You are on page 1of 6

Item No. Project Control No. Internal Drawing No.

LMB1-C-2-D0-CP-AA3-002 PCD-GFH-XILB1-0047

LMB1-C-2-D0-CP-PH2-001 PCD-GFH-XILB1-0026

LMB1-C-2-D0-CP-PH2-002 PCD-GFH-XILB1-0048

LMB1-C-2-D0-CP-PH7-001 PCD-GFH-XILB1-0040

LMB1-C-2-D0-CP-TG1-001 PCD-GFH-XILB1-0028

LMB1-C-2-D1-BES-AA0-001 SPC-GFH-XILB1-0001

LMB1-C-2-M0-OPR-CW3-003 PCD-GFH-XILB1-0030

LMB1-Q-2-D0-IP-TG8-001 QCD-GFH-XILB1-0006
LMB1-Q-2-Q2-IP-TG8-001 QCD-GFH-XILB1-0008

PCD-GFH-XILB1-0036

PCD-GFH-XILB1-0037

PCD-GFH-XILB1-0038

PCD-GFH-XILB1-0039

PCD-GFH-XILB1-0032

PCD-GFH-XILB1-0041

PCD-GFH-XILB1-0042
PCD-GFH-XILB1-0043

PCD-GFH-XILB1-0044

PCD-GFH-XILB1-0045

PCD-GFH-XILB1-0031

PCD-GFH-XILB1-0029

PCD-GFH-XILB1-0033

PCD-GFH-XILB1-0034

PCD-GFH-XILB1-0035
Customer
Issue Date
Drawing Title Issue Statu Rev.
(1st)
(Latest)

METHOD STATEMENT OF CABLE


IFA
INSTALLATION

OVERHEAD CRANE INSTALLATION


IFA 22-Dec-17 0
PROCEDURE

METHOD STATEMENT OF LOAD TEST FOR


IFA
OVERHEAD CRANE

METHOD STATEMENT OF POWER PLANT


IFA
PIPING INSTALLATION

METHOD STATEMENT OF STEAM TURBINE


IFA 19-Apr-18 0
INSTALLATION

SPECIFICATION FOR NON SHRINK GROUT


IFA 23-Feb-18 0
MATERIAL (GPP PORTION)

METHOD STATEMENT OF HOT WATER PUMP


IFA 17-Apr-18 0
INSTALLATION
WPS / PQR (for Condenser) IFA 30-Aug-17 0
Penetrant Test Procedure IFA 30-Oct-17 1
METHOD STATEMENT OF STATIC EQUIPMENTS
IFA
INSTALLATION

METHOD STATEMENT OF ROTARY


IFA
EQUIPMENTS INSTALLATION

METHOD STATEMENT OF ELECTRICAL


IFA
COMPONENTS INSTALLATION

METHOD STATEMENT OF C&I COMPONENTS


IFA
INSTALLATION

METHOD STATEMENT FOR INSTALLATION


IFA
(GSUT, UAT, SSAT & USAT)

HYDRAULIC TEST PROCEDURE FOR POWER


IFA
PLANT

METHOD STATEMENT OF GLAND STEAM BLOW


IFA
OUT
METHOD STATEMENT OF WATER FLUSHING IFA

METHOD STATEMENT OF INSULATION


IFA
INSTALLATION
PAINTING PROCEDURE IFA
METHOD STATEMENT OF LIQUID RING
IFA
VACUUM PUMP INSTALLATION

METHOD STATEMENT OF STEAM TURBINE


IFA 1-May-18 0
GENERATOR INSTALLATION

METHOD STATEMENT OF EDG INSTALLATION IFA

METHOD STATEMENT OF WATER TREATMENT


IFA
SYSTEM INSTALLATION

METHOD STATEMENT OF COMPRESSED AIR


IFA
SYSTEM INSTALLATION
Customer Customer
Internal
Issue Date Review Return Date / Revisions
Rev.
(Latest) Status Deemed (Issued)
(Latest)
(Latest) Date(Latest)

0 22-Dec-17 AN 21-Jan-18 1

0 19-Apr-18 DA 11-May-18 1

0 23-Feb-18 AN 9-Mar-18 1

0 17-Apr-18 DA 11-May-18 1

0 30-Aug-17 AN 7-Sep-17 1
1 6-Nov-17 DA 12-Jan-18 2

0
0

0 1-May-18 DA 23-May-18 1