PRIME4INSPECTION LLC

INSPECTION / SURVEILLANCE FLASH REPORT

Report Number: 3844-53165-001

1) DATE / PERIOD Of INSPECTION: 11th June 2018

2) DETAILS OF WORK PERFORMED & RESULTS:

 Visited ABB to discuss the MRB status.

 It was noticed MRB index was approved, however ABB didn’t start the
preparation of manual

 Explained ABB how to prepare the MRB manual as per TCM specification.

 Informed ABB to collect all the original documents and collide in MRB manual
for TCM review.

 Instructed ABB that I will visit on 21st June to review the draft preparation of
MRB manual.

INSPECTION PERFORMED BY: Chitti Raju D

DATE: 10th June 2018

P4I-F-037 v 1.0 Rev0 (01/10/12) Page 1