You are on page 1of 10

Regional D

Division: Civil

Sample ID Name of the Sample Specification


followed (IS/Other)

73826 Mix design M-35 IS


73826 Mix Design M-40 IS
75128 SRC IS 12330
75202 WPC IS 2645
75257 WPC LIQUID FORM IS 2645
75257 TILE ADHESIVE IS 15477
75203 VITRIFIED TILES IS 13630

Page 1 of 10
75544 Flush door IS2202 -1
75569 PAVING BLOCKS-3 SETS (A,B,C) IS 15658
75569 PAVING BLOCKS-3 SETS (D,E,F) IS 15658
75706 A COARSE AGGREGATES 20MM IS 383
75706 B CA 10MM IS 383
75706C SAND IS 383
75706D CEMENT IS 269
75706E WATER IS 456
75722 FLUSH DOOR IS 2202-1
75905 VITRIFIED TILES IS15622
76545 Ceramic Tiles IS 15622
76562 53 Gr. OPC IS 269
76661 Burma Teak Wood IS 1708
76662 Burma Teak Wood IS 1708
76663 Burma Teak Wood IS 1708

Page 2 of 10
76701 Timber IS 1708
76781 Quartz Stone IS 15622, IS 1124
76775 Kerb Stone IS

Inter Laboratory Samples

Page 3 of 10
Interlab Sample ID & Sample Name IS Specification
Issuing
Laboratory

Civil 75128, SRC IS 12330


Civil 76562, 53 Gr. OPC IS 269/ IS 4032

Page 4 of 10
Regional Daily Pending Sample Status Report as on 24-07-2018

Region: NTH (WR), MUMBAI

Date of Receipt of Date of Allotment Allotted To PDC Date


Sample

4/17/2018 4/17/2018 RNL 6/8/2018


4/17/2018 4/17/2018 RNL 6/8/2018
6/1/2018 6/1/2018 RNL 7/13/2018
6/5/2018 6/5/2018 RNL 7/18/2018
6/6/2018 6/6/2018 RNL 7/30/2018
6/6/2018 6/6/2018 RNL 7/31/2018
6/5/2018 6/6/2018 RNL 6/29/2018

Page 5 of 10
6/13/2018 6/13/2018 RNL 7/20/2018
6/18/2018 6/18/2018 RNL 7/20/2018
6/18/2018 6/18/2018 AS 7/20/2018
6/15/2018 6/15/2018 RNL 7/20/2018
6/15/2018 6/15/2018 RNL 7/20/2018
6/15/2018 6/15/2018 RNL 7/20/2018
6/15/2018 6/15/2018 RNL 7/30/2018
6/15/2018 6/15/2018 RNL 7/30/2018
6/19/2018 6/19/2018 RNL 7/30/2018
6/22/2018 6/22/2018 RNL 7/10/2018
7/12/2018 7/12/2018 AS 7/31/2018
7/12/2018 7/12/2018 AS 8/31/2018
7/16/2018 7/16/2018 AS 8/24/2018
7/16/2018 7/16/2018 AS 8/24/2018
7/16/2018 7/16/2018 AS 8/24/2018

Page 6 of 10
7/18/2018 7/18/2018 AS 8/31/2018
7/18/2018 7/18/2018 AS 8/3/2018
7/18/2018 7/18/2018 RNL 8/24/2018

Page 7 of 10
Date of Raising PDC Date Raised To
(Laboratory
Name)

6/26/2018 7/3/2018 chem


7/17/2018 8/31/2018 chem

Page 8 of 10
MUMBAI

Reason for pending

Page 9 of 10
Remarks

Page 10 of 10

You might also like