Upah Kerja
1 Bahan batu
Batu belah/kali Rp. 120,000.00 /m3
8 Portland Cement
Semen PC : 50 kg Rp. 40,000.00 /zak
Semen Putih/Warna Rp. 92,600.00 /zak
9 Bahan Kayu
a. Kamper Samarinda : papan (oven) Rp. 4,500,000.00 /m3
: balok (oven) Rp. 4,100,000.00 /m3
b. Kayu Banjar : papan Rp. 4,000,000.00 /m3
: balok Rp. 3,800,000.00 /m3
c. Kamper Medan : papan Rp. 3,300,000.00 /m3
: balok Rp. 3,100,000.00 /m3
d. Kayu Meranti : papan Rp. 2,200,000.00 /m3
: balok Rp. 2,100,000.00 /m3
e. Kayu Borneo Super : papan Rp. 2,100,000.00 /m3
: balok Rp. 2,000,000.00 /m3
Page 2 of 26
NO. U r a i a n Harga satuan Satuan
10 Besi
a.Harga rata-rata U.24 Ex Jawa : Dia 6 mm Rp. 7,250.00 /kg
Harga rata-rata U.29 Ex Jawa : Dia 6 mm Rp. 7,250.00 /kg
Harga rata-rata U.39 Ex Jawa Rp. 7,975.00 /kg
b. Jenis Kawat
-Kawat Pengikat/Kawat beton Rp. 10,000.00 /kg
-Kawat berduri/1gulung : 50 m' Rp. 1,500.00 /m'
-Kawat nyamuk hijau Rp. 19,000.00 /m2
-Kawat nyamuk alumunium Rp. 35,000.00 /m2
-Ram kawat Rp. 11,200.00 /m2
c.Besi Siku rata-rata Rp. 7,800.00 /kg
Besi Plat 4' x 8' Rp. 7,800.00
d.Harga besi plat rata2 Rp. 7,600.00 /kg
e.Harga rata-rata plat lipet chanal Rp. 7,600.00 /kg
f.Harga rata-rata IWF Rp. 7,600.00 /kg
g.Besi beton rata-rata Rp. 7,600.00 /kg
11 Bahan atap
a. Asbes plat datar : Uk. 5mm x 80 x 180 Rp. 17,400.00 /lbr
: Uk 100 x 200 x 4 Rp. 27,000.00 /lbr
b. Bahan atap Seng Gelombang : BJLS 28 Rp. 20,000.00 /lbr
0.2/2.5/6/BDR 9 Rp. 19,000.00
0.3 BWG 32 Rp. 33,000.00
c.Asbes Gelombang Besar : ( 90 x 180 x 0,5 ) Rp. 36,500.00 /lbr
Asbes Gelombang kecil : ( 105 x 180 x 0,4 ) Rp. 35,000.00 /lbr
d.Plastik/ Fiber /lbr
-warna putih Rp. 20,000.00
-fiber glass Rp. 35,000.00
e. Bahan-bahan penutup atap
-Genteng beton Rp. 3,000.00 /bh
-Nok genteng beton Rp. 5,000.00 /bh
-Genteng keramik Rp. 8,000.00 /bh
-Nok genteng keramik Rp. 15,000.00 /bh
-Atap sirap Rp. 14,000.00 /m2
-Penutup atap genting metal rainbaouw Rp. 135,000.00 /m2
-Nok atas parabung rainbaouw Rp. 165,000.00 /m'
-Genteng plentong press Ex Jatiwangi Type Morando Rp. 1,300.00 /bh
-Genteng Bubungan Ex Jatiwangi Type Morando Rp. 1,700.00 /bh
-Genteng plentong press Ex Jatiwangi Berglazur Rp. 1,800.00 /bh
-Bubungan Ex Jatiwangi Berglazur Rp. 11,800.00 /bh
-Nok pinggir rainbouw Rp. 75,200.00 /m'
-Genteng Tegola Rp. 112,800.00 /m2
-Genteng Plam Rp. 500.00 /bh
Page 3 of 26
NO. U r a i a n Harga satuan Satuan
15 Keramik
a.1. Kramik Warna Putih
- Kramik sekualitas Asia Tiles (KW1) : 10 x 20 cm Standar Rp. 28,000.00 /m2
- Kramik sekualitas Asia Tiles (KW1) : 20 x20 cm Standar Rp. 28,000.00 /m2
- Kramik sekualitas Asia Tiles (KW1) : 30 x30 cm Standar Rp. 30,000.00 /m2
b. TEGEL
- Tegel Pc 20 x 20 Abu - abu Rp. 12,500.00 /m2
- Tegel Pc 20 x 20 Warna Rp. 20,000.00 /m2
- Tegel Wafel 20 x 20 Abu - abu Rp. 25,000.00 /m2
- Plint 20 x 20 Abu - abu Rp. 15,000.00 /m2
16 Bahan Loteng/Plapon
a. Triplek Ex Sankiong
-Uk. 1.2x2.4x3mm Rp. 35,000.00 /lbr
-Uk. 1.2x2.4x4mm Rp. 40,000.00 /lbr
-Uk. 1.2x2.4x6mm Rp. 60,000.00 /lbr
-Uk. 1.2x2.4x12mm Rp. 145,000.00 /lbr
b. Teak wood Uk. 1,2 x 2,4 x 4 mm Rp. 75,000.00 /lbr
- Teakwood untuk pintu Uk. 90 x220 x 4 mm Rp. 65,000.00 /lbr
c. Enternit type 1 Rp. 8,000.00 /lbr
- Eternit type 2 Rp. 7,000.00 /lbr
d. Multiplek 9 mm 120 x 240 Rp. 78,000.00 /m2
Multiplek 12 mm 120 x 240 Rp. 140,000.00 /m2
e. Gypsum
Gypsum 120 x 240 t = 9 mm ex DN Rp. 36,000.00 /lbr
Gypsum 120 x 240 t = 9 mm ex Luar Rp. 39,000.00 /lbr
Page 4 of 26
NO. U r a i a n Harga satuan Satuan
Page 5 of 26
NO. U r a i a n Harga satuan Satuan
Page 6 of 26
NO. U r a i a n Harga satuan Satuan
Catatan :
1. Harga satuan tersebut merupakan harga yang berlaku pada Th ………………
Page 7 of 26
ANALISA HARGA SATUAN BAHAN DAN UPAH
NO. URAIAN HASIL ANALISA NOMOR HASIL ANALISA HARGA BERIKUT KEUNTUNGAN
1 Hasil Analisa Pekerjaan Cor Beton Site Mix K- 175 acp.20 Rp. 653,600.00
2 Hasil Analisa Pekerjaan Cor Beton Site Mix K- 225 acp.21 Rp. 692,200.00
3 Hasil Analisa Pekerjaan Cor Beton Site Mix K- 300 acp.21a Rp. 727,400.00
4 Hasil Analisa Pekerjaan Cor Beton Ready Mix K- 175 acp.21b Rp. 488,100.00
5 Hasil Analisa Pekerjaan Cor Beton Ready Mix K- 225 acp.21c Rp. 499,100.00
6 Hasil Analisa Pekerjaan Cor Beton Ready Mix K- 300 acp.21d Rp. 544,200.00
7 Hasil Analisa Pekerjaan Besi U. 24 acp22 Rp. 10,800.00
8 Hasil Analisa Pekerjaan Besi U. 39 acp22.a Rp. 12,100.00
9 Hasil Analisa Pekerjaan Bekisting Papan Terentang acp.24 Rp. 67,100.00
10 Hasil Analisa Pekerjaan Bekisting Multiplek 9 mm acp.25 Rp. 73,500.00
11 Hasil Analisa Pekerjaan Bekisting Multiplek 12 mm acp.25a Rp. 97,200.00
12 Hasil Analisa Pekerjaan Stoot Werk acp.26 Rp. 121,300.00
A. KOLOM
I. KOLOM LANTAI I
1 KOLOM 25 X 25 (K1) 243,37 KG/M3 U.39 K-225 READY MIX BEKISTING MULTI 9 MM
- Beton Readymix K-225 ( Acp.21.d ) 499,100.00
- Besi Beton U. 39 ; 243,37 x Hasil analisa ( Acp. 22.a ) 2,944,777.00
- Bekisting Multi 9 mm ( 1 : 0,25 : 025 ) x ( 0,25 x 4 ) x Hasil Analisa ( Acp. 25a ) 588,000.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 4,284,585.33
4,285,000.00
2 KOLOM 30 x 35 (K2) 383,66 KG/M3 U.39 K-225 READY MIX BEKISTING PAPAN
- Beton Readymix K-225 ( Acp.21.d ) 499,100.00
- Besi Beton U. 39 ; 383,66 x Hasil analisa ( Acp. 22.a ) 4,642,286.00
- Bekisting Papan ( 1 : 0,3 : 0.35 ) x ( 0,35 + 0.35 + 0.3 + 0.3 ) x Hasil Analisa ( Acp. 24 ) 415,380.95
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 5,809,475.29
5,809,500.00
3 KOLOM 30 x 35 (K3) 270,14 KG/M3 U.24 K-225 READY MIX BEKISTING MULTI 9 MM
- Beton Readymix K-225 ( Acp.21.c ) 499,100.00
- Besi Beton U. 24 ; 270,14 x Hasil analisa ( Acp. 22 ) 2,917,512.00
- Bekisting Multi 9 mm ( 1 : 0,3 : 0,35 ) x ( 0,35 x 4 ) x Hasil Analisa ( Acp. 25.a ) 98,000.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 3,767,320.33
3,767,300.00
4 KOLOM 30 x 35(K4) 213,38 KG/M3 U.24 K-225 SITE MIX BEKISTING MULTI 9 MM
- Beton Sitemix K-225 ( Acp.21 ) 692,200.00
- Besi Beton U. 24 ; 213,38 x Hasil analisa ( Acp. 22 ) 2,304,504.00
- Bekisting Multi 9 mm ( 1 : 0,3 : 0,35 ) x ( 0,35 x 4 ) x Hasil Analisa ( Acp. 25.a ) 49,000.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 3,298,412.33
3,298,400.00
5 KOLOM 30 X 35 150 KG/M3 U.24 K-175 SITE MIX BEKISTING MULTI 9 MM
- Beton Sitemix K-175 ( Acp.20 ) 653,600.00
- Besi Beton U. 24 ; 150 x Hasil analisa ( Acp. 22 ) 1,620,000.00
- Bekisting Multi 9 mm ( 1 : 0,3 : 0,35 ) x ( 0,35 x 4 ) x Hasil Analisa ( Acp. 25.a ) 49,000.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 2,575,308.33
a b c d e f=(dxe) g=(dxe) h
2,575,300.00
6 KOLOM 20 X 25 ( 115 KG/M3 U.24 ) K-175 SITE MIX BEKISTING MULTIPLEK 9 MM
- Beton Sitemix K-175 ( Acp.20 ) 653,600.00
- Besi Beton U. 24 ; 115 x Hasil analisa ( Acp. 22 ) 1,242,000.00
- Bekisting Multiplek 9 mm ( 1 : 0,20 : 0.25 ) x ( 0,25 x 2 + 0.2 X 2 ) x Hasil Analisa ( Acp. 24 ) 661,500.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 2,809,808.33
2,809,800.00
7 KOLOM PRAKTIS15 X 15 ( 175 KG/M3 U.24 ) K-175 SITE MIX BEKISTING MULTIPLEK 9 MM
- Beton Sitemix K-175 ( Acp.20 ) 653,600.00
- Besi Beton U. 24 ; 175 x Hasil analisa ( Acp. 22 ) 1,890,000.00
- Bekisting Multiplek 9 mm ( 1 : 0,15 : 0.15 ) x ( 0,15 x 2 ) x Hasil Analisa ( Acp. 24 ) 490,000.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 3,286,308.33
3,286,300.00
8 KOLOM STRUKTUR 50 X 30 ( 200 KG/M3 U.24 ) K-225 READYMIX BEKISTING MULTI 9 MM
- Beton Readymix K-225 ( Acp.21b ) 499,100.00
- Besi Beton U. 24 ; 200 x Hasil analisa ( Acp. 22 ) 2,160,000.00
- Bekisting Multi 9 mm ( 1 : 0,5 : 0.30 ) x ( 0,30 x 2+0.50X2 ) x Hasil Analisa ( Acp. 25.a ) 392,000.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 3,303,808.33
3,303,800.00
9 KOLOM STRUKTUR 25 X 30 ( 150 KG/M3 U.24 ) K-225 READYMIX BEKISTING MULTI 9 MM
- Beton Readymix K-225 ( Acp.21b ) 499,100.00
- Besi Beton U. 24 ; 150 x Hasil analisa ( Acp. 22 ) 1,620,000.00
- Bekisting Multi 9 mm ( 1 : 0,25 : 0.30 ) x ( 0,25 + 0.25+0.30+0.30 ) x Hasil Analisa ( Acp. 25.a ) 539,000.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 2,910,808.33
2,910,800.00
10 KOLOM PRAKTIS15 X 20 ( 150 KG/M3 U.24 ) K-225 READY MIX BEKISTING MULTIPLEK 9 MM
- Beton Readymix K-225 ( Acp.20 ) 499,100.00
- Besi Beton U. 24 ; 150 x Hasil analisa ( Acp. 22 ) 1,620,000.00
- Bekisting Multiplek 9 mm ( 1 : 0,15 : 0.2 ) x ( 0,2 x 2 ) x Hasil Analisa ( Acp. 24 ) 490,000.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 2,861,808.33
2,861,800.00
II. KOLOM LANTAI II
1 KOLOM 25 X 25 (K1) 243 ,37 KG/M3 U.39 K-225 READY MIX BEKISTING MULTI 9 MM
- Beton Readymix K-225 ( Acp.21.d ) 499,100.00
- Besi Beton U. 39 ; 243,37 x Hasil analisa ( Acp. 22.a ) 2,944,777.00
- Bekisting Multi 9 mm ( 1 : 0,25 : 025 ) x ( 0,25 x 4 ) x Hasil Analisa ( Acp. 25a ) 588,000.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 4,284,585.33
4,285,000.00
2 KOLOM 30 x 35 (K2) 301,45 KG/M3 U.39 K-225 READY MIX BEKISTING PAPAN
- Beton Readymix K-225 ( Acp.21.d ) 499,100.00
- Besi Beton U. 39 ; 301,45 x Hasil analisa ( Acp. 22.a ) 3,647,545.00
- Bekisting Papan ( 1 : 0,3 : 0.35 ) x ( 0,35 + 0.35 + 0.3 + 0.3 ) x Hasil Analisa ( Acp. 24 ) 415,380.95
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 4,814,734.29
4,814,700.00
3 KOLOM 30 x 35 (K3) 235,23 KG/M3 U.24 K-225 READY MIX BEKISTING MULTI 9 MM
- Beton Readymix K-225 ( Acp.21.c ) 499,100.00
- Besi Beton U. 24 ; 235,23 x Hasil analisa ( Acp. 22 ) 2,540,484.00
- Bekisting Multi 9 mm ( 1 : 0,3 : 0,35 ) x ( 0,35 x 4 ) x Hasil Analisa ( Acp. 25.a ) 98,000.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 3,390,292.33
3,390,300.00
4 KOLOM 30 x 35 (K4) 244,37 KG/M3 U.24 K-225 SITE MIX BEKISTING MULTI 9 MM
- Beton Sitemix K-225 ( Acp.21 ) 692,200.00
- Besi Beton U. 24 ; 244,37 x Hasil analisa ( Acp. 22 ) 2,639,196.00
- Bekisting Multi 9 mm ( 1 : 0,3 : 0,35 ) x ( 0,35 x 4 ) x Hasil Analisa ( Acp. 25.a ) 49,000.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 3,633,104.33
3,633,100.00
B PONDASI
1 TYPE (P1) TELAPAK 154.84 KG/M3 U.24 K-225 READY MIX BEKISTING MULTIPLEK 9 MM
- Beton Readymix K-225 ( Acp.20 ) 499,100.00
- Besi Beton U. 24 ; 154.84 x Hasil analisa ( Acp. 22 ) 1,672,272.00
- Bekisting Multiplek 9 mm ( 1 : 0,15 : 0.15 ) x ( 0,15 x 2 ) x Hasil Analisa ( Acp. 24 ) 490,000.00
J U M LAH 2,661,372.00
2,661,400.00
2 TYPE (P2) TELAPAK 71.10 KG/M3 U.24 K-225 READY MIX BEKISTING MULTIPLEK 9 MM
- Beton Readymix K-225 ( Acp.20 ) 499,100.00
- Besi Beton U. 24 ; 71.10 x Hasil analisa ( Acp. 22 ) 767,880.00
- Bekisting Multiplek 9 mm ( 1 : 0,15 : 0.15 ) x ( 0,15 x 2 ) x Hasil Analisa ( Acp. 24 ) 490,000.00
J U M LAH 1,756,980.00
a b c d e f=(dxe) g=(dxe) h
1,757,000.00
C. BALOK
1 BALOK 25 X 50 (B1) 305,02 KG/M3 U.39 K-300 READY MIX BEKISTING MULTI 9 MM
- Beton Readymix K-300 ( Acp.21.d ) 544,200.00
- Besi Beton U. 39 ; 305,02 x Hasil analisa ( Acp. 22.a ) 3,690,742.00
- Bekisting Multi 9 mm ( 1 : 0,25 : 0.5 ) x ( 0,5 x 2+0.25 ) x Hasil Analisa ( Acp. 25a ) 367,500.00
- Stoot Werk ; (1 : 0.25 : 0.5 ) x ( 0.25 + 0.3 ) x Hasil Analisa ( Acp. 26 ) 427,680.00
J U M LAH 5,030,122.00
5,030,100.00
2 BALOK 20 X 40 (B2) 275,92 KG/M3 U.39 K-300 READY MIX BEKISTING MULTIPLEK 9 MM
- Beton Readymix K-300 ( Acp.21.d ) 544,200.00
- Besi Beton U. 39 ; 275,92 x Hasil analisa ( Acp. 22.a ) 3,338,632.00
- Bekisting Multiplek 9 mm ( 1 : 0,2 : 04 ) x ( 0,4 x 2 + 0.2 ) x Hasil Analisa ( Acp. 24 ) 459,375.00
- Stoot Werk ; ( 1 : 0.2 : 0.4 ) x ( 0.2 + 0.3 ) x Hasil Analisa ( Acp. 26 ) 758,125.00
J U M LAH 5,100,332.00
5,100,300.00
3 BALOK 20 X 30 (B3) 237,67 KG/M3 U.24 K-225 SITEMIX BEKISTING MULTI 9 MM
- Beton Readymix K-225 ( Acp.21.c ) 499,100.00
- Besi Beton U. 24 ; 237,67 x Hasil analisa ( Acp. 22 ) 2,566,836.00
- Bekisting Multi 9 mm ( 1 : 0,2 : 0,3 ) x ( 0,3 x 2 + 0.2 ) x Hasil Analisa ( Acp. 25.a ) 490,000.00
- Stoot Werk ; (1 : 0.2 : 0.3 ) (0.2 + 0.3 ) x Hasil Analisa ( Acp. 26 ) 1,010,833.33
J U M LAH 4,566,769.33
4,566,800.00
4 BALOK 20 X 40 (B4) 200,42 KKG/M3 U.24 -225 SITE MIX BEKISTING MULTIPLEK 9 MM
- Beton Sitemix K-225 ( Acp.21 ) 692,200.00
- Besi Beton U. 24 ; 200,42 x Hasil analisa ( Acp. 22 ) 2,164,536.00
- Bekisting Multiplek 9 mm ( 1 : 0,2 : 0,4 ) x ( 0,4 x 2 +0.2) x Hasil Analisa ( Acp. 24 ) 459,375.00
- Stoot Werk ; ( 1 : 0.2 : 0.4 ) x ( 0.4 + 0.3 ) x Hasil Analisa ( Acp. 26 ) 606,500.00
J U M LAH 3,922,611.00
3,922,600.00
5 RING BALK BETON 15 X 15 ( 175 KG/M3 U.24 ) K-175 SITE MIX BEKISTING MULTIPLEK 9 MM
- Beton Sitemix K-175 ( Acp.20 ) 653,600.00
- Besi Beton U. 24 ; 175 x Hasil analisa ( Acp. 22 ) 1,890,000.00
- Bekisting Multiplek 9 mm ( 1 : 0,15 : 0,15 ) x ( 0,15 x 2 ) x Hasil Analisa ( Acp. 24 ) 490,000.00
J U M LAH 3,033,600.00
3,033,600.00
6 RING BALK SELASAR BETON 15 X 20 ( 138.5 KG/M3 U.24 ) K-175 SITE MIX BEKISTING MULTIPLEK 9 MM
- Beton Sitemix K-175 ( Acp.20 ) 653,600.00
- Besi Beton U. 24 ; 138.5 x Hasil analisa ( Acp. 22 ) 1,495,800.00
- Bekisting Multiplek 9 mm ( 1 : 0,15 : 0,20 ) x ( 2 x 0.2 +0.15) x Hasil Analisa ( Acp. 24 ) 232,750.00
- Stoot Werk ; ( 1 : 0.4 : 0.8 ) x ( 0.4 + 0.3 ) x Hasil Analisa ( Acp. 26 ) 265,343.75
J U M LAH 2,647,493.75
2,647,500.00
7 BALOK STRUKTUR 50 X 30 ( 250 KG/M3 U.24 ) K-225 READYMIX BEKISTING MULTI 9 MM
- Beton Readymix K-225 ( Acp.21b ) 499,100.00
- Besi Beton U. 24 ; 250 x Hasil analisa ( Acp. 22 ) 2,700,000.00
- Bekisting Multi 9 mm ( 1 : 0,5 : 0.30 ) x ( 0,30 +0.50 ) x Hasil Analisa ( Acp. 25.a ) 196,000.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 3,647,808.33
3,647,800.00
8 BALOK G0RDES 25 X 30 ( 150 KG/M3 U.24 ) K-225 READYMIX BEKISTING MULTI 9 MM
- Beton Readymix K-225 ( Acp.21b ) 499,100.00
- Besi Beton U. 24 ; 150 x Hasil analisa ( Acp. 22 ) 1,620,000.00
- Bekisting Multi 9 mm ( 1 : 0,25 : 0.30 ) x ( 0,30 +0.250 ) x Hasil Analisa ( Acp. 25.a ) 196,000.00
- Stoot Werk ; 0,25 x ( 1 : 0,12 ) x Hasil Analisa ( Acp. 26 ) 252,708.33
J U M LAH 2,567,808.33
2,567,800.00
D. PLAT LANTAI
1 PLAT LANTAI T = 12 CM ( 125 KG/M3 U.24 ) READY MIX K-225 READY MIX BEKISTING MULTI 12 MM
- Beton Readymix K-225 ( Acp.21.c ) 499,100.00
- Besi Beton U. 24 ; 125 x Hasil analisa ( Acp. 22 ) 1,350,000.00
- Bekisting Multi 12 mm ( 1 : 0,12 ) x Hasil Analisa ( Acp. 25.a ) 810,000.00
- Stoot Werk ; (1 : 0.12 ) x Hasil Analisa ( Acp. 26 ) 606,500.00
J U M LAH 3,265,600.00
3,265,600.00
2 PLAT LANTAI T = 12 CM ( 125 KG/M3 U.24 ) READY MIX K-225 SITE MIX BEKISTING MULTI 12 MM
- Beton Sitemix K-225 ( Acp.21 ) 692,200.00
- Besi Beton U. 24 ; 125 x Hasil analisa ( Acp. 22 ) 1,350,000.00
- Bekisting Multi 12 mm ( 1 : 0,12 ) x Hasil Analisa ( Acp. 25.a ) 810,000.00
- Stoot Werk ; (1 : 0.12 ) x Hasil Analisa ( Acp. 26 ) 1,010,833.33
J U M LAH 3,863,033.33
a b c d e f=(dxe) g=(dxe) h
3,863,000.00
3 PLAT GORDES T = 12 CM ( 150 KG/M3 U.24 ) READY MIX K-225 READY MIX BEKISTING MULTI 12 MM
- Beton Readymix K-225 ( Acp.21 ) 499,100.00
- Besi Beton U. 24 ; 150 x Hasil analisa ( Acp. 22 ) 1,620,000.00
- Bekisting Multi 12 mm ( 1 : 0,12 ) x Hasil Analisa ( Acp. 25.a ) 405,000.00
- Stoot Werk ; (1 : 0.12 ) x Hasil Analisa ( Acp. 26 ) 1,010,833.33
J U M LAH 3,534,933.33
3,534,900.00
E. SLOOF
1 SLOOF 25 x 40 198.36 KG/M3 U.39 READY MIX K-225 READY MIX BEKISTING MULTI 9 MM
- Beton Readymix K-225 ( Acp.21.c ) 488,100.00
- Besi Beton U. 24 ; 198.36 x Hasil analisa ( Acp. 22 ) 1,350,000.00
- Bekisting Multi 9 mm ( 1 : 0.25 : 0.4 ) x ( 2 x 0.4 ) x Hasil Analisa ( Acp. 25.a ) 275,625.00
J U M LAH 2,113,725.00
2,113,700.00
2 SLOOF 25 x 40 168.56 KG/M3 U.39 READY MIX K-225 READY MIX BEKISTING MULTI 9 MM
- Beton Sitemix K-225 ( Acp.21.c ) 692,200.00
- Besi Beton U. 24 ; 168.56 x Hasil analisa ( Acp. 22 ) 1,620,000.00
- Bekisting Multi 9 mm ( 1 : 0.25 : 0.4 ) x ( 2 x 0.4 ) x Hasil Analisa ( Acp. 25.a ) 275,625.00
J U M LAH 2,587,825.00
2,587,800.00
3 SLOOF (SL3) 15 x 20 186.96 KG/M3 U.24 ) SITE MIX K-175 SITE MIX BEKISTING MULTIPLEK 9 MM
- Beton Sitemix K-175 ( Acp.21.c ) 653,600.00
- Besi Beton U. 24 ; 150 x Hasil analisa ( Acp. 22 ) 1,620,000.00
- Bekisting Multiplek 9 mm ( 1 : 0.15 : 0.2 ) x ( 2 x 0.2 ) x Hasil Analisa ( Acp. 25.a ) 275,625.00
J U M LAH 2,549,225.00
2,549,200.00
4 SLOOF 25 x 35 ( 150 KG/M3 U.24 ) SITE MIX K-225 READY MIX BEKISTING MULTIPLEK 9 MM
- Beton Readymix K-225 ( Acp.21.c ) 499,100.00
- Besi Beton U. 24 ; 150 x Hasil analisa ( Acp. 22 ) 1,620,000.00
- Bekisting Multiplek 9 mm ( 1 : 0.25 : 0.35 ) x ( 2 x 0.35 ) x Hasil Analisa ( Acp. 25.a ) 294,000.00
J U M LAH 2,413,100.00
2,413,100.00
5 SLOOF PRAKTIS 15 x 20 ( 150 KG/M3 U.24 ) SITE MIX K-225 READY MIX BEKISTING MULTIPLEK 9 MM
- Beton Readymix K-225 ( Acp.21.c ) 499,100.00
- Besi Beton U. 24 ; 150 x Hasil analisa ( Acp. 22 ) 1,620,000.00
- Bekisting Multiplek 9 mm ( 1 : 0.15 : 0.20 ) x ( 2 x 0.20 ) x Hasil Analisa ( Acp. 25.a ) 490,000.00
J U M LAH 2,609,100.00
2,609,100.00
F. BETON TANGGA
1 TANGGA ( 218.1 KG/M3 U.39 ) READY MIX K-225 READY MIX BEKISTING MULTI 9 MM
- Beton Readymix K-225 ( Acp.21.c ) 499,100.00
- Besi Beton U. 39 ; 218.1 x Hasil analisa ( Acp. 22a ) 2,639,010.00
- Bekisting Multi 9 mm ( 1 : 0.15 ) x Hasil Analisa ( Acp. 25.a ) 245,000.00
- Stoot Werk ; (1 : 0.15 ) x Hasil Analisa ( Acp. 26 ) 808,666.67
J U M LAH 4,191,776.67
4,191,800.00
2 TANGGA ( 218.1 KG/M3 U.39 ) READY MIX K-225 SITE MIX BEKISTING MULTI 9 MM
- Beton Sitemix K-225 ( Acp.21.c ) 692,200.00
- Besi Beton U. 39 ; 218.1 x Hasil analisa ( Acp. 22a ) 2,639,010.00
- Bekisting Multi 9 mm ( 1 : 0.15 ) x Hasil Analisa ( Acp. 25.a ) 245,000.00
- Stoot Werk ; (1 : 0.15 ) x Hasil Analisa ( Acp. 26 ) 808,666.67
J U M LAH 4,384,876.67
4,384,900.00
3 PLAT TRAP TANGGA ( 150 KG/M3 U.24 ) READY MIX K-225 READY MIX BEKISTING MULTI 9 MM
- Beton Readymix K-225 ( Acp.21.c ) 499,100.00
- Besi Beton U. 24 ; 150 x Hasil analisa ( Acp. 22a ) 1,620,000.00
- Bekisting Multi 9 mm ( 1 : 0.15 ) x Hasil Analisa ( Acp. 25.a ) 245,000.00
- Stoot Werk ; (1 : 0.15 ) x Hasil Analisa ( Acp. 26 ) 808,666.67
J U M LAH 3,172,766.67
3,172,800.00