LIST OF PROJECTS IN INFRASTRUCTURE AND CONSTRUCTION

Conceptual/Planning Stage
N Organization Project Title / Details Location Budget Contacts Sector
Euro*
1 A2Z Gurgaon based engineering, procurement and construction (EPC) NA 521.12 Mamta Joshi, CEO (Admin), 5th & 6th Biomass
Maintenance & company plans to set up a 500-MW biomass power plant from Floor, Enkay Square 448–A, Udyog Energy
Engineering municipal solid-waste, within two years. Funding planned through Vihar, Phase – V, Gurgaon – 122016,
Services IPO and internal accruals. Haryana. T: 0124 - 4517600, 4776100,
F: 4380014, (Amit Mittal, CMD)

2 Jaiprakash The company plans to expand its clinker and cement Baga 217.13 Rahul Kumar, Chief Financial Offi cer, Cement
Associates Ltd manufacturing capacity of existing unit Baga in Himachal Himachal Jaypee Vasant Continental, Vasant
Pradesh. The current capacity is 4 MTPA and would be further Pradesh Vihar, New Delhi - 110057. T: 011-
expanded by 2.5 MTPA by 2012. 26140101 / 54099, F: 26151177,
jil@jalindia.co.in

3 Orient Paper & The company is into paper, cement and electrical goods NA NA 9/1, R. N. Mukherjee Road, Kolkata, Cement
Industries Ltd manufacturing. This company is contemplating plans to scale up West Bengal - 700001. T: 033- 2248
its cement production capacity from 5 MTPA to 15 MTPA in the 0135/22131680, F: 22430490,
next few years. This expansion will be carried out mainly by info@orientpaperindia.com
setting up greenfield projects. These projects are likely to be
announced in the next six months.

4 Kalinga The company is interested in setting up a Calcined Petroleum Kalingana- NA G M Goenka, Head of Dept, Coke
Calciners Ltd Coke plant at Kalinganagar. gar Orissa Udayabata. Post Paradeepgarh, District
Jagatsingpur, Paradip, Orissa - 754

1
141. T: 033-22551801-3,
cpc@maniyargroup.com

2
5 The Orissa Plans to setup a renewable energy park at Nawarangpur spread Nawrang- 0.17 AK Chaudhary, Deputy Director, S- Energy
Renewable over 2-3 acre of land. The detailed project report is being pur Orissa 3/59, Mancheswar Industrial Estate, Park
Energy prepared. The completion will take one year from the work Bhubaneswar-751010, T: 0674-580660,
Development commencement date. M: 09861310407
Agency
(OREDA)

6 Ishan These companies have signed an agreement to set up Premier Mohali 34.74 BB Geol, CFO, Ishan Group of Hospitality
Developers & Hotel Mohali near Chandigarh. The hotel will be built in 2 phases Chandigarh Companies, S.C.O. 24-25, Sector 33-D
Infrastructure consisting of 239 rooms and suites. The first phase will be (U.T.) Chandigarh. T: 0172-5026664-69, F:
Ltd/Best completed by March 2012. 2623025, bbgoel@ishanindia.com (R K
Western India Sharma, MD)

7 The company is setting up an inland container depot (ICD) at Kalingana- NA Logistics


Renu Kakkar, Corp Comm, Apeejay
Kalinganagar. The Ministry of Commerce has recently accorded gar Orissa Park
House, 15 Park Street, Kolkata 700016.
approval to this project. This logistic park will cater to the
Apeejay T: 033- 44035455-58, F: 22172075, M:
requirements of the steel units coming up in the area.
Infralogistics Pvt 9980946435, rkakkar@apee-
8 The company is setting up Haldia inte-grated logistics park Haldia West 34.74 Logistics
Ltd jaygroup.com, (Sourav Daspatnaik,
spread over 90 acre. This project will be executed in phases. The Bengal Park
Director) rkakkar@apeejaygroup.com,
project Phase-I will come up by year end comprising ICD,
(Sourav Daspatnaik, Director)
warehousing facilities, trade facilitation centre and other facilities.

9 Gopalpur Ports This company is a special purpose vehicle formed for developing Ganjam 4.69 M M Moharana, Director - Operations, Port
Ltd (GPL) the minor port at Gopalpur into an all-weather port. GPL has Orissa Arjeepalli, VIA Chhatrapur, Ganjam,
plans to construct eight stone embankments off the Ganjam Orissa -761020. T: 06811-257699,
coast. Clearance from the MoEF are not yet received. 257799, F: 263383,
www.gopalpurports. com

3
10 Gopalpur Ports The port authorities plans to implement the second stage of Ganjam 156.33 M M Moharana, Director - Operations, Port
Ltd (GPL) Phase-I project comprising construction of deep-water direct Orissa Arjeepalli, VIA Chhatrapur, Ganjam,
berthing facility. The financial closure is achieved in this regard. Orissa -761020. T: 06811-257699,
The port authorities had signed a loan agree-ment with a 257799, F: 263383,
consortium of 11 banks for a total amount of Rs 848.78 cr. www.gopalpurports.com
NA
11 Dumraon Plans to set up a 2 MW husk based captive power plant. The Buxar Bihar Pawan Patwari, Director, 26A, Camac Power
Textiles Ltd environment clearance is pending. The work is expected to start Street, Park Street, Kolkata, West
in a couple of months. Bengal-700016, T: 033-22873025,
M: 09831079279

12 Ministry of Requests for Qualification (RFQs) for the Surguja Ultra Mega Chhattisgarh NA N D Tyagi, CEO, Power Finance Corpo- Power
Power, Govt of Power Project (UMPP) is current invited. This UMPP project will ration (PFC), Urjanidhi, 1, Barakhamba
India have a capacity of 4,000 MW. Lane, Connaught Place, New Delhi -
110001. T: 011-23456504, 23456000,
www.pfcindia.com

13 The corporation has recently invited expression of interest for a Dhopave NA


JV partner to setup 3200 MW coal based power plant at Dhopave Maharashtra
in Konkan. The JV model with 26% stake to Mahagenco would
ensure that the state gets 100% power generated at these plants AT Dawlekar, Executive Director -
as Mahagenco will be able to leverage supply of coal and land. Projects, Prakashgad, Plot No. G-9,
Mahagenco Power
14 The corporation has recently invited expression of interest for a Dhule NA Bandra (East), Mumbai - 400051. T:
JV partner to setup 1600 MW coal based power plant at Dhondai District 022-26478121, 26474211, F: 26476749
in Dhule District. The JV model (26% stake to Mahagenco) would Maharashtra
ensure the State gets 100% power generated at these plants as
Mahagenco will be able to leverage supply of coal and land.

4
15 Tata Power Ltd The company plans to start construction of 1,600-MW power Raigad NA Shalini Singh-CCM, Corporate Center, Power
project in Raigad district by September 2010. This project will be District Block A, 34 Sant Tukaram Road,
based on imported coal. Maharashtra Carnac Bunder, Mumbai - 400009. T:
022-66658748 / 7511, F: 66658626,
shalinis@tatapower.com (Prasad
Menon, MD)

16 Sonebhadra Plans to set up for 3x660 MW Dopaha Thermal Power project in Lucknow NA VK Verma, Chief Engineer (Project), Power
Power Sonebhadra District. So far, discussions are on with the State Uttar 3rd Floor, Shakti Bhawan Extension,
Generation Government with regard to signing of the MOU. After approval is Pradesh 14-Ashok Marg, Lucknow, Uttar
Company Ltd received the detailed project report will be prepared. Pradesh. T: 522- 2287867. F: 2288484,
cgm2plg@yahoo.co.in

17 Prajay This company plans development of residential town ship of Hyderabad NA Sujata Rao, Project Manager, 8-2- Real
Engineers approximate 45,00,000 square feet in Hyderabad. In this regard, Andhra 293/82/APlot # 1091,Road#41, Near Estate
Syndicate Ltd the company has received foreign investment. Pradesh Peddamma Temple Jubilee Hills,
Hyderabad -500033. T: 040 -
66222999, F: 66222966,
info@prajayengineers.com

18 The company is planning to build a residential project at Ambattur 36.48 Jayanti, Sales Manager, Vijay Complex, Real
Ambattur. The total area floor space of the project would be Tamil Nadu No 3, Blackers Road, Mount Road, Estate
Vijay Shanthi
around 6-7 lakh sft. Chennai - 600002. T: 044-28582336,
Builders Ltd
19 The company is planning a premium residential project at Thiruvan- 8.68 M: 09790716666, Real
(VSBL)
Thiruvanmiyur. miyur Tamil sales@vijayshanthibuilders.com Estate
Nadu (Suresh Jain, MD)

20 Rail Land RLDA is responsible for the commercial development of vacant Kolkata NA Anil Kumar Gupta, Project Manager, Real
Development Railway land for revenue generation. The authority is likely to West Bengal IRCON Office Compound, Next to Estate
Authority (RLDA) invited private participation for exploiting about 33,000 sq mtr of Safdarjung Railway Station, Moti Bagh

5
unused space in possession with the Kolkata Metro Railway. The I, New Delhi - 110021. T: 011-
authority intends to develop air-space and railway land at six 24122834/5, F: 24104793
Metro Railway stations — Central, Chandni Chowk, Mahanayak
Uttam Kumar, New Garia and Masterda Surya Sen — through a
long-term revenue sharing model.

6
21 Andhra Pradesh This agency is implementing Phase VI for construction of rural Andhra 5.73 R. Venkateswara Rao, Cheif Engineer, Roads/
State Rural roads in Andhra Pradesh under Pradhan Mantri Gram Sadak Pradesh SRTGN Bhavan, Erramanzil Colony, Highways
Roads De- Yojana (PMGSY). The Ministry of Rural Development has O/O ENC PR Hyderabad. T: 040-
velopment released grant in aid of Rs 33 cr in this regard. The sum is from 23321306
Agency the special window created in NABARD.
(APSRRDA)

22 Gujarat State This agency is implementing Phase- VIII, for construction of rural Gujarat 5.04 H D Vala, CEO, R&B Department, Roads/
Rural Roads roads in Gujarat under Pradhan Mantri Gram Sadak Yojana Block No.-14/3, New Sachivalaya, Highways
Development (PMGSY).The Ministry of Rural Development has released grant Gandhinagar. T: 02712-23220280,
Agency in aid of Rs 29 cr in this regard. The sum is from the special 23251816.
(GSRRDA) window created in NABARD.

23 Ministry of Road The five national highways approved by the ministry are Himachal NA S K Marva, Chief Engineer - North East Roads/
Transport and Hamirpur-Sujanpur-Palampur 60-km highway, Brahmpukhar- Pradesh Projects, (P 10), Transport Bhavan, Highways
Highways, Govt Bilaspur-Sarkaghat 12- km stretch, Bharmaur-Pathankot 133-km, Room No. 345, 3rd Floor No. 1,
of India 106-km Taradevi-Nalagarh road and Chandigarh-Baddi- Parliament Street, New Delhi - 110001.
Shalaghat of 84-km length. T: 011-23719070. F: 23730647.

24 Jammu & This agency is implementing Phase VII for construction of rural Jammu & 3.47 Khalid Muzaffer, Cheif Engineer, Roads/
Kashmir State roads in Jammu & Kashmir under Pradhan Mantri Gram Sadak Kashmir Engineering Complex Rajbagh Bund Highways
Rural Roads Yojana (PMGSY). The Ministry of Rural Development has Srinagar. T: 0191-2312435
Development released grant in aid of Rs 20 cr in this regard. The sum is from
Agency the special window created in NABARD.
(JKSRRDA)

25 Karnataka Rural This agency is implementing Phase VIII for construction of rural Karnataka 22.77 P S Prakash Kumar, Chief Engineer, Roads/
Roads roads in Karnataka under Pradhan Mantri Gram Sadak Yojana 2nd Flr, Kscc Bldg,Nirman Bhavan, Dr Highways
Development (PMGSY). The Ministry of Rural Development has released grant Rajkumar Rd, Rajajinagar, Bangalore -
Agency in aid of Rs 131.11 cr in this regard. The sum is from the special 560010. T: 080-23376145, 23376096,

7
(KRRDA) window created in NABARD. 23376124, 23376112, F: 23376122

8
26 Maharashtra This agency is implementing Phase VII, for construction of rural Maharashtra 23.31 Sudhir Thakare, CEO, 1st Floor, Main Roads/
Rural Roads roads in Maharashtra under Pradhan Mantri Gram Sadak Yojana Bldg, RD & Water Conservation Dept., Highways
Development (PMGSY).The Ministry of Rural Development has released grant Mantralaya, Mumbai-400032. T: 022-
Association in aid of Rs 134.18 cr in this regard. The sum is from the special 22025201
(MRRDA) window created in NABARD.

27 Geodesic The company has proposed a 59-km monorail system for Bangalore NA K S Kartik, Business Development Transport
Techniques Pvt Bangalore.The project is under evaluation by the Bangalore Karnataka Officer, # 31, HM Elegance Museum
Ltd Metropolitan Land and Transport Authority. The final clearance of Road, Bangalore-560001. T: 080-
the Karnataka Govt is awaited and thereafter bids will be invited 42971200/18, F: 42971219,
for this project. kartik@geodesictechniques.com

28 The State Government plans to implement a drinking water Vellore 312.67 Leelavati, Executive Engineer, Northern Water
scheme with a capacity to supply 270 million litres per day in District Region, No.8, 1st East Main Road, Sector
Vellore district. Tamil Nadu Gandhi Nagar, Vellore-632006. T:
0416-2243201, 2243743, F: 2242294,
ce_twad@dataone.in
Government of
29 The State Government plans to take up drinking water projects in Tamil Nadu 173.71
Tamil Nadu
Virudunagar, Pudukottai, Kovilpatti, Kayalpatti, Tiruvanamallai, Raghunathan, Chief Engineer, 31,
Pudukottai and Chennai. Kamaraj Salai, Chepauk, Chennai - 5. Water
T: 044 28416420, 28412341, F: Sector
30 The State Government also plans to take water connectivity Tamil Nadu 66.11
projects with the sup-port of Union Government for 7,000 rural 2247368
households.
*figures are approximate (in million)

CONTRACT AWARDED

N Organization Project Title / Details Location Budget Contacts Sector

9
Euro*

10
31 Consolidated This company has bagged Goa airport Goa 34.74 1) K. Nellaiappan, Manager -Business Airport
Construction construction project from Airport Authority of Development, No 5, Second Link Street, CIT
Consortium Ltd India. The contract comprises building a 5 lakh Colony, Mylapore, Cennai-600004, Tamil Nadu.
(CCCL) sq.ft terminal, with a capacity to handle over 8 T: 044-23454500, 24661083, F: 24990225 2)
lakh passengers annually, and a 1.6 lakh sq.ft PV Subbayam, Sr. DGM, No 5, Second Link
multi-level car park for the airport. Street, CIT Colony, Mylapore, Chennai-600004,
Tamil Nadu. T: 044-23469300, 23454500,
24661083, F: 24990225

32 Larsen & Toubro The Metallurgical, Material Handling & Water Hirakud 36.65 K. Venkataramanan, President (Engineering Aluminium
Ltd Operating Company of Larsen &Toubro has Orissa and Construction), Saki-Vihar Road, P.O. Box
bagged contract from Hindal-co Industries for 8901, Powai, Mumbai-400072, T: 022-
an aluminium rolling mill complex at its Hirakud 67050505, F: 67051462, kv@lntenc.com
unit. The order is scheduled for completion in
16 months.

33 Sadbhav The company has been awarded the project/ NA 15.99 Parul Shah, Sr. Business Develop-ment Officer Coal
Engineering Ltd works consisting of Two Jobs by Western Coal Sadbhav House Opp Law Garden Police
Fields Ltd. (A subsidiary of Coal India Ltd.) Chowki, Ellisbridge, Ahmedabad-
380006.Gujarat. T: 079-26463384, F:
26400210. parul.shah@ sadbhaveng. com,
(Vishnubhai M Patel, MD)

34 ARSS The company has received an order from Nagpur 19.88 Gyanaranjan Bihari, Tender Manager, Plot No Construction
Infrastructure RITES Ltd, Nagpur for undertaking earthwork Maharashtra 38, Sector-A, Zone-D, Mancheswar Industrial
Projects Ltd and constructing bridges, supply of permanent Estate, Bhubaneswar-751010. Orissa. T: 0674-
way material, supply of ballast and permanent 2588552 2588554, F: 2585074, M:
way linking for proposed private railway siding 09437578023, gyanabihari@gmail. com
for NTPC Mauda, Nagpur (Subhash Agarwal, Chairman)

11
35 Punj Lloyd Ltd This company has bagged contract from the Rae Bareli NA Bhavna Dayal, Head PR, P.K. Gupta, Director, Construction
Rajiv Gandhi Institute of Petroleum Technology Uttar 78 Institutional Area, Sector 32, Gurgaon,
(RGIPT) to construct their technical institute at Pradesh Haryana - 122001. T: 0124- 2620123, 2620152,
Jais in Rae Bareli, Uttar Pradesh. The scope of F: 2620111.
work entails civil, structural and associated
work including site development for setting up
of RGIPT. This would involve construction of 27
building consisting of the adminis-tration and
library building, auditorium, community centre,
lecture halls, commer-cial centre, staff housing
facility, hostels and healthcare centre. The
order will be executed over a period of 24
months.

36 ARSS The company has received a new work order Guwahati 7.21 Gyanaranjan Bihari, Tender Manager, Plot No Railways
Infrastructure from Northeast Frontier Railway, Assam 38, Sector - A, Zone - D, Mancheswar Industrial
Projects Ltd Maligaon/Guwahati on June 04, 2010. Estate, Bhubaneswar-751010. Orissa. T: 0674-
2588552 2588554, F: 2585074, M:
09437578023, gyanabihari@gmail.com
(Subhash Agarwal, Chairman)

37 PBA Infrastructure The company has got contract from Nagpur 2.49 Sunil Wadhawan, Project Manager, 611/3, Roads/
Ltd Maharashtra Industrial Development Maharashtra V.N.Purav Marg, Chembur, Mumbai - 400071. Highways
Corporation for the construction of WMM road T: 022-67978200, 67973767, F: 25229699,
with asphalt treatment including central road pbaltd@vsnl.net, www.pbail.com
divider and allied work in IT Park-II (Phase-I).
The location is Nagpur (Butibori) Industrial
Area.

12
38 Maytas Infra Ltd Gurgaon 32.19 Tarun Udwala, Dy. Manager - Corporate Transport
Bagged a contract from ITNL ENSO Rail Haryana Communications, 285 6-3-1186 / 5 / A, 3rd
Systems Ltd (IERS) for design and construction Floor, Amogh Plaza, Begumpet, Hyderabad -
of elevated viaduct (single/ double line) and six 500016. T: 040-23408100, 40037800, F:
stations for Rapid Metro Rail Gurgaon Ltd for a 23401107, tarun_udwa-la@maytas.in,
total value of Rs 185.32 crore. www.maytasinfra.com

JOINT VENTURE

39 Indian Oil The company is likely to an agreement with V K Mittal, GM - Project, 3079 / 3, JB Tito Marg,
Corporation(IOC) NPCIL to form a joint venture to set up nuclear NA NA Sadiq Nagar, New Delhi - 110049. T: 011- Power
power plant. 26260000, 24360443, www.iocl.com

40 Indian Oil The company has joined hands with Tata


Corporation(IOC) Power for a thermal plant to be set up in Orissa V K Mittal, GM - Project, 3079 / 3, JB Tito Marg,
Paradip
for the Paradip refi nery and petrochemical NA Sadiq Nagar, New Delhi - 110049. T: 011- Power
Orissa
complex. The Tatas will hold a 74 per cent 26260000, 24360443, www.iocl.com
stake in the venture.
*figures are approximate (in million)

13
COMMISSIONED PROJECT

N Organization Project Title / Details Location Budget Contacts Sector


Euro*
41 Airport Authority of The new integrated terminal building of Mangalore 31.27 Peter Abraham, Director, Airports Authority of India Airport
India Mangalore airport was inaugurated on 15th Karnataka Mangalore Airport Mangalore, T: 0824-2220400, F:
May 2010. As part of the upgrada-tion 2254175, apd_mangalore@aai.aero
project, the work order for extending the
runway would be issued soon, cargo
complex will also come up.

42 Consolidated This company is implementing Chennai Chennai NA 1) K. Nellaiappan, Manager -Business Development, Airport
Construction Airport Project. The work on the Chennai Tamil Nadu No 5, Second Link Street, CIT Colony, Mylapore,
Consortium Ltd airport terminal expansion is likely to be Chennai-600004, Tamil Nadu. T: 044-23454500,
(CCCL) completed by August 2011. 24661083, F: 24990225 2) PV Subbayam, Sr. DGM,
No 5, Second Link Street, CIT Colony, Mylapore,
Chennai-600004, Tamil Nadu. T: 044-23469300,
23454500, 24661083, F: 24990225

43 National Aviation Plans to set up an aircraft maintenance Nagpur NA K Unnikrishnan, Additional General Manager - Aviation
Company of India base along with Boeing at Nagpur in three Maharashtra NACIL, Old Airport, Santacruz (East), Mumbai -
Ltd (NACIL) / years time. Lease agreement is signed 400029. T: 022- 26263558,
Boeing between Air India and Maharashtra Airport k.unnikrishnan@airindia.in
Development Company Ltd (MADC) for 50
acre land in the special economic zone
(SEZ) near Nagpur airport for this project.

14
44 FACT-RCF The joint venture between FACT and Kochi Kerala NA FACT-CD Campus, Ambalamedu, Ernakulam Dist, Building
Building Products Mumbai-based RCF is constructing a new Kerala-682303. T: 0484-2721971, F: 2721972, Materials
Ltd (FRBL) plant within the compound of FACT Kochi frbl@factltd.com
Division at Ambalamedu. The plant will
manufacture wall panels, wall plaster, wall
putty and other products from gypsum, a
by-product in the production of phosphor-ic
acid. The commissioning of this project is
expected shortly.

45 Municipal The municipal corporation plans Delhi NA M P Gupta, Executive Engineer (Project), Room No. Car Parking
Corporation of construction of conventional underground 31, Ambedkar Stadium, Delhi Gate, Delhi-02, Delhi.
Delhi multilevel car parking at Central Market T: 011-23988845, M: 9717788605
Park Ashok Vihar in Rohini zone. Tenders
evaluation process is on. The completion
will take 18 months from the
commencement date.

46 Hindustan The company got an order from Nuclear Kota 154.23 Sandeep Sawant, DGM-Media Relations, Hincon Construction
Construction Power Corporation of India Ltd for civil Rajasthan House, Lal Bahadur Shastri Marg, Vikhroli West,
Company Ltd works of the main plant of Rajasthan Mumbai-400083. Maharashtra. T: 022-25775959, F:
Atomic Power Project (RAPP), Units 7 & 8 25777568. sandeep.sawant@hccindia. com, ( Ajit
(2x700 MW) PWHR at Rawatbhata, Kota, Gulabchand, CMD)
Rajasthan. The completion period is of 50
months.

47 Adani-Welspun The company will begin drilling at its Gujarat NA Devendra Amin, President, Sambhaav Press Oil & Gas
Exploration Ltd onshore block in the Cambay basin close Building, Nr Judges Bunglow, Bodakdev,
(AWEL) to Bharuch shortly. Ahmedabad – 380015. T: 079-25556900, 25556850,

15
F: 25556846, info@awel.com

16
48 GAIL Ltd The company plans to commence work on Dabhol Ma- 347.41 Jignesh Vasavada, Dy. Manager -Corporate Pipeline
the 800-km pipeline shortly. This pipeline harashtra Communications, 16, Bhikaji Cama Place, New Delhi
will be used to transport gas from the LNG - 110066. T: 011-26172580, 26182955, ext: 6771, F:
terminal in Dabhol to Bidadi near 26185941, M: 09871039345
Bangalore.

49 Cairn India Ltd The company plans to commission its 590- Barmer NA Manu Kapoor, Director - Corporate Affairs, 3rd & 4th Pipeline
KM heated crude oil pipeline, from its Rajasthan Floor, Vipul Plaza, Suncity, Sector 54, Gurgaon -
Barmer field to near the Gujarat coast, 122002. T: 0124-4593000, 2703000, F: 2889320,
early next month. cilmediainfo@cairnindia. com (Rahul Dhir, CEO)

50 Cochin Port Trust The port trust plans to set up an interna- Kochi Kerala NA Jay Karthikeyan, Chief Engineer, Willingdon Island, Port
(CPT) tional bunkering terminal to supply fuel to Cochin - 682 009. T: 0484-2666414, 2666871,
foreign vessels calling at port. 2668122, F:2668163, coptce@satyam.net.in

51 Ministry of Power, Requests for Qualification (RFQs) for the Chhattisgarh NA N D Tyagi, CEO, Power Finance Corporation (PFC), Power
Govt of India Bedabahal Ultra Mega Power Project Urjanidhi, 1, Barakhamba Lane, Connaught Place,
(UMPP) is current invited and the deadline New Delhi -110001. T: 011-23456504, 23456000,
for submitting the proposal is July 31. This www.pfcindia.com
UMPP project will have a capacity of 4,000
MW.

52 Gammon The company plans setting up a 250 MW NA NA Satish Chandran, Company Secretary, Gammon Power
Infrastructure coal based power plant, in Western India. House, Veer Savarkar Marg, P O Box No 9129,
Projects Ltd The letter of allocation for supply of water Prabhadevi, Mumbai-400025. T: 022- 6661400, F:
for its operations is received. 67444025. (R L Telang, VP - Marketing)

53 Neyveli Lignite The company has dedicated Unit-I of the Rajasthan NA S RajaGopal, CEO-Projects, Block - 1, Neyveli - Power
Corporation Ltd Barsingsar Thermal Power Plant and 607801, Cuddalore District, Tamil Nadu. T & F :
announced the inauguration of Unit-II 04142- 252205, F: 252645, M: 09443369327,
synchronization of the Barsingsar Power rajagopal@nlcindia.com, (A R Ansari, CMD)

17
Plant.

18
54 National Highway Request for Qualification was recently Gujarat 891.81 B K Thakur, Deputy General Manager (MC II), G-5& Roads/
Authority of India invited for the project of design, 6, Sector-10, Dwarka, New Delhi-110075. T: 011- Highways
(NHAI) engineering, fi nance, construction, 25074100 Ext. 2251, F: 25074100
operation & maintenance of 6 laning of
Kishangarh Udaipur Ahmedabad Section
of NH 79A, 79, 78 & NH -8 on BOT (Toll)
Basis in the State of Gujarat & Rajasthan.

55 CCCL This company is a subsidiary of CCCL and Tuticorin NA 1) K. Nellaiappan, Manager - Busi-ness SEZ
Infrastructure Ltd is setting up a food processing SEZ in Tamil Nadu Development, No 5, Second Link Street, CIT Colony,
Tuticorin. Mylapore, Chennai-600004, Tamil Nadu. T: 044-
23454500, 24661083, F: 24990225 2) PV Sub-
bayam, Sr. DGM, No 5, Second Link Street, CIT
Colony, Mylapore, Chennai-600004, Tamil Nadu. T:
044-23469300, 23454500, 24661083, F: 24990225

56 Rapid Metro Rail The company a joint venture between Gurgaon 188.99 The IL&FS Financial Centre’, Plot No. C 22, G Block, Transport
Gurgaon Ltd ITNL, ENSO Rail Systems Ltd, DLF Metro Haryana Bandra-Kurla Complex, Bandra (East), Mumbai 400
Ltd and IL&FS, is developing the rail metro 051. T: 022- 26533333
link in Gurgaon. The project will be
executed on build, operate and transfer
basis and has achieved financial closure.
*figures are approximate (in million)

19
PROJECTS UNDER IMPLEMENTATION STAGE

N Organization Project Title / Details Location Budget Contacts Sector


Euro*
57 Airports Authority Plans to install solar panels on the roof of the Leh Jammu & 0.86 Piyush Joshi, Director (Planning), Rajiv Gandhi Airport
of India (AAI) new terminal at Leh Airport that will be used to Kashmir Bhawan, Safdarjung Airport, New Delhi -
generate about 100kw and use that to heat up 110003. T: 011- 24610517, 24632950
water. This green project is likely to be ready in
next two years.

58 Grand Luxe Chennai based company is refurbishing Queen’s Pudokottai 6.94 K Shriram, Head (Finance), Pallavaram - Hospitality
Hotels Ltd Palace hotel spread over 3.5 acre at Pudukottai. Tamil Nadu Thuraipakkam 200 Feet Road, Okkiam
The hotel in Pudukottai will be converted into 27- Thuraipakkam, Chennai - 600 097. T: 044-
room luxury hotel. 24967013, 24967020, F: 24967070,
kshriram@etlinfra.com, www.etlinfra.com

59 Uniworld The company is setting up an integrated logistics Navi Mumbai 13.03 Nihar Parida, Vice President - Logistics & Logistics
Logistics park in Mumbai. The work has started and likely Maharashtra Marketing, #225, S.T Bed Extn, 5th Main, 4th Park
to complete in 5 months. Block, Koramangala, Ban-galore - 560034. T:
080-25633366, M: 09910897083,
nihar.parida@uniworld-logistics.com, (Prem
Kumar M, Group Managing Director & CEO)

60 Sri City Pvt Ltd This company is developing Sri City Logistics & Tamil Nadu NA Raghini Peter, Vice President -Business Logistics
Warehousing Park spread over 500 acre near Development, 85, Kutchery Road, Mylapore, Park
TADA near Chennai bordering Andhra Pradesh. Chennai, Tamil Nadu - 600004. T: 044-
250-acre will be for a Free Trade Warehousing 39402000, 24616768, M: 09840444085,
Zone (FTWZ) and another 250 acre in the raghini@sricity.in
domestic industrial zone. The project will be

20
executed in 3 phases. Phase-1 will commission
by end of 2010. So far, the preliminary work has
started.

21
61 Adani Welspun The company is a 65:35 venture between Adani Bharuch NA Devendra Amin, President, Sambhaav Press Oil & Gas
Exploration Ltd Enterprises Ltd and Welspun Natural Resources District Gujarat Building, Nr Judges Bunglow, Bodakdev,
(AWEL) Pvt Ltd. The company has recently commenced Ahmedabad – 380015. T: 079-25556900,
exploratory drilling in the Palej block in Cambay 25556850, F: 25556846, info@awel.com
Basin near Bharuch.

62 Jindal Power Ltd Setting up a 4000 MW hydroelectric power Etalin NA Shoubhik Khamrohi, Asst. Manager, 2nd Floor, Power
project in Etalin, Arunachal Pradesh. The Arunachal DCM Building, Plot No: -94, Sector- 32,
projects in Arunachal Pradesh are being Pradesh Gurgaon- 122001, T: 0124-6689000, F:
developed through joint ventures with Hydro 6689101.
Power Development Corporation of Arunachal
Pradesh Ltd. (HPDCAPL).

63 Jindal Power Ltd Setting up a 2400 MW (4x600 MW) power Chhattisgarh 2329.42 Shoubhik Khamrohi, Asst. Manager, 2nd Floor, Power
project in Chhattisgarh. This project is expected DCM Building, Plot No: -94, Sector- 32,
to be completed by 2013. Gurgaon- 122001, T: 0124-6689000, F:
6689101.

64 Jindal Power Ltd The company is setting up 1,320 MW at Dumka Dumka NA Shoubhik Khamrohi, Asst. Manager, 2nd Floor, Power
Equipment supplier is not yet finalised. Jharkhand DCM Building, Plot No: -94, Sector- 32,
Gurgaon- 122001, T: 0124-6689000, F:
6689101.

65 Jindal Power Ltd The company is setting up 660 MW coal based Godda NA Shoubhik Khamrohi, Asst. Manager, 2nd Floor, Power
power project in Godda. Equipment supplier is Jharkhand DCM Building, Plot No: -94, Sector- 32,
not yet finalised. Gurgaon- 122001, T: 0124-6689000, F:
6689101.

22
66 A2Z Maintenance Gurgaon based engineering, procurement and Punjab NA Mamta Joshi, CEO (Admin), 5th & 6th Floor, Power
& Engineering construction (EPC) company is setting up three Enkay Square 448–A, Udyog Vihar, Phase – V,
Services co-generation power plants in collaboration with Gurgaon – 122016, Haryana. T: 0124 -
sugar mills on a Build-Own-Operate-Transfer 4517600, 4776100, F: 4380014, (Amit Mittal,
(BOOT) model for a period of 15 years. A2Z will CMD)
provide steam and power for operating the
manufacturing process of the sugar mills during
the crushing season.

67 Sri Krishna The company is coming up with a commercial Hyderabad 60.79 Suresh Sarma, Marketing Manager, Krishe Real
Developers office space project named ‘Krishe Sapphire’ in Andhra Gardens, Opp Begumpet Police Stn, Huda Estate
Hyderabad. This project will have 6,00,000 sq. ft Pradesh Lane, Begumpet, Hyderabad - 500016. T: 040-
office space and is expected to be ready by 23201829, 23201379, 23202288,
December 2010. The funding is through a mix of www.krishegardens.com (Saji Koshy Paul, Vice-
debt, equity and internal accruals. President)

68 Sri Krishna The company is coming up with a one luxury Hyderabad 13.89 Suresh Sarma, Marketing Manager, Krishe Real
Developers residential complex project named ‘Krishe Valley Andhra Gardens, Opp Begumpet Police Stn, Huda Estate
‘in Hyderabad. This project will have premium Pradesh Lane, Begumpet, Hyderabad - 500016. T: 040-
apartments and is expected to be ready by 23201829, 23201379, 23202288,
December 2011. www.krishegardens.com (Saji Koshy Paul, Vice-
President)

69 Acron Developers Vivara Residences’ is a real estate project Arpora Goa NA HH Fernandes, Marketing & Sales Consultant, Real
Pvt Ltd addressing senior citizens housing category. The 591, Montemar, Retreat House Road, Baga, Estate
project is on and the first set of Vivara homes will Goa 403 516. T: 0832-2276147, 2276342, F:
be ready in 2-3 months. The project comprises 2277706 (Dr John Britto, Director)
52 apartments.

23
70 Sunil Mantri The Square is a residential cum com-mercial Solapur NA Park Chowk, Solapur 413001. T: 0217-2740221, Real
Group project coming up at Solapur. The project Maharashtra 2740222, F: 2740223, solapuroffi Estate
comprises G+7 floors of 2-3 bhk, total 140 ce@mantrirealty.com
apartments with amenities like clubhouse, gym,
swimming pool, shops etc.

71 Satra Properties The company has undertaken ‘Satra City’ which Mumbai NA Anuradha Singh, Leasing Manager, Dev Plaza, Real
India Ltd is a SRA (Slum Rehabilita-tion Authority) project Maharashtra 2nd Floor, Opp. Andheri Fire Station, S. V. Estate
at Ghatkopar in Mumbai. The project is spread Road, Andheri (W), Mumbai 400058. T: 022-
over 7.50 acre and will have a saleable area of 26719999, F: 26203999,
nine lakh sq ft. info@satraproperties.in,
sales@satraproperties.in (Praful N. Satra, CMD)

72 Satra Properties The company was successful in getting a tender Mumbai 15.63 Anuradha Singh, Leasing Manager, Dev Plaza, Real
India Ltd sanctioned for a property located at Matunga for Maharashtra 2nd Floor, Opp. Andheri Fire Station, S. V. Estate
premium luxurious residence project on 1.5 acre. Road, Andheri (W), Mumbai 400058. T: 022-
26719999, F: 26203999,
info@satraproperties.in,
sales@satraproperties.in (Praful N. Satra, CMD)

73 SJ Developers & Royal Heritage’ is an upcoming residential Bhubaneswar NA Mohan Chaudhary, Manager-Marketing, 103, Real
Housing Ltd project to be developed on 1.3 acre at Orissa Miknik Mall,Room No B/6, Nr Iscon Temple & Estate
Patrapada. The project comprises 70 flats in Rajdhani GAS Complex, Nayapalli,, Nayapalli,
eight storeys bldgs offering a mix of 1-2-3-4 BHK Bhubaneshwar - 751012. T: 0674-2725875,
flats and a total built-up area of 1.3 lakh sq ft. 2565575, 2565675, mohan@sjdevelopers.com,
The construction work has already started and (Debidutta Mishra, MD)
completion is targeted by March 2012.

24
74 Earth Earth Town’ is an affordable housing project Greater Noida 86.85 Shubham Khanna, Marketing Associate, Karol Real
Infrastructure Ltd being developed by the company comprising Uttar Pradesh Bagh, New Delhi, Noida, T: 09311114064-68, Estate
2,400 units. The completion is expected by June M: 9268573999
2012.

75 Earth Earth Sapphire Court is a commercial project Greater Noida 22.58 Shubham Khanna, Marketing Associate, Karol Real
Infrastructure Ltd which would be a green building with a saleable Uttar Pradesh Bagh, New Delhi, Noida, T: 09311114064-68, Estate
area of six lakh sq feet. The completion is M: 9268573999
expected by June 2013.

76 Satra Properties The company has joined hands with Gammon Bhopal NA Anuradha Singh, Leasing Manager, Dev Plaza, Township
India Ltd India for undertaking a township project spread Madhya 2nd Floor, Opp. Andheri Fire Station, S. V.
over 15 acre in Bhopal. This project will take 3 Pradesh Road, Andheri (W), Mumbai 400058. T: 022-
years to complete and will have 25 lakh sq ft 26719999, F: 26203999,
saleable area. info@satraproperties.in,
sales@satraproperties.in (Praful N. Satra, CMD)

77 The Kolkata East-West Kolkata Metro corridor project is 14.5- Kolkata West 846.75 Tarun Kumar, Chief Engineer, 4th Floor, HRBC Transport
Metro Rail km corridor starting from Salt Lake Sector V up Bengal House, Munsi Premchand Sarani, Kolkata-
Corporation to Howrah Maidan. Of this, around 8 km will be 700021. T: 033-22134350, F: 2213 4347,
(KMRC) underground with six stations and the balance ce.kmrc@gmail.com, www. kmrc.in, (Sumantra
will be on an elevated track. About 6 km of Chowdhury, MD)
elevated roads work is awarded to Gammon
India and so far they have completed 30% of the
work. Recently the contract for con-structing 5
km underground pathway is awarded to Afcons.
This work will start by December 2010. The
project completion will take 4 years.

25
78 A2Z Maintenance Gurgaon based engineering, procurement and Kanpur Uttar NA Mamta Joshi, CEO (Admin), 5th & 6th Floor, Waste-to-
& Engineering construction (EPC) company is setting municipal Pradesh Enkay Square 448–A, Udyog Vihar, Phase – V, Energy
Services 15 MW solid-waste-to-power project using RDF Gurgaon – 122016, Haryana. T: 0124 -
(Refuse Derived Fuel), which is derived from 4517600, 4776100, F: 4380014, (Amit Mittal,
solid waste for Kanpur Municipal Corporation. CMD)
This plant will be operational by March 2011.

79 Government of Karnataka Rural Water Supply and Sanitation Karnataka NA P Boregowda, Director, 2nd Floor, E Block, Water
Karnataka Project (Jal Nirmal Project) aims to increase rural K.H.B Complex, Cauvery Bhavan, K.G Road, Sector
communities’ access to improved and Bangalore-560009. T: 080-22240508,22122851,
sustainable drinking water and sanitation F: 22240509
services. The World Bank has recently approved
Rs 698 crore International Development
Association (IDA) credit in additional financing
for this project.
*figures are approximate (in million)