System: (Untitled) 12/12/17 10:24 pm


Lineup: <Design Case>
Company: o
rev: 12/12/17 10:23 pm
Project: a
Atm pressure: 14.7 psi a by: a

Total System Volume: 0.216 m³


Pressure drop calculations: Darcy-Weisbach method, laminar cutoff Re = 2100
Calculated: 1 iteration Avg Deviation: 0 %
Specifications
Specification Material / Schedule Roughness Sizing Design Limits
Specification Steel A53-B36.10 / 40 0.04572 mm not specified ---
Valves: standard C: 140 ---

Fluid Zones
Fluid Zone Fluid Temp Pressure Density Viscosity Pv / Pc or k
°C psi a kg/m³ cP psi a
Fluid zone Water 25 101 997.2 0.8883 0.4595 / 3198

PIPE-FLO 2009 a pg 1
List Report 12/12/17 10:24 pm

Demands
(exceptions only)
Demand Set Value Flow Rate Pressure Elev Status Grade
m³/s psi a m m
~N{001} Flow out 0.00867 -16.32 0 Invalid -21.88

PIPE-FLO 2009 a pg 2
List Report 12/12/17 10:24 pm

Notes