH 1.778 3.83 6.81
ZZ0004 PEON HH 8.889 1.25 11.11
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.76 191.50

--------------------------------------------------------------------------------------------------------------------------
03.03 ENCOFRADO Y DESENCOFRADO M2 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.20-PEON + 0.00-BRI.
Rendimiento : 8.00 M2/DIA
IP3875 ALAMBRE NEGRO # 16 KG 0.060 3.80 0.23
IP3876 ALAMBRE NEGRO # 8 KG 0.060 3.80 0.23
IP4893 CLAVOS 3" KG 0.150 3.80 0.57
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 2.800 3.00 8.40
ZZ0002 OPERARIO HH 1.000 4.22 4.22
ZZ0003 OFICIAL HH 1.000 3.83 3.83
ZZ0004 PEON HH 0.200 1.25 0.25
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.25 17.98

--------------------------------------------------------------------------------------------------------------------------
03.04 PICADO Y RESANE DE ESTRUCTURAS M3 0.00-CAP. + 0.50-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 0.25 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 7.300 21.40 156.22
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 1.010 85.00 85.85
ZZ0002 OPERARIO HH 16.000 4.22 67.52
ZZ0004 PEON HH 32.000 1.25 40.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 5.38 354.97

--------------------------------------------------------------------------------------------------------------------------
04.01 TARRAJEO MORTERO 1:2, E=1.5 CM M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 0.140 21.40 3.00
IP4893 CLAVOS 3" KG 0.015 3.80 0.06
NA0120 ARENA FINA (NO AFECTO IGV) M3 0.020 85.00 1.70
ZZ0002 OPERARIO HH 0.667 4.22 2.81
ZZ0004 PEON HH 0.333 1.25 0.42
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.10 8.09

--------------------------------------------------------------------------------------------------------------------------

05.01 FILTRO DE ARENA M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.


Rendimiento : 6.00 M3/DIA
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 1.050 85.00 89.25
ZZ0004 PEON HH 1.333 1.25 1.67
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.08 91.00

--------------------------------------------------------------------------------------------------------------------------
05.02 FILTRO DE GRAVA M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 6.00 M3/DIA
NA0977 FILTRO DE GRAVA O CASCAJO(NO AFECTO IGV) M3 1.030 85.00 87.55
ZZ0004 PEON HH 1.333 1.25 1.67
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.08 89.30

--------------------------------------------------------------------------------------------------------------------------
05.03 RELLENO DE ARCILLA M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 M3/DIA
IC2515 ARCILLA M3 1.250 50.00 62.50
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.13 65.13

--------------------------------------------------------------------------------------------------------------------------
05.04 RELLENO CON MATERIAL ORGANICO M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 5.00 M3/DIA
IC0444 TIERRA M3 1.200 1.00 1.20
ZZ0004 PEON HH 1.600 1.25 2.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.10 3.30

--------------------------------------------------------------------------------------------------------------------------
06.01 TAPA METALICA 0.4X0.4X1/8" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IP8159 TAPA METALICA Y ACC. 0.4X0.4X1/8 UN 1.000 80.00 80.00
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 91.27

--------------------------------------------------------------------------------------------------------------------------
06.02 TAPA METALICA 0.6X0.6X1/8" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IP8160 TAPA METALICA Y ACC. 0.6X0.6X1/8 UN 1.000 100.00 100.00
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 111.27

--------------------------------------------------------------------------------------------------------------------------
07.01 PINTURA EN EXTERIORES M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 30.00 M2/DIA
IP7286 PINTURA ESMALTE GL 0.025 30.00 0.75
IP8500 THINNER GL 0.013 16.00 0.21

ZZ0002 OPERARIO HH 0.267 4.22 1.13


DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 2.12

--------------------------------------------------------------------------------------------------------------------------
07.02 EMPEDRADO M2 0.00-CAP. + 0.10-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 15.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.000 15.00 0.00
ZZ0002 OPERARIO HH 0.053 4.22 0.22
ZZ0004 PEON HH 0.533 1.25 0.67
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 0.92

--------------------------------------------------------------------------------------------------------------------------
07.03 CERCO PERIMETRICO DE MURO SECO DE PIEDRA ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 9.00-PEON + 0.00-BRI.
Rendimiento : 5.00 ML/DIA
NA0133 BARRO (NO AFECTO IGV) M3 0.000 1.00 0.00
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.000 15.00 0.00
ZZ0002 OPERARIO HH 1.600 4.22 6.75
ZZ0004 PEON HH 14.400 1.25 18.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 1.24 25.99

--------------------------------------------------------------------------------------------------------------------------
07.04 PUERTA DE CALAMINA CON MARCOS DE MADERA UN 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 10.00 UN/DIA
IC1300 BISAGRA 2" UN 2.000 2.00 4.00
IP4609 CALAMINA GALVANIZADA 1.83X0.83X0.3MM PL 1.000 19.00 19.00
IP4783 CEMENTO PORTLAND TIPO I BL 0.122 21.40 2.61
IP4893 CLAVOS 3" KG 0.120 3.80 0.46
IP7256 PIEDRA MEDIANA M3 0.013 30.00 0.39
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 7.486 3.00 22.46
NA0658 HORMIGON (NO AFECTO IGV) M3 0.029 80.00 2.32
ZZ0002 OPERARIO HH 0.800 4.22 3.38
ZZ0004 PEON HH 0.800 1.25 1.00
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.13 55.75

--------------------------------------------------------------------------------------------------------------------------
08.01 ACCESORIOS EN CAPTACION SALE 1" UN 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 5.00 UN/DIA
IC0010 ADAPTADOR PVC 1" UN 3.000 1.80 5.40
IC0503 NIPLE FO GO 1" X 2" UN 2.000 7.00 14.00
IC0513 PEGAMENTO PLASTICO PVC GL 0.005 68.00 0.34
IC0607 VALVULA BRONCE COMPUERTA 1" UN 1.000 18.80 18.80
IC0682 UNION FO GO UNIVERSAL 1" UN 2.000 15.00 30.00
IC1441 CANASTILLA BRONCE 1" UN 1.000 15.00 15.00
IC1445 CONO DE REBOSE PVC 4"X2" UN 1.000 10.00 10.00
IC1798 CINTA TEFLON UN 0.500 0.80 0.40
IP5050 CODO PVC SAP 2" UN 1.000 7.00 7.00
IP8226 TAPON PVC SAP HEMBRA C 10, 2" UN 1.000 7.00 7.00
IP8951 TUBERIA PVC SAP CLASE 7.5, 2" ML 4.000 6.30 25.20

ZZ0002 OPERARIO HH 1.600 4.22 6.75


ZZ0004 PEON HH 1.600 1.25 2.00
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.26 142.15

--------------------------------------------------------------------------------------------------------------------------
08.02 TUBERIA PVC SAL 4" PERFORADO ML 0.00-CAP. + 2.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 50.00 ML/DIA
IP7088 PEGAMENTO PLASTICO PVC GL 0.001 68.00 0.07
IP8884 TUBERIA PVC SAL 4" ML 1.030 7.33 7.55
ZZ0002 OPERARIO HH 0.320 4.22 1.35
ZZ0004 PEON HH 0.160 1.25 0.20
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.05 9.22

--------------------------------------------------------------------------------------------------------------------------
08.03 TUBERIA PVC SAL 2" PERFORADO ML 0.00-CAP. + 2.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 160.00 ML/DIA
IP7088 PEGAMENTO PLASTICO PVC GL 0.005 68.00 0.34
IP8881 TUBERIA PVC SAL 2" ML 1.030 1.60 1.65
ZZ0002 OPERARIO HH 0.100 4.22 0.42
ZZ0004 PEON HH 0.050 1.25 0.06
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 2.48

--------------------------------------------------------------------------------------------------------------------------
08.08 ACCESORIOS DE TUBERIA DE DRENAJE GLB 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 5.00 GLB/DIA
IC0791 YEE PVC SAL 4" X 2" UN 1.000 8.00 8.00
IC1488 YEE PVC SAL DOBLE 4" X 2" UN 1.000 12.00 12.00
IC2037 TAPON PVC SAL 2" UN 3.000 2.00 6.00
IP8218 TAPON PVC SAL 4" UN 1.000 8.00 8.00
ZZ0002 OPERARIO HH 1.600 4.22 6.75
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.20 40.95

--------------------------------------------------------------------------------------------------------------------------

**.** 02 - CONST. CAPTACION (01 UND)

01.01 LIMPIEZA Y DEFORESTACION MANUAL M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 4.00-PEON + 0.00-BRI.


Rendimiento : 200.00 M2/DIA
ZZ0004 PEON HH 0.160 1.25 0.20
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 0.21

--------------------------------------------------------------------------------------------------------------------------
01.02 TRAZO Y REPLANTEO PRELIMINAR M2 0.00-CAP. + 1.50-OPE. + 0.00-OFI. + 4.50-PEON + 0.00-BRI.
Rendimiento : 300.00 M2/DIA
IC0430 YESO KG 0.050 0.21 0.01
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 0.020 3.00 0.06
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.120 1.25 0.15
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.02 0.41

--------------------------------------------------------------------------------------------------------------------------
02.01 EXCAVACION PARA ESTRUCTURAS M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
03.01 CONCRETO F'C=175 KG/CM2. SIN MEZCLADORA M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 12.00-PEON + 0.00-BRI.
Rendimiento : 10.00 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 8.430 21.40 180.40
NA0017 PIEDRA CHANCADA 1/2" (NO AFECTO IGV) M3 0.640 85.00 54.40
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 0.510 85.00 43.35
ZZ0002 OPERARIO HH 1.600 4.22 6.75
ZZ0003 OFICIAL HH 1.600 3.83 6.13
ZZ0004 PEON HH 9.600 1.25 12.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 1.24 304.27

--------------------------------------------------------------------------------------------------------------------------
03.02 CONCRETO 1:8 + 25% PM M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 10.00-PEON + 0.00-BRI.
Rendimiento : 9.00 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 3.800 21.40 81.32
NA0370 PIEDRA MEDIANA (NO AFECTO IGV) M3 0.400 30.00 12.00
NA0658 HORMIGON (NO AFECTO IGV) M3 0.900 80.00 72.00
ZZ0002 OPERARIO HH 1.778 4.22 7.50
ZZ0003 OFICIAL HH 1.778 3.83 6.81
ZZ0004 PEON HH 8.889 1.25 11.11
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.76 191.50

--------------------------------------------------------------------------------------------------------------------------
03.03 ENCOFRADO Y DESENCOFRADO M2 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.20-PEON + 0.00-BRI.
Rendimiento : 8.00 M2/DIA
IP3875 ALAMBRE NEGRO # 16 KG 0.060 3.80 0.23

IP3876 ALAMBRE NEGRO # 8 KG 0.060 3.80 0.23


IP4893 CLAVOS 3" KG 0.150 3.80 0.57
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 2.800 3.00 8.40
ZZ0002 OPERARIO HH 1.000 4.22 4.22
ZZ0003 OFICIAL HH 1.000 3.83 3.83
ZZ0004 PEON HH 0.200 1.25 0.25
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.25 17.98

--------------------------------------------------------------------------------------------------------------------------
04.01 TARRAJEO CON IMPERMEABILIZANTE,MEZCLA 1:1,E=1.5CM M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA
HR0002 REGLA DE MADERA P2 0.020 3.90 0.08
IP4783 CEMENTO PORTLAND TIPO I BL 0.220 21.40 4.71
IP7988 SIKA 1 KG 0.400 7.00 2.80
NA0120 ARENA FINA (NO AFECTO IGV) M3 0.015 85.00 1.27
ZZ0002 OPERARIO HH 0.667 4.22 2.81
ZZ0004 PEON HH 0.333 1.25 0.42
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.10 12.19

--------------------------------------------------------------------------------------------------------------------------
04.02 TARRAJEO MORTERO 1:2, E=1.5 CM M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 0.140 21.40 3.00
IP4893 CLAVOS 3" KG 0.015 3.80 0.06
NA0120 ARENA FINA (NO AFECTO IGV) M3 0.020 85.00 1.70
ZZ0002 OPERARIO HH 0.667 4.22 2.81
ZZ0004 PEON HH 0.333 1.25 0.42
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.10 8.09

--------------------------------------------------------------------------------------------------------------------------
05.01 FILTRO DE ARENA M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 6.00 M3/DIA
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 1.050 85.00 89.25
ZZ0004 PEON HH 1.333 1.25 1.67
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.08 91.00

--------------------------------------------------------------------------------------------------------------------------
05.02 FILTRO DE GRAVA M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 6.00 M3/DIA
NA0977 FILTRO DE GRAVA O CASCAJO(NO AFECTO IGV) M3 1.030 85.00 87.55
ZZ0004 PEON HH 1.333 1.25 1.67
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.08 89.30

--------------------------------------------------------------------------------------------------------------------------
06.01 TAPA METALICA 0.4X0.4X1/8" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IP8159 TAPA METALICA Y ACC. 0.4X0.4X1/8 UN 1.000 80.00 80.00
ZZ0002 OPERARIO HH 2.000 4.22 8.44

ZZ0004 PEON HH 2.000 1.25 2.50


DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 91.27

--------------------------------------------------------------------------------------------------------------------------
06.02 TAPA METALICA 0.6X0.6X1/8" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IP8160 TAPA METALICA Y ACC. 0.6X0.6X1/8 UN 1.000 100.00 100.00
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 111.27

--------------------------------------------------------------------------------------------------------------------------
07.01 PINTURA EN EXTERIORES M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 30.00 M2/DIA
IP7286 PINTURA ESMALTE GL 0.025 30.00 0.75
IP8500 THINNER GL 0.013 16.00 0.21
ZZ0002 OPERARIO HH 0.267 4.22 1.13
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 2.12

--------------------------------------------------------------------------------------------------------------------------
07.02 EMPEDRADO M2 0.00-CAP. + 0.10-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 15.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.000 15.00 0.00
ZZ0002 OPERARIO HH 0.053 4.22 0.22
ZZ0004 PEON HH 0.533 1.25 0.67
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 0.92

--------------------------------------------------------------------------------------------------------------------------
07.03 CERCO PERIMETRICO DE MURO SECO DE PIEDRA ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 9.00-PEON + 0.00-BRI.
Rendimiento : 5.00 ML/DIA
NA0133 BARRO (NO AFECTO IGV) M3 0.000 1.00 0.00
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.000 15.00 0.00
ZZ0002 OPERARIO HH 1.600 4.22 6.75
ZZ0004 PEON HH 14.400 1.25 18.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 1.24 25.99

--------------------------------------------------------------------------------------------------------------------------
07.04 PUERTA DE CALAMINA CON MARCOS DE MADERA UN 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 10.00 UN/DIA
IC1300 BISAGRA 2" UN 2.000 2.00 4.00
IP4609 CALAMINA GALVANIZADA 1.83X0.83X0.3MM PL 1.000 19.00 19.00
IP4783 CEMENTO PORTLAND TIPO I BL 0.122 21.40 2.61
IP4893 CLAVOS 3" KG 0.120 3.80 0.46
IP7256 PIEDRA MEDIANA M3 0.013 30.00 0.39
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 7.486 3.00 22.46
NA0658 HORMIGON (NO AFECTO IGV) M3 0.029 80.00 2.32
ZZ0002 OPERARIO HH 0.800 4.22 3.38
ZZ0004 PEON HH 0.800 1.25 1.00

DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.13 55.75

--------------------------------------------------------------------------------------------------------------------------
08.01 ACCESORIOS EN CAPTACION E 1" S 1" UN 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 5.00 UN/DIA
IC0010 ADAPTADOR PVC 1" UN 3.000 1.80 5.40
IC0503 NIPLE FO GO 1" X 2" UN 2.000 7.00 14.00
IC0513 PEGAMENTO PLASTICO PVC GL 0.050 68.00 3.40
IC0607 VALVULA BRONCE COMPUERTA 1" UN 1.000 18.80 18.80
IC0682 UNION FO GO UNIVERSAL 1" UN 2.000 15.00 30.00
IC1441 CANASTILLA BRONCE 1" UN 1.000 15.00 15.00
IC1445 CONO DE REBOSE PVC 4"X2" UN 1.000 10.00 10.00
IC1798 CINTA TEFLON UN 0.500 0.80 0.40
IP5044 CODO PVC SAP 1" UN 3.000 2.50 7.50
IP5050 CODO PVC SAP 2" UN 1.000 7.00 7.00
IP8226 TAPON PVC SAP HEMBRA C 10, 2" UN 1.000 7.00 7.00
IP8951 TUBERIA PVC SAP CLASE 7.5, 2" ML 4.000 6.30 25.20
ZZ0002 OPERARIO HH 1.600 4.22 6.75
ZZ0004 PEON HH 1.600 1.25 2.00
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.26 152.71

--------------------------------------------------------------------------------------------------------------------------

**.** 03 - LINEA DE CONDUCCION

01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS ML 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 4.00-PEON + 0.00-BRI.
Rendimiento : 500.00 ML/DIA
HR0189 TEODOLITO HM 0.016 7.37 0.12
HR0190 NIVEL HM 0.016 5.90 0.09
HR0191 MIRAS Y JALONES HM 0.016 0.75 0.01
IC0430 YESO KG 0.002 0.21 0.00
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 0.020 3.00 0.06
ZZ0004 PEON HH 0.064 1.25 0.08
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.00 0.36

--------------------------------------------------------------------------------------------------------------------------
02.01 EXCAVACION MANUAL M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
02.02 REFINE, NIVELACION Y FONDOS PARA TUBERIA ML 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 60.00 ML/DIA
ZZ0004 PEON HH 0.133 1.25 0.17
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.01 0.18

--------------------------------------------------------------------------------------------------------------------------
02.03 CAMA DE APOYO PARA TUBERIAS ML 0.00-CAP. + 0.00-OPE. + 0.10-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 100.00 ML/DIA
ZZ0003 OFICIAL HH 0.008 3.83 0.03
ZZ0004 PEON HH 0.080 1.25 0.10
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.01 0.14

--------------------------------------------------------------------------------------------------------------------------
02.04 RELLENO Y APISONADO DE ZANJAS M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 20.00 M3/DIA
ZZ0004 PEON HH 0.800 1.25 1.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.05 1.05

--------------------------------------------------------------------------------------------------------------------------
03.01 TUBERIA PVC SAP CLASE 10, 1" ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 200.00 ML/DIA
IP7088 PEGAMENTO PLASTICO PVC GL 0.001 68.00 0.07
IP8908 TUBERIA PVC SAP CLASE 10, 1" ML 1.030 2.80 2.88
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.080 1.25 0.10
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.01 3.23

--------------------------------------------------------------------------------------------------------------------------
04.01 ACCESORIOS PVC, INC. COLOCACION GLB 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 GLB/DIA

IC1693 COSTO GLOBAL GLB 1.000 100.00 100.00 100.00

--------------------------------------------------------------------------------------------------------------------------
05.01 DOBL PRUEBA HIRAULICA Y DESINFECC REDES ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 200.00 ML/DIA
HR0300 BOMBA PARA PRUEBAS HIDRAULICAS HM 0.020 12.50 0.25
IP6210 HIPOCLORITO DE CALCIO GR 1.000 0.01 0.01
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.040 1.25 0.05
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.01 0.49

--------------------------------------------------------------------------------------------------------------------------

**.** 04 - REHAB. RESERVORIO (01 UND)

01.01 LIMPIEZA DE TERRENO M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 4.00-PEON + 0.00-BRI.


Rendimiento : 200.00 M2/DIA
ZZ0004 PEON HH 0.160 1.25 0.20
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 0.21

--------------------------------------------------------------------------------------------------------------------------
01.02 TRAZO Y REPLANTEO PRELIMINAR M2 0.00-CAP. + 1.50-OPE. + 0.00-OFI. + 4.50-PEON + 0.00-BRI.
Rendimiento : 300.00 M2/DIA
IC0430 YESO KG 0.050 0.21 0.01
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 0.020 3.00 0.06
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.120 1.25 0.15
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 0.40

--------------------------------------------------------------------------------------------------------------------------
01.03 PICADO DE TARRAJEO EN MALE ESTADO M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 20.00 M2/DIA
ZZ0004 PEON HH 0.400 1.25 0.50
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.03 0.53

--------------------------------------------------------------------------------------------------------------------------
02.01 EXCAVACION MANUAL M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
03.01 PICADO Y RESANE DE ESTRUCTURA M3 0.00-CAP. + 0.50-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 0.25 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 7.300 21.40 156.22
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 1.010 85.00 85.85
ZZ0002 OPERARIO HH 16.000 4.22 67.52
ZZ0004 PEON HH 32.000 1.25 40.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 5.38 354.97

--------------------------------------------------------------------------------------------------------------------------
04.01 TARRAJEO CON IMPERMEABILIZANTE M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA
HR0002 REGLA DE MADERA P2 0.020 3.90 0.08
IP4783 CEMENTO PORTLAND TIPO I BL 0.220 21.40 4.71
IP4893 CLAVOS 3" KG 0.015 3.80 0.06
IP7988 SIKA 1 KG 0.400 7.00 2.80
NA0120 ARENA FINA (NO AFECTO IGV) M3 0.013 85.00 1.11
ZZ0002 OPERARIO HH 0.667 4.22 2.81
ZZ0004 PEON HH 0.333 1.25 0.42
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.16 12.15

--------------------------------------------------------------------------------------------------------------------------

04.02 TARRAJEO EN EXTERIORES CEMENTO ARENA M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA
HR0002 REGLA DE MADERA P2 0.020 3.90 0.08
IP4783 CEMENTO PORTLAND TIPO I BL 0.140 21.40 3.00
NA0120 ARENA FINA (NO AFECTO IGV) M3 0.020 85.00 1.70
ZZ0002 OPERARIO HH 0.667 4.22 2.81
ZZ0004 PEON HH 0.333 1.25 0.42
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.16 8.17

--------------------------------------------------------------------------------------------------------------------------
05.01 PINTURA EN EXTERIORES M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 30.00 M2/DIA
IP6499 LIJA PARA METAL UN 0.100 2.20 0.22
IP7286 PINTURA ESMALTE GL 0.025 30.00 0.75
IP8500 THINNER GL 0.013 16.00 0.21
ZZ0002 OPERARIO HH 0.267 4.22 1.13
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 2.34

--------------------------------------------------------------------------------------------------------------------------
06.01 HIPOCLORADOR FLUJO DIFUSION UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IC0679 HIPOCLORADOR UN 1.000 25.00 25.00
IP3873 ALAMBRE GALVANIZADO # 16 KG 0.100 5.80 0.58
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 36.85

--------------------------------------------------------------------------------------------------------------------------
06.02 TAPA METALICA 0.60X0.60X1/8" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IP8160 TAPA METALICA Y ACC. 0.6X0.6X1/8 UN 1.000 100.00 100.00
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 111.27

--------------------------------------------------------------------------------------------------------------------------
06.03 EMPEDRADO PERIMETRAL M2 0.00-CAP. + 0.10-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 15.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.000 15.00 0.00
ZZ0002 OPERARIO HH 0.053 4.22 0.22
ZZ0004 PEON HH 0.533 1.25 0.67
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 0.92

--------------------------------------------------------------------------------------------------------------------------
07.01 CERCO PERIMETRICO CON ALAMBRE DE PUAS ML 0.00-CAP. + 0.20-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 100.00 ML/DIA
IC0043 ALAMBRE DE PUAS ML 6.180 0.30 1.85
IP4893 CLAVOS 3" KG 0.033 3.80 0.13

ZZ0002 OPERARIO HH 0.016 4.22 0.07


ZZ0004 PEON HH 0.160 1.25 0.20
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 2.26

--------------------------------------------------------------------------------------------------------------------------
07.02 COLUMNAS DE MADERA CON CIMIENTO DE Cø UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 7.00 UND/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 0.239 21.40 5.11
IP4893 CLAVOS 3" KG 0.044 3.80 0.17
IP6666 MADERA TORNILLO, D=3", L=8' UN 1.000 9.00 9.00
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 2.240 3.00 6.72
NA0370 PIEDRA MEDIANA (NO AFECTO IGV) M3 0.025 30.00 0.75
NA0658 HORMIGON (NO AFECTO IGV) M3 0.057 80.00 4.56
ZZ0002 OPERARIO HH 1.143 4.22 4.82
ZZ0004 PEON HH 1.143 1.25 1.43
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.19 32.75

--------------------------------------------------------------------------------------------------------------------------
07.03 PUERTA DE MADERA ROLLIZA UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 10.00 UND/DIA
IC0043 ALAMBRE DE PUAS ML 2.400 0.30 0.72
IC1300 BISAGRA 2" UN 2.000 2.00 4.00
IC3449 MADERA ROLLIZA D=2" ML 4.100 2.20 9.02
IP4893 CLAVOS 3" KG 0.222 3.80 0.84
ZZ0002 OPERARIO HH 0.800 4.22 3.38
ZZ0004 PEON HH 0.800 1.25 1.00
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.13 19.09

--------------------------------------------------------------------------------------------------------------------------

**.** 05 - REHAB. CASETA VALVULAS (01UND)

01.01 PICADO DE TARRAJEO EN LAM ESTADO M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 20.00 M2/DIA
ZZ0004 PEON HH 0.400 1.25 0.50
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.03 0.53

--------------------------------------------------------------------------------------------------------------------------
02.01 EXCAVACION MANUAL M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
03.01 CONCRETO F'C=175 KG/CM2. SIN MEZCLADORA M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 12.00-PEON + 0.00-BRI.
Rendimiento : 10.00 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 8.430 21.40 180.40
NA0017 PIEDRA CHANCADA 1/2" (NO AFECTO IGV) M3 0.640 85.00 54.40
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 0.510 85.00 43.35
ZZ0002 OPERARIO HH 1.600 4.22 6.75
ZZ0003 OFICIAL HH 1.600 3.83 6.13
ZZ0004 PEON HH 9.600 1.25 12.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 1.24 304.27

--------------------------------------------------------------------------------------------------------------------------
03.02 ENCOFRADO Y DESENCOFRADO M2 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.20-PEON + 0.00-BRI.
Rendimiento : 14.00 M2/DIA
IP3875 ALAMBRE NEGRO # 16 KG 0.060 3.80 0.23
IP3876 ALAMBRE NEGRO # 8 KG 0.060 3.80 0.23
IP4893 CLAVOS 3" KG 0.150 3.80 0.57
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 2.800 3.00 8.40
ZZ0002 OPERARIO HH 0.571 4.22 2.41
ZZ0003 OFICIAL HH 0.571 3.83 2.19
ZZ0004 PEON HH 0.114 1.25 0.14
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.14 14.31

--------------------------------------------------------------------------------------------------------------------------
03.03 PICADO Y RESANE DE ESTRUCTURA M3 0.00-CAP. + 0.50-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 0.25 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 7.300 21.40 156.22
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 1.010 85.00 85.85
ZZ0002 OPERARIO HH 16.000 4.22 67.52
ZZ0004 PEON HH 32.000 1.25 40.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 5.38 354.97

--------------------------------------------------------------------------------------------------------------------------
04.01 TARRAJEO EN EXTERIORES CEMENTO ARENA M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA

IP4783 CEMENTO PORTLAND TIPO I BL 0.140 21.40 3.00


NA0120 ARENA FINA (NO AFECTO IGV) M3 0.020 85.00 1.70
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 0.020 3.00 0.06
ZZ0002 OPERARIO HH 0.667 4.22 2.81
ZZ0004 PEON HH 0.333 1.25 0.42
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.16 8.15

--------------------------------------------------------------------------------------------------------------------------
05.01 ACCESORIOS EN CASETA DE VALVULAS E 1" S 1 1/2" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IC0496 NIPLE FO GO 1 1/2" X 1 1/2" UN 6.000 6.00 36.00
IC0502 NIPLE FO GO 2" X 1 1/2" UN 2.000 9.00 18.00
IC0576 TEE FO GO 1 1/2" UN 2.000 9.00 18.00
IC0583 TEE FO GO 2" UN 1.000 15.00 15.00
IC0610 VALVULA BRONCE COMPUERTA 1 1/2" UN 3.000 35.00 105.00
IC0683 UNION FO GO UNIVERSAL 2" UN 2.000 20.00 40.00
IC0684 UNION FO GO UNIVERSAL 1 1/2" UN 6.000 18.00 108.00
IC0822 VALVULA BRONCE COMPUERTA 2" UN 1.000 40.00 40.00
IC1442 CANASTILLA BRONCE 1 1/2" UN 1.000 25.00 25.00
IC1445 CONO DE REBOSE PVC 4"X2" UN 1.000 10.00 10.00
IC1712 UNION FO GO 2" UN 2.000 15.00 30.00
IC1798 CINTA TEFLON UN 1.000 0.80 0.80
IC2002 REDUCCION PVC SAP C 10, 1 1/2" X 1" UN 1.000 6.00 6.00
IC2017 ADAPTADOR PVC 2" UN 2.000 4.40 8.80
IP3773 ADAPTADOR PVC 1 1/2" UN 5.000 3.80 19.00
IP4994 CODO FO GO 1 1/2" UN 3.000 8.00 24.00
IP5000 CODO FO GO 2" UN 3.000 12.00 36.00
IP5040 CODO PVC SAP 1 1/2" UN 1.000 4.50 4.50
IP5050 CODO PVC SAP 2" UN 1.000 7.00 7.00
IP7088 PEGAMENTO PLASTICO PVC GL 0.100 68.00 6.80
IP8226 TAPON PVC SAP HEMBRA C 10, 2" UN 1.000 7.00 7.00
IP8418 TEE PVC SAP 1 1/2" UN 2.000 7.00 14.00
IP8835 TUBERIA FO GO 2" X 3.3 MM ML 6.000 29.00 174.00
IP8951 TUBERIA PVC SAP CLASE 7.5, 2" ML 5.000 6.30 31.50
IP9082 UNION FO GO 1 1/2" UN 4.000 10.00 40.00
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 835.67

--------------------------------------------------------------------------------------------------------------------------
06.01 TAPA METALICA 0.6X1.05X1/8" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IP0024 TAPA METALICA 1.6M X 1.10, 2MM UN 1.000 140.00 140.00
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 151.27

--------------------------------------------------------------------------------------------------------------------------

06.02 PINTURA EN EXTERIORES M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.


Rendimiento : 30.00 M2/DIA
IP6499 LIJA PARA METAL UN 0.100 2.20 0.22
IP7286 PINTURA ESMALTE GL 0.025 30.00 0.75
IP8500 THINNER GL 0.002 16.00 0.03
ZZ0002 OPERARIO HH 0.267 4.22 1.13
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 2.16

--------------------------------------------------------------------------------------------------------------------------
06.03 EMPEDRADO M2 0.00-CAP. + 0.10-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 15.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.000 15.00 0.00
ZZ0002 OPERARIO HH 0.053 4.22 0.22
ZZ0004 PEON HH 0.533 1.25 0.67
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 0.92

--------------------------------------------------------------------------------------------------------------------------

**.** 06 - CONST. RESERVORIO (01 UND)

01.01 LIMPIEZA DE TERRENO M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 4.00-PEON + 0.00-BRI.


Rendimiento : 200.00 M2/DIA
ZZ0004 PEON HH 0.160 1.25 0.20
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 0.21

--------------------------------------------------------------------------------------------------------------------------
01.02 TRAZO Y REPLANTEO PRELIMINAR M2 0.00-CAP. + 1.50-OPE. + 0.00-OFI. + 4.50-PEON + 0.00-BRI.
Rendimiento : 300.00 M2/DIA
IC0430 YESO KG 0.050 0.21 0.01
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 0.020 3.00 0.06
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.120 1.25 0.15
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 0.40

--------------------------------------------------------------------------------------------------------------------------
02.01 EXCAVACION MANUAL M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
02.02 ELIMINACION DE MATERIAL EXCEDENTE M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 20.00 M3/DIA
IP4299 BOLSAS DE POLIETILENO UN 0.010 1.00 0.01
ZZ0004 PEON HH 0.400 1.25 0.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.02 0.53

--------------------------------------------------------------------------------------------------------------------------
02.03 NIVELACION INTERIOR APISONADO MANUAL M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 7.00 M2/DIA
ZZ0004 PEON HH 1.143 1.25 1.43
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.07 1.50

--------------------------------------------------------------------------------------------------------------------------
03.01 CONCRETO F'C=100 KG/CM2., SIN MEZCLADORA M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 10.00-PEON + 0.00-BRI.
Rendimiento : 9.00 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 4.500 21.40 96.30
NA0017 PIEDRA CHANCADA 1/2" (NO AFECTO IGV) M3 0.620 85.00 52.70
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 0.610 85.00 51.85
ZZ0002 OPERARIO HH 1.778 4.22 7.50
ZZ0003 OFICIAL HH 1.778 3.83 6.81
ZZ0004 PEON HH 8.889 1.25 11.11
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.76 227.03

--------------------------------------------------------------------------------------------------------------------------
03.02 CONCRETO F'C=210 KG/CM2 M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 10.00-PEON + 0.00-BRI.
Rendimiento : 9.00 M3/DIA

IP4783 CEMENTO PORTLAND TIPO I BL 9.730 21.40 208.22


NA0017 PIEDRA CHANCADA 1/2" (NO AFECTO IGV) M3 0.530 85.00 45.05
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 0.520 85.00 44.20
ZZ0002 OPERARIO HH 1.778 4.22 7.50
ZZ0003 OFICIAL HH 1.778 3.83 6.81
ZZ0004 PEON HH 8.889 1.25 11.11
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.76 323.65

--------------------------------------------------------------------------------------------------------------------------
03.03 ENCOFRADO Y DESENCOFRADO M2 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.16-PEON + 0.00-BRI.
Rendimiento : 8.00 M2/DIA
IP3875 ALAMBRE NEGRO # 16 KG 0.060 3.80 0.23
IP3876 ALAMBRE NEGRO # 8 KG 0.060 3.80 0.23
IP4893 CLAVOS 3" KG 0.150 3.80 0.57
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 2.800 3.00 8.40
ZZ0002 OPERARIO HH 1.000 4.22 4.22
ZZ0003 OFICIAL HH 1.000 3.83 3.83
ZZ0004 PEON HH 0.160 1.25 0.20
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.25 17.93

--------------------------------------------------------------------------------------------------------------------------
03.04 ACERO FY=4200 KG/CM2 KG 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 250.00 KG/DIA
IP3875 ALAMBRE NEGRO # 16 KG 0.060 3.80 0.23
IP5933 FIERRO FY=4200 KG/CM2 KG 1.070 3.10 3.32
ZZ0002 OPERARIO HH 0.032 4.22 0.14
ZZ0003 OFICIAL HH 0.032 3.83 0.12
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.01 3.82

--------------------------------------------------------------------------------------------------------------------------
04.01 TARRAJEO CON IMPERMEABILIZANTE M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA
HR0002 REGLA DE MADERA P2 0.020 3.90 0.08
IP4783 CEMENTO PORTLAND TIPO I BL 0.220 21.40 4.71
IP4893 CLAVOS 3" KG 0.015 3.80 0.06
IP7988 SIKA 1 KG 0.400 7.00 2.80
NA0120 ARENA FINA (NO AFECTO IGV) M3 0.013 85.00 1.11
ZZ0002 OPERARIO HH 0.667 4.22 2.81
ZZ0004 PEON HH 0.333 1.25 0.42
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.16 12.15

--------------------------------------------------------------------------------------------------------------------------
04.02 TARRAJEO EN EXTERIORES CEMENTO ARENA M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA
HR0002 REGLA DE MADERA P2 0.020 3.90 0.08
IP4783 CEMENTO PORTLAND TIPO I BL 0.140 21.40 3.00
NA0120 ARENA FINA (NO AFECTO IGV) M3 0.020 85.00 1.70
ZZ0002 OPERARIO HH 0.667 4.22 2.81

ZZ0004 PEON HH 0.333 1.25 0.42


DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.16 8.17

--------------------------------------------------------------------------------------------------------------------------
04.03 MORTERO 1:5 E=2.5 PARA PENDIENTE DE FONDO M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 15.00 M2/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 0.140 21.40 3.00
NA0120 ARENA FINA (NO AFECTO IGV) M3 0.016 85.00 1.36
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 0.201 3.00 0.60
ZZ0002 OPERARIO HH 0.533 4.22 2.25
ZZ0004 PEON HH 0.267 1.25 0.33
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.08 7.62

--------------------------------------------------------------------------------------------------------------------------
05.01 PINTURA EN EXTERIORES M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 30.00 M2/DIA
IP6499 LIJA PARA METAL UN 0.100 2.20 0.22
IP7286 PINTURA ESMALTE GL 0.025 30.00 0.75
IP8500 THINNER GL 0.013 16.00 0.21
ZZ0002 OPERARIO HH 0.267 4.22 1.13
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 2.34

--------------------------------------------------------------------------------------------------------------------------
06.01 HIPOCLORADOR FLUJO DIFUSION UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IC0679 HIPOCLORADOR UN 1.000 25.00 25.00
IP3873 ALAMBRE GALVANIZADO # 16 KG 0.100 5.80 0.58
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 36.85

--------------------------------------------------------------------------------------------------------------------------
06.02 TAPA METALICA 0.60X0.60X1/8" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IP8160 TAPA METALICA Y ACC. 0.6X0.6X1/8 UN 1.000 100.00 100.00
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 111.27

--------------------------------------------------------------------------------------------------------------------------
06.03 VENTILACION FøGø 2" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 10.00 UND/DIA
IP5000 CODO FO GO 2" UN 2.000 12.00 24.00
IP8834 TUBERIA FO GO 2" X 3.0 MM ML 0.400 29.00 11.60
ZZ0002 OPERARIO HH 0.800 4.22 3.38
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.10 39.08

--------------------------------------------------------------------------------------------------------------------------

06.04 EMPEDRADO PERIMETRAL M2 0.00-CAP. + 0.10-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.


Rendimiento : 15.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.000 15.00 0.00
ZZ0002 OPERARIO HH 0.053 4.22 0.22
ZZ0004 PEON HH 0.533 1.25 0.67
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 0.92

--------------------------------------------------------------------------------------------------------------------------
07.01 CERCO PERIMETRICO CON ALAMBRE DE PUAS ML 0.00-CAP. + 0.20-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 100.00 ML/DIA
IC0043 ALAMBRE DE PUAS ML 6.180 0.30 1.85
IP4893 CLAVOS 3" KG 0.033 3.80 0.13
ZZ0002 OPERARIO HH 0.016 4.22 0.07
ZZ0004 PEON HH 0.160 1.25 0.20
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 2.26
--------------------------------------------------------------------------------------------------------------------------
07.02 COLUMNAS DE MADERA CON CIMIENTO DE Cø UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 7.00 UND/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 0.239 21.40 5.11
IP4893 CLAVOS 3" KG 0.044 3.80 0.17
IP6666 MADERA TORNILLO, D=3", L=8' UN 1.000 9.00 9.00
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 2.240 3.00 6.72
NA0370 PIEDRA MEDIANA (NO AFECTO IGV) M3 0.025 30.00 0.75
NA0658 HORMIGON (NO AFECTO IGV) M3 0.057 80.00 4.56
ZZ0002 OPERARIO HH 1.143 4.22 4.82
ZZ0004 PEON HH 1.143 1.25 1.43
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.19 32.75

--------------------------------------------------------------------------------------------------------------------------
07.03 PUERTA DE MADERA ROLLIZA UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 10.00 UND/DIA
IC0043 ALAMBRE DE PUAS ML 2.400 0.30 0.72
IC1300 BISAGRA 2" UN 2.000 2.00 4.00
IC3449 MADERA ROLLIZA D=2" ML 4.100 2.20 9.02
IP4893 CLAVOS 3" KG 0.222 3.80 0.84
ZZ0002 OPERARIO HH 0.800 4.22 3.38
ZZ0004 PEON HH 0.800 1.25 1.00
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.13 19.09

--------------------------------------------------------------------------------------------------------------------------

**.** 07 - CONST. CASETA VALVULAS (01UND)

01.01 TRAZO Y REPLANTEO M2 0.00-CAP. + 1.50-OPE. + 0.00-OFI. + 4.50-PEON + 0.00-BRI.


Rendimiento : 300.00 M2/DIA
IC0437 YESO (BOLSA DE 25 KG) BL 0.050 5.41 0.27
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 0.020 3.00 0.06
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.120 1.25 0.15
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 0.66

--------------------------------------------------------------------------------------------------------------------------
02.01 EXCAVACION MANUAL M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
03.01 CONCRETO F'C=175 KG/CM2. SIN MEZCLADORA M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 12.00-PEON + 0.00-BRI.
Rendimiento : 10.00 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 8.430 21.40 180.40
NA0017 PIEDRA CHANCADA 1/2" (NO AFECTO IGV) M3 0.640 85.00 54.40
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 0.510 85.00 43.35
ZZ0002 OPERARIO HH 1.600 4.22 6.75
ZZ0003 OFICIAL HH 1.600 3.83 6.13
ZZ0004 PEON HH 9.600 1.25 12.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 1.24 304.27

--------------------------------------------------------------------------------------------------------------------------
03.02 ENCOFRADO Y DESENCOFRADO M2 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.20-PEON + 0.00-BRI.
Rendimiento : 14.00 M2/DIA
IP3875 ALAMBRE NEGRO # 16 KG 0.060 3.80 0.23
IP3876 ALAMBRE NEGRO # 8 KG 0.060 3.80 0.23
IP4893 CLAVOS 3" KG 0.150 3.80 0.57
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 2.800 3.00 8.40
ZZ0002 OPERARIO HH 0.571 4.22 2.41
ZZ0003 OFICIAL HH 0.571 3.83 2.19
ZZ0004 PEON HH 0.114 1.25 0.14
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.14 14.31

--------------------------------------------------------------------------------------------------------------------------
03.03 ACERO FY=4200 KG/CM2 KG 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 250.00 KG/DIA
IP3875 ALAMBRE NEGRO # 16 KG 0.060 3.80 0.23
IP5933 FIERRO FY=4200 KG/CM2 KG 1.070 3.10 3.32
ZZ0002 OPERARIO HH 0.032 4.22 0.14
ZZ0003 OFICIAL HH 0.032 3.83 0.12
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.01 3.82

--------------------------------------------------------------------------------------------------------------------------

04.01 TARRAJEO EN EXTERIORES CEMENTO ARENA M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 0.140 21.40 3.00
NA0120 ARENA FINA (NO AFECTO IGV) M3 0.020 85.00 1.70
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 0.020 3.00 0.06
ZZ0002 OPERARIO HH 0.667 4.22 2.81
ZZ0004 PEON HH 0.333 1.25 0.42
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.16 8.15

--------------------------------------------------------------------------------------------------------------------------
05.01 ACCESORIOS CASETA DE VALVULAS E 1 1/2" S 1" MOD UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IC0496 NIPLE FO GO 1 1/2" X 1 1/2" UN 6.000 6.00 36.00
IC0502 NIPLE FO GO 2" X 1 1/2" UN 2.000 9.00 18.00
IC0576 TEE FO GO 1 1/2" UN 2.000 9.00 18.00
IC0583 TEE FO GO 2" UN 1.000 15.00 15.00
IC0610 VALVULA BRONCE COMPUERTA 1 1/2" UN 3.000 35.00 105.00
IC0683 UNION FO GO UNIVERSAL 2" UN 2.000 20.00 40.00
IC0684 UNION FO GO UNIVERSAL 1 1/2" UN 6.000 18.00 108.00
IC0822 VALVULA BRONCE COMPUERTA 2" UN 1.000 40.00 40.00
IC1442 CANASTILLA BRONCE 1 1/2" UN 1.000 25.00 25.00
IC1445 CONO DE REBOSE PVC 4"X2" UN 1.000 10.00 10.00
IC1712 UNION FO GO 2" UN 2.000 15.00 30.00
IC2002 REDUCCION PVC SAP C 10, 1 1/2" X 1" UN 1.000 6.00 6.00
IC2017 ADAPTADOR PVC 2" UN 2.000 4.40 8.80
IC3773 VALVULA BRONCE FLOTADOR 1 1/2" UN 1.000 45.00 45.00
IP3773 ADAPTADOR PVC 1 1/2" UN 5.000 3.80 19.00
IP4994 CODO FO GO 1 1/2" UN 5.000 8.00 40.00
IP5000 CODO FO GO 2" UN 3.000 12.00 36.00
IP5050 CODO PVC SAP 2" UN 1.000 7.00 7.00
IP8418 TEE PVC SAP 1 1/2" UN 1.000 7.00 7.00
IP9082 UNION FO GO 1 1/2" UN 4.000 10.00 40.00
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 665.07

--------------------------------------------------------------------------------------------------------------------------
06.01 TAPA METALICA 0.60X0.60X1/8" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IP8160 TAPA METALICA Y ACC. 0.6X0.6X1/8 UN 1.000 100.00 100.00
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 111.27

--------------------------------------------------------------------------------------------------------------------------
06.02 PINTURA EN EXTERIORES M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 30.00 M2/DIA
IP6499 LIJA PARA METAL UN 0.100 2.20 0.22

IP7286 PINTURA ESMALTE GL 0.025 30.00 0.75


IP8500 THINNER GL 0.002 16.00 0.03
ZZ0002 OPERARIO HH 0.267 4.22 1.13
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 2.16

--------------------------------------------------------------------------------------------------------------------------
06.03 FILTRO DE GRAVA M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 6.00 M3/DIA
NA0977 FILTRO DE GRAVA O CASCAJO(NO AFECTO IGV) M3 1.030 85.00 87.55
ZZ0004 PEON HH 1.333 1.25 1.67
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.08 89.30

--------------------------------------------------------------------------------------------------------------------------
06.04 EMPEDRADO M2 0.00-CAP. + 0.10-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 15.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.000 15.00 0.00
ZZ0002 OPERARIO HH 0.053 4.22 0.22
ZZ0004 PEON HH 0.533 1.25 0.67
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 0.92

--------------------------------------------------------------------------------------------------------------------------

**.** 08 - LINEA DE DISTRIBUCION

01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS ML 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 4.00-PEON + 0.00-BRI.
Rendimiento : 500.00 ML/DIA
HR0189 TEODOLITO HM 0.016 7.37 0.12
HR0190 NIVEL HM 0.016 5.90 0.09
HR0191 MIRAS Y JALONES HM 0.016 0.75 0.01
IC0430 YESO KG 0.002 0.21 0.00
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 0.020 3.00 0.06
ZZ0004 PEON HH 0.064 1.25 0.08
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.00 0.36

--------------------------------------------------------------------------------------------------------------------------
02.01 EXCAVACION MANUAL DE ZANJA M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
02.02 REFINE, NIVELACION Y FONDOS PARA TUBERIA ML 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 60.00 ML/DIA
ZZ0004 PEON HH 0.133 1.25 0.17
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.01 0.18

--------------------------------------------------------------------------------------------------------------------------
02.03 CAMA DE APOYO PARA TUBERIAS ML 0.00-CAP. + 0.00-OPE. + 0.10-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 100.00 ML/DIA
ZZ0003 OFICIAL HH 0.008 3.83 0.03
ZZ0004 PEON HH 0.080 1.25 0.10
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.01 0.14

--------------------------------------------------------------------------------------------------------------------------
02.04 RELLENO Y APISONADO DE ZANJAS M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 20.00 M3/DIA
ZZ0004 PEON HH 0.800 1.25 1.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.05 1.05

--------------------------------------------------------------------------------------------------------------------------
03.01 TUBERIA PVC SAP CLASE 10, 1 1/2" ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 180.00 ML/DIA
IP7088 PEGAMENTO PLASTICO PVC GL 0.002 68.00 0.14
IP8906 TUBERIA PVC SAP CLASE 10, 1 1/2" ML 1.030 5.90 6.08
ZZ0002 OPERARIO HH 0.044 4.22 0.19
ZZ0004 PEON HH 0.089 1.25 0.11
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.02 6.54

--------------------------------------------------------------------------------------------------------------------------
03.02 TUBERIA PVC SAP CLASE 10, 1" ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 200.00 ML/DIA

IP7088 PEGAMENTO PLASTICO PVC GL 0.001 68.00 0.07


IP8908 TUBERIA PVC SAP CLASE 10, 1" ML 1.030 2.80 2.88
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.080 1.25 0.10
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.01 3.23

--------------------------------------------------------------------------------------------------------------------------
03.03 TUBERIA PVC SAP CLASE 10, 3/4" ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 180.00 ML/DIA
IP7088 PEGAMENTO PLASTICO PVC GL 0.001 68.00 0.07
IP8913 TUBERIA PVC SAP CLASE 10, 3/4" ML 1.030 2.56 2.64
ZZ0002 OPERARIO HH 0.044 4.22 0.19
ZZ0004 PEON HH 0.089 1.25 0.11
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.02 3.03

--------------------------------------------------------------------------------------------------------------------------
03.04 TUBERIA PVC SAP CLASE 10, 1/2" ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 180.00 ML/DIA
IP7088 PEGAMENTO PLASTICO PVC GL 0.001 68.00 0.07
IP8909 TUBERIA PVC SAP CLASE 10, 1/2" ML 1.030 1.70 1.75
ZZ0002 OPERARIO HH 0.044 4.22 0.19
ZZ0004 PEON HH 0.089 1.25 0.11
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.02 2.14

--------------------------------------------------------------------------------------------------------------------------
03.05 TENDIDO DE LD CON TUBERIA REHUSADO ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 180.00 ML/DIA
IP7088 PEGAMENTO PLASTICO PVC GL 0.002 68.00 0.14
ZZ0002 OPERARIO HH 0.044 4.22 0.19
ZZ0004 PEON HH 0.089 1.25 0.11
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.02 0.46

--------------------------------------------------------------------------------------------------------------------------
04.01 ACCESORIOS PVC, INC. COLOCACION GLB 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 GLB/DIA
IC1693 COSTO GLOBAL GLB 1.000 100.00 100.00 100.00

--------------------------------------------------------------------------------------------------------------------------
05.01 PRUEBA HIRAULICA Y DESINFECCION DE REDES ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 200.00 ML/DIA
HR0300 BOMBA PARA PRUEBAS HIDRAULICAS HM 0.020 12.50 0.25
IP6210 HIPOCLORITO DE CALCIO GR 1.000 0.01 0.01
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.040 1.25 0.05
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.01 0.49

--------------------------------------------------------------------------------------------------------------------------
FONCODES-MIMDES 17/04/2006
ANALISIS DE COSTOS UNITARIOS PAG.-027
EXPEDIENTE :
--------------------------------------------------------------------------------------------------------------------------
ORDEN TITULO DE PARTIDA UNID
INSUMOS UNID CANTIDAD P.UNIT COSTO PARCIAL TOTAL
--------------------------------------------------------------------------------------------------------------------------
**.** 09 - CONST. CRP T7 ( 01 UND )

01.01 TRAZO Y REPLANTEO PRELIMINAR M2 0.00-CAP. + 1.50-OPE. + 0.00-OFI. + 4.50-PEON + 0.00-BRI.


Rendimiento : 300.00 M2/DIA
IC0430 YESO KG 0.050 0.21 0.01
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.120 1.25 0.15
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 0.34

--------------------------------------------------------------------------------------------------------------------------
01.02 PICADO DE TARRAJEO EN MAL ESTADO M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 20.00 M2/DIA
ZZ0004 PEON HH 0.400 1.25 0.50
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.03 0.53

--------------------------------------------------------------------------------------------------------------------------
02.01 EXCAVACION MANUAL M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
03.01 CONCRETO F'C=175 KG/CM2. SIN MEZCLADORA M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 12.00-PEON + 0.00-BRI.
Rendimiento : 10.00 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 8.430 21.40 180.40
NA0017 PIEDRA CHANCADA 1/2" (NO AFECTO IGV) M3 0.640 85.00 54.40
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 0.510 85.00 43.35
ZZ0002 OPERARIO HH 1.600 4.22 6.75
ZZ0003 OFICIAL HH 1.600 3.83 6.13
ZZ0004 PEON HH 9.600 1.25 12.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 1.24 304.27

--------------------------------------------------------------------------------------------------------------------------
03.02 ENCOFRADO Y DESENCOFRADO M2 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.20-PEON + 0.00-BRI.
Rendimiento : 14.00 M2/DIA
IP3875 ALAMBRE NEGRO # 16 KG 0.060 3.80 0.23
IP3876 ALAMBRE NEGRO # 8 KG 0.060 3.80 0.23
IP4893 CLAVOS 3" KG 0.015 3.80 0.06
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 2.800 3.00 8.40
ZZ0002 OPERARIO HH 0.571 4.22 2.41
ZZ0003 OFICIAL HH 0.571 3.83 2.19
ZZ0004 PEON HH 0.114 1.25 0.14
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.14 13.80

--------------------------------------------------------------------------------------------------------------------------
03.03 PICADO Y RESANE DE ESTRUCTURAS M3 0.00-CAP. + 0.50-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 0.25 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 7.300 21.40 156.22

NA0121 ARENA GRUESA (NO AFECTO IGV) M3 1.010 85.00 85.85


ZZ0002 OPERARIO HH 16.000 4.22 67.52
ZZ0004 PEON HH 32.000 1.25 40.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 5.38 354.97

--------------------------------------------------------------------------------------------------------------------------
04.01 TARRAJEO EN EXTERIORES CON CEMENTO ARENA M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA
HR0002 REGLA DE MADERA P2 0.020 3.90 0.08
IP4783 CEMENTO PORTLAND TIPO I BL 0.140 21.40 3.00
IP4893 CLAVOS 3" KG 0.015 3.80 0.06
NA0120 ARENA FINA (NO AFECTO IGV) M3 0.020 85.00 1.70
ZZ0002 OPERARIO HH 0.667 4.22 2.81
ZZ0004 PEON HH 0.333 1.25 0.42
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.10 8.17

--------------------------------------------------------------------------------------------------------------------------
05.01 ACCESORIOS PARA C.R.P T-7 E 1 1/2" S 1 1/2" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IC0496 NIPLE FO GO 1 1/2" X 1 1/2" UN 2.000 6.00 12.00
IC0610 VALVULA BRONCE COMPUERTA 1 1/2" UN 1.000 35.00 35.00
IC1442 CANASTILLA BRONCE 1 1/2" UN 1.000 25.00 25.00
IC1445 CONO DE REBOSE PVC 4"X2" UN 1.000 10.00 10.00
IC1798 CINTA TEFLON UN 0.500 0.80 0.40
IC3773 VALVULA BRONCE FLOTADOR 1 1/2" UN 1.000 45.00 45.00
IP3773 ADAPTADOR PVC 1 1/2" UN 2.000 3.80 7.60
IP4998 CODO FO GO 1/2" UN 1.000 1.00 1.00
IP5040 CODO PVC SAP 1 1/2" UN 1.000 4.50 4.50
IP5044 CODO PVC SAP 1" UN 1.000 2.50 2.50
IP5050 CODO PVC SAP 2" UN 1.000 7.00 7.00
IP7088 PEGAMENTO PLASTICO PVC GL 0.020 68.00 1.36
IP8224 TAPON PVC SAP HEMBRA C 10, 1" UN 1.000 1.50 1.50
IP8226 TAPON PVC SAP HEMBRA C 10, 2" UN 1.000 7.00 7.00
IP8947 TUBERIA PVC SAP CLASE 7.5, 1 1/2" ML 4.000 4.40 17.60
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 188.73

--------------------------------------------------------------------------------------------------------------------------
06.01 TAPA METALICA 0.6X0.6X1/8" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IP8160 TAPA METALICA Y ACC. 0.6X0.6X1/8 UN 1.000 100.00 100.00
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 111.27

--------------------------------------------------------------------------------------------------------------------------
06.02 PINTURA EN EXTERIORES M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 30.00 M2/DIA

IP6499 LIJA PARA METAL UN 0.100 2.20 0.22


IP7286 PINTURA ESMALTE GL 0.025 30.00 0.75
IP8500 THINNER GL 0.013 16.00 0.21
ZZ0002 OPERARIO HH 0.267 4.22 1.13
ZZ0004 PEON HH 0.133 1.25 0.17
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.04 2.52

--------------------------------------------------------------------------------------------------------------------------
06.03 EMPEDRADO M2 0.00-CAP. + 0.10-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 15.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.000 15.00 0.00
ZZ0002 OPERARIO HH 0.053 4.22 0.22
ZZ0004 PEON HH 0.533 1.25 0.67
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 0.92

--------------------------------------------------------------------------------------------------------------------------
07.01 CERCO PERIMETRICO CON ALAMBRE DE PUAS ML 0.00-CAP. + 0.20-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 100.00 ML/DIA
IC0043 ALAMBRE DE PUAS ML 6.180 0.30 1.85
IP4893 CLAVOS 3" KG 0.033 3.80 0.13
ZZ0002 OPERARIO HH 0.016 4.22 0.07
ZZ0004 PEON HH 0.160 1.25 0.20
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 2.26

--------------------------------------------------------------------------------------------------------------------------
07.02 COLUMNAS DE MADERA CON CIMIENTO DE Cø UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 7.00 UND/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 0.239 21.40 5.11
IP4893 CLAVOS 3" KG 0.044 3.80 0.17
IP6666 MADERA TORNILLO, D=3", L=8' UN 1.000 9.00 9.00
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 2.240 3.00 6.72
NA0370 PIEDRA MEDIANA (NO AFECTO IGV) M3 0.025 30.00 0.75
NA0658 HORMIGON (NO AFECTO IGV) M3 0.057 80.00 4.56
ZZ0002 OPERARIO HH 1.143 4.22 4.82
ZZ0004 PEON HH 1.143 1.25 1.43
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.19 32.75

--------------------------------------------------------------------------------------------------------------------------
07.03 PUERTA DE ROLLIZO DE EUCALIPTO UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 10.00 UND/DIA
IC0043 ALAMBRE DE PUAS ML 2.400 0.30 0.72
IC1300 BISAGRA 2" UN 2.000 2.00 4.00
IC3449 MADERA ROLLIZA D=2" ML 4.100 2.20 9.02
IP4893 CLAVOS 3" KG 0.222 3.80 0.84
ZZ0002 OPERARIO HH 0.800 4.22 3.38
ZZ0004 PEON HH 0.800 1.25 1.00
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.13 19.09

--------------------------------------------------------------------------------------------------------------------------

**.** 10 - REHAB. CRUCE AEREO (01 UND)

01.01 TRAZO Y REPLANTEO PRELIMINAR M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 4.50-PEON + 0.00-BRI.


Rendimiento : 300.00 M2/DIA
IC0430 YESO KG 0.050 0.21 0.01
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 0.020 3.00 0.06
ZZ0002 OPERARIO HH 0.027 4.22 0.11
ZZ0004 PEON HH 0.120 1.25 0.15
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 0.34

--------------------------------------------------------------------------------------------------------------------------
02.01 EXCAVACION MANUAL M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
03.01 CONCRETO F'C=175 KG/CM2. SIN MEZCLADORA M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 12.00-PEON + 0.00-BRI.
Rendimiento : 10.00 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 8.430 21.40 180.40
NA0017 PIEDRA CHANCADA 1/2" (NO AFECTO IGV) M3 0.640 85.00 54.40
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 0.510 85.00 43.35
ZZ0002 OPERARIO HH 1.600 4.22 6.75
ZZ0003 OFICIAL HH 1.600 3.83 6.13
ZZ0004 PEON HH 9.600 1.25 12.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 1.24 304.27

--------------------------------------------------------------------------------------------------------------------------
04.01 SUMIN. E INST. DE CABLE TIPO BOA 3/8" ML 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 35.00 ML/DIA
IP4478 CABLE DE ACERO TIPO BOA 3/8" ML 1.050 9.50 9.98
ZZ0002 OPERARIO HH 0.229 4.22 0.97
ZZ0003 OFICIAL HH 0.229 3.83 0.88
ZZ0004 PEON HH 0.457 1.25 0.57
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.12 12.52

--------------------------------------------------------------------------------------------------------------------------
04.02 PENDOLA DE ALAMBRE LISO GALVANIZADO Nø 16 ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 25.00 ML/DIA
IC3578 ALAMBRE GALVANIZADO # 16 KG 1.500 5.80 8.70
ZZ0002 OPERARIO HH 0.320 4.22 1.35
ZZ0004 PEON HH 0.640 1.25 0.80
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.06 10.91

--------------------------------------------------------------------------------------------------------------------------
04.03 ACCESORIOS DE FøGø UND 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 UND/DIA
IC3436 GRAPAS DE ACERO DE 3/8" UN 9.000 6.00 54.00

IC3515 TEMPLADOR UN 1.000 15.00 15.00


IP3740 ACCESORIOS FO GO UN 1.000 50.00 50.00 119.00

--------------------------------------------------------------------------------------------------------------------------

**.** 11 - VALVULA DE PURGA (04 UND)

01.01 TRAZO Y REPLANTEO PRELIMINAR M2 0.00-CAP. + 1.50-OPE. + 0.00-OFI. + 4.50-PEON + 0.00-BRI.


Rendimiento : 300.00 M2/DIA
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.120 1.25 0.15
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 0.33

--------------------------------------------------------------------------------------------------------------------------
02.01 EXCAVACION MANUAL M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
03.01 CONCRETO F'C=140 KG/CM2. SIN MEZCLADORA M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 12.00-PEON + 0.00-BRI.
Rendimiento : 10.00 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 7.010 21.40 150.01
NA0017 PIEDRA CHANCADA 1/2" (NO AFECTO IGV) M3 0.550 85.00 46.75
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 0.540 85.00 45.90
ZZ0002 OPERARIO HH 1.600 4.22 6.75
ZZ0003 OFICIAL HH 1.600 3.83 6.13
ZZ0004 PEON HH 9.600 1.25 12.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 1.24 268.78

--------------------------------------------------------------------------------------------------------------------------
03.02 ENCOFRADO Y DESENCOFRADO M2 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.20-PEON + 0.00-BRI.
Rendimiento : 14.00 M2/DIA
IP3875 ALAMBRE NEGRO # 16 KG 0.060 3.80 0.23
IP3876 ALAMBRE NEGRO # 8 KG 0.060 3.80 0.23
IP4893 CLAVOS 3" KG 0.015 3.80 0.06
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 2.800 3.00 8.40
ZZ0002 OPERARIO HH 0.571 4.22 2.41
ZZ0003 OFICIAL HH 0.571 3.83 2.19
ZZ0004 PEON HH 0.114 1.25 0.14
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.14 13.80

--------------------------------------------------------------------------------------------------------------------------
04.01 TARRAJEO (MORTERO 1:5) M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA
HR0002 REGLA DE MADERA P2 0.020 3.90 0.08
IP4783 CEMENTO PORTLAND TIPO I BL 0.140 21.40 3.00
NA0120 ARENA FINA (NO AFECTO IGV) M3 0.020 85.00 1.70
ZZ0002 OPERARIO HH 0.667 4.22 2.81
ZZ0004 PEON HH 0.333 1.25 0.42
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.10 8.11

--------------------------------------------------------------------------------------------------------------------------

05.01 ACCESORIOS VALVULA PURGA TI 3/4" GLB 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 12.00 GLB/DIA
IC0505 NIPLE FO GO 3/4 X 1 1/2" UN 2.000 5.00 10.00
IC0680 UNION FO GO UNIVERSAL 3/4" UN 2.000 6.50 13.00
IC1798 CINTA TEFLON UN 0.200 0.80 0.16
IC2015 ADAPTADOR PVC 3/4" UN 2.000 1.50 3.00
IP7088 PEGAMENTO PLASTICO PVC GL 0.050 68.00 3.40
IP8233 TAPON PVC SAP HEMBRA C 10, 3/4" UN 1.000 1.40 1.40
IP9231 VALVULA BRONCE COMPUERTA 3/4" UN 1.000 14.80 14.80
ZZ0002 OPERARIO HH 0.667 4.22 2.81
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.08 48.65

--------------------------------------------------------------------------------------------------------------------------
05.02 ACCESORIOS VALVULA PURGA TI 1"-3/4" GLB 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 12.00 GLB/DIA
IC0505 NIPLE FO GO 3/4 X 1 1/2" UN 2.000 5.00 10.00
IC0680 UNION FO GO UNIVERSAL 3/4" UN 2.000 6.50 13.00
IC1798 CINTA TEFLON UN 0.200 0.80 0.16
IC2001 REDUCCION PVC SAP C 10, 1" X 3/4" UN 1.000 2.80 2.80
IC2015 ADAPTADOR PVC 3/4" UN 2.000 1.50 3.00
IP7088 PEGAMENTO PLASTICO PVC GL 0.050 68.00 3.40
IP8233 TAPON PVC SAP HEMBRA C 10, 3/4" UN 1.000 1.40 1.40
IP9231 VALVULA BRONCE COMPUERTA 3/4" UN 1.000 14.80 14.80
ZZ0002 OPERARIO HH 0.667 4.22 2.81
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.08 51.45

--------------------------------------------------------------------------------------------------------------------------
05.03 ACCESORIOS VALVULA PURGA TII 1 1/2"-3/4" GLB 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 12.00 GLB/DIA
IC0505 NIPLE FO GO 3/4 X 1 1/2" UN 2.000 5.00 10.00
IC0680 UNION FO GO UNIVERSAL 3/4" UN 2.000 6.50 13.00
IC1798 CINTA TEFLON UN 0.200 0.80 0.16
IC2015 ADAPTADOR PVC 3/4" UN 2.000 1.50 3.00
IC3353 REDUCCION PVC SAP 1 1/2 X 3/4" UN 1.000 3.50 3.50
IP7088 PEGAMENTO PLASTICO PVC GL 0.050 68.00 3.40
IP8233 TAPON PVC SAP HEMBRA C 10, 3/4" UN 1.000 1.40 1.40
IP8418 TEE PVC SAP 1 1/2" UN 1.000 7.00 7.00
IP9231 VALVULA BRONCE COMPUERTA 3/4" UN 1.000 14.80 14.80
ZZ0002 OPERARIO HH 0.667 4.22 2.81
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.08 59.15

--------------------------------------------------------------------------------------------------------------------------
05.04 TAPA METALICA 0.4X0.40X1/8" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IP8159 TAPA METALICA Y ACC. 0.4X0.4X1/8 UN 1.000 80.00 80.00
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 91.27

--------------------------------------------------------------------------------------------------------------------------

05.05 FILTRO DE GRAVA M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.


Rendimiento : 6.00 M3/DIA
NA0977 FILTRO DE GRAVA O CASCAJO(NO AFECTO IGV) M3 1.030 85.00 87.55
ZZ0004 PEON HH 1.333 1.25 1.67
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.08 89.30

--------------------------------------------------------------------------------------------------------------------------
05.06 EMPEDRADO M2 0.00-CAP. + 0.10-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 15.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.000 15.00 0.00
ZZ0002 OPERARIO HH 0.053 4.22 0.22
ZZ0004 PEON HH 0.533 1.25 0.67
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 0.92

--------------------------------------------------------------------------------------------------------------------------

**.** 12 - VALVULA DE CONTROL (06 UND)

01.01 TRAZO Y REPLANTEO PRELIMINAR M2 0.00-CAP. + 1.50-OPE. + 0.00-OFI. + 4.50-PEON + 0.00-BRI.


Rendimiento : 300.00 M2/DIA
IC0430 YESO KG 0.050 0.21 0.01
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.120 1.25 0.15
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 0.34

--------------------------------------------------------------------------------------------------------------------------
02.01 EXCAVACION MANUAL M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
03.01 CONCRETO F'C=140 KG/CM2. SIN MEZCLADORA M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 12.00-PEON + 0.00-BRI.
Rendimiento : 10.00 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 7.010 21.40 150.01
NA0017 PIEDRA CHANCADA 1/2" (NO AFECTO IGV) M3 0.550 85.00 46.75
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 0.540 85.00 45.90
ZZ0002 OPERARIO HH 1.600 4.22 6.75
ZZ0003 OFICIAL HH 1.600 3.83 6.13
ZZ0004 PEON HH 9.600 1.25 12.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 1.24 268.78

--------------------------------------------------------------------------------------------------------------------------
03.02 ENCOFRADO Y DESENCOFRADO M2 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.20-PEON + 0.00-BRI.
Rendimiento : 14.00 M2/DIA
IP3875 ALAMBRE NEGRO # 16 KG 0.060 3.80 0.23
IP3876 ALAMBRE NEGRO # 8 KG 0.060 3.80 0.23
IP4893 CLAVOS 3" KG 0.015 3.80 0.06
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 2.800 3.00 8.40
ZZ0002 OPERARIO HH 0.571 4.22 2.41
ZZ0003 OFICIAL HH 0.571 3.83 2.19
ZZ0004 PEON HH 0.114 1.25 0.14
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.14 13.80

--------------------------------------------------------------------------------------------------------------------------
04.01 TARRAJEO EN INTERIORES (MORTERO 1:5) M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 0.220 21.40 4.71
NA0120 ARENA FINA (NO AFECTO IGV) M3 0.015 85.00 1.27
ZZ0002 OPERARIO HH 0.667 4.22 2.81
ZZ0004 PEON HH 0.333 1.25 0.42
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.16 9.37

--------------------------------------------------------------------------------------------------------------------------

05.01 ACCESORIOS PARA VALVULAS DE CONTROL 1" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IC0607 VALVULA BRONCE COMPUERTA 1" UN 1.000 18.80 18.80
IC0682 UNION FO GO UNIVERSAL 1" UN 2.000 15.00 30.00
IC1796 NIPLE FO GO 1" X 1" UN 2.000 5.00 10.00
IC1798 CINTA TEFLON UN 0.500 0.80 0.40
IP3774 ADAPTADOR PVC 1" UN 2.000 1.80 3.60
IP7088 PEGAMENTO PLASTICO PVC GL 0.020 68.00 1.36
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 75.43

--------------------------------------------------------------------------------------------------------------------------
05.02 ACCESORIOS PARA VALVULAS CONTROL 1 1/2" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IC0496 NIPLE FO GO 1 1/2" X 1 1/2" UN 2.000 6.00 12.00
IC0610 VALVULA BRONCE COMPUERTA 1 1/2" UN 1.000 35.00 35.00
IC0684 UNION FO GO UNIVERSAL 1 1/2" UN 2.000 18.00 36.00
IC1798 CINTA TEFLON UN 0.250 0.80 0.20
IP3773 ADAPTADOR PVC 1 1/2" UN 2.000 3.80 7.60
IP7088 PEGAMENTO PLASTICO PVC GL 0.020 68.00 1.36
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 103.43

--------------------------------------------------------------------------------------------------------------------------
05.03 TAPA METALICA 0.4X0.4X1/8" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA
IP8159 TAPA METALICA Y ACC. 0.4X0.4X1/8 UN 1.000 80.00 80.00
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0004 PEON HH 2.000 1.25 2.50
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.33 91.27

--------------------------------------------------------------------------------------------------------------------------
05.04 FILTRO DE GRAVA M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 6.00 M3/DIA
NA0977 FILTRO DE GRAVA O CASCAJO(NO AFECTO IGV) M3 1.030 85.00 87.55
ZZ0004 PEON HH 1.333 1.25 1.67
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.08 89.30

--------------------------------------------------------------------------------------------------------------------------

**.** 13 - CONEXIONES DOMICILIARIAS(76UN)

01.01 TRAZO Y REPLANTEO PRELIMINAR M2 0.00-CAP. + 1.50-OPE. + 0.00-OFI. + 4.50-PEON + 0.00-BRI.


Rendimiento : 300.00 M2/DIA
IC0430 YESO KG 0.050 0.21 0.01
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.120 1.25 0.15
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 0.34

--------------------------------------------------------------------------------------------------------------------------
02.01 EXCAVACION MANUAL M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
03.01 CONCRETO F'C=175 KG/CM2. SIN MEZCLADORA M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 12.00-PEON + 0.00-BRI.
Rendimiento : 10.00 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 8.430 21.40 180.40
NA0017 PIEDRA CHANCADA 1/2" (NO AFECTO IGV) M3 0.640 85.00 54.40
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 0.510 85.00 43.35
ZZ0002 OPERARIO HH 1.600 4.22 6.75
ZZ0003 OFICIAL HH 1.600 3.83 6.13
ZZ0004 PEON HH 9.600 1.25 12.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 1.24 304.27

--------------------------------------------------------------------------------------------------------------------------
03.02 ENCOFRADO Y DESENCOFRADO M2 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.20-PEON + 0.00-BRI.
Rendimiento : 14.00 M2/DIA
IP3875 ALAMBRE NEGRO # 16 KG 0.060 3.80 0.23
IP3876 ALAMBRE NEGRO # 8 KG 0.060 3.80 0.23
IP4893 CLAVOS 3" KG 0.015 3.80 0.06
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 2.800 3.00 8.40
ZZ0002 OPERARIO HH 0.571 4.22 2.41
ZZ0003 OFICIAL HH 0.571 3.83 2.19
ZZ0004 PEON HH 0.114 1.25 0.14
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.14 13.80

--------------------------------------------------------------------------------------------------------------------------
03.03 ACERO FY=4200 KG/CM2 KG 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 250.00 KG/DIA
IP3875 ALAMBRE NEGRO # 16 KG 0.040 3.80 0.15
IP5933 FIERRO FY=4200 KG/CM2 KG 1.050 3.10 3.26
ZZ0002 OPERARIO HH 0.032 4.22 0.14
ZZ0003 OFICIAL HH 0.032 3.83 0.12
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.01 3.68

--------------------------------------------------------------------------------------------------------------------------

04.01 TARRAJEO MORTERO 1:5 E=1.5 CM M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.50-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 0.140 21.40 3.00
NA0120 ARENA FINA (NO AFECTO IGV) M3 0.020 85.00 1.70
ZZ0002 OPERARIO HH 0.667 4.22 2.81
ZZ0004 PEON HH 0.333 1.25 0.42
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.10 8.03

--------------------------------------------------------------------------------------------------------------------------
05.01 DRENAJE M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 6.00 M3/DIA
IC1484 PLASTICO M2 1.691 2.00 3.38
NA0370 PIEDRA MEDIANA (NO AFECTO IGV) M3 0.000 30.00 0.00
NA0658 HORMIGON (NO AFECTO IGV) M3 0.172 80.00 13.76
ZZ0004 PEON HH 1.333 1.25 1.67
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.08 18.89

--------------------------------------------------------------------------------------------------------------------------
06.01 LLAVE DE PASO DE 1/2" UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 8.00 UND/DIA
IC0768 LLAVE PVC SAP 1/2" UN 1.000 6.00 6.00
IC1798 CINTA TEFLON UN 0.100 0.80 0.08
IP3775 ADAPTADOR PVC 1/2" UN 2.000 0.60 1.20
IP7088 PEGAMENTO PLASTICO PVC GL 0.020 68.00 1.36
ZZ0002 OPERARIO HH 1.000 4.22 4.22
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.13 12.99

--------------------------------------------------------------------------------------------------------------------------
06.02 ACCESORIO PARA INSTACION DOMICILIARIA UND 0.00-CAP. + 1.00-OPE. + 0.50-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 25.00 UND/DIA
IC0166 GRIFO FO FO CROMADO 1/2" UN 1.000 6.00 6.00
IC0380 REDUCCION PVC SAP C 10, 3/4" X 1/2" UN 0.650 1.40 0.91
IC1798 CINTA TEFLON UN 1.000 0.80 0.80
IC2000 REDUCCION PVC SAP C 10, 1" X 1/2" UN 0.350 2.80 0.98
IC2003 REDUCCION PVC SAP 2" X 1" UN 0.050 7.00 0.35
IP3605 CODO PVC SAP 1/2" UN 2.000 0.80 1.60
IP3775 ADAPTADOR PVC 1/2" UN 1.000 0.60 0.60
IP4998 CODO FO GO 1/2" UN 1.000 1.00 1.00
IP5025 CODO PVC SAL 2" X 90ø UN 2.000 6.00 12.00
IP7088 PEGAMENTO PLASTICO PVC GL 0.010 68.00 0.68
IP8070 SUMIDERO DE BRONCE 2" UN 1.000 3.00 3.00
IP8420 TEE PVC SAP 1" UN 0.300 2.00 0.60
IP8423 TEE PVC SAP 2" UN 0.050 8.00 0.40
IP8426 TEE PVC SAP 3/4" UN 0.650 1.50 0.98
IP8606 TRAMPA TIPO S PVC SAL 2" UN 1.000 6.50 6.50
IP8881 TUBERIA PVC SAL 2" ML 3.000 1.60 4.80
IP8909 TUBERIA PVC SAP CLASE 10, 1/2" ML 10.000 1.70 17.00
ZZ0002 OPERARIO HH 0.320 4.22 1.35

ZZ0003 OFICIAL HH 0.160 3.83 0.61


ZZ0004 PEON HH 0.640 1.25 0.80
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.08 61.04

--------------------------------------------------------------------------------------------------------------------------
07.02 EMPEDRADO PERIMETRAL M2 0.00-CAP. + 0.10-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 15.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.000 15.00 0.00
ZZ0002 OPERARIO HH 0.053 4.22 0.22
ZZ0004 PEON HH 0.533 1.25 0.67
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 0.92
--------------------------------------------------------------------------------------------------------------------------

**.** 14 - LETR.HOYO SECO VENTILADO(85UN)

01.01 TRAZO Y REPLANTEO PRELIMINAR M2 0.00-CAP. + 1.50-OPE. + 0.00-OFI. + 4.50-PEON + 0.00-BRI.


Rendimiento : 300.00 M2/DIA
IC0430 YESO KG 0.050 0.21 0.01
ZZ0002 OPERARIO HH 0.040 4.22 0.17
ZZ0004 PEON HH 0.120 1.25 0.15
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.01 0.34

--------------------------------------------------------------------------------------------------------------------------
02.01 EXCAVACION MANUAL M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.50 M3/DIA
ZZ0004 PEON HH 2.286 1.25 2.86
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.14 3.00

--------------------------------------------------------------------------------------------------------------------------
02.02 FORMACION DE TERRAPLEN COMPACT.A MANO M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 3.00 M3/DIA
ZZ0004 PEON HH 2.667 1.25 3.33
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.17 3.50

--------------------------------------------------------------------------------------------------------------------------
03.01 CONCRETO F'C=175 KG/CM2. SIN MEZCLADORA M3 0.00-CAP. + 2.00-OPE. + 2.00-OFI. + 12.00-PEON + 0.00-BRI.
Rendimiento : 10.00 M3/DIA
IP4783 CEMENTO PORTLAND TIPO I BL 8.430 21.40 180.40
NA0017 PIEDRA CHANCADA 1/2" (NO AFECTO IGV) M3 0.640 85.00 54.40
NA0121 ARENA GRUESA (NO AFECTO IGV) M3 0.510 85.00 43.35
ZZ0002 OPERARIO HH 1.600 4.22 6.75
ZZ0003 OFICIAL HH 1.600 3.83 6.13
ZZ0004 PEON HH 9.600 1.25 12.00
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 1.24 304.27

--------------------------------------------------------------------------------------------------------------------------
03.02 ENCOFRADO Y DESENCOFRADO M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 10.00 M2/DIA
IC3558 MOLDE P' ENCOFRADO LOSA SANITARIA UN 0.056 100.00 5.60
ZZ0002 OPERARIO HH 0.800 4.22 3.38
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.10 9.08

--------------------------------------------------------------------------------------------------------------------------
03.03 ACERO FY=4200 KG/CM2 KG 0.00-CAP. + 1.00-OPE. + 1.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 250.00 KG/DIA
IP3876 ALAMBRE NEGRO # 8 KG 0.040 3.80 0.15
IP5933 FIERRO FY=4200 KG/CM2 KG 1.050 3.10 3.26
ZZ0002 OPERARIO HH 0.032 4.22 0.14
ZZ0003 OFICIAL HH 0.032 3.83 0.12
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.01 3.68

--------------------------------------------------------------------------------------------------------------------------

04.01 CIMENTACION MURO (INCLUYE 30%P.G) M3 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 6.00 M3/DIA
NA0133 BARRO (NO AFECTO IGV) M3 0.000 1.00 0.00
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.000 15.00 0.00
ZZ0002 OPERARIO HH 1.333 4.22 5.63
ZZ0004 PEON HH 2.667 1.25 3.33
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.45 9.41

--------------------------------------------------------------------------------------------------------------------------
04.02 MURO DE ADOBE ASENT C/BARRO. ADOBE 40X25X15 M2 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 12.00 M2/DIA
NA0133 BARRO (NO AFECTO IGV) M3 0.000 1.00 0.00
NA1160 ADOBE 40 X 30 X 12 CM (NO AFECTO IGV) UN 0.000 0.40 0.00
ZZ0002 OPERARIO HH 0.667 4.22 2.81
ZZ0004 PEON HH 1.333 1.25 1.67
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.13 4.61

--------------------------------------------------------------------------------------------------------------------------
05.01 COBERTURA DE CALAMINA GALVANIZADA M2 0.00-CAP. + 0.50-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 25.00 M2/DIA
IC0392 CLAVOS PARA CALAMINA KG 0.075 6.40 0.48
IP3875 ALAMBRE NEGRO # 16 KG 0.500 3.80 1.90
IP4609 CALAMINA GALVANIZADA 1.83X0.83X0.3MM PL 0.727 19.00 13.81
ZZ0002 OPERARIO HH 0.160 4.22 0.68
ZZ0004 PEON HH 0.320 1.25 0.40
DESGASTE DE HERRAMIENTAS 5 % DE LA MANO DE OBRA 0.05 17.32

--------------------------------------------------------------------------------------------------------------------------
05.02 CORREAS DE MADERA ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 2.00-PEON + 0.00-BRI.
Rendimiento : 50.00 ML/DIA
IC3449 MADERA ROLLIZA D=2" ML 1.050 2.20 2.31
IP4893 CLAVOS 3" KG 0.040 3.80 0.15
ZZ0002 OPERARIO HH 0.160 4.22 0.68
ZZ0004 PEON HH 0.320 1.25 0.40
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.03 3.57
--------------------------------------------------------------------------------------------------------------------------
05.03 TRONCOS DE MADERA EUCALIPTO D=6" ML 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 1.00-PEON + 0.00-BRI.
Rendimiento : 24.00 ML/DIA
IP3875 ALAMBRE NEGRO # 16 KG 0.075 3.80 0.28
IP4893 CLAVOS 3" KG 0.015 3.80 0.06
NA5620 MAD.TRONCO EUCAL.D=6",L=1M.(NO AFECT IGV ML 1.050 6.00 6.30
ZZ0002 OPERARIO HH 0.333 4.22 1.41
ZZ0004 PEON HH 0.333 1.25 0.42
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.05 8.52

--------------------------------------------------------------------------------------------------------------------------
06.01 PUERTAS DE MADERA CON CALAMINA GALV. INCL. MARCO UND 0.00-CAP. + 1.00-OPE. + 0.50-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 4.00 UND/DIA

IC0857 MALLA MOSQUITERO DE PLASTICO M2 0.185 5.00 0.93


IC1300 BISAGRA 2" UN 2.000 2.00 4.00
IP4609 CALAMINA GALVANIZADA 1.83X0.83X0.3MM PL 1.000 19.00 19.00
IP4893 CLAVOS 3" KG 0.015 3.80 0.06
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 6.600 3.00 19.80
ZZ0002 OPERARIO HH 2.000 4.22 8.44
ZZ0003 OFICIAL HH 1.000 3.83 3.83
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.37 56.43

--------------------------------------------------------------------------------------------------------------------------
06.02 SALIDA DE VENTILACION PVC 4" UND 0.00-CAP. + 0.00-OPE. + 1.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 20.00 UND/DIA
IC0857 MALLA MOSQUITERO DE PLASTICO M2 0.030 5.00 0.15
IP3875 ALAMBRE NEGRO # 16 KG 0.100 3.80 0.38
IP5025 CODO PVC SAL 2" X 90ø UN 2.000 6.00 12.00
IP8035 SOMBRERO DE VENTILACION PVC SAL 4" UN 1.000 10.00 10.00
IP8884 TUBERIA PVC SAL 4" ML 3.000 7.33 21.99
ZZ0003 OFICIAL HH 0.400 3.83 1.53
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.05 46.10

--------------------------------------------------------------------------------------------------------------------------
06.03 TAPA DE MADERA UND 0.00-CAP. + 1.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 20.00 UND/DIA
IP4893 CLAVOS 3" KG 0.045 3.80 0.17
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 0.800 3.00 2.40
ZZ0002 OPERARIO HH 0.400 4.22 1.69
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 0.05 4.31

--------------------------------------------------------------------------------------------------------------------------

**.** 15 - MODULO DE CAPACITACION

01.01 MODULO DE CAPACITACION PARA SANEAMIENTO GLB 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 GLB/DIA
EA0008 CARTULINA PLIE 25.000 0.25 6.25
EA0009 PAPEL BOND A4 MILL 0.100 25.00 2.50
EA0013 CHINCHES CAJA 4.000 1.00 4.00
EA0017 FOLDER DE CARTULINA UN 5.000 1.00 5.00
EA0024 CINTA MASKIN TAPE ROLL 5.000 3.00 15.00
EA0053 WINCHA UN 1.000 75.00 75.00
EA0054 PEGAMENTO UN 2.000 3.00 6.00
EA0056 PELICULA PARA FOTOGRAFIA ROLL 1.000 13.00 13.00
EA0060 REVELADO DE FOTOS ROLL 1.000 18.00 18.00
EA0069 ROTAFOLIO UN 3.000 35.00 105.00
EA0071 MATERIAL EDUCATIVO (GLOBAL) GLB 1.000 50.00 50.00
EA0172 GUIA DE CAPACITACION UN 57.000 20.00 1,140.00
EA0205 PAPEL BOND A0 (PAPELOGRAFO) UN 70.000 0.50 35.00
EA0206 PLUMONES Nø 47 UN 4.000 5.00 20.00
EA0207 LAPICEROS UN 2.000 0.50 1.00
EA0259 LIBRO DE ACTAS UN 2.000 20.00 40.00
EA0260 LIBRO DE CAJA UN 2.000 20.00 40.00
HR0912 PICO UN 1.000 26.00 26.00
HR0973 DESARMADOR PLANO UN 1.000 4.00 4.00
HR0992 GUANTES DE JEBE PAR 1.000 9.00 9.00
IA0039 LAMPAS CUCHARAS UN 1.000 24.00 24.00
IA0999 BALDE DE 15 LTS UN 1.000 12.00 12.00
IC0006 ACEITE PARA MOTOR GL 0.250 3.00 0.75
IC0902 CAJA METALICA UN 1.000 25.00 25.00
IC1068 GRIFO BRONCE 1/2" UN 5.000 6.00 30.00
IC1798 CINTA TEFLON UN 3.000 0.80 2.40
IC1885 HOJA DE SIERRA UN 1.000 5.40 5.40
IC3466 ESCOBILLA DE FIERRO UN 1.000 6.00 6.00
IC3467 ESCOBA UN 1.000 6.00 6.00
IC3468 BROCHA PEQUE¥A UN 1.000 1.50 1.50
IC3469 BADILEJO UN 1.000 6.00 6.00
IC3470 ARCO DE SIERRA UN 1.000 12.00 12.00
IC3472 LLAVE FRANCESA UN 1.000 8.00 8.00
IC3473 ALICATE UN 1.000 12.00 12.00
IC3475 LLAVE ESTILSON DE 12" UN 1.000 18.60 18.60
IP6210 HIPOCLORITO DE CALCIO GR 8000.000 0.01 80.00
IP6499 LIJA PARA METAL UN 3.000 2.20 6.60
IP7088 PEGAMENTO PLASTICO PVC GL 0.250 68.00 17.00
IP7286 PINTURA ESMALTE GL 0.250 30.00 7.50
IP8909 TUBERIA PVC SAP CLASE 10, 1/2" ML 10.000 1.70 17.00
IP9237 VALVULA BRONCE DE COMPUERTA 1/2" UN 5.000 50.00 250.00 2,162.50

--------------------------------------------------------------------------------------------------------------------------

**.** 16 - PLACA RECORDATORIA

01.01 PLACA RECORDATORIA UND 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.


Rendimiento : 0.00 UND/DIA
IC3484 PLACA RECORDATORIA .40X.60M UN 1.000 160.00 160.00 160.00
--------------------------------------------------------------------------------------------------------------------------
**.** 17 - PRUEBAS

01.01 PRUEBA A LA COMPRESION UND 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.


Rendimiento : 0.00 UND/DIA
IC3482 PRUEBAS DE LABORATORIO GLB 1.000 150.00 150.00 150.00

--------------------------------------------------------------------------------------------------------------------------
FONCODES-MIMDES 17/04/2006
ANALISIS DE COSTOS UNITARIOS PAG.-047
EXPEDIENTE :
--------------------------------------------------------------------------------------------------------------------------
ORDEN TITULO DE PARTIDA UNID
INSUMOS UNID CANTIDAD P.UNIT COSTO PARCIAL TOTAL
--------------------------------------------------------------------------------------------------------------------------
**.** 18 - FLETE

01.01 FLETE GLB 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.


Rendimiento : 0.00 GLB/DIA
FL0004 FLETE TERRESTRE GLB 1.000 2687.88 2,687.88
FL9999 FLETE EN ZONA RURAL (NO AFECTO AL IGV) GLB 1.000 2021.08 2,021.08 4,708.96

--------------------------------------------------------------------------------------------------------------------------

**.** 19 - CARTEL DE OBRA

01.01 CARTEL DE OBRA UND 0.00-CAP. + 1.00-OPE. + 2.00-OFI. + 2.00-PEON + 0.00-BRI.


Rendimiento : 1.00 UND/DIA
IC3380 PERNO 5/8" X 6" UN 18.000 2.50 45.00
IP3875 ALAMBRE NEGRO # 16 KG 1.000 3.80 3.80
IP4751 CARTEL DE OBRA UN 1.000 550.00 550.00
IP4783 CEMENTO PORTLAND TIPO I BL 0.527 21.40 11.28
IP4893 CLAVOS 3" KG 0.500 3.80 1.90
NA0353 MADERA TORNILLO O SIMILAR(NO AFECTO IGV) P2 29.520 3.00 88.56
NA0370 PIEDRA MEDIANA (NO AFECTO IGV) M3 0.096 30.00 2.88
NA0658 HORMIGON (NO AFECTO IGV) M3 0.216 80.00 17.28
ZZ0002 OPERARIO HH 8.000 4.22 33.76
ZZ0003 OFICIAL HH 16.000 3.83 61.28
ZZ0004 PEON HH 16.000 1.25 20.00
DESGASTE DE HERRAMIENTAS 3 % DE LA MANO DE OBRA 3.45 839.19

--------------------------------------------------------------------------------------------------------------------------

**.** 20 - APORTE COMUNAL

01.01 EMPEDRADO M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.


Rendimiento : 0.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.280 15.00 4.20 4.20

--------------------------------------------------------------------------------------------------------------------------
01.02 CERCO PERIMETRICO ML 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 ML/DIA
NA0133 BARRO (NO AFECTO IGV) M3 0.210 1.00 0.21
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.780 15.00 11.70 11.91

--------------------------------------------------------------------------------------------------------------------------
02.01 CAMA DE APOYO ML 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 ML/DIA
NA2589 MATERIAL ZARANDEADO (NO AFECTO IGV) M3 0.046 1.00 0.05 0.05

--------------------------------------------------------------------------------------------------------------------------
03.01 EMPEDRADO PERIMETRAL M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.280 15.00 4.20 4.20

--------------------------------------------------------------------------------------------------------------------------
04.01 EMPEDRADO M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.280 15.00 4.20 4.20

--------------------------------------------------------------------------------------------------------------------------
05.01 CAMA DE APOYO ML 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 ML/DIA
NA2589 MATERIAL ZARANDEADO (NO AFECTO IGV) M3 0.046 1.00 0.05 0.05

--------------------------------------------------------------------------------------------------------------------------
06.01 EMPEDRADO M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.280 15.00 4.20 4.20

--------------------------------------------------------------------------------------------------------------------------
07.01 EMPEDRADO M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.280 15.00 4.20 4.20

--------------------------------------------------------------------------------------------------------------------------
08.01 DRENAJE M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 M3/DIA
NA0370 PIEDRA MEDIANA (NO AFECTO IGV) M3 0.770 30.00 23.10 23.10

--------------------------------------------------------------------------------------------------------------------------

08.02 EMPEDRADO PERIMETRAL M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.


Rendimiento : 0.00 M2/DIA
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.210 15.00 3.15 3.15

--------------------------------------------------------------------------------------------------------------------------
09.01 CIMENTACION DE MURO M3 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 M3/DIA
NA0133 BARRO (NO AFECTO IGV) M3 0.770 1.00 0.77
NA0371 PIEDRA GRANDE (NO AFECTO IGV) M3 0.420 15.00 6.30 7.07

--------------------------------------------------------------------------------------------------------------------------
09.02 MURO DE ADOBE ASEN.C/BARRO, ADOBE 40X25X15 M2 0.00-CAP. + 0.00-OPE. + 0.00-OFI. + 0.00-PEON + 0.00-BRI.
Rendimiento : 0.00 M2/DIA
NA0133 BARRO (NO AFECTO IGV) M3 0.130 1.00 0.13
NA1160 ADOBE 40 X 30 X 12 CM (NO AFECTO IGV) UN 15.000 0.40 6.00 6.13

--------------------------------------------------------------------------------------------------------------------------