SALINITY INDICATOR
YO - 100D
H.5375/76
3 - MAIN UNIT
4 - SYSTEM DIAGRAM
5 - SENSOR (SCHP-1)
6 - SENSOR (SCHP-1)
7 - SENSOR (SCHP-1)
8 - JUNCTION BOX
9 - CIRCUIT DIAGRAM
SALINITY INDICATOR
INSTRUMENT SHIPYARD DAE WOO SHIPYARD
TYPE : YO-100D
3 ACCURACY
11 MOUNTING WALL
COMPONENTS
NO. NAME OF PART TYPE Q'TY REMARK
1 Main Unit YO-100D 5 Wall
1
FUNCTION NORMAL FULL SCALE
OSCILLATOR
SELECTION SPAN ADJ.
SWITCH
SELF
TEST
10 P.P.M. WATER
TEMPERATURE
V1 (+15V) SETTING
V2 (+12V)
POWER V3 (-12V)
SUPPLY V4 (+5V)
SENSOR
POWER
IND.
AC POWER LED
SOURCE
OUTPUT
4-20mA without +
DC24V source ISOLATOR
ALARM (0-20ppm) - PCB
IND.
LED
for for
SOLENOID VALVE ALARM CONTACT ALARM POINT
SETTING
(with source voltage) (without power)
SALINITY INDICATOR
Drawn Check Final Revised Title SYSTEM BLOCK DIAGRAM
M.Y.KIM Y.T.OH DWG. NO. YO-100D-02
2
30
9x4 4.5
95 22
1 6
ALARM
POWER ALARM SETPOINT POWER
"A"
2 3 4 5
20Bx2
180(betwn hole) Gland 20Cx2
220
22 RUBBER
"A"
SECTION 30
95
3.5
GND
220
5 POWER SWITCH
3
Salinity High Alarm Power Source
AC 220v 1Ph
60Hz
ECRRPS2
ECRD2
220 0
C NO NC U V
* MAIN UNIT
(YO-100D)
A B
Output Signal
4-20mA (without power)
ECRD2
(DC24V Loop power)
ECRRPS2
* JB-T
* Sensor
* Cable
3m
* Socket Valve
4
3 m
Cable
abt.210
PT 1 1 2
47
26
5
1 Installed in Pipe
40
47 26
abt.203
37
Spring return socket valve
6
WELDING
BOSS
max. 40
7
84
90 35
3 5
7
118
50
4 34
1
A Blue
1 1
To Main Unit B Brown To Sensor
2 2
3 3
4 4
Terminal
3 PACKING RUBBER 1
5 CABLE GLAND BRASS 2 M24xW14 2 COVER BRASS 1
4 TERMINAL BLOCK 1 4P 1 BODY BRASS 1
NO NAME OF PARTS MATERIAL Q`TY REMARKS NO NAME OF PARTS MATERIAL Q`TY REMARKS
APPROVED H. H. LEE UNIT MM SYMBOL TITLE
CHECKED B. K. KIM SCALE N/S 2-WAY JUNCTION BOX
DESIGN Y. M. CHA COLOR NATURAL J
FOR MARINE USE
DATE 2000. 03. 27 IP 56
8
Drawn
M.Y.KIM
+15V +12V +12V
POWER
TH Ge
REC
Select Normal Sensor
F1 T1 R83 Sw Signal
OSCILLATOR A B ADJ.
Check
Reg OP OP
R84 AMP AMP
POWER REC Water
220V SW 1A SelfTest
- + 250-280Hz
Temp. (VR1-VR4) (VR5-VR8)
POWER +24V ADJ.
SOURCE + + R48 R49
P.W Zero
0V SelfTest
- - ADJ. ADJ.
ADJ. TH
0V
SelfTest Normal
F2 Reg -12V -12V
REC
Final
3A - + +15V
+ +
Y.T.OH
C
- - R54
SOLENOID
NC
VALVE Reg
REC +12V
- +
NO +12V
+ +
Rz
- -
Revised
OUTPUT
Reg + ISOLATOR
REC 4-20mA without OP
DC24V source AMP
- + PCB
-12V
-
+ + (0-170ppm)
- -
Title
Reg +12V +5V -12V
-12V
REC
- + +5V
+ +
DWG. NO.
- -
0V DISPLAY
PCB
Power
LED
PPM
Alarm
Set point
PB +12V
Alarm
LED
YO-100D-09
+12V
(for Alarm OP
Ry AMP
CIRCUIT DIAGRAM
Contact)
: Outside Components of PCB
+12V Alarm
SET.
(for Solenoid
Rz
valve) -12V
9
SPARE PAGE 10
NO.
SALINITY INDICATOR
BOX NO.
SUPPLY DRAWING
NO. NAME SKETCH MATERIAL REMARKS
Working Spare No. Part No.
012 0101
RED -2-
1 INDICATING LED 4
EA GREEN -2-
012 0200
2 GLASS 3 1A
FUSE
012 0300
14011
3 14011 2
I . C
(4011)
012 0400
4 I . C
2902 4 2902
012 1300
5 7805 2 7805
VOLTAGE REGULATOR
012 1400
6 7815 2 7815
VOLTAGE REGULATOR
012 1501
7 1 SCHP-1
SENSOR
10
11
12
PPM
13
7 8 11 12
2 3 4 5 9 10
14
1
1
1) Cable Gland 20B (2EA), 20C (2EA) for cable inlet.
2) Power Indicating Lamp The lamp illuminates when power switch is `on'.
(DC 12V LED)
3) Alarm Indicating Lamp The lamp illuminates when density of salinity is
over the setting value. (DC 12V LED)
4) Alarm Point By pushing the button, alarm set point is displayed.
8) Power Source Fuse Fuses for power source. (1A Slow Blow)
9) Alarm Relay Relay for salinity high alarm.
( Omron G2R-2-S, 12V DC )
10) External Voltage Signal Relay Relay with source voltage. When salinity high
alarm occurred, this relay is engaged.
( Omron G2R-2-S, 12V DC )
11) Self Test Switch Switching toggle switch to `test' position, enables
operator to ascertain 10 PPM of alarm setting
value. ( Set the self test switch to `Normal'
during normal operation )
12) Adjusting Knob for Self Test The self test switch position to `Test', turn
adjusting knob to the clockwise, the indicating
digit will increase.
At 10 PPM, alarm lamp and external volt signal
relay are operated.
13) Temp. Compensating Knob For use in compensating the variation of electirc
conductivity due to temperature of the distilled
water being measured. ( 5 C - 150 C)
* Normally set the `water temp. compensation knob' to actual water temperature.
14) Terminal Block Terminal for wire connection.
2) Wiring
In making wiring for the equipment, ensure the correct wiring by setting
terminal symbols as shown in the circuit diagram, as for the end of the
electric wire, correctly fasten it to the terminal stand using force fitting
terminal.
1) Cleaning of electrode
In order to maintain exact performance of the equipment, remove the sensor
at least once 6 months and clean it.
b. By use of soft cloths (waste cloth or the like), wipe the dust or scale
deposited on the surface of the electrode of the sensor.
2
Water
3
8. Internal Details
10 2
7 9 9
8 4 5 6
3
4
1 Main PCBoard
2 Display PCBoard
3 4-20mA Isolating PCBoard
4 Self Test Switch
5 Adjusting Knob of Self Test
6 Temp. Compensating Knob
7 Alarm Point
8 power Source Fuse
9 Alarm Relay
10 Transformer
Cable
Cathod Anode
SENSOR
( )
Disconnect a cable to check
a sensor insulation resistance.
Over
10 M :is good.
5
Selecting installation position of Main Unit
(Display Unit) & Salinity Sensor
1. Main Unit (Display Unit)
1) Please avoid severely vibrating position(Paricularly, to avoid Tank, or near Tank
Wall, which transmitting easily water hammering vibration)
2) Steel Seat should be installed with strong one sustainable to the vibration.
3) Please selsect the position as possible as lower surrounding temperature.
4) To avoid the position any possible water splashing or dropping.
2. Salinity Sensor
1) Normal installation of Sensor ( in case of full water in pipe )
sensor
water water
sensor
pipe pipe
Top installation Side installation
(O) (O)
2) In case of low flow rate
sensor
water water
sensor
pipe pipe
Top installation Side installation
(X) (O)
6
3) The phenomen of PPM Reading of Main unit gradually increasing is the case when
the sensor has been installed in collected water, which is corresponding to the case
water flow stoppage inside the pipe when the system shutdown.
When water flow stopped, conductivity increase due to either `rusting occurrence' or
`Ion Increase'. When conductivity increase, PPM increase.
(For your reference, The principle of the `Salinity Indicator Sensing Method' is the
one of Conductivity check of the water).
Accordingly, when there is no water flow due to system stoppage, the sensor should
be installed at the location either not to touch with collected water or removing the
collected water as below figure;
WATER WATER
SENSOR
SENSOR
(X) (O)
4) Do not installate a sensor on bottom side
Under the circumstances of system stoppage, or no
water flow inside the pipinig system, or nearly no water
existence in the system, there might be yet occurred
water
sensor
abnormal alarm (high ppm) due to ion increase, which
caused by collected water inside socket valve itself
(X) (water collection phenomenon from gravity).