Professional Documents
Culture Documents
SYSTEM FAILURE.
UNIT EMRGENCY ACTION PLAN FCB Fail with System Failure
TEAM MEMBERS
OEE (3 NOs) Symbol ESS/MSS (3) Symbol USFSS (4) Symbol Others (2) Symbol
OE (Turbine) OE (T) ES/MS (Turbine) ES (T) Turbine US (T) NVQ (1) N (1)
OE (Bolier) OE (B) ES/MS (Boiler) ES (B) Boiler US (B) NVQ (2) N (2)
05 Check & confirm the generator output breaker is open. OE (T), ES (E)
06 Otherwise manualy open it. OE (T), ES (E)
07 Check & confirm 6kV section power breaker is open. OE (T), ES (E)
08 Otherwise manualy open it. OE (T), ES (E)
09 Check & confirm the field suppression breaker is open. OE (T), ES (E)
10 Otherwise manualy open it. OE (T), ES (E)
OEE (3 NOs) Symbol ESS/MSS (3) Symbol USFSS (4) Symbol Others (2) Symbol
OE (Turbine) OE (T) ES/MS (Turbine) ES (T) Turbine US (T) NVQ (1) N (1)
OE (Bolier) OE (B) ES/MS (Boiler) ES (B) Boiler US (B) NVQ (2) N (2)
Check & Confirm that the power for valves & dampers of
38 turbine side & boiler side are supplied by emergency OE (E), ES (E)
power.