Professional Documents
Culture Documents
2004 2007
t (initial) t (actual)
1. Corrosion Rate = 7.8 — 3.24
2005 2007
(Short Term) 0 — 0
0 year = #DIV/0! mm / year
time(year) between t (previous) and t (actual)
t (actual) t (min/required)
Unit : mm/yrs
Glossary:
t(actual)= The actual thickness, in milimeters, measured at the time of inspection for given location
or component.
t (min/required)= The required thickness, in milimeters, at same location or component as the t (actual) measurement,
Minimun Req.Thk. computed by the design formulas (e.g. pressure and structural) before corrosion allowance and
manufacturer's are added.
t (initial)= The thickness, milimeters, at same location or component as the t (actual) measured
at initial installation or the commencement of a new corrosion rate enviroment.
t (previous)= The thickness, milimeters, at same location or component as the t (actual) measured
during a previous inspection.
= 0.00 inches
0.12 mm
Legend:
MAWP = Design pressure/Temperature.
D= Outside diameter of pipe.
S= Allowable stress.
E= Lognitudinal weld efficiency.
Formula
4.56
2.87