MATERIALES CANTIDAD COSTO UNIT COSTO TOTAL

CEMENTO 10 22 220
AGREGADO (material de
acarreo) 150
TRONCO 10 25 200

570

m3 7 bosas en 175

220 lampas (arena


m3 chancada + arena
gruesa)
DETALLE
M2 M3
L A E
PISO 1 (RESISTENCIA BAJA) 6.3 3.2 0.1 20.16 2.0
PISO 2 (RESISTENCIA BAJA) 2 3 0.1 6 0.6

TOTAL (MEZCLA) 8.3 3.2 0.1 2.7


RELLENO 8.3 3.3 0.15 4.1
ACCESORIOS CANT COST UNIT COSTO TOTAL

BISAGRA 8 4.5 36
RIEL PARA CAJON 7 3 21
GOMA 1 16 16
PERNO 100 0.2 20
BROCA ABELLANADORA 0 25 0
DISCO CARBURO 0 170 0
MDF 4 90 360
ACCESORIOS 50
503
V HR USO DIAS kwh PRECIO kwh SUB TOTAL IGV

caladora 400 2 10 8 0.65 5.2 0.18


sierra 1100 1 10 11 0.65 7.15 0.18
Taladro 750 3 10 22.5 0.65 14.63 0.18
amoladora 600 2 10 12 0.65 7.8 0.18
hervidora 2000 0.5 30 30 0.65 19.5 0.18
licuadora 450 0.3 10 1.35 0.65 0.88 0.18
tv 180 8 30 43.2 0.65 28.08 0.18
cargador 5 2 15 0.15 0.65 0.10 0.18
laptop 300 2 2 1.2 0.65 0.78 0.18
foco 50 5 30 7.5 0.65 4.88 0.18
TOTAL

6.14
8.44
17.26
9.20
23.01
1.04
33.13
0.12
0.92
5.75
105.00