ACTION PLAN FOR ANTI-ACCIDENT MANEUVER OF UNIT OPERATION ON

SYSTEM FAILURE.
UNIT EMRGENCY ACTION PLAN FCB Fail with System Failure
TEAM MEMBERS

OEE (3 NOs) Symbol ESS/MSS (3) Symbol USFSS (4) Symbol Others (2) Symbol

OE (Turbine) OE (T) ES/MS (Turbine) ES (T) Turbine US (T) NVQ (1) N (1)
OE (Bolier) OE (B) ES/MS (Boiler) ES (B) Boiler US (B) NVQ (2) N (2)

OE (ESP/FGD) OE (E) ES (ESP) ES (E) Electrical US (E)


CW Intake US (CW)

Actions – Operations Related to Electrical.


Finish /
Action / Description Responsibility OK
Remarks

01 Confirm from the OE (GIS) about incident. OE (T)


02 Inform situation to the system. OE (T)
03 Then inform System about our requirement (eg. FCB) OE (T)
04 Line restoration by communicating with system control OE (GIS)

05 Check & confirm the generator output breaker is open. OE (T), ES (E)
06 Otherwise manualy open it. OE (T), ES (E)
07 Check & confirm 6kV section power breaker is open. OE (T), ES (E)
08 Otherwise manualy open it. OE (T), ES (E)
09 Check & confirm the field suppression breaker is open. OE (T), ES (E)
10 Otherwise manualy open it. OE (T), ES (E)

When Diesel Generator start automatically;


11 Arrange to locally check the diesel generator. ES(E), US(E)
12 Check emergency power section. OE (E)
13 Check DC system & UPS system operates normally. OE (E), ES (E)
14 Monitor the fuel oil level of the diesel generator. ES(E), US(E)

When Diesel Generator is not started automatically;


15 Press the button on operation console to start DG. OE (E)
If it is not started, start it on the DG operation diagram
16 OE (E)
in DCS immediately.
If again fail; make arrangements to confirm that the
17 incoming switch on section A & B are open in OE (E), ES (E)
emergency power section, if not manualy open them.
18 Then turn knob on the DG control panel to “manual” OE (E), ES (E)
19 Then start the Diesel Generator. OE (E), ES (E)
UNIT EMRGENCY ACTION PLAN FCB Fail with System Failure
TEAM MEMBERS

OEE (3 NOs) Symbol ESS/MSS (3) Symbol USFSS (4) Symbol Others (2) Symbol

OE (Turbine) OE (T) ES/MS (Turbine) ES (T) Turbine US (T) NVQ (1) N (1)
OE (Bolier) OE (B) ES/MS (Boiler) ES (B) Boiler US (B) NVQ (2) N (2)

OE (ESP/FGD) OE (E) ES (ESP) ES (E) Electrical US (E)


CW Intake US (CW)

Actions – Operations Related to Electriclal. cntd


Finish /
Action / Description Responsibility OK
Remarks

When the voltage & frequency shown on the outgoing


swtich panel is 400V & 50Hz respectively, turn the
20 OE (E), ES (E)
outgoing swtich to “manual” & close it by pushing “Close”
Button.
Then confirm whether the backup incoming switch on
21 OE (E), ES (E)
emergency section A & B is closed.
Otherwise turn the relevant switch to “Loacal” & manualy
22 EE (E)
close emergency section A & B.
23 Finally check the voltage on emergency section A & B. EE (E)

24 Again arrange to locally check the diesel generator. ES(E), US(E)


25 Check emergency power section. OE (E)
26 Check DC system & UPS system operates normally. OE (E), ES (E)
27 Monitor the fuel oil level of the diesel generator. ES(E), USFS (E)

Check whether the switches of power suplly for each 6kV


28 OE (E), ES (E)
motors in 6kV room are open.
29 Otherwise open all breakers in manually. OE (E), ES (E)
30 Power switch of ID Fan A & B. OE (E), ES (E)
31 Power switch of FD Fan A & B. OE (E), ES (E)
32 Power switch of PA Fan A & B. OE (E), ES (E)
33 Power switch of Mill A, B, C, D & E. OE (E), ES (E)
34 Power switch of BFP A, B & C. OE (E), ES (E)
35 Power switch of Condensate pump A & B. OE (E), ES (E)
36 Power switch of CCCW pump A & B. OE (E), ES (E)
37 Power switch of OCCW pump A & B. OE (E), ES (E)

Check & Confirm that the power for valves & dampers of
38 turbine side & boiler side are supplied by emergency OE (E), ES (E)
power.