Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 330B LN EXCAVATOR 5LR
Configuration: 330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engine
i02231141
Operational Checks
SMCS - 5050
The checks during operation can be used to find leakage in the system and components that are not
functioning correctly. The speed of rod movement or the torque on a motor can be used to check the
condition of the cylinders, motors and the pumps.
Specifications are listed in tables for the following operational checks. These specifications are
calculated average values. The values will vary due to the configuration of the machine.
A machine with the following equipment was used to achieve these specifications: 6500 mm (21 feet
3 inches) boom, 3300 mm (10 feet 8 inches) stick and 1.5 m3 (1.7 yd3) bucket.
Table 1
Required Tools
Part Number Description Qty
6V-2100 Multitach group 1
Engine speed for an excavator with no load at high idle is 1960 ± 50 rpm.
Table 2
Specifications
Item
New Rebuild Service Limit
1850 ± 50 rpm (1) 1660 to 1900 rpm (1)
(2)
No load high idle
1960 ± 50 rpm (3) 1760 to 2010 rpm (3)
No load low idle 720 ± 50 rpm 720 ± 100 rpm
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engine... Page 2 of 19
Maximum speed with load (4) 1720 rpm (5) 1650 rpm (5) 1600 rpm (5)
No load speed (6) 1300 ± 80 rpm 1300 ± 100 rpm
(2)
AEC switch in the OFF position
(1)
Three seconds after the engine speed dial was placed at position "10"
(3)
Engine rpm within three seconds after the engine speed dial was placed at position "10"
(4)
Pressure is relieved from both pumps.
(5)
Minimum rpm
(5)
Minimum rpm
(5)
Minimum rpm
(6)
AEC switch in the ON position
Note: A New specification is the performance that can be expected for a new machine. A Rebuild
specification is the performance that can be expected after rebuilding the components of a system.
Performance beyond the Service Limit is an indication of these problems: improper maintenance or
adjustment, component wear and failure.
2. Place the machine controls at the following settings: Power Mode, Boom Priority Mode,
Engine speed dial "10" and AEC switch OFF.
Preparation
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engine... Page 3 of 19
Illustration 1 g00296317
1. Travel distance must be at least 25 m (82 ft) long. Travel test ground must be hard and as level
as possible.
2. Draw a 25 m (82 ft) straight line on travel test ground as a reference line.
3. Position the machine so that one track is parallel with the reference line. Position the machine
for the travel test. Refer to Illustration 1.
Test
Reference: Make reference to "Preparation For Operational Checks".
2. Move the machine by operating both travel levers at the same time.
3. The first 5 m (16.4 ft) are for a preliminary run. Measure the travel time that is required to
travel the remaining 20 m (65.6 ft). Measure the time that is required in each direction.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engine... Page 4 of 19
5. Place the travel speed control switch on the LOW position and repeat Steps 2 through 4.
Table 4
Travel Time (time in seconds)
Travel Speed New Rebuild Service Limit
Forward
HIGH 16.5 or less 20.0 or less 22.0 or less
Reverse
Forward
LOW 28.0 or less 32.0 or less 35.0 or less
Reverse
Note: The following table represents the travel deviation (distance) from the reference line.
Table 5
Travel Deviation
mm (inch)
Travel Speed New Rebuild Service Limit
Forward
HIGH 800 (31.5) or less 1200 (47.2) or less 1500 (59.1) or less
Reverse
Forward
LOW 800 (31.5) or less 1200 (47.2) or less 1500 (59.1) or less
Reverse
Table 6
Required Tools
Part Number Description Qty
Stopwatch 1
Preparation
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engine... Page 5 of 19
Illustration 2 g00297292
Test
Reference: Make reference to "Preparation For Operational Checks".
2. Move the control lever of the raised track to full travel position.
3. Measure the time that is required for the raised track to make three complete revolutions.
Measure the time that is required in each direction.
4. Place the travel speed control switch in the LOW position and repeat Steps 2 through 3.
Table 7
330B Specifications (time in seconds)
Travel Speed New Rebuild Service Limit
Forward
HIGH 24.0 or less 28.0 or less 31.0 or less
Reverse
Forward
LOW 38.0 or less 44.0 or less 50.0 or less
Reverse
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engine... Page 6 of 19
Table 8
330B L Specifications (time in seconds)
Travel Speed New Rebuild Service Limit
Forward
HIGH 26.0 or less 30.0 or less 34.0 or less
Reverse
Forward
LOW 42.0 or less 48.0 or less 54.0 or less
Reverse
Drift On Slope
Note: Measuring the amount of drift of the machine on a slope will determine if there is a need to
check the travel brake.
Preparation
Table 9
Required Tools
Part Number Description Qty
Stopwatch 1
Scale
1
150 mm (6 inch)
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engine... Page 7 of 19
Illustration 3 g00297342
1. Place the machine on a slope of 12 degrees. The surface of the slope must be hard and smooth.
Test
Illustration 4 g00297498
1. To indicate the machine's relative position to the slope, put a mark on both the track and the
ground. Refer to Illustration 4.
Table 10
Drift mm (inch)
New Rebuild Service Limit
0 0 0
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engine... Page 8 of 19
Table 11
Required Tools
Part Number Description Qty
5P-3277 Measuring Tape 1
Stopwatch 1
Preparation
Illustration 5 g00297618
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engine... Page 9 of 19
Illustration 6 g00293972
(C) Marking
3. To indicate the relationship of the two positions, put a mark (C) on the inner race and the outer
race of the swing bearing. The mark will be used as a target to stop the swing operation. Refer
to Illustration 6.
Test (Overswing)
Reference: Make reference to "Preparation For Operational Checks".
1. Move the swing control lever in either direction until the machine completes a 180 degree
swing operation away from the target.
2. Move the swing control lever in either direction until the machine completes a 180 degree
swing operation toward the target. Return the swing control lever to the NEUTRAL position at
the target.
3. Measure the distance between the marks on the swing bearing. This is the amount of
overswing. Refer to Illustration 6.
Note: Use a point that is visible from the operator seat as a reference point for the target.
Table 12
Specifications (Overswing)
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engi... Page 10 of 19
Test (Speed)
1. Move the swing control lever in each direction and measure the time that is required to
complete a 180 degree swing operation.
Table 13
Swing Time
Item New Rebuild Service Limit
Right Swing
5.0 seconds or less 5.8 seconds or less 6.5 seconds or less
Left Swing
Table 14
Required Tools
Part Number Description Qty
5P-3277 Measuring Tape 1
Stopwatch 1
Preparation
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engi... Page 11 of 19
Illustration 7 g00298078
3. Position the implements at maximum reach. Position the bucket above the ground so that the
bucket will clear any obstacles.
Test (Speed)
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engi... Page 12 of 19
Illustration 8 g00298079
1. Position the upper structure at position (A). The upper structure should be at a 90 degree angle
to the lower structure. Refer to Illustration 8.
2. Measure the time that is required to swing the upper structure from position (A) to position
(B) .
3. Position the upper structure at position (C). The upper structure should be at a 90 degree angle
to the lower structure.
4. Measure the time that is required to swing the upper structure from position (C) to position (B) .
Table 15
Swing Time (seconds)
Item New Rebuild Service Limit
Right Swing
5.8 or less 6.6 or less 7.4 or less
Left Swing
Test (Drift)
Illustration 9 g00298079
1. Position the upper structure at position (A). The upper structure should be at a 90 degree angle
to the lower structure. Refer to Illustration 9.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engi... Page 13 of 19
Illustration 10 g00293972
(C) Marking
2. To indicate the relationship of the two positions, put a mark (C) on the inner race and the outer
race of the swing bearing. Refer to Illustration 10.
4. Leave the machine in this position for three minutes. Measure the swing drift on the
circumference of the swing bearing.
5. Position the upper structure at position (C). The upper structure should be at a 90 degree angle
to the lower structure. Refer to Illustration 9.
Table 16
Swing Drift mm (inch)
Item New Rebuild Service Limit
Right Swing
0 0 0
Left Swing
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engi... Page 14 of 19
Cylinder Drift
Table 17
Required Tools
Part Number Description Qty
5P-3277 Measuring Tape 1
Stopwatch 1
Preparation
Illustration 11 g00298378
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engi... Page 15 of 19
6. Leave the machine in this position for five minutes. Measure each cylinder's length from
cylinder pin to cylinder pin for drift.
Illustration 12 g00298379
1. Raise the boom high enough so that the stick can be positioned perpendicular to the ground.
Refer to Illustration 12.
3. Measure the bucket cylinder's length from cylinder pin to cylinder pin.
5. Leave the machine in this position for five minutes. Measure the bucket cylinder's length from
cylinder pin to cylinder pin for cylinder drift.
Table 18
Cylinder Drift
Item New Rebuild Service Limit
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engi... Page 16 of 19
Boom Cylinder
6.0 mm (0.24 inch) or 12.0 mm (0.47 inch) or 24.0 mm (0.94 inch) or
less less less
Stick Cylinder
10.0 mm (0.39 inch) or 15.0 mm (0.59 inch) or 25.0 mm (0.98 inch) or
less less less
Bucket Cylinder
10.0 mm (0.39 inch) or 15.0 mm (0.59 inch) or 25.0 mm (0.98 inch) or
less less less
Preparation
Reference: Make reference to "Preparation For Operational Checks".
Extension Test
Start with the bucket on the ground. Measure the time that is required for the boom cylinders to reach
full extension.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engi... Page 17 of 19
Illustration 13 g00298498
Retraction Test
Start with the boom cylinders at full extension. Measure the time that is required for the bucket to
come in contact with the ground.
Extension Test
Start with the stick cylinder in the full retracted position. Measure the time that is required for full
extension of the stick cylinder.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engi... Page 18 of 19
Illustration 14 g00298558
Retraction Test
Start with the stick cylinder in the full extended position. Measure the time that is required to retract
the stick cylinder.
Extension Test
Start with the bucket cylinder in the full retracted position. Measure the time that is required for full
extension of the bucket cylinder.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017
330B L, 330B LN Excavators 5LR00001-UP (MACHINE) POWERED BY 3306 Engi... Page 19 of 19
Illustration 15 g00298598
Retraction Test
Start with the bucket cylinder in the full extended position. Measure the time that is required to retract
the bucket cylinder.
Table 20
Cylinder Operating Speed (seconds)
Item New Rebuild Service Limit
Extension 4.1 ± 0.3 5.3 max. 6.1 max.
Boom
Retraction 3.1 ± 0.3 3.9 max. 4.6 max.
Extension 5.0 ± 0.3 6.6 max. 7.7 max.
Stick
Retraction 3.4 ± 0.3 4.4 max. 5.1 max.
Extension 5.0 ± 0.3 6.4 max. 7.4 max.
Bucket
Retraction 2.7 ± 0.3 3.5 max. 4.0 max.
Copyright 1993 - 2017 Caterpillar Inc. Wed Apr 19 07:19:47 UTC+0700 2017
All Rights Reserved.
Private Network For SIS Licensees.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 4/19/2017