Drawing Disburse to site

Final Drawing
Serial No Project Name
Completed Drawing Completed
Date
1 Eminence Shore Protection 11-29-2016
2 Babylonia VRF Support structure 12-06-2016
3 Symphony Swiming pool and boundary wall details 01-01-2017
4 Platinum Square Supper roof detail structure 01-19-2017
5 Ivory Tower Shore Protection 02-05-2017
Foundation Drawing, Retainig wall,Column & Shear wall
6 Eminence Details 02-22-2017
7 Platinum Square Lift Pit Bottom Beam Details 02-26-2017
8 RL Square Boundary wall details 03-01-2017
9 Lake Placid i) Basement-1 slab ii) Ground floor slab 03.15.2017
10 Sanchayeeta Generator Room Shade 03.19.2017
11 RD Center Support structure of generator's radiator canopy 03-21-2017
12 Ivory Tower Shore Protection with 4X8 Joist (Revised) 04-06-2017
13 Symphony Lift core breaking & construction procedure details 04-24-2017
14 Ivory tower 1st level braching details 04-06-2017
15 Eminence Stair details Basement 02 04-24-2017
Roof top water tank & machine room details with solar
16 RL Square 05-04-2017
panel slab
17 Ivory Tower 2nd level bracing layout plan 05-25-2017
18 Babylonia Ground floor slab extention details 05-31-2017
19 Babylonia Ground floor slab extention details (Revised) 06-13-2017
20 Basundhara Shore Protection Phase 1 06-11-2017
21 Eminence Beam layout plan at 1st basement level 06-13-2017
22 Platinum Square Safety shade 07-11-2017
23 Babylonia First floor slab extension 07-09-2017
24 Babylonia 1st floor slab extension (Revised) 07-16-2017
25 Babylonia Ground floor ramp, drive way and water body details 07-10-2017
26 FC Enclave Service toilet and Generator base 07-13-2017
27 RD Center Ground floor slab extension details 07-19-2017
28 Eminence 1st Basement slab details 07-25-2017
29 Eminence Ground floor slab details 07-25-2017
30 Babylonia Planter Box detail 08-02-2017
31 RL Square Rain water pit details 08-03-2017
32 Lake Placid Ground floor slab (Revised) 05-09-2017
33 Eminence Stair details (Typical) 08-09-2017
34 Symphony Symphony Front Planter box detail 11-09-2017
Roof top water tank & machine room details with solar
35 RL Square 08-13-2017
panel slab (Revised)
36 Platinum Square Supper roof details structure (Revised) 08-17-2017
37 RL Square Boundary wall details (Revised) 08-20-2017
38 Lake Placid 1st floor slab & Beam layout plan 9-12-2017
39 Rangs Hira Generator roof slab 09-25-2017
40 RD Center Samsonite false slab for baggage storage 09-26-2017
41 Lake Placid Stair detais (Typical) 10-02-2017
42 Basundhara Shore pile layout (Revised) 10-03-2017
43 RPL Head office Boundary wall details 10-04-2017
44 Eminence Ground floor slab details (Revised) 10-29-2017
45 FC Enclave Rising bollared pit (Hand scatch) 10-31-2017
i) 1st floor slab ii) 2nd to 9th floor slab (Slab out line will
46 Lake Placid 11-02-2017
be currected after receiving architectural drwaing)
47 Basundhara Shore protection phase 1 11-06-2017
48 Symphony Ventilation duct detail 10-24-2017
49 Symphony Symphony Front Planter box detail 11-09-2017
50 Basundhara Service pile layout & support pile location (Observation) 11-22-2017
51 Symphony Front green area detail 11-23-2017
52 Eminence Ground floor slab details (Revised) 12-03-2017
53 FC Enclave Boundary wall (Revised) 12-03-2017
Revised section 03-03 (Swiming pool and boundary wall
54 Symphony 12-13-2017
details)
55 Symphony Toilet top slab rebar details (Hand scatch) 12-19-2017
Rectification drawing of column C1 at grid 6&D (Hand
56 Eminence 12-21-2017
Scatch)
57 RD Center Rising bollared pit (Hand scatch) 12-26-2017
58 FC Enclave Boundary wall (back side) detail (Hand scatch) 12-28-2017
59 Basundhara General specification 12-28-2017
Service pile layout with sectional details {Property line
60 Basundhara 01-08-2018
adjusted}
61 Eminence Partial panel wall detail 01-28-2018
Pylon foundation & Metal clading foundation (hand
62 FC Enclave 01-30-2018
scatch)
63 Eminence Panel wall details 01-31-2018
64 Eminence 1st to roof floor slab detail 01-31-2018
65 Dhanmondi 27 Shore protection details 01-31-2018
66 FC Enclave Pylon foundation (hand scatch) Revised 02-06-2018
Foundation to roof, i) foundation details, ii)slab and
67 Ivory Tower 02-14-2018
beam, panel wall detail, ramp, shear wall details
i) Stair details typical (Revised), ii) Ground floor slab
68 Eminence details (Revised), iii) Panel wall details 05 (Revised), iv) 02-19-2018
1st floor to roof slab details (Revised)
69 FC Enclave North west corner slab details (hand scatch) 02-20-2018
70 Ivory Tower Ivory front wall brick wall (Hand scatch) 02-21-2018
71 Babylonia Babylonia pylon details (Hand scatch) 02-22-2018
72 RL Square RL Square slab breaking & construction 02-28-2018
73 Eminence Stair details(fire) typical (Revised) 03-01-2018
74 Platinum Square Fire stair roof slab (Hand scatch) 03-04-2018
75 Rangs Hira Cantilever slab design 03-06-2018
76 RL Square Super roof (revised) 03-14-2018
77 Ivory Tower Stair details (basement to ground) 03-22-2018
78 Ivory Tower Shear wall rebar and column tie details 03-22-2018
79 Eminence Scaffolding removal methodology (hand scathc) 03-07-2018
80 Port Height Column & pile layout(observation) 03-22-2018
81 RL Square Tower hoist tie member details (hand scatch) 04-02-2018
82 Park height Support structure of solar panel 04-06-2017
83 Lake Placid 4th to 9th floor slab Revised 04-11-2018
84 Eminence Scaffolding design 04-17-2018
85 RL Square Generator base & guard room detail 04-24-2018
86 Eminence Rain water collection pit wall 04-17-2018
87 Lake Placid Fair face wall modification as per architectural dwg. 04-17-2018
88 Basundhara Earth excavation & Water proofing methodology 04-26-2018
89 RL Square
RL square super roof (Revised) as per site requirement 04-30-2018
90 Eminence 2nd floor section for land owner 05-06-2018
91 Eminence 2nd floor slab (Revised) 07-05-2018 05-07-2018
92 RL Square Ground floor water body details 05-15-2018
93 Sultan's Glass Canopy details 05-16-2018
94 Ivory Tower Foundation and Panel wall details (Revised) 05-21-2018
95 Ivory Tower Slab, Beam & Ramp details (Revised) 05-21-2018
96 Ivory Tower General specification (Revised) 05-21-2018
97 Babylonia Boundary wall design for pylon support 05-24-2018
98 Babylonia Babylonia glass lift 06-03-2018
99 Babylonia Revised boundary wall for pylon foundation 07-05-2018
100 Babylonia Steel shutter support details 07-05-2018
101 Ivory Tower Column & wall layout Rectification 07-12-2018
2nd floor to roof, i) 2nd to 3rd floor slab Revised, ii) 4th
102 Lake Placid to 10th floor slab Revised, iii)11th to 12th floor slab, iv) 07-12-2018
Roof slab
103 Sultan's Pylon support foundation 07-22-2018
104 Dhanmondi 27 (390/B) 01 Shore protection Drawing 07-24-2018
105 Ivory Tower Column & wall for rectofitting 07-26-2018
106 RL Square Slab, column, wall extension 07-26-2018
Foundation to Basement-1, i) Column & wall
107 Ivory Tower Rectification, ii) Mat details, iii) Basement Slab, beam & 07-30-2018
Ramp
108 RL Square Vault structure 01 07-31-2018
109 Dhanmondi 27 (390/B) Shore protection (Revised) 07-31-2018
110 Eminence Boundary wall (Eminence) 08-02-2018
111 Dhanmondi 27 (390/B) Shore protection (Revised) 08-02-2018
112 Babylonia Glass lift bracket support details 08-05-2018
113 Eminence 1)Glass lift 6th floor. 2) Glass lift 7th floor 08-13-2018
Manual hand correction: 1. Basement2 beam layout, 2.
114 Ivory Tower Basement 2 slab Rebar, 3. Basement 1 beam layout, 4. 08-13-2018
Basement1 slab rebar
115 Dhanmondi 27 (390/B) Shore protection (Revised) 09-05-2018
116 Eminence Scaffolding support details 09-18-2018
117 Courtyard General specification (25-09-2018) 09-25-2018
118 Courtyard Foundation,column schedule (25-09-2018) 09-25-2018
119 Courtyard Ground floor Slab & Beam Details (25-09-2018) 09-25-2018
120 Courtyard Ramp Details (25-09-2018) 09-25-2018
121 Courtyard Stair details (25-09-2018) 09-25-2018
122 Lake Placid cantilever slab detail 09-30-2018
123 Lake Placid Fire stair back side (As cast wall details) 09-30-2018
124 Lake Placid Front side slab breaking 09-30-2018
125 Ivory Tower Basement-1 slab, Beam (Revised) 04-10-2018 10-04-2018
Architectural Information
Design by Drawn by Architectural Drawing
Consultant Name Date
hand scatch

hand scatch

hand scatch
hand scatch
hand scatch

hand scatch

hand scatch

Soybur
Mejba
Mejba
Mejba
Mejba
mejba
mejba

Hand scatch
Hand scatch

Soybur

Mejba

Hand scatch
Soybur
Mejba
Soybur/Mejba

Mejba

Mejba
Soybur
hand scatch
Soybur
Hand scatch
Hand Scatch

Hand Scatch

Soybur
Hand Scatch
Mejba/Soybur
Mejba/Soybur
Mejba/Soybur
Mejba/Soybur
Mejba/Soybur
Hand Scatch
Hand Scatch
Hand Scatch
Mejba
Drawing Disburse to architect
Final Drawing
Completed Drawing Completed
Date

Beam layout plan with column size


Name: Rangs Eminence
Project Address: Plot:-79, Satmosjid Road, Dhanmondi, Dhaka
Project Information: 02-Basement & G+13 Storied Commercial Building
Concern Person (Office): Rafi
Concern Person (Site): Ruhul Amin
Current pending Issues: Ramp super elevation, Services drawing
Structural
Disbursed Drawing to project
Serial
No Name Date Sheet nos.

1 Shore Protection 11-29-2016 S-01 to S-14

2 Foundation drawing retainig wall 02-22-2017 S-18 to S-34


column & shear wall details
3
4 Stair details Basement 02 04-24-2017 S-35
Beam layout plan at 1st basement
5 06-13-2017 S-37
level

i) 1st basement slab details ii)


6 07-25-2017 S-36 to S-46
Ground floor slab details

7 Stair details (Typical) 08-09-2017 S-35A to S-35L

8 Ground floor slab details (Revised) 10-29-2017 S-39, 40, 42

9 Ground floor slab details (Revised) 12-03-2017 S-39, 40,41, 42,


45, 45A, 46
Rectification drawing of column C1
10 12-21-2017 Hand Scatch
at grid 6&D (Hand Scatch)
S-79, 81, 82,
11 Partial panel wall details 01-28-2018
85,86

12 Panel wall details 01-31-2018

13 1st to roof floor slab, 01-31-2018 S-47 to S-77 &


8o, 83, 84
i) Stair details typical (Revised), ii)
Ground floor slab details (Revised),
14 iii) Panel wall details 05 (Revised), 02-19-2018 S-35 to S-84
iv) 1st floor to roof slab details
(Revised)
S-35B to 35D &
15 Stair details(fire) typical (Revised) 03-01-2018
35J to 35L
16 Scaffolding removal methodology 03.07.2018 Hand Scatch
17 04-17-2018
Scaffolding design S-01 to S-03
18 Rain water collection pit wall 04-17-2018 Hand Scatch
19 2nd floor section for land owner 05-06-2018 2 nos
20 2nd floor slab (Revised) 05-07-2018
21 Boundary wall (Eminence) 08-02-2018 Hand Scatch
1)Glass lift 6th floor. 2) Glass lift 7th
22 08-13-2018 Hand Scatch
floor
23 09-18-2018 Hand Scatch
Scaffolding support details
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
uilding

g
Structural
to project Disbursed Drawing to Architect Consultant
Serial
Refrence Architectural Drawing Name Date Sheet nos. No

Revised Working_05 Beam Layout 06-06-2017 1 INSPACE

Revised Working_05 28.11.2016 PIPE LOCATION 04-23-2018 1 2 INSPACE

3
Revised Working_05 28.11.2016 4 INSPACE
Revised Working_05 28.11.2016 5 INSPACE

DH-79_Revised_13_07_2017 Beam 6 INSPACE

Stair Revised_26_07_2017 7 INSPACE

Verbal discussion 8 INSPACE

Revised_07_2017 9 INSPACE

10 INSPACE

11 INSPACE

12 INSPACE

01_Revised Plan_For Duct


13
02_Revised Elevation_For Panel wall

03_Revised Plan_For Panel


14
wall_Print

05_Revised Plan_Fire Stair rev 15


16
17
18
19
20
21
EMINANCE_MRL LIFT_R2 22

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Architectural /EME/PLUMBING/HVAC
Drawing

Drawing Name Date Remarks & contents


Rev _14.06.17 06-14-2017 Architectural

DH-79_Revised_07_2017 07-13-2017 Architectural

Stair Revised_26_07_2017 07-26-2017 Architectural


Revised eme Integrated plan_07_2017 EME (1st basement only)

Architectural change after site visit by architect (Himel


Revised_07_2017 11-21-2017 shaha) changes area in drawing, ground floor front
level raise, Ramp adjust and car lift top slab level raise
Architectural working drawing all plan, slab out line,
Revised Working_03.12.2017_Print 12-5-2017 elevation & section, Perspective, some partial section
& pnnel wall details
Revised Plumbing Rangs Eminence 12-07-2017 Plumbing drawing
Architectural working drawing all floor plan, duct
01_Revised Plan_For Duct 1-9-2018 location, 1st floor slab out line, elevation & section,
some partial section & pnnel wall details
02_Revised Elevation_For Panel wall 1-18-2018 Revised 4 (four) side elevation, Pannel wall detail &
stair typpical plan
Stair Section 1-24-2018 Section through stair after height change due to panel
wall shuttering
Revised architectural working drawing all floor plan,
03_Revised Plan_For Panel wall_Print 02-07-2018 slab out line, elevation & section, some partial section
& pnnel wall details, stair plan

05_Revised Plan_Fire Stair rev 02-26-2018 Revised stair (only for fire stair) after change

05_Revised Plan_Fire Stair rev 03-01-2018 Revised stair (only for fire stair) after change (revised)

Revised Plumbing Rangs Eminence.dwg 111 04-03-2018 Revised plumbing drawing


3rd Floor 05-22-2018 3rd floor plan & slab revised
EMINENCE _ GLASS LIFT _ For Eye
08-06-2018 MRL glass lift
Hospital
Revised Roof & Top Roof Plan_09.08.18 08-09-2018 Roof plan
EMINANCE_MRL LIFT 08-11-2018 MRL glass lift beam added at typical floor
EMINANCE_MRL LIFT 08-12-2018 MRL lift size has increased & pit beam added
EMINANCE_MRL LIFT 08-13-2018 MRL lift pit beam position adjusted
EMINANCE_MRL LIFT_R2
08-13-2018 MRL lift size reduced (Revised)
Revised Roof & Top Roof Plan_17.09.18 09-17-2018 Revised Roof plan & Roof top slab layout, roof top
canopy plan and two partial section
EME/PLUMBING/HVAC
Pending/dependency Issue
Mailing
Isuue Opening date Closing Date
Date
Engr. Ruhul Amin will come to office and discuss with him as
11-1-2017
per change issue(follow up him)

Ramp side fair face wall detail required (over phone) 11-7-2017

Architectural complete drawing required 11-7-2017


Basement beam layout finalization 6-6-2017

Service final drawing 11-23-2017 11-27-2017

Toilet block vertical pipe plumbing issue.


Project Concrete t
Project work Status
Responsible Serial No Serial No
Preson Work Date
1 Ground floor slab shuttering will start 11-20-2017 1

2 2

3 3
4 4
5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22

23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
46 46
47 47
48 48
49 49
50 50
Concrete test report

Age of tested
Location of tested sample Date
sample (Days)

1st basement column 12.05.2017 33

1st basement floor 09-25-2017 31

1st basement retaining wall 12-12-2017 32


ramp 12-28-2017 35
1st floor slab 04-28-2018 31
Name: Ivory Tower
Project Address: Plot:-118, Gulshan Avenue, Dhaka
Project Information: 3 Basement+ G+ 18 storied building
Concern Person (Office): Irtiaz
Concern Person (Site): Kajol
Current Pending Issues: Services drawing has not solved yet, structural drawing fully depends on it
Structural
Disbursed Drawing to project
Serial
No Name Date Sheet nos.
1 Shore Protection 02-05-2017 S-03 to S-13

2 Shore Protection with 4X8 Joist (Revised) 04-06-2017 S-4

3 1st level bracing with connection detail 04-27-2017 S-4 to


4 2nd level bracing layout plan 05-25-2017 S-09 to 09A

Foundation to roof, i) Foundation and


5 panel wall details, ii) Slab, Beam & Ramp 02-14-2018 ST-01 to ST-79
details

6 Ivory front wall brick wall 02-21-2018 Hand scatch


7 Stair details (basement to ground) 03-22-2018

8 Shear wall rebar & column tie details 03-22-2018

Foundation and Panel wall details


9 05-21-2018
(Revised)
10 Slab, Beam & Ramp details (Revised) 05-21-2018
11 General specification (Revised) 05-21-2018
12 Column & wall layout Rectification 07-12-2018
01 to 03
Foundation to Basement-1, i) Column &
13 wall Rectification, ii) Mat details, iii) 07-30-2018 REC-01 TO REC-07
Basement Slab, beam & Ramp
Manual hand correction: 1. Basement2
14 beam layout, 2. Basement 2 slab Rebar, 3. 08-13-2018 Hand scatch
Basement 1 beam layout, 4. Basement1
slab rebar
Basement-1 slab, Beam (Revised) 04-10-
15 10-04-2018
2018
17

18

19

20

21
22

23

24
25
26
27
28
29

30

31
32

33

34

35

36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
awing fully depends on it
Structural
ject Disbursed Drawing to Architect
Refrence Architectural Drawing Name Date Sheet nos.
RANGS 118-31012017 Beam Layout Ivory Tower 05-08-2017

RANGS 118-31012017 Changed front wall & Beam layout 26.10.2017 10-26-2017

RANGS 118-31012017 Rangs,Gulshan_(Feet)_151117 11-16-2017


RANGS 118-31012017 EME Solution 12-14-2017
118 --WORKING DRAWING for
Structure--06.08.2017, Ivory
Rev_Front Elevation, 118 Plan 04- Mat out line & grid line 12-26-2017
12-17_Mico vai, Ivory-Architectural
MOb,
Beam Layout{revised}27-12-2017 12-27-2017
Structural observation on EME & Integrated
RANGS 118-31012017
drawing (Inspace) jpeg 01-07-2018
Structural observation on Architectural drawing
(Inspace) jpeg 01-07-2018

for model 06-07-2018

Z square architectural plans


17072018
Architectural /E
Consultant Drawing
Serial
No
Drawing Name Date
1 URBANA 20160517.dwg TOWER 118 05-17-2016

2 INSPACE Ivory Tower EME feedback-31-10-16


12-01-2016
3 URBANA RANGS 118-31012017 01-31-2017
4 URBANA RANGS 118 - FIRE EXIT.pdf 06-01-2017

118 --WORKING DRAWING for Structure--


5 URBANA 08-06-2017
06.08.2017

6 INSPACE Ivory Tower EME feedback-16-10-17 10-16-2017


7 REVISED PLumbing Drawing 13-09-2017 9-13-2017

8 REVISED PLumbing Drawing 17.10.17 10-17-2017

9 Survey consultant Rangs,Gulshan_(Feet)_151117


11-15-2017
10 INSPACE 118 --Terrace Pluming Line Plan (Inspace) 11-30-2017
11 INSPACE 13-12-17.dwg
12 118 Plan 04-12-17_Mico vai
URBANA 12-04-2017

13 IVORY Basement_03 241217


INSPACE 12-26-2017

14 Ivory-Architectural MOb
INSPACE 01-04-2018
15 Ivory-EME
INSPACE 01-04-2018
16 Ivory-Architectural MOb.
INSPACE 01-09-2018
17 Ivory-EME JANUARY 09.01.18
INSPACE 01-09-2018
18 Ivory Rev_Front Elevation
INSPACE 02-06-2018
19 Ivory Rev_12.02.18_All Elevation
INSPACE 02-12-2018

20 INSPACE 14.02.2018 Elevations (Corrected) 02-15-2018


21 INSPACE
IVORY Panel wall 04-03-2018
22 INSPACE Section (conceptual) from arch. linkon 05-23-2018

23 INSPACE 30-5-18 05-30-2018


24 Ahsan mico 07-06-18 06-09-2018
25 Ahsan mico Structural feedback 11-06-2018 06-11-2018
26 Ahsan mico Structural feedback 20-06-2018 06-20-2018
27 Ahsan mico Architectural feedback 24-06-2018 06-24-2018
28 Ahsan mico z square section 07-09-2018

29 Ahsan mico for model 06-07-2018 07-12-2018

30 Ahsan mico Z square architectural plans 17072018 07-17-2018


31 Ahsan mico Z SQUARE_FOR STRUCTURE_26.07.18 07-26-2018

32 Ahsan mico Z SQUARE_FOR STRUCTURE_09.08.18 08-09-2018

33 Ahsan mico Z SQUARE_FOR STRUCTURE_12.08.18 08-12-2018

34 Ahsan mico Z SQUARE_Final 270918 09-27-2018

35 Ahsan mico Basement_z square 10-03-2018


36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
Architectural /EME/PLUMBING/HVAC
Drawing
Remarks & Contents
Architectural Sent to SC

EME Only for basements has changed

Architectural
Architectural

Architectural

EME Only for basements


Plumbing 3rd basement to 14th floor

Plumbing 3rd basement to 14th floor

Total station survey drawing for shore pile shifting


vertically
Proposed rain water piping both horizontal & vertical

Revised Architectural drawing as per shore pile shifting


(Priliminary)

Basement-3 Architectural drawing for observation (only


mat layout plan)

Basement-3 to ground floor plan and partial section up to


ground floor (Observation)

Basement 3 to basement 1 EME integrated drawing


Basement-3 to ground floor plan and partial section up to
ground floor (substructure Final)
Basement 3 to basement 1 EME integrated drawing
(substructure Final)
Only front elevation after change front beam position and
size
4 (four) side elevation after change front beam position
and size
4 (four) side elevation after correction copy (south
elevation ground to 1st column adjust & north elevation
window position adjust)
3rd basement to ground floor panel wall details & adjusted
with related beam
Conceptual hand scatch detail by Architect wahid ahmed
linkon
Proposed 3B+G+18 architectural drawing for structural
analysis
Size enlargement of mid 4 columns
For electromechanical check
Architectural plan adjusted as per required additional
column
Partially corrected plan & section
Stair section (only)
Previous architectural & structural drawing with new
column & shear wall rectofitting drawing (basement 3 to
basement 1)
Only plan, basement-3 to 18th floor plan
Water reserver added below ramp basement-1 & ground
floor at ramp area
2nd basement height has change, presentation plan
(Basement 3 to typical floor) 2 nos section, 2 nos
elevation & 2 nos partial section

Presentation plan, Ramp super elevation, Duct position,


Basement-2 slab out line(Basement 3 to typical floor) 2
nos section, 4nos elevation & 2 nos partial section

(North side slab extention in 1st basement & Shear wall


revised) Presentation plan, basement 3 to typical floor
(Revised basement 1 slab layout) Presentation plan,
basement 3 to Basement 1
LUMBING/HVAC
Pending/dependency Issue
Opening Closing Mailing
Isuue
date Date Date
Front wall thickness 22 in instead of 14 10-17-2017 10-30-2017
Ventilation system beneath ground floor conflicts with
ground floor toilet block 10-17-2017

Fresh air intake assembly needed to relocate 10-17-2017


Exhaust horizontal duct conflicts with structural wall 10-17-2017

Exhaust duct transition from below GF to above GF

10-17-2017
How VRF conduits will pass 10-17-2017
Lift door height
10-17-2017
Pit location & disposal system for basement 1 toilet
10-17-2017
Soak well is misplaced over the basement slab
10-17-2017
How to cover the topmost portion of the service shaft. 10-17-2017
How the rainwater pipe will pass through beam 10-17-2017
Total station survey is required after excavation is complete
11-09-2017

Membrane procurement
11-16-2017

Service final drawing


11-23-2017 12-12-2017
Project Concrete test report
Project work Status
Serial Location of
Responsible Serial No
No tested sample
Preson Work Date
1 Piling work has completed 1 Base-3

2 2
Basement
3 3 Mat floor
4 4 Shear wall

5 5

6 6
7 7

8 8

9 9
10 10
11 11
12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20
21 21

22 22

23 23
24 24
25 25
26 26
27 27
28 28

29 29

30 30
31 31

32 32

33 33

34 34

35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
46 46
47 47
48 48
49 49
50 50
51 51
52 52
Concrete test report

Age of tested
Date
sample (Days)
05-16-2018

04-28-2018

07-19-2018
07-19-2018
Name: Port Height
Project Address: Sewrapara
Project Information:
Concern Person (Office):
Concern Person (Site):
Current Pending Issues:
Structural
Disbursed Drawing to project
Serial
No Name Date Sheet nos.

1 Column & pile layout(observation) 03-22-2018 ST-04 to ST-06

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Structural
roject Disbursed Drawing to Architect
Refrence Architectural Drawing Name
Date Sheet nos.
NEW WORKING SHEWRAPARA
Beam & column layout 03.22.2018
gr. slab- 080318
Architectural /EME/PL
Consultant Drawing
Serial
No INSPACE
Drawing Name Date
1
6-2-18 02-06-2018
2 NEW WORKING SHEWRAPARA- 070218 02-07-2018
NEW WORKING SHEWRAPARA gr. slab-
3 03-08-2018
080318
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
Architectural /EME/PLUMBING/HVAC
Drawing Pending/dependency Issu
Remarks & Contents Isuue

Architectural plan (Semi basement, ground floor and 1st floor to


9th floor)
Architectural plan (Semi basement, ground floor and 1st floor to
9th floor) 2 nos full section and some partial section
Architectural plan (only ground floor) with slab outline and level
Project
Pending/dependency Issue Project work Status
Serial
Opening Closing Mailing Responsible No Work Date
date Date Date Preson
1

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Concrete test report

Location of Age of tested


Serial No Date
tested sample sample (Days)

2
3
4
5
6
7
8
9
10
11
12
Name: Dhanmondi-2
Project Address: Plot:-20, Road-2, Dhanmondi, Dhaka
Project Information: G+9 with 3 basement commercial building
Concern Person (Office): Irtiaz
Concern Person (Site): N/A
Current Pending Issues:
Structural
Serial Disbursed Drawing to project
No Name Date Sheet nos.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Structural
roject Disbursed Drawing to Architect
Refrence Architectural Drawing Name Date Sheet nos.
Architectural /EME/PLU
Serial Consultant Drawing
No Drawing Name Date
1 URBANA RANGS DHANMONDI 2 RAJUK SHEET_08.11.17 11-08-2017
2 RANGS DHANMONDI-2 FOR STRUCTURE 12-04-2017
3 RANGS DHANMONDI 20180201 02-01-2018
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Architectural /EME/PLUMBING/HVAC
ing Pending/dependency Issue
Opening
Remarks & Contents Isuue
date
Architectural (Rajuk sheet)
For Structural (Observation)
Updated drawing
Project Conc
ependency Issue Serial Project work Status
Closing Mailing Responsible Serial No
No Work Date
Date Date Preson
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Concrete test report
Location of Age of tested
Date
tested sample sample (Days)
Name: Uttara Commercial
Project Address: Uttara, Dhaka
Project Information: G+13 with 3 basement commercial building
Concern Person (Office): Rafi
Concern Person (Site): N/A
Current Pending Issues:
Structural
Serial Disbursed Drawing to project
No Name Date Sheet nos.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Structural
roject Disbursed Drawing to Architect
Refrence Architectural Drawing Name Date Sheet nos.
01.Column & Beam Layout Plan 09-11-2018 ST-01 to ST-06
Architectural /EME/PLU
Serial Consultant Drawing
No Drawing Name Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Architectural /EME/PLUMBING/HVAC
ing Pending/dependency Issue
Opening
Remarks & Contents Isuue
date
Project Conc
ependency Issue Serial Project work Status
Closing Mailing Responsible Serial No
No Work Date
Date Date Preson
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Concrete test report
Location of Age of tested
Date
tested sample sample (Days)
Name: Asad gate
Project Address: Asad gate,Mohammad pur, Dhaka
Project Information: Commercial building
Concern Person (Office): Rafi
Concern Person (Site): N/A
Current Pending Issues:
Structural
Serial Disbursed Drawing to project
No Name Date Sheet nos.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Structural
roject Disbursed Drawing to Architect
Refrence Architectural Drawing Name Date Sheet nos.
Architectural /EME/PLU
Serial Consultant Drawing
No Drawing Name Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Architectural /EME/PLUMBING/HVAC
ing Pending/dependency Issue
Opening
Remarks & Contents Isuue
date
Project Conc
ependency Issue Serial Project work Status
Closing Mailing Responsible Serial No
No Work Date
Date Date Preson
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Concrete test report
Location of Age of tested
Date
tested sample sample (Days)
Name: Rangs Lake Placid
Project Address: Plot:-35, Road-35, Gulshan, Dhaka
Project Information: 02-Basement & G+13 Storied Residential Building
Concern Person (Office): Irtiaz
Concern Person (Site): Tajul Islam
Current Pending Issues: Architectural & services drawing needed for structural dessign
Structural
Serial Disbursed Drawing to project
No Name Date Sheet nos.
1 1st basement slab & beam layout 02-23-2017
2 1st basement slab & beam layout 03-05-2017
i) Basement-1 slab ii) Ground
3 03-15-2017 S-34 to S-39
floor slab
4 Ground floor slab (Revised) 05-09-2017 S-37 to S-39
5 1st floor slab & Beam layout plan 09-12-2017 S-40
6 i) 1st floor
Stairslab ii) 2nd
details to 9th floor
(Typical) 10-02-2017 S-45 to S-49
slab (Slab out line will be
7 11-02-2017 S-40 to S-58
currected after receiving
8 2nd
4th floor
to
2nd floor toroof
9thwallroof,
architectural
floor
to slab i)(Revised)
2nd to
drwaing)
revised: 3rd
i) (jpeg)
2nd 04-11-2018 S-54 to S-58
Fair
floor face
slab modification
Revised, ii) 4th to 10th
9 floor
as perslab Revised, ii)dwg.
architectural 3rd floor 04-17-2018 Hand scatch
floor slab Revised, iii)11th
slab Revised, iii) 4th to 10th floor to
10 12th floor slab,iv)iv)11th
Roof 07-12-2018 53 to 69
slab Revised, toslab
12th
11 floor slab, v) Stair revised 07-22-2018 53A to 66
12 cantilever slab side
detail(As cast wall 09-30-2018 Hand scatch
Fire stair back
13 details) 09-30-2018 Hand scatch
14 Front side slab breaking 09-30-2018 Hand scatch
15
16
17
18
19

20

21

22

23

24
25
26

27
28
29

30

31

32

33

34

35

36

37

38

39
40
41
42
43
44
45
46
47
48
49
idential Building

wing needed for structural dessign


Structural
d Drawing to project Disbursed Drawing to Architect
Refrence Architectural Drawing Name Date

08_Working_03.02.2017 & for beam punch


11th & 12th floor beam layout plan 10-22-2017
14.03.2017

LAKE PALCID_1ST FLOOR SLAB


STAIR DETAIL
LAKE PLACID All PLAN_01.11.17
LAKE PLACID WORKING_Revised_11.04.18_F

LAKE PLACID WORKING_All Plans UPDATE


11.07.2018
LAKE PLACID WORKING_All Plans 22.07.2018
LAKE PLACID 30th Sep 2018
LAKE PLACID 30th Sep 2018
LAKE PLACID 30th Sep 2018
Architectural /EME/PLUMBING/HVAC
chitect Serial Consultant Drawing
Sheet nos. No Drawing Name

1 revised beam layout


2 Villa placid all plan revised 19 july 2017
3 Rev_1st Floor Slab_29.07.17
4 Rev_1st Floor Slab_29.07.17
5 1ST FLOOR SLAB _30.08.2017
6 1ST FLOOR SLAB _Rev_12.09.2017
7 Ac & Light_Zakir vhai Observation
8 STAIR DETAIL
9 VRF LAYOUT IN TYPICAL FLOOR_LAKE PLACID_27.09.2017
10 VRF LAYOUT IN TYPICAL FLOOR_LAKE PLACID_27.09.2017(1)
11 LAKE PALCID_1ST FLOOR SLAB
12 PROPOSED VRF LAYOUT IN TYPICAL FLOOR 09.10.2017
13 AS CAST WALL LAYOUT
14 1ST FLOOR SLAB _Rev_10.10.2017
15 1st & typical floor beam layout plan
16 Typical Floor_Habib
17 GFloor Beam

18 LAKE PLACID All PLAN_17.10.17

19 LAKE PLACID All PLAN_24.10.17

20 LAKE PLACID All PLAN_01.11.17

21 LAKE PLACID All PLAN_16.11.17

22 Duplex final (18.12.2017


23 Rev Plumbing Drawing of Ranks Lake Placid 30.12.2017
24 LAKE PLACID Revised _vertical green_06.02.18_F

25 2nd Floor Plan


26 Lake Placid _Front void revised
27 LAKE PLACID WORKING_Revised_11.04.18_F

28 LAKE PLACID Duplex ALL SECTION 22.05.2018

29 2nd to 4th floor

30 LAKE PLACID WORKING_All Plans UPDATE 11.06.2018

31 LAKE PLACID WORKING_All Plans UPDATE 04.07.2018

32 LAKE PLACID WORKING_All Plans UPDATE 08.07.2018

33 LAKE PLACID WORKING_All Plans UPDATE 11.07.2018

34 LAKE PLACID 17.07.2018

35 LAKE PLACID WORKING_All Plans 22.07.2018

36 LAKE PLACID 30th Sep 2018

37
38
39
40
41
42
43
44
45
46
47
E/PLUMBING/HVAC
Drawing
Remark & Contents Date Remarks

Revised beam layout for basements 03-06-2017


Preliminary level floor plans (MD sir's change) 07-19-2017
Slab out line for 1st floor revised 7-29-2017
Plumbing solution 08-29-2017
Plumbing solution 08-30-2017
Plumbing solution 09-12-2017
VRF Introduced 09-19-2017
Stair section corrected after observation 09-26-2017
VRF Layout 09-27-2017
VRF Observation 09-28-2017
Slab out line for 1st floor 09-29-2017
VRF Observation two pipe required 10-09-2017
As cast wall introduced 10-10-2017
As cast wall for typical 10-10-2017
Observation on beam layout from INSPACE 10-11-2017
Observation on beam layout from INSPACE 10-11-2017
Ground floor beam layout finalized 10-17-2017
Ground to typical floor plan (with reflected
beam) including duplex & roof With typical floor 10-17-2017
light & VRF AC layout plan
Ground to typical floor plan (with reflected
beam) including duplex and roof plan & partial
10-24-2017
section With typical floor light & VRF AC layout
plan
Ground to typical floor plan (with reflected
beam) including duplex and roof plan & partial
section With typical floor light & VRF AC layout 11-2-2017
plan and 1st to 12th floor slab and beam layout
plan
Lower basement to roof plan & 4 nos section &
4 nos elevation With typical floor light & VRF
AC layout plan and 1st to 12th floor slab and 11-16-2017
beam layout plan with some beam and slab
punch details
Duplex upper & lower floor plan, partial section
12-18-2017
& elevation
Plumbing Drawing all plan and pipe diagram 1-7-2018
2nd to 10th floor plan & 2 nos elevation &
partial section with two 3 dimentional elevation 02-06-2018
(C-01 & C-02)
2nd floor plan and slab out line (Revised) 02-20-2018
front side void revised for typical floor 04-05-2018
2nd to 10th floor working plan, slab layout, due
04.11.2018
to change front side void and beam
Duplex upper & lower floor plan, roof plan &
super roof plan, partial section & elevation 05-23-2018

2nd floor plan and slab out line (Revised) some


05-27-2018
area demolished and some are constructed

Ground floor to Roof top plan including duplex


lower and upper floor, lift machine room, 06-12-2018
overhead water tank, all side elevation
Elevation, section, and some pertial section,
slab out line etc after modification duplex floor

Ground floor to Roof top plan including duplex


lower and upper floor, lift machine room,
overhead water tank, all side elevation 07-05-2018
Elevation, section, and some pertial section,
slab out line etc after observation by structural
engineer
Drawing corrected as per structural 07-08-2018
observation

Ground floor to Roof top plan including duplex


lower and upper floor, lift machine room,
overhead water tank, all side elevation 07-11-2018
Elevation, section, and some pertial section,
slab out line etc after observation by structural
engineer
only floor plan 07-17-2018

Ground floor to Roof top plan (revised 2nd to


12th floor plan) including duplex lower and
upper floor, lift machine room, overhead water 07-22-2018
tank, all side elevation Elevation, section, and
some pertial section, slab out line etc after
observation by structural engineer
(For front side slab breaking & fire stair back
side ascat wall detail) Ground and typical floor 09-30-2018
plan & slab out line
Pending/dependency Issue
Opening
Isuue Closing Date Mailing Date
date

Proposed VRF punch has not incorporated yet 10-10-2017


Sectional
Swimming drawing
pool through
support swimming
& detail of pool,
roof, Main
it has stair & Fireimpact
a significant stair 10-22-2017
Toilet fixture layout has changed, few toilet block omitted, changed
on structural
overhead system.
water tank location, veranda omitted & added. Plumbing 10-22-2017
drawing needs to be redesigned. 10-22-2017
Fire, HVAC, EME drawing needed 10-22-2017
Lake Placid Baasement final architectural drawing 11-15-2017 closed
LAKE PLACID All PLAN_16.11.17 section 3-3 doesnot match 2-28-2018
Compiled architectural drawing required 4-10-2018
Project Concrete test report
Serial Project work Status Location of
Responsible Serial No
No Work Date tested sample
Preson

1 1st basement slab on going 1


2 Ground floor slab ongoing 2
3 1st floor slab on going 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17

18 18

19 19

20 20

21 21

22 22
23 23
24 24

25 25
26 26
27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
46 46
47 47
Concrete test report
Age of tested
Date
sample (Days)
Name: Gulshan 32
Project Address: Plot:-, Gulshan, Dhaka
Project Information: Residential Building
Concern Person (Office):Sanjana
Concern Person (Site): N/A
Current Pending Issues: Architectural & services drawing needed for structural dessign
Structural
Serial Disbursed Drawing to project
No Name Date Sheet nos.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
wing needed for structural dessign
Structural
d Drawing to project Disbursed Drawing to Architect
Refrence Architectural Drawing Name Date
Architectural /EME/PLUMBING/HVAC
chitect Serial Consultant Drawing
Sheet nos. No Drawing Name
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
E/PLUMBING/HVAC
Drawing
Remark & Contents Date Remarks
Pending/dependency Issue
Opening
Isuue Closing Date Mailing Date
date
Project Concrete test report
Serial Project work Status Location of
Responsible Serial No
No Work Date tested sample
Preson
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
46 46
47 47
Concrete test report
Age of tested
Date
sample (Days)
Name: Attrium
Project Address: Plot:-390 (old) 7 (new), Road-27 (old) 16 (new), Dhanmondi, Dhaka
Project Information: 3 basement + 13 storied commercial building
Concern Person (Office): Irtiaz
Concern Person (Site): N/A
Current Pending Issues:
Structural
Serial Disbursed Drawing to project
No Name Date Sheet nos.
1 Shore protection details 01-31-2018 S-01 to S-07
2 01 Shore protection Drawing 07-24-2018
3 Shore protection (Revised) 07-31-2018 ST-P-01 to P-06
4 Shore protection (Revised) 08-02-2018 ST-P-01 to P-03
5 Shore protection (Revised) 09-05-2018 ST-P-01 to P-03
6
7
8
9
10
11
12
13

14

15

16

17

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
ondi, Dhaka

Structural
roject Disbursed Drawing to Architect
Refrence Architectural Drawing Name Date Sheet nos.
Dhanmondi-27 10-10-17 Superimposed survey drawing 01-11-2018
(Mobilization drg)
Survey Drawing 16-01-2018 01-16-2018
29_07_18 Beam layout plan (02-08-2018) 08-02-2018
29_07_18 Beam Layout plan(revised)02-08-2018 08-05-2018
R_03_04.09.18 Column & Beam layout 14-08-2018 08-14-2018
Archit
Serial Consultant Drawing
No Drawing Name Date
1 Inspace House # 390-B, Road # 27, Dhanmondi, Dhaka-1209_(Feet)_140816 01-02-2017
2 Urbana Dhanmondi-27 10-10-17 (Mobilization drg) 10-10-2017
3 Inspace Dhanmondi-27 all floor plan 10-22-2017
4 Inspace Dhanmondi-27 New 01-09-2018
5 Inspace modi 4 copy amonia RAJUK DHANMONDI 27-310717 01-10-2018
6 Inspace Dhanmondi_27 01-28-2018
7 Inspace 01_Rev_After discution with LO_Feb_18 02-06-2018
8 Inspace Dhanmondi27 for st _19.04.2018 04-19-2018
9 Inspace Dhanmondi27 all plan & section for st 18.04.2018 05-14-2018
10 Inspace DHANMONDI 27 REV_04 BASEMENT_G+12 06-11-2018
11 Inspace July_18_All Plan 07-18-2018
12 Inspace 22-7-18 07-24-2018
13 Inspace 29_07_18 07-29-2018

14 Inspace DHANMONDI _27_07.08.18 08-07-2018

15 Inspace R_03_04.09.18 09-04-2018

16 Inspace R_05_17.09.18 09-18-2018

17 Inspace R_01_02.10.18 10-02-2018

18 Inspace Mobilization Dwg 10-04-2018


19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Architectural /EME/PLUMBING/HVAC
Drawing Pending/dependency
Remarks & Contents Isuue
Digital survey drawing
Architectural (Mobilization Drawing)
Architectural (All floor plan)
Site layout plan
Rajuk Drawing
Architectural partial section, (plan is not adjusted asper
observation)
Revised architectural plan (basement-3 to ground floor) and
architectural
Basement-03column
to 13thlayout, adjusted
floor plan, asper
two nos observation
section and one partial
section
All plan & section
All floor presentation plan & two nos section
Basement 4 to typical floor plan and 2 nos section
Basement 4 to typical floor presentation plan and 1 nos section
Basement 4 to typical floor presentation plan and 1 nos section
Basement 4 to 1st floor presentation plan (revised basement
Retaining wall design.)

Basement 4 to Ground floor presentation plan with partial section


{Revised for site (back side) adjustment for project requiement}

Basement 4 to Roof presentation plan with one nos section and


one nos partial section {Revised for column & beam requiement}

(Revised for 5 basement instead of 4 basement) 5th basement to


roof top presentation plan, one section & 2 nos partial section.
Mobilization drawing Basement 5 to typical floor presentation plan
with 3 nos partial section
Project
Pending/dependency Issue Serial Project work Status
Opening Closing Mailing Responsible No Work Date
date Date Date Preson
1
2
3
4
5
6
7
8
9
10
11
12
13

14

15

16

17

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Concrete test report
Location of Age of tested
Serial No Date
tested sample sample (Days)
1
2
3
4
5
6
7
8
9
10
11
12
13

14

15

16

17

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Name: Dhanmondi-27
Project Address: Plot:-390 (old) 7 (new), Road-27 (old) 16 (new), Dhanmondi, Dhaka
Project Information: commercial building
Concern Person (Office): Rafi
Concern Person (Site): N/A
Current Pending Issues:
Structural
Serial Disbursed Drawing to project
No Name Date Sheet nos.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
ondi, Dhaka

Structural
roject Disbursed Drawing to Architect
Refrence Architectural Drawing Name Date Sheet nos.
Archit
Serial Consultant Drawing
No Drawing Name Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Architectural /EME/PLUMBING/HVAC
Drawing Pending/dependency
Remarks & Contents Isuue
Project
Pending/dependency Issue Serial Project work Status
Opening Closing Mailing Responsible No Work Date
date Date Date Preson
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Concrete test report
Location of Age of tested
Serial No Date
tested sample sample (Days)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Name: Dhanmondi-2
Project Address: Plot:-Nikunja, Dhaka
Project Information: 3 basement + 13 storied commercial building
Concern Person (Office): Sanjana
Concern Person (Site): N/A
Current Pending Issues:
Structural
Serial Disbursed Drawing to project
No Name Date Sheet nos.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Structural
roject Disbursed Drawing to Architect
Refrence Architectural Drawing Name Date Sheet nos.
Beam layout 08-02-2018 08 nos
Architectural /
Serial Consultant Drawing
No Drawing Name Date
1 NIKUNJA_Plans_26.2.2018 05-14-2018
2 Nikunjo- for structure analysis nov-06 06-11-2018
3 Nikunjo- for structure analysis june-12 06-12-2018
4 Nikunjo- for service analysis july-03 07-03-2018
5 Nikunjo- for service analysis july-03 08-02-2018
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Architectural /EME/PLUMBING/HVAC
Drawing Pending/dependency
Remarks & Contents Isuue
Floor plan
Basement 3 to typical floor presentation plan & 2 nos section
Plan & section
All floor presentation plan Basement 3 to 13th floor and 2 nos
section
Generator slab added at ground floor
Project
Pending/dependency Issue Serial Project work Status
Opening Closing Mailing Responsible No Work Date
date Date Date Preson
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Concrete test report
Location of Age of tested
Serial No Date
tested sample sample (Days)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Name: Courtyard
Project Address: DHALI BARI, VATARA, DHAKA
Project Information: One Basement +G+ 10 storied Residential Bulding
Concern Person (Office):
Concern Person (Site): Rokon
Current Pending Issues: Architectural & services drawing needed for structural dessign
Structural
Disbursed Drawing to project
Serial No
Name Date Sheet nos.
1 Shore Protection Phase 1 06-11-2017 S-02 & S-07
2 Shore pile layout (Revised) 10-03-2017
Service pile layout & support pile location
3 11-22-2017 S-02 to S-04
(Observation)
4 General specification 12-28-2017 S-03 to S-05
Service pile layout with sectional details
5 1-8-2018 S-05 to S-07
{Property line adjusted}
Earth excavation & Water proofing
6 04-26-2018 S-EX 01to EX-05
methodology
7 General specification (25-09-2018) 09-25-2018 GN-01 to GN-03
8 Foundation,column 09-25-2018 F-01 to F-16
Ground floor Slab &schedule (25-09-2018)
Beam Details (25-09-
9 2018) 09-25-2018 SL-01 to SL-10
10 Ramp Details (25-09-2018) 09-25-2018 R-01 to R-02
11 Stair details (25-09-2018) 09-25-2018 S-01 to S-06
12
13

14
15
16

17

18

19

20

21

22

23

24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
ral dessign
Structural
Disbursed Drawing to Architect
Refrence Architectural Drawing Name Date Sheet nos.
21-5-17 Bashundhara
Bashundhara Column beam layout
Beam Column Layout Revised 02 06-21-2017
latest col 25 katha (02.07.2017) 07-02-2017
MOBI 25 KATHA BASHUNDHARA
location of u g w r & pit 11-20-2017
201117
Beam Layout (revised) 27-12-2017 12-27-2017
25 KATHA BASHUNDHARA
Observation Architectural drawing 07-01-2018 1-7-2018
BASEMENT 080118
UGWR Location 1-7-2018
Beam Layout Plan 08-09-2018

BASHUNDHARA 25 KATHA
MOBILIZATION DWG 140818
Architectural /EME/PLUMBING/HVAC
Serial Consultant Drawing
No Drawing Name Date
1 Inspace 21-5-17 05-21-2017
2 Inspace Email 05-28-2017
3 Inspace 1-7-17 07-01-2017
4 Inspace Bashundhara 25 katha 170917 09-18-2017
5 Inspace modi Bashundhara 25 katha 031017 10-03-2017
6 Inspace MOBI 25 KATHA BASHUNDHARA 111017 10-11-2017
7 Inspace location of u g w r & pit 10-11-2017
8 Inspace MOBI 25 KATHA BASHUNDHARA 201117 11-21-2017
9 Inspace Rajuk plan-02.01.2013 11-23-2017
10 Inspace latest col 25 katha 11-29-2017
11 Inspace final PLAN 12-05-2017
12 Inspace bashundhara PLAN 12-10-2017
13 Inspace 17.12.26_B a s h u n d h a r a 25 12-26-2017

14 new 25 bashundhara mobi.030118 01-03-2018


Inspace
15 Inspace revised mobi.25 katha bashundhara 040118 01-04-2018
16 25 KATHA BASHUNDHARA BASEMENT 080118 01-09-2018
Inspace
17 plumbing 25 KATHA BASHUNDHARA BASEMENT 150118 01-17-2018
Inspace
18 25 katha bashundhara integrated 160118 01-17-2018
Inspace
REVESIED 25 KATHA BASHUNDHARA WORKING
19 02-25-2018
Inspace BASEMENT RE WALL
25 katha bashundhara Typical floor Electrical working-
20 04-15-2018
Inspace 150418
1. 25 KATHA BASHUNDHARA BASEMENT SLAB OUTLINE
21 04-17-2018
Inspace 120418
25 KATHA BASHUNDHARA BASEMENT SLAB OUTLINE
22 04-23-2018
Inspace 120418
23 basement out line & ground floor slab plan & ramp sec 04-26-2018
Inspace
25 KATHA BASHUNDHARA TYPICAL FLOOR SLAB
24 04-26-2018
Inspace OUTLINE 240418
25 Inspace Basement to typical floor plan and slab out line 060518 05-23-2018
26 Inspace Bashundhara 25 katha all section 05-23-2018
27 26-6-18 06-28-2018
Inspace
28 Inspace BASHUNDHARA 25 KATHA final plan & section 04-07-18 07-04-2018
29 Inspace BASHUNDHARA 25 KATHA final plan & section 04-07-18 07-04-2018
30 Inspace change ramp final plan10-07-18 07-10-2018
31 Inspace Bashundhara 25 Katha_Final_15.07.18 07-15-2018
32 Inspace final plan & section 19-07-18 07-22-2018
33 Inspace final bashundhara plan & section 19-07-18 08-05-2018
34 Inspace bashundhara 25 final plan, section & slab 08-08-18 08-08-2018
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
PLUMBING/HVAC
Drawing
Remarks & Contents
Preliminary Drawing floor plan (2nd basement to 12th floor plan)
Floor & basement height given
Observation
Few column'sonorientation
beam layout
has(2nd to 11th
change floor plan)
& retaining wall's outline
changed (2nd basement to 12th floor plan)
Ventilation duct changed (2nd basement to gr. floor with basement
column layout)
Ventilation duct changed (2nd basement to 12th floor plan with partial
section)
Under
Revisedground water
drawing reserviour
after location
observation andcorrected
pertially sump pit (2nd basement
to 12th floor plan with partial section)

architectural column layout (conflict with structural grid fractional


dimension)
Revised Architectural plan after observation (conflict with structural
grid fractional
Revised dimension)
Architectural plan after observation for structural grid
fractional dimension
Revised architectural plan with one basement instead of two
basement (without grid line)
Revised architectural Drawing observation for column & grid line
cheking
Floor plan basement to 1st floor with partial section
Floor plan basement to 1st floor with partial section and reflected floor
beam (Substucture Final)
Plumbing pipe layout diagram, (basement & ground floor) location of
U.G.W.R & partial section
Electrical integrated drawing (Basement to ground floor) & fixture
layout plan (Substucture Final)
1B+G+12 storied, 1st basement retaining wall (only)

Electrical integrated drawing (Basement to typical floor) & fixture


layout plan
Architectural drawing 1st to typical floor presentation plan and slab
out line and partial section
Architectural drawing ( all floor) presentation plan and slab out line
and partial section
Architectural drawing basement to 1st floor plan, ground & 1st floor
slab out line, section through ramp, and some pertial section
1st to typical floor plan and slab out line
Basement to typical floor plan and slab out line with beam layout
Elevation 4 nos, section 4 nos & some partial section
Conceptual layout plan (basement to roof) after convert 6 unit to 8
unit
Plan & section
Plan & section (Revised)
Ramp position changed
2 additional lift core added, Basement to roof only presentation plan,
Basement to roof presentation plan, two nos section and two nos
elevation
Fractional problem adjusted
Basement to typical floor plan, two nos elevation, two nos section and
some partial section.
Pending/dependency Issue
Isuue Opening date Closing Date Mailing Date
UGWR location 11-15-2017
Service 11-23-2017 02-28-2017
Massivedrawing
mistake final
in plumbing drawing (date of
ref. drawing) 01-17-2018 1-18-2018
Project Concrete test r
Project work Status
Serial No Serial No
Responsible Preson Work Date
Arch. Wahid ahmed Linkon 1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13

14 14
15 15
16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
46 46
47 47
48 48
49 49
Concrete test report
Location of Age of tested
Date
tested sample sample (Days)
Name: Baridhara
Project Address: BARIDHARA, DHAKA
Project Information: Two Basement +G+ 13 Storied Residential Bulding
Concern Person (Office): Sanjana
Concern Person (Site):
Current Pending Issues: Architectural & services drawing needed for structural dessign
Structural
Disbursed Drawing to project
Serial No
Name Date Sheet nos.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
ng

r structural dessign
Structural
Disbursed Drawing to Architect
Refrence Architectural Drawing Name Date Sheet nos.
Architectural /EME/PLUMBING/HVAC
Serial Consultant Drawing
No Drawing Name Date
1 Rajuk _Final_05.07.2018 07-10-2018
2 All Plan_ 11-7-18 07-19-2018
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
NG/HVAC
Drawing Pending/depe
Remarks & Contents Isuue
Rajuk drawing
Basement+ground floor+typical floor plan with roof plan &
one section elevations, sections & level
Project
Pending/dependency Issue
Serial No
Opening date Closing Date Mailing Date Responsible Preson

8-4-2018 Arch. Wahid ahmed Linkon 1


2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Project Concrete test report
Project work Status Location of Age of tested
Serial No Date
Work Date tested sample sample (Days)

1
2
3
4
5
6
7
8
9
10
11
12
Name: Rangs Babylonia
Project Address: Plot:-246,Bir uttam Mir sawkat sarok Gulshan link road, Dhaka
Project Information: 3-Basement with 12-Storied Commercial Building
Concern Person (Office): Rafi
Concern Person (Site): Kajol
Structural
Serial Disbursed Drawing to project
No Name Date Sheet nos.
S-VRF-01 to S-VRF-02
1 VRF support structure & generator base 12-06-2016 & S-Gen-01to S-Gen-06
3 Ground floor slab extension details 05-31-2017 S-43A to S-43C
4 Ground
Ground floor
floor slab
rampextension
drive waydetails (Revised)
and water body 06-13-2017 S-43A to S-43C
5 details 07-10-2017 S-WB-01 to S-WB-04
6 First floor slab extension 07-09-2017 S- 44A to S-44B
7 First floor slab extension Revised 07-16-2017 S- 44A to S-44B
8 Planter box details 08-02-2017 S-PB-01 to S-PB-03
9 Babylonia pilon details 02-28-2018 Hand scatch
10 Boundary wall design for pylon support 05-24-2018 Hand scatch
11 Babylonia glass lift 06-03-2018 Hand scatch
12 Revised boundary wall for pylon foundation 07-05-2018 S-PY 01
13 Steel shutter support details 07-05-2018 Hand scatch
14 Glass lift bracket support details 08-02-2018 Hand scatch
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
haka

ctural Architectural /EME/PLUMBING/HVA


Disbursed Drawing to Architect Serial Consultant Drawing
Name Date Sheet nos. No Drawing Name
1 31-10-17
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
l /EME/PLUMBING/HVAC Project
Drawing Serial Project work Status
Date Remarks No Work Date
11-1-2017 Punch for glass lift 1 VRF & Generator room work on going
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Name: RANGS PLATINUM SQUARE
Project
Project Address: PLOT-
Information: 11, ROAD-17,
2 (TWO) BASEMENTBANANI,
WITH DHAKA
15 STORIED
COMMERCIAL BUILDING
Concern Person (Office): Rafi
Concern Person (Site): Alok
Structural
Serial Disbursed Drawing to project
No Name Date Sheet nos.
1 Super Roof Details structure 01-19-2017 S-SR-01 to S-SR-12
2 Lift Pit Bottom Beam Details 02-26-2017 Null (01)
3 Safety shade 07-11-2017 S-SH 01 to S-SH 03
4 Supper roof details structure (Revised) 08-17-2017 S-SR-01 to S-SR-12
5 Fire stair top slab details 03-04-2018 hand scatch
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
ctural Architectural /EME/PLUMBING/HV
Disbursed Drawing to Architect Serial Consultant Drawin
Name Date Sheet nos. No Drawing Name
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
al /EME/PLUMBING/HVAC Project
Drawing Serial Project work Status
Date Remarks No Work Date
1 Super Roof Construction work on going
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Name: RANGS SYMPHONY
Project
Project Address: ROAD
Information: NO-25A,
2 (TWO) BLOCK WITH
BASEMENT NO- A12
BANANI, DHAKA
STORIED
RESIDENTIAL BUILDING
Concern Person (Office): Rafi
Concern Person (Site): Joha & Elias
Structural
Serial Disbursed Drawing to project
No Name Date Sheet nos.
1 Swiming pool & Boundary wall Details 01.01.2017 S-SWM-01 to S-SWM-14
2 Lift core breaking & construction procedure details 04-24-2017 S-LW-01 to S-LW-08
3 Ventilation duct detail 10-24-2017 JPEG
4 Symphony Front Planter box detail 11-9-2017 JPEG
5 Front green area03-03
detail (Swiming pool and boundary 11-23-2017 JPEG
Revised section
6 wall details) 12-13-2017 Hand scatch
7 Toilet top slab rebar details 12-19-2017 Hand scatch
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Architectural /EME/PLUMBING/HV
Disbursed Drawing to Architect Serial Consultant Drawin
Name Date Sheet nos. No Drawing Name
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
al /EME/PLUMBING/HVAC Project
Drawing Serial Project work Status
Date Remarks No Work Date
1 Boundary wall Construction work on going
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Name: RANGS
DAG NO. RL1034,
- 1033, SQUARE
& 1035 (P) PROGOTI SORONI,
MIDDLE BADDA,
COMMERCIAL CUMDHAKA.
RESIDENTIAL
BUILDING
Concern Person (Office): Rafi
Concern Person (Site): EMRAN
Structural
Serial Disbursed Drawing to project
No Name Date Sheet nos.
1 Boundary wall Details 03.01.2017 Null-1
Roof top water tank & machine room
2 05-04-2017
details with solar panel slab S-70 to S-78 (09)
3 Rain water pit details 08-03-2017
Roof top water tank & machine room
4 08-13-2017 S-70 to S-80
details with solar panel slab (Revised)
5 Boundary wall details (Revised) 08-20-2017 S- SB 01
6 Slab breaking & construction 02-28-2018
7 Super roof (revised) 03-14-2018 Hand scatch
8 Tower hoist tie member details 04-02-2018 Handscatch
9 Generator base & guard room detail 04-24-2018 S-G 01 to G 05
10 RL square super roof (Revised) 04-30-2018 Handscatch
11 Ground floor water body details 05-15-2018 S-W 01 to W 02
12 Slab, column, wall extension 07-26-2018 S-W 01 to W 15
13 Vault structure 01 07-31-2018 ST-VR-01 TO VR-03
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Structural
ject Disbursed Drawing to Architect
Reference architectural drawing Name Date Sheet nos.
1st & 2nd to typical floor beam layout plan 10-11-2017

11th & 12th floor beam layout plan 10-22-2017

RL Square jun 2018 (4)


RL Square jun 2018 for GARDA
Architectural /EME/PLUMBING/HVAC
Serial Consultant Drawing
No Drawing Name Date
1 R L Square G.floor Slab Revision Jan 2018 02-06-2018
2 RL Square jun 2018 (4) 07-09-2018

3
4

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
HVAC Project
ing Serial Project work Status
Remarks No Work Date
Ground floor presentation plan 1
2

3
4

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Name:
ProjectRANGS RDAT
Address: CENTRE
PLOT NO. SEF (3),GULSHAN AVENUE
GULSHAN, DHAKA-1212
Project Information: PROPOSED 3 (THREE) BASEMENT & 14 (FOURTEEN) STORIED
COMMERCIAL BUILDING
Concern Person (Office): Rafi
Concern Person (Site): Gobinda
Structural
Serial Disbursed Drawing to project
No Name Date
1 Support structure of generator's radiator canopy 03-21-2017
2 Ground floor slab extension details 07-19-2017
3 Samsonite false slab for baggage storage 09-26-2017
4 RD Rising bollared pit 12-26-2017
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Structural Architec
Disbursed Drawing to Architect Serial
Sheet nos. Name Date Sheet nos. No
Null-4 1
S-56A to 56B 2
Hand scatch 3
Hand scatch 4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Architectural /EME/PLUMBING/HVAC Project
Consultant Drawing Serial
Drawing Name Date Remarks No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Project
Project work Status
Work Date
Name:
ProjectRANGS FCAT
Address: ENCLAVE
PLOT NO. CWS (A)6/83, ROAD NO. 32,
NORTH GULSHAN, DHAKA-1212
Project Information: PROPOSED 3 (THREE) BASEMENT & 14 (FOURTEEN) STORIED
COMMERCIAL BUILDING
Concern Person (Office): Rafi
Concern Person (Site): FATTAH
Structural
Serial Disbursed Drawing to project
No Name Date
1 Service toilet and Generator base 07-13-2017
2 Rising bollared pit 10-31-2017
3 Boundary wall (Revised) 12-03-2017
4 Boundary wall back side 12-28-2017
5 Pylon foundation & Metal clading foundation 01-30-2018
6 Pylon foundation details (Revised) 02-06-2018
8 North east corner slab details 02-20-2018
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Disbursed Drawing to Architect Serial
Sheet nos. Name Date Sheet nos. No
Null- 5 1
Hand scatch 2
Hand scatch 3
Hand scatch 4
Hand scatch
Hand scatch
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Architectural /EME/PLUMBING/HVAC
Consultant Drawing
Drawing Name Date
Inspace fc enclave ground floor.Back side DETAILS_Rev 12-28-2017
AC Project
g Serial Project work Status
Remarks & content No Work Date
Ground floor back side work releted
architectural drawing 1
2
3
4

7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Name:
ProjectRANGS PARK
Address: HEIGHT
C.S DAG NO-848 (P), J.L NO-242,
MOUZA- KATASUR, MOHAMMAD PUR
Project Information: (G+9) 10 (TEN) STORIED
RESIDENTIAL BUILDING
Concern Person (Office): Rafi
Concern Person (Site):
Structural
Serial Disbursed Drawing to project
No Name Date Sheet nos.
1 Support structure of solar panel 04-06-2017 3
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Architectural /EME/PLUMBING/HV
Disbursed Drawing to Architect Serial Consultant Drawin
Name Date Sheet nos. No Drawing Name
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
al /EME/PLUMBING/HVAC Project
Drawing Serial Project work Status
Date Remarks No Work Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Project Address: PLOT NO. 40, 41, 42, BLOCK NO. E,
Name:
EASTERNRANGS SONCHOYEETA
HOUSING LTD., MIRPUR, DHAKA.
Project Information:1(ONE) BASEMENT & 15 (FIFTEEN)
STORIED APARTMENT
Concern Person (Office): Rafi
Concern Person (Site): Mahbub
Structural
Serial Completed Drawings
No Name Date Sheet nos.
1 Generator room shade 19.03.2017 Null-2
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
ructural Architectural /EME/PLUMBING/HV
Disbursed Drawing to Architect Serial Consultant Drawin
Name Date Sheet nos. No Drawing Name
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
al /EME/PLUMBING/HVAC Project
Drawing Serial Project work Status
Date Remarks No Work Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Project Address: PLOT NO. 63, ROAD NO. 12, SECTOR-
Name: RANGS
10, UTTARA HIRA TOWN, DHAKA.
MODEL
Project Information: G+9 STORIED RESIDENTIAL
BUILDING
Concern Person (Office): N/A
Concern Person (Site): N/A
Structural
Serial Completed Drawings
No Name Date Sheet nos.
1 Generator roof slab 09-25-2017
2 Cnatilever slab design 03-06-2018
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
ructural Architectural /EME/PLUMBING/HV
Disbursed Drawing to Architect Serial Consultant Drawin
Name Date Sheet nos. No Drawing Name
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
al /EME/PLUMBING/HVAC Project
Drawing Serial Project work Status
Date Remarks No Work Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Project Address: PLOT NO. 32, ROAD NO. 02,
Name: RANGSRESIDENTIAL
DHANMONDI HIRA AREA, DHAKA-1205.
Project Information: 3 BASEMENT + G+ 13 STORIED
COMMERCIAL BUILDING
Concern Person (Office): N/A
Concern Person (Site): N/A
Structural
Serial Completed Drawings
No Name Date Sheet nos.
1 Glass Canopy details 05-16-2018
2 Pylon support foundation 07-22-2018
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
ructural Architectural /EME/PLUMBING/HV
Disbursed Drawing to Architect Serial Consultant Drawin
Name Date Sheet nos. No Drawing Name
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
al /EME/PLUMBING/HVAC Project
Drawing Serial Project work Status
Date Remarks No Work Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
SOIL TEST REPORT
SL. NO. CONSULTANT PROJECT NAME
1 AQUA SOIL ENGINEER'S RANGS PORT HEIGHT
2 Subsoil Engineering & Construction Co. Ltd RANGS EFES
3 UNIQUE BORING AND ENGINEERING LTD. RANGS IVORY TOWER
4 CREATIVE DESIGN & DEVELOPMENT RANGS LAKE PLACID
5 Subsoil Engineering & Construction Co. Ltd RANGS BASUNDHARA
6 UNIQUE BORING AND ENGINEERING LTD. Dhanmondi-27
7 UNIQUE BORING AND ENGINEERING LTD. Nikunja north
8 UNIQUE BORING AND ENGINEERING LTD. Dhanmondi-2
ST REPORT
NO. OF COPY
PROJECT ADDRESS TESTED DATE
Plot-1040/1, West shawrapara, mouza senpara, 1 02.11.2014
C.S Dag
BI-CWS (C)no.
Plot1084, 1234
No. 13, & 1236
South (P), Rokeya
gulshan, Gulshan- 1 April 2016
Sorony,1,Mirpur,
Dhaka Dhaka
Plot no. 118, Gulshan avenue, Gulshan Model 1 February-2016
Plot no. 35, Roadtown, Dhaka
no. 35/A Gulshan-2, Dhaka 1 February-2008
Dhali Bari, Vatara, Dhaka-1212 1 June-2017
Plot no. 390/B, Road no. 27, Dhanmondi, Dhaka 1 Dec-2017& Jan-2018
Plot no. 28, Farukh Sarani, Nikunja north
commercial area, Dhaba 1 February-2018
Plot no 20, Road no. 02, Dhanmondi R/A, Dhaka 1 April & May-2018
REMARKS
Hand over to Engr. Habib-05.03.2018
Hand over to Engr. Shadheen-15.07.2017

Hand over to Engr. Habib-06.06.2018

Hand over to Engr. Zaber-11.10.2018


Plumbing Drawing
SL. NO. PROJECT NAME ENGINEER
1 RANGS JHORNA MEJBA
2 RANGS KATASUR MEJBA
3 "RANGS AVOYARANYA" MEJBA
4 RANGS SPRING MEJBA
5
6
g Drawing
PROJECT ADDRESS
PLOT NO. 54, BLOCK-B, ROAD NO.-9,
C.S DAG BASUNDHARA, DHAKA MOUZA-
NO-848 (P), J.L NO-242,
KATASUR,
PLOT MOHAMMADPUR
NO# 7/10, DHAKA-1207.
BLOCK-B,LALMATIA HOUSING
ESTATE, DHAKA.
PLOT NO -216, BLOCK-D, ROAD NO-6,
BASUNDHARA, DHAKA
Babylonia water body
babylonia ramp top glass side water proofing I enterprise & console
Syphony retaining wall microconcreting Consol & marge
Babylonia fair face wall top water proofing I enterprise & console
Paramount roof top water proofing