900
800
700
600
No. of Structures
500
1945‐1972
400
1973‐1982
1983‐2009
300
200
100
15%
30%
25%
30%
60
60
50 47
40
40
30
20 14
8 7 7
10
2 3 3 2 3 3 2
0
1948 1961 1964 1965 1969 1974 1979 1985 1992 2002 2004 2005 2005 2008 2008
Year
1.20E-03
1.00E-03 1.00E-03
R
RSR =
1.00E-03
Annual Failure P robability
S 8.00E-04
RSR = 4.00E-04
2.00E-04
S100 2.00E-04
1.00E-05
0.00E+00
Stiff, 2009 Stiff, 2009 Stahl, et.al., THIC, 1992 Stahl, 1986 ISO 19901-2, ISO 19902,
2000 2004 2008
Source
SIM and RBI – Recent Developments
SNAME Texas Section Meeting, 08 December 2009
© Det Norske Veritas AS. All rights reserved. 8
Platform Structural Analysis
Load exposure
Characteristic Characteristic
Load Resistance
Resistance Mean
Resistance
Probability Density
Factor
Mean
Load Load
Factor
SIM Process
Hazard Evaluation and
Company Risk Assessment Contingency
Policy Plans
Develop Integrity
Management Plan (IMP) for
Structure / System
Findings
Actions
Plan survey
Inspect
Do follow-up
actions Inspect
Evaluate Record
findings findings
Maintain
Plan follow up
actions
Condition
Evaluation
Condition evaluations
(sections and components)
Action plans
Activities plan Inspection plan
0
1.0E-04 1.0E-03 1.0E-02 1.0E-01
SIM and RBI – Recent Developments Target Failure Probability Level
SNAME Texas Section Meeting, 08 December 2009
© Det Norske Veritas AS. All rights reserved. 18
Key Concepts
Consequence of
RISK = Probability of Failure X Failure
GFF X Item DF
International Classification
Maritime Societies
Organization
Rules
Rules
Classification of Mobile
MODU Code Offshore Units
Step 3
Risk Control Options
Step 4
Cost Benefit Assessment
Management
System
Engineering judgement
Tolerable
region
Risk criteria
Broadly acceptable
Cost-benefit analysis region
Company values
SIM and RBI – Recent Developments
SNAME Texas Section Meeting, 08 December 2009
© Det Norske Veritas AS. All rights reserved. 24
Quantitative Methods
Weather Outcome
Historical data analysis
Severe 50% fatalities
Fault tree analysis 0.01
Calm 5% fatalities
Risks and uncertainties 0.5
Severe
Calm 5%
26%
Rough
28%
Moderate
41%
SIM and RBI – Recent Developments
SNAME Texas Section Meeting, 08 December 2009
© Det Norske Veritas AS. All rights reserved. 25
Influences on Technique Selection
Decision context
Lifecycle stage
Major hazard potential
Novelty/non-standard Techniques
Uncertainty Practicality
Views/perceptions Strengths and
weaknesses
Good practice
Efficiency
Traditional RBI
Inspection based on experience and
Inspection based on experience
systematic (risk) review
(usually by previous
failures/breakdowns) Inspection effort driven by “risk”, i.e.
likelihood of failure and consequences
Inspection effort driven by of failure
“likelihood of failure” Pro-active planning and execution of
inspections
Reactive “fire fighting”, running
behind the ball Systematic identification of appropriate
NDT techniques
Use of appropriate / Inappropriate
NDT techniques
S i n g l e c o m p o n e n t c o n si d d e r e d ; D e si g n l i v e = 2 0 y r
1 . 0 E -0 2
Failure probability
1 . 0 E -0 3
1 . 0 E -0 4
1 . 0 E -0 5
1 . 0 E -0 6
0 2 4 6 8 10 12 14 16 18 20
S e rv ic e tim e in y e a rs
SIM and RBI – Recent Developments
SNAME Texas Section Meeting, 08 December 2009
© Det Norske Veritas AS. All rights reserved. 28
RBI Investment and Savings
$800,000
$675,000
$700,000
$600,000 $550,000
$600,000
$500,000
$500,000
$400,000
$400,000
$250,000
$300,000
$200,000
$50,000 $85,000 $65,000
$100,000
$0
RBI Inspect Prod RBI Inspect Prod RBI Inspect Prod
Study & Maint Cost Study & Maint Cost Study & Maint Cost
Invest Savings Savings Invest Savings Savings Invest Savings Savings
Chemical Plant - 200 Refinery - 35 Refinery - 50
Pressure Vessels Pressure Vessels Pressure Vessels
Subsidence of seabed/
Possible WiD Objective – Reassessment of Jacket Platforms:
To
Todocument
documentsafe useuse
safe untiluntil
end of production
end of production
Deck
Date for change in platform operation
(from
Datemanned
for change in platform operation
to unmanned)
Strength
(from manned to unmanned)
Establish evacuation criteria
Cost and scheduling of structural mitigation
Cost and scheduling of structural mitigation
Fatigue strength & Foundation
Inspection planning
Inspection planning
capacity
Large amount
of
information
SIM and RBI – Recent Developments
SNAME Texas Section Meeting, 08 December 2009
© Det Norske Veritas AS. All rights reserved. 43
Some Challenges
Wave-in-deck-load (WiD) and load on jacket (WoJ) and variation with time
90 90
Fx - Total (inc. "jet" effect)
80 Fx - WoJ (incl. "jet" effect) 80
40 40
Fx (MN)
Fz (MN)
30 30
20 20
10 10
0 0
2.2 2.7 3.2 3.7 4.2 4.7 5.2 5.7 6.2 6.7 7.2 7.7 8.2 8.7 9.2 9.7
-10 -10
-20 -20
-30 -30
Time (sec)
Dynamic behavior
delta
P - Rise time for wave-in-deck load coincide with one quarter of platform
lowest eigenperiod
Elastic
flexibility
Detailed work
Evaluation of
Managed system Overall inspection scopes for
structural integrity
for archive and philosophy & inspection
and fitness for
retrieval of SIM strategy and activities and
purpose;
data and other criteria for in- offshore execution
development of
pertinent records service inspection to obtain quality
remedial actions
data
Initiator No
Data Evaluation Strategy Program
Triggered
Yes
Assessment
Alternative
Methods
(see 7.8)
Mitigation
And Risk
Assessment
Document
(see 4.2)
1. Includes
platforms located in the associated Transition Regions. The 100-year
return period metocean conditions as defined in API RP2 MET should be
used to compute the RSR.
20th Ed. Other U.S. Offshore Areas
Assessment Category Reserve Strength Ratio (RSR)
www.dnv.com