Classification and
Regulatory Standards used
in Novel Design Concepts
for Deepwater
Developments
Alastair Jones
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
OUTLINE
• 20 minute presentation
• 10 minutes for questions and answers
• Content:
• Introduction
• New Build versus Conversion
• Rules and Regulations (Overview)
• LR Managed Verification Scheme (Overview)
• Technology and New Developments
• Summary
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
INTRODUCTION
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
Typical FPSO
Development
-Multiple Interfaces
Client
Hull Shipyard
Flare Tower
Turret Living quarters
Prod Water/Inj
Water/Inj..
Utilities Gas Oil Sep.
Comp.
Utilities
MOORING ARRANGEMENTS
Internal turret
mooring
Bow
mooring
Spread
mooring
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
Internal External
Riser Turret
Large Internal Turret Small Internal Turret Mooring (D)
Turret upper
slewing bearing
DEVELOPMENT ALTERNATIVES :
NEWBUILD vs CONVERSION
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
SOLAS
Permanent
Means of Access
(PMA)
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
Conoco MacCulloch
North Sea Producer -
Teesside
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
DEFINITIONS
• Class
• to Class Society Rules
• LR Rules for a Floating Offshore Installation at a Fixed
Location (FOIFL Rules)
• LR Rules for Ships
• Certification
• to Regulations and Codes
• Verification
• to Performance Standards
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
GOVERNING REGULATIONS
• Classification Rules
• Local and / or National Authority
• Some authorities require identification of Safety Critical Elements (ie.
Hull)
• SCEs then require verification by third party against Performance
Standard
• Class rules provide appropriate Performance Standard
• Flag state
• International conventions for ships
• SOLAS, MARPOL, LOADLINE, TONNAGE
• Disconnectable FPSOs effectively become ships – flag becomes relevant
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
Part 3 Regulations
Rules and
Regulations
Parts 2 to 9
Rules and
Technical Regulations
Part 2
Regulations
Part 1A
Part 1
Part 1A
ABCD
Risk Based Approach
ABCD
Part 1
Regulations
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
LR Project Manager
LR Project Deliverables
Deliver the Validation to Client’s Specification and Classification
to Equivalent Rule requirements via an integrated scheme:
Com pany L lo y d ’s R e g is te r
P r o g r e s s R e p o r ts
(P ro je c t / E n g in e e rin g M a n a g e r) P r o je c t M a n a g e r
Mo r
n it o n ito
O ve r Mo
r v ie
w
D o c s /D ra w in g s N o tific a tio n
E P IC - 1
C o -o r d in a to r D e s ig n R e v ie w
(C lie n t / C o n tra c to r C o -o r d in a to r
R e p re s e n ta tiv e )
C om m ent C om m ent
R esponse S heet R esponse S heet
(C R S ) L iv e L in k (C R S )
S e rv e r
P ro d u ce “T asks” *
T o S p e c ia lis ts
D o c s /D ra w in g s
E P IC - 2
C o -o r d in a to r
(C lie n t / C o n tra c to r R e fe r S p e c ia lis t to th e
R e p re s e n ta tiv e ) L iv e L in k D o c u m e n ts
C om m ent
R esponse S heet
(C R S ) R o u te re p lie s to a n d fr o m
a n d tr a c k v ia D o c u m e n t
* O u tlo o k T a s k s T r a c k in g S y s te m
P ro v id e tra c k in g
P ro v id e d ia ry
P ro v id e re p o rt in fo rm a tio n P ro d u c e F u ll A u d it T r a il to
C o m p le tio n o f a ll D o c s a n d
P ro v id e a le rts to o v e rru n (la te re s p o n s e ) D r a w in g s
L R V IS 1 3 5
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
Typical
Project
Validation
Work
Instruction
(VWI)
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
Service Implementation
Design Appraisal
Procurement
Main Site Survey of Fabrication
Main Site Survey of Testing and Commissioning
Installation Survey
Hook-up and Commissioning Survey
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
Service Implementation –
Design Appraisal
Work Instructions and VWIs passed to LR design appraisal specialists.
Review of ‘Main Contractor’ & Equipment Supplier’s key design
documents (Independent Analysis only performed when judged to be
required).
♦ Design analyses and primary drawings, Sample review of
schematic diagrams such as P&IDs, SLDs, Cause & Effects.
Comments detailed in Comment Response Sheets (CRS).
Monitor and report status to closeout of LR CRSs.
Advise site surveyors of status and any special instructions for survey
so that they can verify the facilities as-built.
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
Service Implementation -
Procurement Survey
Main Contractor Procurement registers and Contract PO Quality
Verification Matrix reviewed by LR to identify orders involving SCEs
LR to review ITPs for orders with SCEs for adequacy of inspection
involvement (including Classification requirements).
Identify orders where LR involvement required at source.
Any required LR design appraisal arranged with Project lead engineers.
Potential involvement for LR surveyable orders is attendance at PIM, final
testing and Document review. Cognisance taken of:
♦ 2nd party inspection activities.
♦ Code survey for pressure vessels and lifting appliances included in
this work where applicable.
Selected LR MDR review at main sites.
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
Service Implementation -
Main Fabrication Site Survey
Instructions passed to the surveyors in the form of Work Instructions and
VWIs.
Attend Pre-inspection meeting to review and mark up Main Contractor
Quality Plans and Procedures.
Survey on a sampling basis, monitoring the activities of the site QA/QC
team, against approved plans.
Attend selected tests.
♦ Hydrotests, Loop Tests, Commissioning, Cause & Effect, etc.
Review supporting documentation for free issue materials, equipment
and Main Contractors certification records.
Agree punchlist of outstanding items.
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
Typical
Anomaly
Report
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
Service Implementation –
Survey at Onshore and Offshore Project locations
Instructions passed to the surveyors in the form of Work
Instructions and VWIs.
Attend initial meeting offshore to review and mark up Main
Contractor Quality Plans and Procedures.
Survey attendance on a block visit basis, monitoring the activities
of the offshore QA/QC team. Emphasis: key stages such as
substructure installation.
Witness selected tests.
♦ Hydrotests, HUC Tests, Commissioning, Cause & Effect, etc.
Review Offshore Contractors certification records.
Agree punchlist of outstanding items and monitor to closeout.
Recommend issue of final deliverables.
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
Typical
Design
Appraisal
CRS
Lloyd’s Register: IQPC 11th Annual FPSO Congress 2010
Summary