You are on page 1of 19

WHITE

LINE

WHITE
LINE
ONE
WAY CAR PARKING CAR PARKING CAR PARKING

WHITE LINE

1 2 3 4 5 6 7 8 9
ONE WAY ONE WAY

CABLE STREET WHITE LINE

Canopy Above
Canopy

Sta
Above
ENTRY 2

ff E
ntry
ENTRY 1

Wind A
Lobby
Wind Furniture Store (under Escalators)
Lobby
B

Line of Floor Over


+2.650 CC Lift Egress
Stair 02

BB Structure and general A


MUSEUM paint finish to Museum Potential Museum

er
BB Structure and External
LOBBY Lobby Walls and Ceilings Scope as hatched

or Ov
Finish to Lobby Walls Void Over CC Lift
in Hatched Area (Special (TMML Fitout)
B

of Flo
Finishes TMML Scope)
Line of Floor Over Signage / Information
C

Line
Glass Wall to shop

op
sh

Glass doors to shop


PUBLIC TOILETS Goods Lift 1

to
(SHARED) Line of Bridge Over CONVENTION
Seismic Gap

s
or
BB Escalator REGISTRATION

do
ss
BB Walls

Line of Floor Over


la
G
RETAIL SHOP

Canopy Above
TMML Scope ALL INTERIOR WORKS TO SHOP IS TMML SCOPE Loading Dock
COMMS Room PUBLIC TOILETS
& Sick Room (SHARED)
Cafe D
Kitchen

Sign in
Glass Wall to shop
-- TMML Fitout BB Floor Finish

STAFF TOILETS
to Cafe (to match Lobby) Goods
Lift 4
TICKETING LOBBY

+2.650 Goods
Museum
Lift 3
BB Structure and External Lifts
Finish to Lobby Walls
CAFE +2.650 Goods
(Covered Courtyard) Lift 2
E

TORY STREET
Gl
as
sW

BB Lifts and Enclosure Walls Staff Entry

LANE
all
to

BB Slab Level Change


sh

(All Infill Floor to Rear of


op

PROPOSED LANE
Sets is TMML Scope)
10
r
ve

PROPOSED
+2.650
11 rO
loo Lift #1
ofF
Line F

TMML Scope Lift


TMML Scope Stair
ALL INTERIOR WORK TO MUSEUM IS TMML SCOPE
Ramp
FIRE & HYDRAULIC

M U S E U M V O L U M E
SERVICES

Line of Floor Over


G

Canopy Above
+2.100

+2.100
Seismic Gap
BB Structure, Fire rating
and External Finish to
Lobby Walls (Unfinished
Wind Interior)
Lobby

H
ENTRY 3

J
Scope of Works Key:
12
Base Build Scope (BB)
Canopy Above
NEW DROP OFF LANE TMML Scope (General)
ONE
WAY
2 3 4 5 6 7 8 9
TMML Scope (Lifts & Stairs)

BB Temporary Railing to Edge


WHITE

M U S E U M S C O P E - S HE L L O NL Y
LINE

BB Fire Separation to Edge


WHITE
LINE
TMML Scope Fire Separation
WHITE LINE

PRELIMINARY
(Wall or Fire Curtains) DESIGN
ONE WAY

WAKEFIELD STREET W

Ground (Level 1) Plan -


Development Agreement
MACC
A r c hit ec t s
Ur ban Designer s
Int e r io r D e s i g n e r s Scope
Scale: 1:400, 1:200 Orig. Size: A3
L a n d s c a p e A r c hit ec t s
Drawing No. Job No.:
Level 2
74 C ub a St
T EL : 64 4 8 02 5 4 4 4
FA X : 64 4 8 02 5 4 4 6 CONFIDENTIAL 2130
P.O. B o x 11- 5 17 www.studiopacific.co.nz
W e l l i n g t o n , N Z email: architects@studiopacific.co.nz DA-01 Revision: B
© Studio of Pacific Architecture Limited 2017 Printed: 16/01/18,4:14 PM CAD Ref:2130_20170926_MACC_TMML_2018_Drawings.
1 2 3 4 5 6 7 8 9

Canopy Canopy Below


Above

Void Over Entry


A
+7.100

Convention Escalators B

ir 01
ss Sta
BB Fire Curtains/ Void Over Convention Foyer
Lift Egress
Separation to
Shaft Stair 02

Egre
Void Over Foyer Mezzanine (Final Line of Void Over
locations tbc)

C
Bridge
BB Fire Curtains/
Separation to Goods Lift 1
Mezzanine (Final
locations tbc) BB Structure, Fire rating
+7.100 and External Finish to +7.100
Lobby Walls (Unfinished
Interior)

Canopy Below
Egre
s
Stair s TMML Scope Void Over Foyer TMML Scope Toilets
01
COMMS Room
D
TMML Scope Toilets
BB Escalator
-- Goods
BB Escalator
Lift 4
BB Walls
ALL INTERIOR WORK TO MUSEUM IS TMML SCOPE
Goods

UP
Lift 3

Lift #2 Museum BB Lifts and Enclosure Walls Goods


Glazed Roof Over Lifts Lift 2
Cafe Below
E
Louvred Air Intake

TMML Scope Lift


+7.100 TMML Scope
LOBBY

COMMS Room
AHU

TMML Scope Stair


M U S E U M V O L U M E

10 PLANTROOM

+8.100
11 Lift #1
F

Plant for TMML TMML Scope Lift


Exhibits
TMML Scope Stair

GROUND & L1
AHU BB Plant
BB Floor with Temporary
Edge railing only.
(TMML Fitout Walls to Mezzanine
Edge within Museum Incl Fire
Separation requirements)
G
VOID

BB Structure, Fire rating


Void to Lobby
and External Finish to
Lobby Walls (Unfinished
Interior)

Egress Stair 03

Void over
Entry H

J
Scope of Works Key:
12
Base Build Scope (BB)
Canopy Below

TMML Scope (General)


2 3 4 5 6 7 8 9
TMML Scope (Lifts & Stairs)

BB Temporary Railing to Edge


1 Plan | Level 2
SCALE 1:400 M U S E U M S C O P E - S HE L L O NL Y BB Fire Separation to Edge

TMML Scope Fire Separation


PRELIMINARY
(Wall or Fire Curtains) DESIGN

LEVEL2 Plan - Development


Agreement Scope
MACC
A r c hit ec t s
Ur ban Designer s
Int e r io r D e s i g n e r s
L a n d s c a p e A r c hit ec t s Scale: 1:400, 1:200 Orig. Size: A3
Drawing No. Job No.:
Level 2
74 C ub a St
T EL : 64 4 8 02 5 4 4 4
FA X : 64 4 8 02 5 4 4 6 CONFIDENTIAL 2130
P.O. B o x 11- 5 17 www.studiopacific.co.nz
W e l l i n g t o n , N Z email: architects@studiopacific.co.nz DA-02 Revision: B
© Studio of Pacific Architecture Limited 2017 Printed: 16/01/18,4:14 PM CAD Ref:2130_20170926_MACC_TMML_2018_Drawings.
1 2 3 4 5 6 7 8 9

Canopy Below

B
Landing

Egress
Lift
Stair 02
TMML Scope Toilets Shaft

C
Line of Floor Over

TMML Scope COMMS Room Goods Lift 1

BB Floor with Temporary


Edge railing only.

Line of Floor Over


(TMML Fitout Walls to Mezzanine
Edge within Museum Incl Fire
Separation requirements)
TMML Scope Lift TMML Scope Toilets

Canopy Below
-- Egress Stair 01
Goods
BB Escalator Lift #5
TMML Scope Lift BB Walls Lift 4
Lift #3 TMML Scope Stairs

Goods

UP
Lift 3

Line of Floor Over


Lift #2 Museum BB Lifts and Enclosure Walls Goods
Lifts Lift 2
E
Void to below TMML Scope
COMMS Room
M U S E U M V O L U M E
TMML Scope Lift
ver TMML Scope Lift TMML Scope Stair
orO
f Flo ve
r
10 eo rO
Lin loo +11.700
ofF
Line Lift #6
11
F

Line of Floor Over

TMML Scope Toilets


ALL INTERIOR WORK TO MUSEUM IS TMML SCOPE

TMML Scope Lift

Egress Stair 03

H
Lift #4

J
Scope of Works Key:
12
Base Build Scope (BB)
Canopy Below

TMML Scope (General)


2 3 4 5 6 7 8 9
TMML Scope (Lifts & Stairs)

BB Temporary Railing to Edge


1 Plan | Level 3
SCALE 1:400 M U S E U M S C O P E - S HE L L O NL Y BB Fire Separation to Edge

TMML Scope Fire Separation


PRELIMINARY
(Wall or Fire Curtains) DESIGN

LEVEL 3 Plan - Development


Agreement Scope
MACC
A r c hit ec t s
Ur ban Designer s
Int e r io r D e s i g n e r s
L a n d s c a p e A r c hit ec t s Scale: 1:400, 1:200 Orig. Size: A3
Drawing No. Job No.:
Level 2
74 C ub a St
T EL : 64 4 8 02 5 4 4 4
FA X : 64 4 8 02 5 4 4 6 CONFIDENTIAL 2130
P.O. B o x 11- 5 17 www.studiopacific.co.nz
W e l l i n g t o n , N Z email: architects@studiopacific.co.nz DA-03 Revision: B
© Studio of Pacific Architecture Limited 2017 Printed: 16/01/18,4:14 PM CAD Ref:2130_20170926_MACC_TMML_2018_Drawings.
1 2 3 4 5 6 7 8 9

Opening Canopy Below

+16.700 A

Convention Escalators Void Egress


TMML Scope COMMS Room Lift
Shaft Stair 02

Goods Lift Shaft

+16.700
VOID

BB Plant
+16.700
BB Plant Enclosure TMML
MSB
TMML Scope Plant
VOID
D

Canopy Below
-- Egress Stair 01
Goods
BB Escalator BB Stair
TMML Scope Lift BB Walls (Fire egress) Lift 4
Lift #3 Plantroom
TMML Scope Stair (Over Kitchen)
Goods

UP
Lift 3

Museum BB Lifts and Enclosure Walls Goods


Lifts Lift 2
E

M U S E U M V O L U M E
TMML Scope Lift
+15.500 TMML Scope Stair

10
Lift #6
11
F
ALL INTERIOR WORK TO MUSEUM IS TMML SCOPE
VOID

BB Floor with Temporary


Edge railing only.
(TMML Fitout Walls to Mezzanine
Edge within Museum Incl Fire
Separation requirements)
G

TMML Scope Lift

Egress Stair 03

H
Lift #4

J
Scope of Works Key:
12
Base Build Scope (BB)
Canopy Below

TMML Scope (General)


2 3 4 5 6 7 8 9
TMML Scope (Lifts & Stairs)

BB Temporary Railing to Edge


1 Plan | Level 4
SCALE 1:400 M U S E U M S C O P E - S HE L L O NL Y BB Fire Separation to Edge

TMML Scope Fire Separation


PRELIMINARY
(Wall or Fire Curtains) DESIGN

LEVEL 4 Plan - Development


Agreement Scope
MACC
A r c hit ec t s
Ur ban Designer s
Int e r io r D e s i g n e r s
L a n d s c a p e A r c hit ec t s Scale: 1:400, 1:200 Orig. Size: A3
Drawing No. Job No.:
Level 2
74 C ub a St
T EL : 64 4 8 02 5 4 4 4
FA X : 64 4 8 02 5 4 4 6 CONFIDENTIAL 2130
P.O. B o x 11- 5 17 www.studiopacific.co.nz
W e l l i n g t o n , N Z email: architects@studiopacific.co.nz DA-04 Revision: B
© Studio of Pacific Architecture Limited 2017 Printed: 16/01/18,4:14 PM CAD Ref:2130_20170926_MACC_TMML_2018_Drawings.
1 2 3

1 2 3 4 5 6 7 8 9
9,750 9,500 9,950 9,950 9,950 9,950 9,950 8,500

Canopy Above
Canopy

Sta
Above
ENTRY 2

ff E
ntry
ENTRY 1

Wind A

2,650
Lobby
Wind Furniture Store (under Escalators)
Lobby
B

Line of Floor Over


Shared
A WC's/ Egress/ Servicing
+2.650 CC Lift
A
Egress
Stair 02

6,500
MUSEUM

er
LOBBY

or Ov
Void Over CC Lift
Shared
B

of Flo
Public/ Lobby/ Circulation
Line of Floor Over Signage / Information
C

Line
Glass Wall to shop

op
sh

Glass doors to shop


PUBLIC TOILETS Goods Lift 1

to
(SHARED) Line of Bridge Over CONVENTION
Seismic Gap

s
or
Convention Centre
REGISTRATION

10,000
do
ss
Registration

Line of Floor Over


la
G
RETAIL SHOP

Canopy Above
Loading Dock
PUBLIC TOILETS
(SHARED)
Cafe
TMML D
Kitchen

Sign in
Cafe Glass Wall to shop
Convention Centre
-- Staff

STAFF TOILETS
Goods
Lift 4
TICKETING LOBBY

10,000
+2.650 Goods
Museum Shared
WC's/ Egress/ Servicing Lift 3
Lifts

CAFE +2.650 Goods


(Covered Courtyard) Lift 2
E
Gl
as
sW

Staff Entry
all
to

9,500
sh
op

PROPOSED LANE
10
r
+2.650 ve
11 rO
loo
ofF
Line F

TMML
Museum/ Shop

10,000
B Ramp
B
FIRE & HYDRAULIC

M U S E U M V O L U M E
SERVICES

Line of Floor Over


G

Canopy Above
+2.100

+2.100

10,000
Seismic Gap

Shared
Egress/ Servicing Wind
Lobby
OPEX Area Key:
H

4,500
ENTRY 3
TMML OPEX Area

J
Convention Centre OPEX Area
12
Canopy Above
NEW DROP OFF LANE Shared OPEX Area
2 3 4 5 6 7 8 9

1 2 3

O P E X S P L I T D IPRELIMINARY
A G R DESIGN
AM
Ground (Level 1) Plan -
OPEX Split
MACC
A r c hit ec t s
Ur ban Designer s
Int e r io r D e s i g n e r s
L a n d s c a p e A r c hit ec t s Scale: 1:400, 1:200 Orig. Size: A3
Drawing No. Job No.:
Level 2
74 C ub a St
T EL : 64 4 8 02 5 4 4 4
FA X : 64 4 8 02 5 4 4 6 CONFIDENTIAL 2130
P.O. B o x 11- 5 17 www.studiopacific.co.nz
W e l l i n g t o n , N Z email: architects@studiopacific.co.nz DA-10 Revision: A
© Studio of Pacific Architecture Limited 2017 Printed: 1/02/18,3:11 PM CAD Ref:2130_20170926_MACC_TMML_2018_Drawings.pl
1 2 3

1 2 3 4 5 6 7 8 9
9,750 9,500 9,950 9,950 9,950 9,950 9,950 8,500

Canopy Canopy Below


Above

Void Over Entry


A

2,650
+7.100
Shared
Servicing/ Egress
Convention Escalators B

ir 01
A A

ss Sta
Void Over Convention Foyer

6,500
Shared Lift Egress
Shaft Stair 02

Egre
Void Over Foyer Public/ Lobby/ Circulation Line of Void Over

C
Shared Bridge
Servicing/ Egress Goods Lift 1

10,000
+7.100 +7.100

Shared

Canopy Below
Egre Public/ Lobby/ Circulation
s
Stair s Void Over Foyer
01

-- Goods
Lift 4

10,000
Goods
Shared

UP
Lift 3
Servicing/ Egress
TMML
Shared
Museum Museum/ BOH Goods
Glazed Roof Over Lifts
Circulation Lift 2
Cafe Below
E
Louvred Air Intake

+7.100

M U S E U M V O L U M E

9,500
10 PLANTROOM

+8.100
11
F

Plant for TMML


Exhibits

10,000
B B
Shared
Servicing/ Egress/ Plantroom

G
VOID

Shared
Void to Lobby

10,000
Public/ Lobby/ Circulation

Egress Stair 03

Void over
OPEX Area Key:
Entry H

4,500
TMML OPEX Area

J
Convention Centre OPEX Area
12
Canopy Below

Shared OPEX Area


2 3 4 5 6 7 8 9

1 Plan | Level 2 (Museum Mezzanine)


SCALE 1:400
O P E X S P L I T D IPRELIMINARY
A G R DESIGN
AM
LEVEL2 Plan - OPEX Split

MACC
A r c hit ec t s
Ur ban Designer s
Int e r io r D e s i g n e r s
L a n d s c a p e A r c hit ec t s Scale: 1:400, 1:200 Orig. Size: A3
Drawing No. Job No.:
Level 2
74 C ub a St
T EL : 64 4 8 02 5 4 4 4
FA X : 64 4 8 02 5 4 4 6 CONFIDENTIAL 2130
P.O. B o x 11- 5 17 www.studiopacific.co.nz
W e l l i n g t o n , N Z email: architects@studiopacific.co.nz DA-11 Revision: A
© Studio of Pacific Architecture Limited 2017 Printed: 1/02/18,3:11 PM CAD Ref:2130_20170926_MACC_TMML_2018_Drawings.pl
1 2 3

1 2 3 4 5 6 7 8 9
9,750 9,500 9,950 9,950 9,950 9,950 9,950 8,500

Canopy Below

2,650
Shared
Servicing/ Egress
B

A Landing Shared
Circulation
A

6,500
Egress
Lift
Stair 02
Shaft

C
Line of Floor Over

Goods Lift 1

10,000
Line of Floor Over
Shared
Servicing/ Egress
D

Canopy Below
-- Egress Stair 01
Goods
Lift 4

10,000
Goods
Shared

UP
Lift 3
Servicing/ Egress

Line of Floor Over


Shared
Museum Goods
Lifts
Circulation Lift 2
E
Void to below

M U S E U M V O L U M E

9,500
er
Ov
or
Flo ve
r
of
10 e rO
Lin loo +11.700
ofF
Line
11
F

TMML
Museum/ BOH

10,000
Line of Floor Over
B B

10,000
Shared
Servicing/ Egress

Egress Stair 03
OPEX Area Key:
H

4,500
TMML OPEX Area

J
Convention Centre OPEX Area
12
Canopy Below

Shared OPEX Area


2 3 4 5 6 7 8 9

1 Plan | Level 3 (Museum)


SCALE 1:400
O P E X S P L I T D IPRELIMINARY
A G R DESIGN
AM
LEVEL 3 Plan - OPEX Split

MACC
A r c hit ec t s
Ur ban Designer s
Int e r io r D e s i g n e r s
L a n d s c a p e A r c hit ec t s Scale: 1:400, 1:200 Orig. Size: A3
Drawing No. Job No.:
Level 2
74 C ub a St
T EL : 64 4 8 02 5 4 4 4
FA X : 64 4 8 02 5 4 4 6 CONFIDENTIAL 2130
P.O. B o x 11- 5 17 www.studiopacific.co.nz
W e l l i n g t o n , N Z email: architects@studiopacific.co.nz DA-12 Revision: A
© Studio of Pacific Architecture Limited 2017 Printed: 1/02/18,3:11 PM CAD Ref:2130_20170926_MACC_TMML_2018_Drawings.pl
1 2 3

1 2 3 4 5 6 7 8 9
9,750 9,500 9,950 9,950 9,950 9,950 9,950 8,500

Opening Canopy Below

+16.700 A

2,650
Shared
Servicing/ Egress
B

A Shared
Circulation
A

6,500
Convention Escalators Void Egress
Lift
Shaft Stair 02

Goods Lift Shaft

10,000
+16.700
VOID

+16.700 TMML
MSB
Shared
Servicing/ Egress VOID
D

Canopy Below
-- Egress Stair 01
Goods
Lift 4
Plantroom

10,000
(Over Kitchen)
Goods
Shared

UP
Lift 3
Servicing/ Egress

Shared
Museum Goods
Lifts
Circulation Lift 2
E

M U S E U M V O L U M E

9,500
+15.500

10
11
F

TMML VOID
Museum/ BOH

10,000
B B

10,000
Shared
Servicing/ Egress

Egress Stair 03
OPEX Area Key:
H

4,500
TMML OPEX Area

J
Convention Centre OPEX Area
12
Canopy Below

Shared OPEX Area


2 3 4 5 6 7 8 9

1 Plan | Level 4 (Museum Mezzanine)


SCALE 1:400
O P E X S P L I T D IPRELIMINARY
A G R DESIGN
AM
LEVEL 4 Plan - OPEX Split

MACC
A r c hit ec t s
Ur ban Designer s
Int e r io r D e s i g n e r s
L a n d s c a p e A r c hit ec t s Scale: 1:400, 1:200 Orig. Size: A3
Drawing No. Job No.:
Level 2
74 C ub a St
T EL : 64 4 8 02 5 4 4 4
FA X : 64 4 8 02 5 4 4 6 CONFIDENTIAL 2130
P.O. B o x 11- 5 17 www.studiopacific.co.nz
W e l l i n g t o n , N Z email: architects@studiopacific.co.nz DA-13 Revision: A
© Studio of Pacific Architecture Limited 2017 Printed: 1/02/18,3:11 PM CAD Ref:2130_20170926_MACC_TMML_2018_Drawings.pl
1 2 3

1 2 3 4 5 6 7 8 9
9,750 9,500 9,950 9,950 9,950 9,950 9,950 8,500

Canopy Below

+19.200
Terrace
A

2,650
(Roof Over)
Shared
Meeting Room Convention Centre Servicing/ Egress
Arrival Lobby B
+19.200
A Shared
Circulation
Convention Escalators
CC Lift
A A

6,500
Service
Egress

Stair
Convention Stair 02
CC Lift
Lifts
B

C
FEMALE 12

Goods Lift 1

10,000
FEMALE 5
Acc
CONVENTION CENTRE
ir 01

CL
Shared
EXHIBITION SPACE
ss Sta

Servicing/ Egress

MALE 3+2
D
e

+19.200
Concention Centre
Egre

CL
Servic
Stair

Canopy Below
Exhibition/ Plenary/ WC's/ BOH
-- Goods
Lift 4
MALE 12 + 6

10,000
Goods
Shared
Lift Lobby Lift 3
Servicing/ Egress

Goods
Lift 2
E
Riser Riser
VM
Office

9,500
Meeting A

Store Cool
10 Room Room

11
F

CONVENTION CENTRE
PLENARY SPACE

10,000
B +19.200 B
Plenary 1 Plenary 2 Plenary 3 Meeting B

Kitchen
G
+19.200

Egress

10,000
Stair 03

Service
Meeting C

Stair
Shared
Void
Servicing/ Egress OPEX Area Key:
H
Storage Area

4,500
+19.200 TMML OPEX Area
Staff WC's
Comms
J
Convention Centre OPEX Area
12
Canopy Below

Shared OPEX Area


2 3 4 5 6 7 8 9

1 Plan | Level 5 (Convention Centre)


SCALE 1:400
O P E X S P L I T D IPRELIMINARY
A G R DESIGN
AM
LEVEL 5 Plan - OPEX Split

MACC
A r c hit ec t s
Ur ban Designer s
Int e r io r D e s i g n e r s
L a n d s c a p e A r c hit ec t s Scale: 1:400, 1:200 Orig. Size: A3
Drawing No. Job No.:
Level 2
74 C ub a St
T EL : 64 4 8 02 5 4 4 4
FA X : 64 4 8 02 5 4 4 6 CONFIDENTIAL 2130
P.O. B o x 11- 5 17 www.studiopacific.co.nz
W e l l i n g t o n , N Z email: architects@studiopacific.co.nz DA-14 Revision: A
© Studio of Pacific Architecture Limited 2017 Printed: 1/02/18,3:11 PM CAD Ref:2130_20170926_MACC_TMML_2018_Drawings.pl
1 2 3

1 2 3 4 5 6 7 8 9
9,750 9,500 9,950 9,950 9,950 9,950 9,950 8,500

Canopy Below

2,650
VOID
B

A Escalators Void
Hot water A

6,500
Lift plant

Service
Stair
Overrun

+24.400

Lift
Overrun

10,000
Plant Room
+ 25.000
VOID

Concention Centre D
Exhibition/ Plenary +25.540

Canopy Below
--

10,000
Lift
Overrun

Goods
Lift 2
E

MSB 1

9,500
+25.000
10
Shared
Plantrooms/ Servicing
11
F

10,000
B B

External Area
VOID

+25.000

10,000
Service Plant Room
+25.000
Stair
OPEX Area Key:

Cooling Towers
H
Plant Room

4,500
+25.000
TMML OPEX Area

J
Convention Centre OPEX Area
12 External Area

Canopy Below

Shared OPEX Area


2 3 4 5 6 7 8 9

1 Plan | Level 6 (Plant Mezzanine)


SCALE 1:400
O P E X S P L I T D IPRELIMINARY
A G R DESIGN
AM
LEVEL 6 Plan - OPEX Split

MACC
A r c hit ec t s
Ur ban Designer s
Int e r io r D e s i g n e r s
L a n d s c a p e A r c hit ec t s Scale: 1:400, 1:200 Orig. Size: A3
Drawing No. Job No.:
Level 2
74 C ub a St
T EL : 64 4 8 02 5 4 4 4
FA X : 64 4 8 02 5 4 4 6 CONFIDENTIAL 2130
P.O. B o x 11- 5 17 www.studiopacific.co.nz
W e l l i n g t o n , N Z email: architects@studiopacific.co.nz DA-15 Revision: A
© Studio of Pacific Architecture Limited 2017 Printed: 1/02/18,3:11 PM CAD Ref:2130_20170926_MACC_TMML_2018_Drawings.pl
1 2 3

1 2 3 4 5 6 7 8 9

9,950 9,950 8,500

A
Escalator
Pit Over
B

A Cage Lift Pit A

6,500
Over
Storage

Egress Stair
to Ground
C

Goods Lift 1
Escalator
Pit Over Shared

10,000
Temporary
Vehicle Basement/ Servicing
Parking

12 x 240 litre

6 x 660 litre
Rubbish

bins

bins
DBB.1
Store

-- Goods
Lift 4

10,000
Plant Room
Goods
Lift 3
Chillers
Pallet Store
Lift Pit Over Goods
Lift 2
E
Area identified as possible basement extension

4,920
186 m2

10
11
F

B B

OPEX Area Key:


H

TMML OPEX Area

J
Convention Centre OPEX Area
12

Shared OPEX Area


2 3 4 5 6 7 8 9

1 Basement Plan
SCALE 1:400
O P E X S P L I T D IPRELIMINARY
A G R DESIGN
AM
Basement Plan - OPEX Split

MACC
A r c hit ec t s
Ur ban Designer s
Int e r io r D e s i g n e r s
L a n d s c a p e A r c hit ec t s Scale: 1:400, 1:200 Orig. Size: A3
Drawing No. Job No.:
Level 2
74 C ub a St
T EL : 64 4 8 02 5 4 4 4
FA X : 64 4 8 02 5 4 4 6 CONFIDENTIAL 2130
P.O. B o x 11- 5 17 www.studiopacific.co.nz
W e l l i n g t o n , N Z email: architects@studiopacific.co.nz DA-16 Revision: A
© Studio of Pacific Architecture Limited 2017 Printed: 1/02/18,3:11 PM CAD Ref:2130_20170926_MACC_TMML_2018_Drawings.pl
SIGNAGE LOCATION
BUILDING NAME DRAFT

CABLE STREET WAKEFIELD STREET

2 3 4 5 6 7 8 9
9 8 7 6 5 4 3 2 1 of Ridge
Ridge L)

+25.000
Level 6 (Plant)

+21.700
Level 5 (Conventio

+16.700
Level 4 (Museum

+11.700
Level 3 (Museum)

+7.100
Level 2 (Museum

SIGNAGE +2.650
Level 1 (Ground)
SIGNAGE PROPO

Elevation Elevation
1:500 @ A3 1:500 @ A3

Canopy Above BN1A


BN2A Canopy Above

BN1B Kerb Kerb


Edge Edge
BN2B
BN2B
Plan Plan
1:500 @ A3 Signage Area
Signage Area
1:500 @ A3
Font and Size only indicative
Font and Size only indicative

Signage Area Signage Area


Font and Size only indicative Font and Size only indicative

BN1A + BN2A - Signage Location on facade under canopy


BN1B + BN2B - Free standing signage at kerb edge
Note: Either option may be preferred, but not both.
Signage Presentation 27.10.2017

Wellington Movie Museum & Convention Centre SIGNAGE - Building Name 01


© Studio of Pacific Architecture Limited 2017 Rev: -- Printed: 27/10/17,4:26 PM CAD Ref:2130_20170926_MACC_RC_Drawings.pln
SIGNAGE LOCATION
BUILDING NAME DRAFT
BN1A SIGNAGE ON FACADE UNDER CANOPY BN2A SIGNAGE ON FACADE UNDER CANOPY
CABLE STREET WAKEFIELD STREET

BN1B FREE STANDING SIGNAGE AT KERB EDGE BN2B FREE STANDING SIGNAGE AT KERB EDGE
CABLE STREET WAKEFIELD STREET

Signage Presentation 27.10.2017

Wellington Movie Museum & Convention Centre SIGNAGE - Building Name 02


© Studio of Pacific Architecture Limited 2017 Rev: -- Printed: 27/10/17,4:26 PM CAD Ref:2130_20170926_MACC_RC_Drawings.pln
SIGNAGE LOCATION
BUILDING NAME DRAFT

CABLE STREET WAKEFIELD STREET

2 3 4 5 6 7 8 9
9 8 7 6 5 4 3 2 1 of Ridge
Ridge L)

+25.000
Level 6 (Plant)

+21.700
Level 5 (Conventio

+16.700
Level 4 (Museum

+11.700
Level 3 (Museum)

+7.100
Level 2 (Museum Height TBC Height TBC

+2.650
Level 1 (Ground)
PROPO

Elevation Elevation
1:500 @ A3 1:500 @ A3

Location and number of Plinths TBC Location and number Location and number of Plinths TBC
of Plinths TBC

Canopy Above
Canopy Above
Kerb Edge Kerb E BN2C
BN1C dge
BN2C

Plan Plan
1:500 @ A3 1:500 @ A3

Signage Area Signage Area Signage Area

BN1C + BN2C - Plinth signage at kerb edge

Signage Presentation 27.10.2017

Wellington Movie Museum & Convention Centre SIGNAGE - Building Name 03


© Studio of Pacific Architecture Limited 2017 Rev: -- Printed: 27/10/17,4:26 PM CAD Ref:2130_20170926_MACC_RC_Drawings.pln
SIGNAGE LOCATION
BUILDING NAME DRAFT
BN1C PLINTH SIGNAGE ON KERB EDGE BN2C PLINTH SIGNAGE ON KERB EDGE
CABLE STREET WAKEFIELD STREET

Note: Position, number and size of Plinths TBC

Signage Presentation 27.10.2017

Wellington Movie Museum & Convention Centre SIGNAGE - Building Name 04


© Studio of Pacific Architecture Limited 2017 Rev: -- Printed: 27/10/17,4:26 PM CAD Ref:2130_20170926_MACC_RC_Drawings.pln
SIGNAGE LOCATION
MOVIE MUSEUM DRAFT

CABLE STREET WAKEFIELD STREET

9 8 7 6 5 4 3 2 1 2 3 4 5 6 7 8 9
Ridge of Ridge
L)

+25.000
Level 6 (Plant)

+21.700
Level 5 (Conventio

+16.700
Level 4 (Museum

+11.700
Level 3 (Museum)

+7.100
Signage Zone
Level 2 (Museum
above doors
+2.650
Level 1 (Ground)

PROPO

Elevation Clear view into Lobby Clear view into Lobby


Elevation
1:500 @ A3 1:500 @ A3

MM02
MM01

Canopy Above
Canopy Above
Kerb Edge Kerb
Edge

Plan Plan
1:500 @ A3 1:500 @ A3

Signage Area Signage Area

MM01 + MM02 - Signage on glazing


Note: Coordinate MM02 signage with Convention Centre at Wakefield Street facade

Signage Presentation 27.10.2017

Wellington Movie Museum & Convention Centre SIGNAGE - Movie Museum 05


© Studio of Pacific Architecture Limited 2017 Rev: -- Printed: 27/10/17,4:26 PM CAD Ref:2130_20170926_MACC_RC_Drawings.pln
SIGNAGE LOCATION
CONVENTION CENTRE DRAFT

CABLE STREET WAKEFIELD STREET

2 3 4 5 6 7 8 9
9 8 7 6 5 4 3 2 1 of Ridge
Ridge L)

+25.000
Level 6 (Plant)

+21.700
Level 5 (Conventio

+16.700
Level 4 (Museum

+11.700
Level 3 (Museum)

Signage Signage Zone


Zone +7.100
Level 2 (Museum
above doors
above
doors +2.650
Level 1 (Ground)
PROPO

Clear view into Lobby


Elevation Clear view into Lobby
Elevation
1:500 @ A3 1:500 @ A3

Signage Area

CC02

CC01 Canop
y Abov
e Canopy Above

Kerb
Kerb Edge
Edge

Signage Area
Plan Plan
1:500 @ A3 1:500 @ A3
Signage Area

CC01 + CC02- Signage on glazing


Note: Coordinate CC02 signage with Movie Museum at Wakefield Street facade

Signage Presentation 27.10.2017

Wellington Movie Museum & Convention Centre SIGNAGE - Convention Centre 06


© Studio of Pacific Architecture Limited 2017 Rev: -- Printed: 27/10/17,4:27 PM CAD Ref:2130_20170926_MACC_RC_Drawings.pln
SIGNAGE LOCATION
MOVIE MUSEUM + CONVENTION CENTRE DRAFT
CABLE STREET Key Plan

CABLE STREET
1 - Movie Museum MM01 Signage
1 2

WAKEFIELD STREET

WAKEFIELD STREET
3 - Movie Museum MM02 Signage + Convention Centre CC02 Signage
Note: Coordinate signage to this Entry

2 - Convention Centre CC01 Signage

Signage Presentation 27.10.2017

Wellington Movie Museum & Convention Centre SIGNAGE - Movie Museum + Convention Centre 07
© Studio of Pacific Architecture Limited 2017 Rev: -- Printed: 27/10/17,4:27 PM CAD Ref:2130_20170926_MACC_RC_Drawings.pln
MACC
DRAFT CO-ORDINATED DESIGN & CONSTRUCTION PROGRAMME FOR BASE BUILD AND FIT-OUT
REV 13 - 26TH JANUARY 2018

ID Task Name Duration -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68


1 DESIGN 1044 days DESIGN
2 BASE BUILD 280 days BASE BUILD
6 FIT-OUT 1044 days FIT-OUT
13 TMML / BASE BUILD INTEGRATION ITEMS 160 days TMML / BASE BUILD INTEGRATION ITEMS
26 PRE-CONSTRUCTION 420 days PRE-CONSTRUCTION
27 Lifts and Escalators 180 days Lifts and Escalators
28 Design 5 mons Design
29 Tender 1 mon Tender
30 Shop Drawings/ Order Base Materials & Equipment
3 mons Shop Drawings/ Order Base Materials & Equipment
31 Ground Floor Slab and Below 280 days Ground Floor Slab and Below
32 Design 7 mons Design
33 Peer Review 1 mon Peer Review
34 Consent 1 mon Consent
35 Tender 1 mon Tender
36 Post Tender Negotiations/ Mobilisation 1 mon Post Tender Negotiations/ Mobilisation
37 Shop Drawings/ Order Base Materials 120 days Shop Drawings/ Order Base Materials & Equipment
& Equipment
38 Base Isolators 6 mons Base Isolators
39 Precast Flooring 3 mons Precast Flooring
40 Upper Structure 420 days Upper Structure
41 Design 9 mons Design
42 Peer Review 1 mon Peer Review
43 Consent 1 mon Consent
44 Tender 1 mon Tender
45 Post Tender Negotiations/ Mobilisation 1 mon Post Tender Negotiations/ Mobilisation
46 Shop Drawings/ Order Base Materials 220 days Shop Drawings/ Order Base Materials & Equipment
& Equipment
47 Structural Steel Shop Drawings 9 mons Structural Steel Shop Drawings
48 Structural Steel Fabrication 2 mons Structural Steel Fabrication
49 CONSTRUCTION 885 days CONSTRUCTION
50 Site Establishment 15 days Site Establishment
51 Bulk Excavation 90 days Bulk Excavation
52 Piling 140 days Piling
53 Structure 470 days Structure
54 Foundations and Base Isolation Works 200 days Foundations and Base Isolation Works
55 Basement 135 days Basement
56 Level 1 to 2 115 days Level 1 to 2
57 Level 2 to 3 105 days Level 2 to 3
58 Level 3 to 4 105 days Level 3 to 4
59 Level 4 to 5 105 days Level 4 to 5
60 Level 6 Roof 135 days Level 6 Roof
61 Façade 455 days Façade
62 TMML - Museum 284 days TMML - Museum
63 Level 1 & 2 254 days Level 1 & 2
64 Fitout Access 0 days Fitout Access
65 Fitout 12.7 mons Fitout
66 Level 3 & 4 244 days Level 3 & 4
67 Fitout Access 0 days Fitout Access
68 Fitout 12.2 mons Fitout
69 Conference Centre - Level 5 451 days Conference Centre - Level 5
70 First Fix 271 days First Fix
71 Second Fix 161 days Second Fix
72 Finishes 85 days Finishes
73 COMPLETIONS 60 days COMPLETIONS
74 Final Finishes 27 days Final Finishes
75 Compliance, Integration & Commissioning
3 mons Compliance, Integration & Commissioning
76 Conference Operating 0 days Conference Operating
77 Museum Operating 0 days Museum Operating
78 Placeholder 0 days
79 Programme Clarifications: 0 days
80 -Based upon WCC Demolishing final building0 6days
81 months prior to start, all proof bores having0 days
82 been undertaken, with the final pile design 0 days
83 provided at tender. 0 days