Professional Documents
Culture Documents
.....[1]
where:
log = log10
Ia = arcing current (kA)
K = –0.153 for open configurations or
K = –0.097 for box configurations
Ibf = bolted fault current for three-phase faults (symmetrical RMS) (kA)
V = system voltage (kV)
G = the gap between conductors, (mm) (see Table 2)
For system voltage of 1000 V and higher, equation (2) is applicable:
.....[2]
15 kV switchgear 152
5 kV switchgear 104
Low-voltage switchgear 32
Cable 13
Source: IEEE 1584-2002 IEEE Guide for Performing Arc-Flash Hazard Calculations
Given:
K = -0.097 (Box Configuration)
Ibf = 34.73 kA
log Ibf = 1.540704783
V = 0.46 kV
G = 25 (LV MCC from Table 2)
log Ia = -0.097+0.662log(34.73)+0.0966x0.46+0.000526x25+0.5588x0.46xlog(34.73)-
0.00304x25xlog(34.73)
log Ia = 1.259474086
Ia = 18.17498605 kA
For low-voltage applications, under 1 kV, a reduced arcing fault current which is 85% of the
arcing fault current Ia is required to be calculated to allow a second calculation needed due to
variation in arc current. For cases where the arc current falls on the steep part of the time-
current curve or falls near a step change, the variation in arc current could cause a significant
error in protective-device tripping or operating time.
Ia = 85% x 18.17498605 = 15.4487 kA
On the next post, we will be calculating the Incident Energy and PPE using the provisions of
NPFA 70E.
Arc Flash – Incident Energy at Working Distance
POSTED BY: VER PANGONILO APRIL 29, 2017
From the previous article, the arcing current Ia was calculated from the bolted fault current.
With the arcing current already known, the incident energy can then be calculated. To
determine the incident energy using the empirically derived equation from NFPA 70E 2015,
calculate the log 10 of the normalized incident energy. The following empirical equation [1] is
based on data normalized for an arc time of 0.2 second and a distance from the possible arc
point to the person of 610 mm.
.....[1]
where:
En = incident energy, normalized for time and distance, J/cm2
Ia = 18.17498605 kA (See Arc Flash – Calculating Arcing Current)
85% x Ia = 15.44873814 kA (Second arcing current)
k1 = −0.792 for open air arcs
k1 = −0.555 for arcs-in-a-box
k2= 0 for ungrounded and high-resistance grounded systems
k2 = −0.113 for grounded systems
G = conductor gap, mm (see Table 2)
From the example in the previous article, the bolted fault is 34.73 kA.
Substituting the given values in [1] where k1 = −0.555 for arcs-in-a-box, and k2 = −0.113 for
grounded systems as the transformer is Delta-Wye neutral grounded. G is 25 mm for LV MCC.
J/cm2
This is the incident energy normalized at 0.2 s arcing time and a working distance of 610 mm.
The normalized incident energy based on the reduced arcing fault current is
J/cm2
For other values of arcing time and working distance, use the following equation [2].
.....[2]
where:
E = incident energy, J/cm2.
Cf = calculation factor
Cf = 1.0 for voltages above 1 kV.
Cf = 1.5 for voltages at or below 1 kV.
En = incident energy normalized.
t = arcing time, sec.
x = distance exponent from Table D.4.2.
D = distance, mm, from the arc to the person (working distance). See Table 3.
Opening time at
Circuit breaker rating and type 60 Hz (cycles) Opening time (seconds)
a
This table does not include the external relay trip times.
Source: IEEE 1584-2002 IEEE Guide for Performing Arc-Flash Hazard Calculations
15 kV switchgear 910
5 kV switchgear 910
Cable 455
a
Typical working distance is the sum of the distance between the worker standing in front
of the equipment, and from the front of the equipment to the potential arc source inside the
equipment.
Source: IEEE 1584-2002 IEEE Guide for Performing Arc-Flash Hazard Calculations
Source: NFPA 70E® - 2015 Standard for Electrical Safety in the Workplace
Note: Same table is also provided in IEEE 1584-2002, Table 6 - Factors for equipment and
voltage classes
Source: NFPA 70E® - 2015 Standard for Electrical Safety in the Workplace
a
Note that other PPE listed in Table 130.7(C) (16), which include arc-rated face shields
or arc flash suit hoods, arc-rated hard hat liners, safety glasses or safety goggles, hard
hats, hearing protection, heavy-duty leather gloves, rubber insulating gloves, and leather
protectors, could be required. The arc rating for a garment is expressed in cal/cm 2.
b
The estimated available short-circuit current capacities and fault clearing times or arcing
durations are listed in the text of Table 130.7(C) (15) (A)(b) and Table 130.7(C) (15) (B).
Various tasks are listed in Table 130.7(C) (15) (A)(a). For tasks not listed or for power
systems with greater than the estimated available short-circuit capacity or with longer than
the assumed fault clearing times or arcing durations, an arc flash risk assessment is
required in accordance with 130.5
Source: NFPA 70E® - 2015 Standard for Electrical Safety in the Workplace