You are on page 1of 19

00

CLIENTE UBICACION

ATENCION FECHA
DESCRIPCION GENERAL DEL
SERVICIO 9/18/2018

DEMOSTRACION, EXCEL PARA COSTOS


Nº DE PR
Nº SOLICITUD

DESCRIPCION DEL SERVICIO


DE NUESTRA ESPECIAL CONSIDERACIÓN: A SU SOLICITUD REMITIMOS EL PRESUPUESTO POR EL SERVICIO DESCRITO.

EL SERVICIO COMPRENDE: PROPUESTA: SUMA ALZADA


COSTO DIRECTO TOTAL: $. 1,484.54
GASTOS GENERALES FIJOS: $. 74.23
UTILIDAD : $. 44.54

TOTAL EN DÓLARES (SIN IGV) $. 1,603.31

NOTA: PRECIO OFERTADO NO INCLUYE EL IGV

LOS TRABAJOS INICIAN DENTRO DE LOS 15 DÍAS DESPUÉS DE EMITIDA LA ORDEN DE SERVICIO
TIEMPO DE ENTREGA: 15 DÍAS Calendario
VALIDEZ DE LA OFERT 10 DÍAS Hasta el 9/28/2018

CONDICIONES GENERALES DEL SERVICIO:

APROBACIÓN DE PRESUPUESTO

NOMBRE :
FECHA :
DEMOSTRACION, EXCEL PARA COSTOS
DESCRIPCION GENERAL DEL SERVICIO:

Nº SOLICITUD: Nº PR:

PRESUPUESTO

ANÁLISIS DE COSTOS UNITARIOS (S/. UNID)


COSTO SUB TOTAL
ÍTEM DESCRIPCIÓN UND METRADO MANO DE
MATERIAL EQUIPOS UNITARIO (US$)
OBRA
(US$)

01 TRABAJOS PRELIMINARES
03.01.09 CONCRETO f'c=20Mpa - Zapatas m3 4.32 S/3.07 S/340.18 S/0.39 S/343.64 S/1,484.54
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A

A Costo Directo Total (US$) 1,484.54


B Gastos Generales Fijos (US$) 5% 74.23
C Utilidades (US$) 3% 44.54
D Costo Total General (US$) (A+B+C) = D 1,603.31

Notas:
PRESUPUESTO

RECURSO UNIDAD

MANO DE OBRA
MAESTRO DE OBRA HH
OPERARIO HH
PEON HH
HH

HH
HH
HH

MATERIALES
CONCRETO f'c 20 MPA PREMEZCLADO m3

EQUIPOS
VIBRADOR DE CONCRETO 4HP 1.25" Hm

% MANO DE OBRA
Materiales Consumibles %mo
Herramientas Manuales %mo
S/. PRECIO
UNITARIO

6.720
3.730
2.770
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

283.480
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.420
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%
3%
RENDIMIENT

DESCRIPCION DEL
SERVICIO
CLIENTE 0.000 0
Nº SOLICITUD Nº PR

01 TRABAJOS PRELIMINARES
03.01.09 CONCRETO f'c=20Mpa - Zapatas

T4
Rendimiento: m3/dia 100.00 EQ: 100.00 Costo unitario por m3: 343.644
T5
Descripción Recurso Unidad Cuadrilla CantidadPrecio S/. Parcial S/.
T1 Mano de Obra
MAESTRO DE OBRA HH 0.20 0.016 6.72 0.108
OPERARIO HH 4.00 0.320 3.73 1.194
PEON HH 8.00 0.640 2.77 1.773
#N/A 0.000 #N/A #N/A
#N/A 0.000 #N/A #N/A
3.074

T2 Materiales
CONCRETO f'c 20 MPA PREMEZCLADO m3 1.200 283.48 340.176
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
Materiales Consumibles %mo 0% 3.07 0.000
340.176

T3 Equipos
VIBRADOR DE CONCRETO 4HP 1.25" Hm 1.56 0.125 2.42 0.302
#N/A 0.000 #N/A #N/A
#N/A 0.000 #N/A #N/A
#N/A 0.000 #N/A #N/A
#N/A 0.000 #N/A #N/A
#N/A 0.000 #N/A #N/A
#N/A 0.000 #N/A #N/A
#N/A 0.000 #N/A #N/A
#N/A 0.000 #N/A #N/A
#N/A 0.000 #N/A #N/A
Herramientas Manuales %mo 3% 3.07 0.092
0.394

01.02 #N/A

T4
Rendimiento: #N/A EQ: 0.00 #N/A 0.000
T5
Descripción Recurso Unidad Cuadrilla CantidadPrecio S/. Parcial S/.
T1 Mano de Obra
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
0.000

T2 Materiales
#N/A #N/A #N/A
RENDIMIENT

DESCRIPCION DEL
SERVICIO
CLIENTE 0.000 0
Nº SOLICITUD Nº PR

#N/A #N/A #N/A


#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
Materiales Consumibles %mo 0% 0.00 0.000
UN ERROR FRECUENTE ES ELIMINAR CELDAS CON #N/A Y EN ESE CASO DEBE UNICAMENTE MODIFICARSE 0.000

T3 Equipos
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
Herramientas Manuales %mo 3% 0.00 0.000
0.000

01.02 #N/A

T4
Rendimiento: #N/A EQ: 0.00 #N/A 0.000
T5
Descripción Recurso Unidad Cuadrilla CantidadPrecio S/. Parcial S/.
T1 Mano de Obra
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
0.000

T2 Materiales
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
RENDIMIENT

DESCRIPCION DEL
SERVICIO
CLIENTE 0.000 0
Nº SOLICITUD Nº PR

Materiales Consumibles %mo 0% 0.00 0.000


0.000

T3 Equipos
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
#N/A #DIV/0! #N/A #N/A
Herramientas Manuales %mo 3% 0.00 0.000
0.000
Nº DE SOLICITUD:
Nº DE SOLICITUD:
HOJA DE RECURSOS

Suma de Suma de
TIPO Descripción Recurso Unidad Precio S/.
Cantidad Parcial S/.
MANO DE OBRMAESTRO DE OBRA HH 0.07 6.72 0.46
OPERARIO HH 1.38 3.73 5.16
PEON HH 2.76 2.77 7.66
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
$ TOTAL MANO DE OBRA 4.22 #N/A 13.28

MATERIALES CONCRETO f'c 20 MPA PREMEZCLADO m3 5.18 283.48 1469.56


#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
Materiales Consumibles %mo 0.00 0.00 0.00
$ TOTAL MATERIALES 1,469.56

EQUIPOS VIBRADOR DE CONCRETO 4HP 1.25" Hm 0.54 2.42 1.30


#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
#N/A 0.00 #N/A 0.00
Herramientas Manuales %mo 0.13 0.03 0.40
$ TOTAL HM 1.70

TOTAL S/.: 1,484.54


MATERIALES / HOJA DE RECURSOS MISCELANEOS
FLETE TERRESTRE (0 - 4 TN) GLB 782.00
FLETE TERRESTRE (4 - 8 TN) GLB 1,230.00
FLETE TERRESTRE LIMA-MINA (8 - 12 TN) GLB 1,850.00
FLETE TERRESTRE LIMA-MINA (12 - A MÁS TN) GLB 2,800.00
FLETE TERRESTRE HUALLANCA-MINA (VIAJE) GLB 200.00
TRAJE TYVEK T/L DUPONT UND 4.97
PINTURA EPOXICA JET 02 COMP. + DILUYENTE (COLORES) KIT 92.00
THINER ACRILICO GLN 6.75
SEÑALETICA DE SEGURIDAD / CICA UND 22.00
LONCHERA FRIA ESPECIAL SSEE UND 5.28
DRIZA BLANCA DE 1/4 X 1 ML ML 0.75
SOGA NYLON DE 3/4" X 1 ML ML 3.37
SOGA NYLON DE 1/2" X 1 ML ML 1.45
AFLOJATODO WD-40 11 OZ UND 7.25
ELECTRODO 6011 1/8" KG 3.92
ELECTRODO 7018 1/8" KG 4.55
SOLDADURA CHAMFERCORD DE 5/32" KG 6.77
ELECTRODO INOXIDABLE 3/32" KG 24.85
DISCO DESBASTE 7" X 1/4" X 7/8" UND 2.75
DISCO DESBASTE 4-1/2" X 1/4" X 7/8" UND 1.60
DISCO DE CORTE DE 7" X 1/8" X 7/8" UND 2.52
DISCO DE CORTE DE 4-1/2" X 1/8" X 7/8" UND 1.50
SIKAGROUT 212 X 30KG BLS 42.25
CONCRELISTO 40 KG BLS 5.10
ESCOBILLA CIRCULAR 4 1/2" X 9/16 TRENZ. 20 TIPO COPA UND 6.45
TINTES PENETRANTES CANTESTO 12 ONZ. (CLEANER PENETRANT, D KIT 27.45
FIERRO CORRUGADO 3/8" X 9M UND 4.92
FIERRO CORRUGADO DE 5/8" X 9M UND 13.45
ADHESIVO SIKADUR 32 1 KG KIT 34.75
0.00

EQUIPOS / HOJA DE RECURSOS MISCELANEOS


CAMIÓN GRUA 8 TN (10 HM MIN.) HM 85.00
CAMIÓN GRUA 10 TN (10 HM MIN.) HM 90.00
CAMIÓN GRUA 16 TN (10 HM MIN.) HM 95.00
CAMIÓN GRUA 22 TN (10 HM MIN.) HM 120.00
CAMIONETA PICK UP 4 X 4 HM 7.15
COMBI 14 PSJ / NISSAN HM 6.20
CUSTER 27 PSJ / HYUNDAI HM 9.15
MAQUINA DE SOLDAR MILLER 350 XMT CC/CV HM 1.52
MAQUINA DE SOLDAR MILLER 150 STL CC/CV HM 1.05
ESMERIL ANGULAR 7" HM 0.35
ESMERIL ANGULAR 4-1/2" HM 0.25
TALADRO DE BASE MAGNETICA 1.5HP HM 0.75
TALADRO PERCUTOR GSB 20-2 RE 800W HM 0.45
ROTOMARTILLO 12 KG HM 1.15
ATORNILLADOR INALAMBRICO 1/2" DEWALT HM 0.35
PISTOLA NEUMATICA □3/4" + MANGUERA 1/2" HM 0.45
PISTOLA NEUMATICA □1" + MANGUERA 1/2" HM 0.50
COMPRESOR DE AIRE 2HP HM 0.45
ANDAMIOS LAYHER / CUERPO HM 0.95
ANDAMIOS ULMA / CUERPO HM 0.90
EQUIPO DE OXICORTE + COCHE PORTABOTELLAS HM 0.45
MALETA DE HERRAMIENTAS P/MEC HM 0.33
MALETA DE HERRAMIENTAS P/CIV HM 0.25
LAMPA / BARRETA / PICO / BUGGIE HM 0.50
NIVEL OPTICO / INGENIERO HM 1.55
ESTACIÓN TOTAL HM COTIZAR
VIBRADOR P/ CONCRETO 6.5 HP + MANGUERA 1-1/2" HM 1.85
PLANCHA COMPACTADORA 8 HP HM 2.75
GRUPO ELECTROGENO 5000 WATTS, 120/240V HM 3.25
CIERRA CIRCULAR 7" HM 0.25
MULTÍMETRO FLUKE 117 CAT III 600 V HM 0.85
PINZA AMPERIMETRICA FLUKE 375 HM 0.87
MEGOMETRO DIGITAL 5000 V 3MA, TEMPERATURA (-10-70C) HM 2.85
TRÍPODE CON TORNILLO DE BANCO DE CADENAS 1/8" - 6" HM 0.35
ROSCADORA MANUAL TARRAJA RIDGID 1/2" - 2" HM 0.30
CORTADOR DE TUBOS 1/8" A 1-1/4" HM 0.30
CORTADOR DE TUBOS 1-1/2" A 2-1/2" HM 0.32
MALETA DE HERRAMIENTAS P/ELE HM 0.00
ARNÉS DE CUERPO COMPLETO + LINEA DE VIDA DOBLE HM 0.21
RETRÁCTIL AUTOMÁTICO 10 M / ACERO HM 0.35
RETRÁCTIL AUTOMÁTICO 5 M / CINTA HM 0.30
ESCALERA TELESCOPICA 5M HM 0.22
ESCALERA TIPO TIJERA 2.5M HM 0.20
TECLE DE CADENA 1 - 3TN HM 0.25
TECLE DE CADENA 5TN HM 0.30
TECLE TIPO RACHET 1 - 3TN HM 0.25
ACCESORIOS DE IZAJES (ESLINGAS+GRILLETE) % HM 0.25
MATERIALES CONSIGNADOS EN EL PRESUPUESTO COMO MATERIALES CONSUMIBLES (No requ
inclusión en la hoja de Recursos)
MATERIALES CONSUMIBLES UNIDAD PRECIO
TRAPO INDUSTRIAL KG 1.10
GUANTES DE NITRILO MARCA TOUCH TUFF (VERDE) TALLA 8 CJA 10.20
MICA CLARA ADAPTABLE A CARETA FACIAL UND 3.47
MICA OSCURA ADAPTABLE A CARETA FACIAL UND 3.76
LUNA CLARA ADAPTABLE A CARETA DE SOLDAR UND 0.85
LUNA OSCURA Nº 11 ADAPTABLE A CARETA DE SOLDAR UND 0.87
TIZA PARA CALDERERO UND 0.28
TIZA DE YESO UND 0.22
YESO BLANCO P/OBRA KG 0.75
OCRE ROJO P/PLOMADA KG 3.97
DRIZA BLANCA DE 1/8" P/PLOMADA UND 0.33
CINTA AISLANTE 3M 1/2" RLL 3.75
CINTA TEFLON 1/2" RLL 0.37
CINTA MAKISTEN 1/2" - 3" RLL 1.22
CINTILLOS / VARIOS CTO 3.50
HOJA DE SIERRA 12" X 1/2" SANDFLEX UND 1.72
BROCA HSS <= 3/8" UND 5.35
LIJA DE FIERRO ( #s ) UND 0.80
BROCCHA TUMI 1/2" - 4" UND 8.75
PAPEL BOND A3 150G/M2 X 1/2 MILLAR UND 6.87
PAPEL BOND A4 75G/M2 X 1/2 MILLAR UND 4.00

MATERIALES CONSIGNADOS EN EL PRESUPUESTO COMO HERRAMIENTAS MANUALES (No requ


inclusión en la hoja de Recursos)
HERRAMIENTAS MANUALES UNIDAD PRECIO
CHISPERO PARA OXICORTE UND 4.00
LIMPIABOQUILLA MULTIPLE DE OXICORTE UND 2.55
BOQUILLA DE OXICORTE Nº 2, 3, 4, 5 y 6 UND 3.75
RAYADOR METÁLICO UND 0.80
FLEXÓMETRO C/N PTA MAGNETICA 5M UND 6.80
FLEXÓMETRO C/N PTA MAGNETICA 8M UND 8.25
PUNTO CENTRO 3/8" UND 4.25
COMPÁS METALICO INOX UND 16.00
LINTERNA DE MANO 350 LUMENS UND 18.22
NIVEL DE ALUMINIO 24" UND 7.80
MARTILLO DE GOMA 24 OZ UND 8.35
CALIBRADOR DE GALGAS INOX UND 25.36
HORNO ELECTRICO P/SOLD. UND 75.00
COMBA DE MANO 4 LBS UND 10.20
COMBA DE MANO DE 10 LBS UND 24.32
LLAVE DE COLA UND 2.35
PATA DE CABRA 24" UND 4.00
CANDADO DE BLOQUEO 80MM X 40MM UND 7.70
ESPATULA 1" - 4" UND 2.33
BARILEJO UND 2.00
FROTACHO DE MADERA UND 4.45
PPLA
782.00
1,230.00
1,850.00
2,800.00
200.00
4.97
92.00
6.75
22.00
5.28
0.75
3.37
1.45
7.25
3.92
4.55
6.77
24.85
2.75
1.60
2.52
1.50
42.25
5.10
6.45
27.45
4.92
13.45
34.75
0.00

PPLA
92.00
99.00
105.00
132.00
6.67
6.20
9.17
3.52
1.52
0.35
0.25
0.85
0.45
1.27
0.35
0.45
0.50
0.50
0.95
0.90
0.55
0.33
0.25
0.50
1.71
COTIZAR
2.04
3.03
3.58
0.25
0.94
0.96
3.14
0.35
0.33
0.30
0.32
0.30
0.21
0.35
0.30
0.22
0.20
0.25
0.30
0.25
0.25
NSUMIBLES (No requiere

PRECIO DE COMPRA

MANUALES (No requiere

HM
0.027
0.009
0.019
0.003
0.008
0.009
0.005
0.018
0.020
0.013
0.009
0.028
0.042
0.011
0.027
0.003
0.007
0.004
0.004
0.003