Professional Documents
Culture Documents
Note: The entries against each item below should be made in accordance wit
classification prescribed in Appendix No. 4 CPWD Code
Name of Work Name of Work: Estimate for Repair & Maintenance of Staff Quarters at
Sector-2, Sector-4, New Shimla & Vikas Nagar, Shimla
Estimate framed by Sub Divisional Engineer, Snow Hydrology Division, Central Water Commission, Sh
a probable cost of Rs. 4,26,500/- (Rupees Four Lakh Twenty Six Thousand Five Hundred) only.
REPORT
The estimate amounting to Rs. 4,26,500/- (Rupees Four Lakh Twenty Six Thousand Five Hundred) o
been framed to cover the probable expenditure on "Repair & Maintenance of Staff Quarters at Se
Sector-4, New Shimla & Vikas Nagar, Shimla".
Quarter No. 290, Block No. 18, Sector-2, New Shimla was completely abondonned, accordingly provis
repair of complete plaster, Repair of Doors, Repair of Windows, Repair of Floors, Distempering, Pa
Change of all electrical wirings & Fitting, Change of all waterline & Sanitory fittingshave been
Maintenance of this quarter for such work have not been carried out since last 6 years or more. Fitting o
Doors for 5 flats in Sector-4, New Shimla and 2 Flats in Vikas Nagar haven also been considere
surrounding floor area near Quarter No. 788, Sector-4, New Shimla was completely damaged, repalcem
the same with Cement Concrete has also been considered. Quantities have been workout from
measurement of staff quarters.
For preparation of Estimate, Rates have been taken from the DSR 2016, with a cost index of 35.29%. Ra
few items have also taken directly from open market. GST at 12% have been considered against SA
9954.
Technially sanctioned for Rs. 4,26,500/- (Rupees Four Lakh Twenty Six Thousand Five Hundred) only.
Branch: Central Water Commission
The entries against each item below should be made in accordance with the
classification prescribed in Appendix No. 4 CPWD Code
Name of Work: Estimate for Repair & Maintenance of Staff Quarters at
Sector-2, Sector-4, New Shimla & Vikas Nagar, Shimla
DETAILED HEAD
01.00.27-MW
to Rs. 4,26,500/- (Rupees Four Lakh Twenty Six Thousand Five Hundred) only has
he probable expenditure on "Repair & Maintenance of Staff Quarters at Sector-2,
Vikas Nagar, Shimla".
No. 18, Sector-2, New Shimla was completely abondonned, accordingly provision for
er, Repair of Doors, Repair of Windows, Repair of Floors, Distempering, Painting,
wirings & Fitting, Change of all waterline & Sanitory fittingshave been made.
rter for such work have not been carried out since last 6 years or more. Fitting of Steel
ctor-4, New Shimla and 2 Flats in Vikas Nagar haven also been considered. The
ear Quarter No. 788, Sector-4, New Shimla was completely damaged, repalcement of
Concrete has also been considered. Quantities have been workout from actual
arters.
ate, Rates have been taken from the DSR 2016, with a cost index of 35.29%. Rates for
en directly from open market. GST at 12% have been considered against SAC code
Prepared By
(D.R. Sharma)
Sub Divisional Engineer
Rs. 4,26,500/- (Rupees Four Lakh Twenty Six Thousand Five Hundred) only.
(H.P. Chaurasia)
Executive Engineer
State : Central Division: SHD, CWC, Shimla
ABSTRACT OF COST
Name of Work: Estimate for Repair & Maintenance of Staff Quarters at Sector-2,
Sector-4, New Shimla & Vikas Nagar, Shimla
Financial Year : 2017-18
ABSTRACT OF COST
Name of Work: Estimate for Repair & Maintenance of Staff Quarters at Sector-2, Sector-4, New Shimla &
Vikas Nagar, Shimla
Financial Year : 2017-18
Quarter No. 290, Block No. 18, Sector-2, New Shimla
Item no Description of Items Unit Quantity Rate in Rs.
4
C-6 Providing and fixing Steel door/window grills with
frame of mild steel sections, joints mitred and
welded, including fixing of necessary butt hinges,
screws & lock and applying a priming coat of
approved steel primer and two coats of
Enemmeled Paint of approved colour. (Size of
Door 1m*2.2m or lower size) - Door shall be fitted
with Steel Jali
5
C-11 Providing and fixing Ist quality ceramic glazed wall
tiles conforming to IS: 15622 (thickness to be
specified by the manufacturer), of approved
make, in all colours, shades except burgundy,
bottle green, black of any size as approved by
Engineer-in-Charge, in skirting, risers of steps and
dados, over 12 mm thick bed of cement mortar
1:3 (1 cement : 3 coarse sand) and jointing with
grey cement slurry @ 3.3kg per sqm, including
pointing in white cement mixed with pigment of
matching shade complete (Item No. 11.36 of DSR)
6
Flat No. 290 m3 0.128 7,390.80
7
C-16 Centering and shuttering including strutting,
propping etc. and removal of form for :(item-no-
5.9)
Total
Cost index @ 35.29%
Grand Total
Say Rupees
8
HD, CWC, Shimla
Amount in Rs.
3983.60
30757.32
15534.27
11012.09
1984.14
9
8370.00
20344.15
22166.45
7284.45
5561.33
10
12010.27
26040.62
947.10
1465.86
11
943.66
12
673.99
5349.71
1046.83
175475.86
61925.43
237401.29
237400.00
13
State : Central Division: SHD, CWC, Sh
Bill of Quantities
Name of Work: Estimate for Repair & Maintenance of Staff Quarters at Sector-2, Sector-4, New Shimla & Vikas Nagar, Sh
Financial Year : 2017-18
Quarter No. 290, Block No. 18, Sector-2, New Shimla
S. No. Items Factor Number Length Width Height
C-1 Dismantling old plaster or skirting raking out
joints and cleaning the surface for plaster
including disposal of rubbish to the dumping
ground within 50 metres lead (Item No-15.56)
A Drawing Room
Long Wall No. 1 1 1 4.45 2.67
Long Wall No. 2 1 1 2.63 2.67
Short Walls 1 2 2.83 2.67
Total area without deductions
Deductions
Entry Doors 0.5 1 0.71 2.04
Side Door 0.5 1 0.85 2.03
Bed Room Door 0.5 1 0.9 2
Window 0.5 1 1.56 1.12
Total deductions
Net Area of Drawing Room
B Bed Room
Long Wall 1 2 4.63 2.67
Short Wall 1 2 2.84 2.67
Total area without deductions
Deductions
Door 0.5 1 0.9 2
Window 0.5 1 1.58 1.15
Total deductions
Net Area of Bed Room
C Passage
Long Wall 1 1 1.8 2.67
Short Wall 1 2 3.08 2.67
Total area without deductions
Deductions
Kitchen Door 0.5 1 0.71 2
Toilet Door 0.5 1 0.64 2
Wooden Almirah 1 1 0.61 2.67
Total deductions
Net Area of Passage
D Toilet
14
Long Wall 1 2 2.34 2.67
Short Wall 1 2 1.22 2.67
Total area without deductions
Deductions
Door 0.5 1 0.64 2
Window 0.5 1 0.81 0.58
Tiles 1 1 6.5 1.44
Total deductions
Net Area of Toilet
E Kitchen
Long Wall 1 2 2.38 2.55
Short Wall 1 2 1.55 2.55
Total area without deductions
Deductions
Door 0.5 1 0.71 2
Window 0.5 1 0.77 1.1
Total deductions
Net Area of Kitchen
F Outside
Front Wall 1 1 6.2 2.4
Sun Shade 2 1 0.55 2.8
Side Wall 1 1 9.6 2.5
Backside Wall 1 1 3.1 2.55
Staircase top 1 1 3.1 1.02
Staircase side 1 2 1.02 0.4
Staircase front 1 1 3.1 0.4
Total area without deductions
Deductions
Entry Doors Drawing Room 0.5 1 0.71 2.04
Side Door Drawing Room 0.5 1 0.85 2.03
Window drawing Room 0.5 1 1.56 1.12
Window - Kitchen 0.5 1 0.77 1.1
Window - Toilet 0.5 1 0.81 0.58
Window - Bed Room 0.5 1 1.58 1.15
Total deductions
Net Area of Outside Walls
G Roof Plaster
Passage 1 1 1.8 3.08
Toilet 1 1 2.34 1.22
Kitchen 1 1 2.38 1.55
Total Area for plaster
15
C-2 12 mm cement plaster of mix : 1:4 (1 cement: 4
fine sand)
(Item No-13.1)
A Drawing Room
Long Wall No. 1 1 1 4.45 2.67
Long Wall No. 2 1 1 2.63 2.67
Short Walls 1 2 2.83 2.67
Total area without deductions
Deductions
Entry Doors 0.5 1 0.71 2.04
Side Door 0.5 1 0.85 2.03
Bed Room Door 0.5 1 0.9 2
Window 0.5 1 1.56 1.12
Total deductions
Net Area of Drawing Room
B Bed Room
Long Wall 1 2 4.63 2.67
Short Wall 1 2 2.84 2.67
Total area without deductions
Deductions
Door 0.5 1 0.9 2
Window 0.5 1 1.58 1.15
Total deductions
Net Area of Bed Room
C Passage
Long Wall 1 1 1.8 2.67
Short Wall 1 2 3.08 2.67
Total area without deductions
Deductions
Kitchen Door 0.5 1 0.71 2
Toilet Door 0.5 1 0.64 2
Wooden Almirah 1 1 0.61 2.67
Total deductions
Net Area of Passage
D Toilet
Long Wall 1 2 2.34 2.67
Short Wall 1 2 1.22 2.67
Total area without deductions
Deductions
Door 0.5 1 0.64 2
Window 0.5 1 0.81 0.58
Tiles 1 1 6.5 1.44
Total deductions
Net Area of Toilet
16
E Kitchen
Long Wall 1 2 2.38 2.55
Short Wall 1 2 1.55 2.55
Total area without deductions
Deductions
Door 0.5 1 0.71 2
Window 0.5 1 0.77 1.1
Total deductions
Net Area of Kitchen
F Outside
Front Wall 1 1 6.2 2.4
Sun Shade 2 1 0.55 2.8
Side Wall 1 1 9.6 2.5
Backside Wall 1 1 3.1 2.55
Staircase top 1 1 3.1 1.02
Staircase side 1 2 1.02 0.4
Staircase front 1 1 3.1 0.4
Total area without deductions
Deductions
Entry Doors Drawing Room 0.5 1 0.71 2.04
Side Door Drawing Room 0.5 1 0.85 2.03
Window drawing Room 0.5 1 1.56 1.12
Window - Kitchen 0.5 1 0.77 1.1
Window - Toilet 0.5 1 0.81 0.58
Window - Bed Room 0.5 1 1.58 1.15
Total deductions
Net Area of Outside Walls
17
C-4 Distempering with 1st quality acrylic distemper
(ready mixed) of approved manufacturer, of
required shade and colour complete, as per
manufacturer’s specification (Item No. 13.42 of
DSR) - 13.42.1 Two or more coats on new work
A Drawing Room
Long Wall No. 1 1 1 4.45 2.67
Long Wall No. 2 1 1 2.63 2.67
Short Walls 1 2 2.83 2.67
Total area without deductions
Deductions
Entry Doors 0.5 1 0.71 2.04
Side Door 0.5 1 0.85 2.03
Bed Room Door 0.5 1 0.9 2
Window 0.5 1 1.56 1.12
Total deductions
Net Area of Drawing Room
B Bed Room
Long Wall 1 2 4.63 2.67
Short Wall 1 2 2.84 2.67
Total area without deductions
Deductions
Door 0.5 1 0.9 2
Window 0.5 1 1.58 1.15
Total deductions
Net Area of Bed Room
C Passage
Long Wall 1 1 1.8 2.67
Short Wall 1 2 3.08 2.67
Total area without deductions
Deductions
Kitchen Door 0.5 1 0.71 2
Toilet Door 0.5 1 0.64 2
Wooden Almirah 1 1 0.61 2.67
1 1 1.1 2.67
Total deductions
Net Area of Passage
D Toilet
Long Wall 1 2 2.34 2.67
Short Wall 1 2 1.22 2.67
Total area without deductions
Deductions
Door 0.5 1 0.64 2
Window 0.5 1 0.81 0.58
18
Tiles 1 1 6.5 1.44
Total deductions
Net Area of Toilet
E Kitchen
Long Wall 1 2 2.38 2.55
Short Wall 1 2 1.55 2.55
Total area without deductions
Deductions
Door 0.5 1 0.71 2
Window 0.5 1 0.77 1.1
Total deductions
Net Area of Kitchen
F Outside
Front Wall 1 1 6.2 2.4
Sun Shade 2 1 0.55 2.8
Side Wall 1 1 9.6 2.5
Backside Wall 1 1 3.1 2.55
Staircase top 1 1 3.1 1.02
Staircase side 1 2 1.02 0.4
Staircase front 1 1 3.1 0.4
Total area without deductions
Deductions
Entry Doors Drawing Room 0.5 1 0.71 2.04
Side Door Drawing Room 0.5 1 0.85 2.03
Window drawing Room 0.5 1 1.56 1.12
Window - Kitchen 0.5 1 0.77 1.1
Window - Toilet 0.5 1 0.81 0.58
Window - Bed Room 0.5 1 1.58 1.15
Total deductions
Net Area of Outside Walls
G Roof area
Bed Room 1 1 4.63 2.84
Drawing Room 1 1 4.45 2.83
Passage 1 1 1.8 3.08
Toilet 1 2 2.34 1.22
Kitchen 1 2 2.38 1.55
Total Area for Roof area
19
C-5 Painting with synthetic enamel paint of
approved brand and manufacture of required
colour to give an even shade (item No. 14.54 of
DSR) - Two coats on old work
20
C-8 Providing wood work in frames of doors,
windows, clerestory windows and other frames,
wrought framed and fixed in position with hold
fast lugs or with dash fasteners of required dia &
length ( hold fast lugs or dash fastener shall be
paid for separately).
21
Wall Tiles
Kitchen
Long Wall 1 2 2.38 1.5
Short Wall 1 2 1.55 1.5
Toilet
Short Wall 1 1 0.25 1.44
Repair works
Total area of Tile work without deductions
Deductions
Kitchen Door 1 1 0.71 1.4
Net Area of wall Tiles
22
Total area of Tile work
windows
23
Division: SHD, CWC, Shimla
Quantity Unit
177.84 sqm
11.88 sqm
7.02 sqm
15.11 sqm
34.02 sqm
0.72 sqm
0.86 sqm
0.90 sqm
0.87 sqm
3.36 sqm
30.66 sqm
24.72 sqm
15.17 sqm
39.89 sqm
0.90 sqm
0.91 sqm
1.81 sqm
38.08 sqm
4.81 sqm
16.45 sqm
21.25 sqm
0.71 sqm
0.64 sqm
1.63 sqm
2.98 sqm
18.27 sqm
24
12.50 sqm
6.51 sqm
19.01 sqm
0.64 sqm
0.23 sqm
9.36 sqm
10.23 sqm
8.78 sqm
12.14 sqm
7.91 sqm
20.04 sqm
0.71 sqm
0.42 sqm
1.13 sqm
18.91 sqm
14.88 sqm
3.08 sqm
24.00 sqm
7.91 sqm
3.16 sqm
0.82 sqm
1.24 sqm
55.08 sqm
0.72 sqm
0.86 sqm
0.87 sqm
0.42 sqm
0.23 sqm
0.91 sqm
4.03 sqm
51.06 sqm
5.54 sqm
2.85 sqm
3.69 sqm
12.09 sqm
177.84 sqm
25
177.84
11.88 sqm
7.02 sqm
15.11 sqm
34.02 sqm
0.72 sqm
0.86 sqm
0.90 sqm
0.87 sqm
3.36 sqm
30.66 sqm
24.72 sqm
15.17 sqm
39.89 sqm
0.90 sqm
0.91 sqm
1.81 sqm
38.08 sqm
4.81 sqm
16.45 sqm
21.25 sqm
0.71 sqm
0.64 sqm
1.63 sqm
2.98 sqm
18.27 sqm
12.50 sqm
6.51 sqm
19.01 sqm
0.64 sqm
0.23 sqm
9.36 sqm
10.23 sqm
8.78 sqm
26
12.14 sqm
7.91 sqm
20.04 sqm
0.71 sqm
0.42 sqm
1.13 sqm
18.91 sqm
14.88 sqm
3.08 sqm
24.00 sqm
7.91 sqm
3.16 sqm
0.82 sqm
1.24 sqm
55.08 sqm
0.72 sqm
0.86 sqm
0.87 sqm
0.42 sqm
0.23 sqm
0.91 sqm
4.03 sqm
51.06 sqm
5.54 sqm
2.85 sqm
3.69 sqm
12.09 sqm
177.84 sqm
165.75 sqm
12.09 sqm
177.84 sqm
27
11.88 sqm
7.02 sqm
15.11 sqm
34.02 sqm
0.72 sqm
0.86 sqm
0.90 sqm
0.87 sqm
3.36 sqm
30.66 sqm
24.72 sqm
15.17 sqm
39.89 sqm
0.90 sqm
0.91 sqm
1.81 sqm
38.08 sqm
4.81 sqm
16.45 sqm
21.25 sqm
0.71 sqm
0.64 sqm
1.63 sqm
2.94 sqm
5.92 sqm
15.34 sqm
12.50 sqm
6.51 sqm
19.01 sqm
0.64 sqm
0.23 sqm
28
9.36 sqm
10.23 sqm
8.78 sqm
12.14 sqm
7.91 sqm
20.04 sqm
0.71 sqm
0.42 sqm
1.13 sqm
18.91 sqm
14.88 sqm
3.08 sqm
24.00 sqm
7.91 sqm
3.16 sqm
0.82 sqm
1.24 sqm
55.08 sqm
0.72 sqm
0.86 sqm
0.87 sqm
0.42 sqm
0.23 sqm
0.91 sqm
4.03 sqm
51.06 sqm
13.15 sqm
12.59 sqm
5.54 sqm
5.71 sqm
7.38 sqm
44.37 sqm
207.19 sqm
29
3.80 sqm
3.19 sqm
3.96 sqm
3.12 sqm
2.82 sqm
6.46 sqm
3.58 sqm
4.43 sqm
0.87 sqm
0.91 sqm
0.42 sqm
0.23 sqm
1.75 sqm
1.82 sqm
0.85 sqm
0.47 sqm
38.68 sqm
50.00 kg
50.00 kg
100.00 kg
1.45 sqm
1.73 sqm
2.84 sqm
2.56 sqm
8.57 sqm
30
0.08 cum
0.08 cum
0.05 cum
0.04 cum
0.26 cum
0.98 sqm
1.04 sqm
0.42 sqm
0.19 sqm
2.63 sqm
1.17 cum
31
7.14 sqm
4.65 sqm
0.36 sqm
0.30 sqm
12.45 sqm
0.99 sqm
11.46 sqm
1.34
0.85
1.39
0.85
0.46
0.27
0.29
5.44 sqm
0.11 sqm
0.13 sqm
0.27
0.27 sqm
0.77 sqm
4.67 sqm
16.13 sqm
12.59 sqm
13.15 sqm
5.54 sqm
3.69 sqm
2.85 sqm
32
37.83 sqm
4 Numbers
33
State : Central Division: SHD, CWC, Shimla
Name of Work: Estimate for Repair & Maintenance of Staff Quarters at Sector-2, Sector-4, New Shimla & Vikas Nagar,
Shimla
Financial Year : 2017-18
Quarter No. 290, Block No. 18, Sector-2, New Shimla
Item no Description of Items unit Quantity Rate in Rs.
E-1 Wiring for light point/ fan point/ exhaust fan point/ call bell No. 21.00 548.00
point with 1.5 sq.mm FRLS PVC insulated copper conductor
single core cable in surface / recessed medium class PVC
conduit, with modular switch, modular plate, suitable GI
box and earthing the point with 1.5 sq.mm FRLS PVC
insulated copper conductor single core cable etc. as
required.(Item-No-1.10)
E-2 Wiring for light/ power plug with 2X4 sq. mm FRLS PVC m 58.00 168.00
insulated copper conductor single core cable in surface/
recessed medium class PVC conduit alongwith 1 No. 4 sq.
mm FRLS PVC insulated copper conductor single core cable
for loop earthing as required. (Item-No-1.12))
Amount in Rs.
11508.00
9744.00
826.00
798.00
1071.00
5340.00
29287.00
10335.38
39622.38
39600.00
State : Central Division: SHD, CWC, Shimla
Name of Work: Estimate for Repair & Maintenance of Staff Quarters at Sector-2, Sector-4, New Shimla & Vikas
Nagar, Shimla
Drawing Room
Light point 3
TV 1
Door bell 1
Additional points 2
Bed Room
Light point 2
TV 1
Additional 2
Kitchen
Light point 1
Exhaust Fan point 1
Additional points. 2
Toilet
Light point 1
Exhaust Fan point 1
Additional points. 1
Passage
Light point 1
Additional 1
Total No of points 21
E-2 Wiring for light/ power plug with 2X4 sq. mm FRLS PVC
insulated copper conductor single core cable in surface/
recessed medium class PVC conduit alongwith 1 No. 4 sq.
mm FRLS PVC insulated copper conductor single core cable
for loop earthing as required. (Item-No-1.12))
Bed Room
power point 2 13 26.00
Drawing Room
power point 2 6.5 13.00
Kitchen
power point 2 6 12.00
Toilet
power point 1 7 7.00
Drawing Room
power point 2
Kitchen
power point 2
Toilet
power point 1
Total 7
15/16 A switch.(item-no-1.24.3) 7
Bed Room
power point 2
Drawing Room
power point 2
Kitchen
power point 2
Toilet
power point 1
Total 7
Drawing Room
power point 2
Kitchen
power point 2
Toilet
power point 1
Total 7
Unit
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
meter.
meter.
meter.
meter.
meter.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
State : Central Division: SHD, CWC, Shimla
ABSTRACT OF COST
Name of Work: Estimate for Repair & Maintenance of Staff Quarters at Sector-2, Sector-4, New Shimla &
Vikas Nagar, Shimla
Financial Year : 2017-18
Quarter No. 290, Block No. 18, Sector-2, New Shimla
Item no Description of Items Unit Quantity Rate in Rs.
S-1 Providing and placing on terrace (at all floor levels) per-litre 1000.00 7.25
polyethylene water storage tank, ISI : 12701 marked,
with cover and suitable locking arrangement and
making necessary holes for inlet, outlet and overflow
pipes but without fittings and the base support for
tank.(Item-No-18.48)
W.C. pan with ISI marked white solid plastic seat and No. 1 4593.75
lid(Item-No-17.3.1)
S-6 Providing and fixing C.P. brass long body bib cock of
approved quality conforming to IS standards and
weighing not less than 690 gms. Item No. 18.51.1
Sub total
Cost index @ 35.29%
Grand Total
Say Rupees
Division: SHD, CWC, Shimla
ABSTRACT OF COST
Amount in
Rs.
7250.00
5488.38
3486.95
2186.25
4593.75
2298.55
1970.2
27274.08
9625.02
36899.10
36900.00
State : Central Division: SHD, CWC, Shimla
Name of Work: Estimate for Repair & Maintenance of Staff Quarters at Sector-2, Sector-4, New Shimla & Vikas
Nagar, Shimla
Toilet
point at WC 1 5.5 5.50
point at wash basin. 2 5.5 11.00
Total length of (16mm) pipe. 19.88
W.C. pan with ISI marked white solid plastic seat and 1
lid(Item-No-17.3.1)
15 mm nominal bore 4
Division: SHD, CWC, Shimla
l of Quantities (Electrical)
Unit
No.
meter.
meter.
meter.
meter.
meter.
No.
No.
No.
No.
State : Central Division: SHD, CWC, Shimla
Name of Work: Estimate for Repair & Maintenance of Staff Quarters at Sector-2, Sector-4, New Shimla &
Vikas Nagar, Shimla
Steel Doors in Flat No. 772, 773, 784,785, Block No. kg 350.00 83.70 29295
51 and Flat No. 751, Block No. 50, Set No. 10, Block
-C 42, & Set No. 12A, Block No. B-41-C, Vikas Nagar,
Shimla
C-21
Total 49439.19
Cost index @ 35.29% 17447.09
Grand Total 66886.28
Say Rupees 66900.00
State : Central
Name of Work: Estimate for Repair & Maintenance of Staff Quarters at Sector-2, Sector-4, New Shimla & Vikas Nagar, Sh
Financial Year : 2017-18
Flate No. 772, 773, 784,785, Block No. 51 and Flat No. 751, Block No. 50, Flat No. Quarter No. 788, Block No. 47, Sector-4
No. 10, Block -C 42, Se No. 12A, Block No. B-41-C, Vikas Nagar, Shimla
Total
C-6 Providing and fixing Steel door/window grills with frame of mild
steel sections, joints mitred and welded, including fixing of
necessary butt hinges, screws & lock and applying a priming
coat of approved steel primer and two coats of Enemmeled
Paint of approved colour. (Size of Door 1m*2.2m or lower size) -
Door shall be fitted with Steel Jali
Steel Doors
Flat-No-751 (Entry door) 1
Flat-No-784 (Entry door) 1
Flat-No-785 (Entry door) 1
Flat-No-772 (Entry door) 1
Flat-No-773 (Entry door) 1
Set no. 10, Block -C 42, Vikas Nagar 1
Quater-no-12A, Block-no-B-41-C , 1
Backside grill- Flat-No-773
L section (30x30x4) @1.8kg/m 1 37.84
T section (30x30x4) @1.77kg/m 1 35.28
Flat section (30x4) @0.942kg/m 1 15.88
Total weight of steel used.
No. 788, Block No. 47, Sector-4, New Shimla & Set
2.52 20.01 m2
1 2 14.00 m3
34.01 m2
50.00 Kg
50.00 Kg
50.00 Kg
50.00 Kg
50.00 Kg
50.00 Kg
50.00 Kg
68.112 Kg
62.50 Kg
15.00 Kg
495.61 Kg
2.52 20.01 m2
Rate of GST
9954 Services provided to the 12 9/21/2017
Central Government, State
Government, Union
Territory, a local authority or
a governmental authority or
government entity by way of
construction, erection,
commissioning, installation,
completion, fitting out,
repair, maintenance,
renovation, or alteration of –
(i) an educational
(ii) a clinical, or(iii) an art or
cultural establishment; or