SPESIFIKASI

MAIN OFFICE

NO DESCRIPTION

1 Keramik Lantai KM/WC

2 Keramik Dinding KM/WC

3 Keramik Dinding Dapur

4 Keramik Lantai Dapur

5 Keramik Ruangan 50x50 texture tile

5 Kusen Alumunium 4in

6 Kaca Polos 5mm

7 Pintu KM/WC

8 Pintu Utama Kantor

9 Pintu Timur Kantor

10 Pintu Alumunium Antar Ruangan

11 Pintu Untuk Warehouse

12 Jendela Ruangan Kecil

13 Jendela Ruangan Besar

14 Rangka Baja Ringan


15 Plafon Gyspum 1200x600

17 Cat Dinding

18 Cat Plafond

19 Pipa Air Kotor

20 Pipa Air Bersih

21 Pipa Air Kotor Keliling Bangunan

22 Kran Air

23 Closet Duduk

24 Shower

25 Tempat Sabun Besar

26 Kitchen Sink

27 Wastaefl

28 Urinoir

29 Lampu

30 Stop Kontrak
SPESIFIKASI
MAIN OFFICE

Spesifikasi

Asia Tile atau setingkat

Asia Tile atau setingkat

Asia Tile atau setingkat

Asia Tile atau setingkat

Asia Tile atau setingkat

Aleksindo / Indal

Kaca

Alumunium

Kaca

Kaca

Alumunium

Alumunium

Kaca

Kaca

Taso Zyncalume atau setingkatnya


Kalsi Board atau setingkatnya

Dulux / Catylac atau setingkatnya

Dulux / Catylac atau setingkatnya

Wavin atau setingkatnya

Wavin atau setingkatnya

Wavin atau setingkatnya

Sanei atau setingkatnya

Toto atau Setingkatnya

Sanei atau setingkatnya

Toto atau Setingkatnya

Toto atau Setingkatnya

Toto atau Setingkatnya

Toto atau Setingkatnya

Philip atau setingkatnya

Panasonic atau setingkatnya


BILL OF QUANTITY
2-UNIT TYPICAL TANK 3000 KL - SOLAR

NO DESCRIPTION
A. 2-UNIT TYPICAL FOUNDATION FOR SOLAR STORAGE TANK 3000 KL (T-TGL-200 A/B)
Foundation size: 2 x (21 Dia.) m, Reinforced Concrete
The total quantity of civil works item :

A.1 Civil Works


A.1.1 Site preperation
- Installation of bowplank, wood stiffener, points building coordinat and leveling survey area

A.1.2 Earthworks, Sandbedding, Base course fill and stone masonry foundation, etc.
- Soil fill and compaction, to achieve concrete slab foundation
- Sandbedding 100 mm th'k & compaction
- Stone masonry foundation for slope wall
- Gravel or crush stone (fill in sump pit pocket)
- sand cushion
- Bitument 50mm thickness on top surface concrete slab foundation
- Sump pit pocket drain, Galvanized Steel Pipe 2" Dia.Std Sch.

A.1.3 Pile Foundation


Comp. strength 28 days (min.) f'c = 40Mpa (cylinder spece.test) or K-500 kg/cm2 (cubical spacement test
- Pile Splicing, 1 splicing per point
- PHT Pile Concreate fill K-275, depth 1,2 m with rebar 8-D16 (main bars) & d10-150mm (stirrups)

A.1.4 Concrete
A.1.4.1 Structural
Reinforced Concrete
Concrete (R.C) &structure
building K-275
foundation, compressive strength 28 days (min.) f'c = 22.8 Mpa (cylinder
specement test) or K-275 kg/cm2 (cub.spac.test), Reinforcing-bar, ASTM A-615 Grade 60, SII-0136, BjTD
equivalent Fy (Yield
- Concrete, total stress)
volume= 400 Mpa (min.)
- Reinforcing bar, total weight
D-19
D-16
D-13
Æ12
Æ10

A.1.4.2 Non
Lean/structural concretenon
leveling concrete, and lean concrete
structural K-150
concrete, comp. strength 28 days (min.) f'c = 12 Mpa (cylinder spe
test) or K-150 kg/cm2 (cub.spac.test), Reinforcing-bar less than 13 mmØ, ASTM A-615 Grade 40, SII-013
BjTP36
- Lean/or equivalent Fy (Yield50mm
leveling concrete, stress)th'k
= 240 Mpa
under (min.)
& to achieve levelling bottom R.C structure, total volume

A.1.5 Open Ditch


Open U-Ditch
- 1/2 Æ Hollow Precast Concrete, With ID=300mm & min thickness= 60 mm
- Bickwall c/w plastering in edge of U-Ditch
- Compacted Sand t=100mm
BILL OF QUANTITY
2-UNIT TYPICAL TANK 3000 KL - SOLAR

TOTAL QUANTITY
DESCRIPTION
QTY UNIT
OR SOLAR STORAGE TANK 3000 KL (T-TGL-200 A/B)
inforced Concrete

stiffener, points building coordinat and leveling survey area 307.87 m'

ourse fill and stone masonry foundation, etc.


eve concrete slab foundation 539.65 m3
ompaction 89.82 m3
slope wall 86.92 m3
mp pit pocket) 4.51 m3
3.59 m3
op surface concrete slab foundation 664.72 m2
zed Steel Pipe 2" Dia.Std Sch. 28.00 m`

40Mpa (cylinder spece.test) or K-500 kg/cm2 (cubical spacement test)


126.00 Point
depth 1,2 m with rebar 8-D16 (main bars) & d10-150mm (stirrups) 12.16 m3

re K-275
ation, compressive strength 28 days (min.) f'c = 22.8 Mpa (cylinder
ub.spac.test), Reinforcing-bar, ASTM A-615 Grade 60, SII-0136, BjTD40 or
pa (min.) 289.60 m3

66,849.92 Kg
3,953.90 Kg
451.36 Kg
764.00 Kg
940.17 Kg

concrete K-150
al concrete, comp. strength 28 days (min.) f'c = 12 Mpa (cylinder specement
), Reinforcing-bar less than 13 mmØ, ASTM A-615 Grade 40, SII-0136,
s)th'k
= 240 Mpa
under (min.)
& to achieve levelling bottom R.C structure, total volume 51.41 m3

e, With ID=300mm & min thickness= 60 mm 169.52 m`


of U-Ditch 33.17 m3
13.56 m3