DIMENSIONES
ITEM DESCRIPCIÓN UNIDAD N° VECES
LARGO ANCHO
1 TRABAJOS PRELIMINARES
1.1 Limpieza de terreno m2
ENTRE EJES A-A ; B-B Y EJES 4-4 Y 5-5 4.500 2.000
ENTRE EJES A-A ; D-D Y EJES 1-1 Y 4-4 8.100 7.450
1.2 Niveles
1.2.1. Trazo, nivel y replanteo m2
ENTRE EJES A-A ; B-B Y EJES 4-4 Y 5-5 4.500 2.000
ENTRE EJES A-A ; D-D Y EJES 2-2 Y 4-4 8.100 4.800
ENTRE EJES A-A ; C-C Y EJES 1-1 Y 2-2 5.750 2.650
2 MOVIMIENTO DE TIERRAS
2.1 EXCAVACION DE ZANJAS m3
EJE 5-5 ENTRE A-A Y B-B 2 3.300 0.600
EJE 4-4 ENTRE B-B Y C-C 1 0.825 0.600
EJE 4-4 ENTRE C-C Y D-D 3 1.575 0.600
EJE 1-1 ENTRE A-A Y C-C 4.725 0.600
EJE A-A ENTRE EJES 1-1 Y 5-5 9.450 0.600
EJE B-B ENTRE EJES 3-3 Y 5-5 4.525 0.600
EJE C-C ENTRE EJES 1-1 Y 4-4 7.450 0.600
EJE D-D ENTRE EJE 2-2 Y 4-4 4.800 0.600
2.2 RELLENOS
2.2.1 RELLENO DE NIVEL -0.20 A NTN 0.00 m3
EJE 5-5 ENTRE A-A Y B-B 3.300 0.450
EJE 4-4 ENTRE B-B Y C-C 0.825 0.450
EJE 4-4 ENTRE C-C Y D-D 3 1.575 0.450
EJE 3-3 ENTRE A-A Y B-B 2 3.300 0.225
0.600 0.225
EJE 1-1 ENTRE EJES A-A Y C-C 4.725 0.450
EJE A-A ENTRE EJES 5-5 Y 3-3 2 4.000 0.350
ELIMINACION DE MATERIAL
ELIMINACION DE MATERIAL EXCEDENTE
IMENSIONES
PARCIAL TOTAL
ALTURA
69.35
9.000
60.345
63.12
9.000
38.880
15.238
25.860
1.000 3.960
1.000 0.495
1.000 2.835
1.000 2.835
1.000 5.670
1.000 2.715
1.000 4.470
1.000 2.880
8.609
3.255
0.200 0.297
0.200 0.074
0.200 0.425
0.200 0.297
0.200 0.027
0.200 0.425
0.200 0.560
5.354
0.100 1.600
0.100 0.215
18.874