Professional Documents
Culture Documents
Wanda Curlee
www.wandacurlee.com
neuroscience, pAcuity, playmaker, being the indirect mechanism for effort agil-
political rationality, program ity. To understand how the h uman brings
management, project discipline, the power to the project, pAcuity must be
project management, project portfolio understood. The three sides of the trian-
management, rainmaker, rockstar, gle are finance, variables, and time. Time
strategic focus is constant and is the base of the triangle.
Time cannot be accelerated or slowed.
A new management framework (Figure 1) Finance and variables will change over
will be explained in sections of this article. As the project’s life cycle. They may change
an overview, the framework’s direct mech- for the positive or the negative. pAcuity
anism is human emphasis, with pAcuity empowers the project manager to balance
finance and variables to ensure that they most commonly viewed as a triangle. The
maintain the power of the triangle. When triangle’s sides represent schedule, scope,
one or more sides fail, the project fails. and cost. Many models add quality within
One way in which pAcuity can assist is by the triangle to represent the overarching
enabling the project manager to understand need to ensure the project is delivered
how the brain works. The brain drives how within the constraints and with the neces-
humans use their own human emphasis. sary quality.
First, the project manager needs to under- There are other frameworks and models,
stand the political reality through political but they have proven to be stagnant. Whereas
rationality. There is also a need to under- the PM POWERED management framework
stand the strategic focus of the constituents accommodates advances in technology, project
and the project. Integrated reasoning helps management, and pAcuity through human
the project manager create a more creative emphasis. Technology evolves daily and, in
and innovative team, which leads to a more turn, the importance of a manager’s human
creative solution. Integrated reasoning is emphasis will become more s ignificant as
how a person processes information. Most the infusion of management practice with
individuals are either organized and detail neuroscience is embraced and a dopted. Neu-
oriented (the rockstar), holistic (the coach/ roscience provides the scientific approach,
playmaker, or influential and strategically classification, and alignment structure that
focused (the rainmaker). The framework managers need to infuse h uman emphasis
brings management into focus through (Schaufenbeul 2014).
neuroscience agility, which empowers Project management incorporates many
management professionals with the power facets of business including leadership,
of human emphasis. teams, finance, negotiations, communica-
Project management has been in ex- tion, and several other soft skills. By applying
istence since communities existed. The neuroscience via human emphasis to man-
Incas built an intricate road system. The agement, the project manager has scientific
Egyptians built vast monuments to their
backing for the methods used to advance the
dead, and King Solomon built a mighty project. Findings indicate that pushing indi-
temple. All these required planning, inte- viduals into different m anners of thinking
gration, a loose schedule, and resources. makes them more innovative and creative.
Budget was not an issue for the rich of Innovation and creativity increase the like-
these times. Money was not an object. lihood of a project which drives a program
Project management became more for- and portfolio to succeed.
malized in the 1960s with the introduction The human brain is an electrical o rgan.
of major U.S. weapon systems. This was It is relatively complex. Neuroscientists
the introduction of the cost scheduling sys- are in demand for their insights into the
tem that integrated cost and schedule to brain. Business leaders and other man-
provide a more realistic understanding of agement professionals can take advantage
the project’s status. of scientific research in neuroscience on
The Project Management Institute (PMI) how the brain functions. By studying the
has added to the knowledge needed to brain, managers can be more effective at
advance the profession of project knowl- their jobs. Stimulating the brain through
edge. One of the first standards created by positive behaviors can influence business
PMI was the Guide to the Project Manage- decisions, leadership, corporate gover-
ment Book of Knowledge, more commonly nance, risks, team building, and, as some
referred to as the PMBOK. would say, even our gut feel.
Project management continued to prog- Project managers can be viewed as
ress with the advent of the triple constraints task leaders as defined by Boyatzis et al.